Loading...
HomeMy WebLinkAboutItem #2 Request for Funding44de'_\ CHUBBUCK 1 0 A H 0 290 E. Linden Ave., Chubbuck, ID 83202 208.237.2430 — Fax 208.237.2409 www.cityofchubbuck.us 2025 FUNDING REQUEST FORM Meeting: Council Study Session -Wednesday, March 5, 2025 at 4PM Name of Organization: Name of Representative: Reason for request: Amount of request: Contact Information: Address: Phone: �� The building is home to 14 nationally chartered Veteran Service Organizations and 1 local one Daughters of the American Revolution - Amerian Legion - American Legion Auxiliary - Veterans of Foreign Wars - Veterans of Foreign Wars Auxiliary - Disabled American Veterans - Marine Corp League - Forty and Eight - Military Officers Association of America - AMVETS - AMVETS Auxiliary - Sons of AMVETS - Vietnam Veterans of American - Also the Military Affairs Committee Community Use Over 150 non-military/veteran events happen at the building every year. This building is a vital hub for the community. One of the most affordable event spaces for them to rent. This last year we hosted over; 17 weddings -13 school events - 7 celebrations of life - 13 birthday parties - 11 baby showers -10 christmas parties 6 town halls - 41 community events, plus many more. There are also several groups that use the building for their meetings. A group of home-school students use the building for their class. 2 - May 1923, Mass meeting was called about constructing a memorial building for "veterans of all wars and to show this countys appreciation for their loyal patriotism" - A committee was organized to campaign for the $50,000 needed to carry out the plans for construction - Plans submitted by architect Frank Paradice and construction bid by Alex Mathers were adopted - Fundraising began, donations of a quarter and a dollar at a time - Some of the funds came from simple things such as mending clothes and baking bread - Construction began in 1924 but wasn't completed until 1926, due to supply difficulties and funding - The last several thousand dollars of the project were donated by the builder himself - May 30, 1926. Dedication ceremony and open to the public The Flood - December 28th, a volunteer let in a cleaning crew, only to find water flooding from an upstairs bathroom to the downstairs rooms - Companies were called to come stop the flow, assuming that it was a blockage - Recognizing the extent of the damage, restoration companies were called in for bids on the clean up - The damage incuded the upstairs bathroom, the foyer outside the bathroom, the side room upstairs. It also included three storage rooms downstairs. - Insurance was called to file a claim. Claim was denied due to "water that backs up or overflows from a sewer, drain or sump" - Over the next few weeks, engineers, contractors, plumbers and more came through the building to find the source of the water flow - It was determined that between mold and lead exposure, the whole building would have to be shut down for use, for safety - The initial estimate of around $220,000 began to quickly bloom in to well over $320,000. Every touch of wall or piece of wood removed, the underlying problems of a 100 year old buiding came to light How You Can Help Let's be honest here. The only Way to get this building back open to the public is to have the Work done. And pay for it. The awesome part of you partnering With us to have this completed, is that We have a foundation that Wants to match funds up to $1oo,000. How much can you help us get matched? PP Completed Projects r New HVAC Upstairs Valhalla Floor 417 *A LLLLL Brick Repointing =, � a � W ff, cif i - Museum Floor ,M. aInk••i Over the last few years, several hundred thousand dollars have been invested in to the building. New hvac Upstairs New Roof New Flooring All Bricks Repointed 3 AklM � rAM -A The Financial Burden Original Bid: $218,392 Additions: Entire Upstairs Lead Paint Removal - $38,628 Sub -floor: $56,486 Level Flooring Before Subfloor Replacement: $16,000 Final Total: $329,5o6 And Counting "I I � areTere I I r1 =1