HomeMy WebLinkAboutItem #1 Chubbuck Village Div 1/ao'�C\
CHUBBUCK
1 0 0 H 0
Community Services Department
Development Services Division
290 E. Linden Avenue, Chubbuck, ID 83202
208.237.2430
www.CityofChubbuck.us
CHUBBUCK VILLAGE DIVISION 1
PRELIMINARY PLAT REQUEST - STAFF REPORT
CITY OF CHUBBUCK LAND USE AND DEVELOPMENT COMMISSION
SPECIAL MEETING ON FEBRUARY 25, 2025
STAFF FINDINGS SUMMARIZED
After reviewing the proposed Chubbuck Village Division 1 preliminary plat, Staff finds that it meets the
code requirements with the following comments:
• Secondary irrigation facilities will be required to be designed and constructed in accordance
with section 16.12.230 of city code, which will include a pump station. Applicant has requested
to defer the irrigation system including pump station to a future division.
• Preliminary Plat recommendations are conditional upon City Council approval of Chubbuck
Village Division 1.
STAFF RECOMMENDATION: Staff recommends approval of the preliminary plat with the following
conditions:
The final plat along with supporting documents be submitted in accordance with Title 17 of the
Chubbuck Municipal Code.
If the request to defer the irrigation system and pump station is granted by City Council, a financial
guarantee at 150% of construction cost for the irrigation system and pump station shall be
provided.
FACTS
REQUEST: The applicant proposes a 2 lot Preliminary Plat for 1 commercial building lot and 1 common area
lot in the Chubbuck Village Division 1 subdivision. It includes widening Evans Lane for access and parking
and extending water, sewer, and irrigation services to all lots. (See exhibit 3).
BACKGROUND: This is the 1 I division of the Chubbuck Village subdivision.
TYPE OF COMMISSION ACTION: Quasi -Judicial (Subject to appeal; decisions must be supported by
the evidence and by applying law to the facts; decisions shall be based on the standards for
approval). Recommendation/approval of this preliminary plat shall be whether it meets the requirements
of the City of Chubbuck ordinance and State of Idaho statutes. The Commission may recommend
approval with or without conditions, may table a decision, or may recommend denial of the
application.
OWNER:
Cornerstone Realty & Development
722 Lucy
Chubbuck, ID 83202
PROFESSIONAL SERVICES:
Sunrise Engineering
600 E. Oak St.
Pocatello, ID 83201
LOCATION: NE 1/4 of Section 10, Township 6 South, Range 34 East, of the Boise Meridian, on the north
side of Evans Lane between Yellowstone Ave. and Burley Drive. Generally located at 152 Evans Lane.
SITE CHARACTERISTICS & ZONING:
CURRENT ZONING: Village (V)
CURRENT LAND USE: Vacant
PROJECT SIZE: ±1.90 acres
VIEWS: Generally visible from the north and south
TOPOGRAPHY: Generally flat
EXISTING STRUCTURES: None
SURROUNDING LAND USES AND ZONING
RECENT TRAFFIC COUNTS:
2021: Evans Lane at Yellowstone Ave, 6417/day
2021: Yellowstone Ave at Evans Lane, 25786/day
NORTH: Residential; Village (V) zone
EAST: Residential/Commercial; Village (V) zone
SOUTH: Commercial; Village (V) & General Commercial (C-2) zones
WEST: Commercial; Village (V) zone
SERVICES:
ACCESS STREET: Current access from Evans Lane and E. Linden Avenue
FIRE/EMS PROTECTION: City of Chubbuck Fire Department
SANITARY SEWER: City of Chubbuck Sewer Utility Department
CULINARY WATER: City of Chubbuck Water Utility Department
SURFACE WATER RIGHTS: Bureau of Indian Affairs — Fort Hall Irrigation Project
PROCEDURES:
In accordance with City Code 17.12.030-050 and Resolution 2024-04, a complete petition and
fees for a preliminary plat were filed with the City and which contained the appropriate
documents and waiver requests pursuant to 17.12.040.
In accordance with City Code 17.12.100, the application is scheduled to be heard at the
February 25, 2025 Special Meeting of the Land Use and Development Commission.
In accordance with City Code 17.12.080, notice were provided as follows:
a. Notices posted on the subject property.
b. Notices provided to City departments, other government agencies, and affected public
utility providers.
APPLICABLE LAWS AND PLANS:
1. Idaho Code
a. §50-13, Plats and Vacations
b. §67-6513, Subdivision Ordinance
/9ZC-\
CHUBBUCK
I D A H D
290 E. Linden Avenue, Chubbuck, ID 83202
208.237.2430
www.CityofChubbuck.us
2. Chubbuck Comprehensive Plan (as amended)
3. Chubbuck City Code
a. Title 16, Land Improvement Standards
b. Title 17, Land Development
c. Title 18, Land Use
PUBLIC COMMENTS:
1. No written comments were received as of this report.
/944'C-\
CHUBBUCK
I D A H D
290 E. Linden Avenue, Chubbuck, ID 83202
208.237.2430
www.CityofChubbuck.us
STANDARDS FOR REVIEWING A PRELIMINARY PLAT
1. Does the Preliminary Plat comply with applicable laws and ordinances?
CITY CODE TITLE 17- LAND DEVELOPMENT
Compliant
Standards and Staff Comments
Yes
No
N/A
City Code
City Standard and Staff Comments
x
17.12.030,
Copies to be Submitted, Notice and Fee
17.12.050
Staff
The applicant has completed the requirements of these
Comments
sections.
Department
Public Works:
x
Comments
The department has reviewed the applicant's proposal for
compliance and finds that it meets the code requirements.
Concerns have been addressed by the applicant.
x
Department
Fire Department:
Comments
The department has reviewed the applicant's proposal for
compliance and finds that it meets the code requirements.
No comments received.
x
Department
Police Department:
Comments
The department has reviewed the applicant's proposal for
compliance and finds that it meets the code requirements.
No comments received.
CITY CODE TITLE 17 — PRELIMINARY PLAT STANDARDS
Compliant
Standards and Staff Comments
Yes
No
N/A
City Code
City Standard and Staff Comments
x
17.12.150
Form of Presentation
Staff
Applicant has provided all information required of this section.
Comments
x
17.12.160
Identification and Descriptive Data
Staff
Applicant has provided all information required of this section.
Comments
x
17.12.170
Existing Conditions Data
Staff
Applicant has provided a preliminary plat showing existing
Comments
contours, locations of existing water and sewer systems, street
names and rights-of-way, and all other information required of
this section.
x
17.12.180
Proposed Conditions Data
Staff
Applicant has provided a preliminary plat showing proposed
Comments
conditions including lot dimensions, easement use and
locations, and street layout including proposed dedication of
additional right-of-way.
x
17.12.190
Proposed Utility Methods
Staff
Water and sewer will be stubbed into the development,
Comments
applicant has provided service locations shown on the
preliminary plat.
1940't-\
CHUBBUCK
I D A H D
290 E. Linden Avenue, Chubbuck, ID 83202
208.237.2430
www.CityofChubbuck.us
1940't-\
CHUBBUCK
I D A H D
290 E. Linden Avenue, Chubbuck, ID 83202
208.237.2430
www.CityofChubbuck.us
CITY CODE TITLE 18- LAND USE
Compliant
Standards and Staff Comments
Yes
No
N/A
City Code
City Standard and Staff Comments
x
18.08.042A
Height and area Regulations
Staff
Comments
This is proposed in the Village zone and is limited to 5 stories
high and no minimum lot size.
x
18.08.044
Lot Width to depth ratio
Staff
Comments
This is proposed in the Village zone, maximum ratio is not
applicable.
PUBLIC IMPROVEMENT REQUIREMENTS
Improvement
Description
Water
Water services will be constructed and connected to existing water mainlines.
Sewer
Sewer services will be constructed and connected to existing sewer mainlines.
Streets
Right-of-way will be dedicated and the street will be constructed per 16.12.020C
and in accordance with the comprehensive plan.
Storm Drainage
Storm water from the street will be retained underground, while storm water
from the lots will be required to be retained on site.
Pressurized Secondary
Irrigation
Secondary irrigation facilities will be designed and constructed in accordance
with section 16.12.230 of city code. Applicant has requested to defer the
pressurized irrigation system including pump station to a future division.
Parks
N/A
OTHER AGENCY COMMENTS AND REQUIREMENTS
Agency
Comment
BTPO
No comment received.
Bureau of Indian Affairs
Not all lands within this development are entitled to receive irrigation water. New
delivery points will need to be agreed upon with the Fort Hall Irrigation Project.
Cable One
No comment received.
Century Link
No comment received.
Direct Communications
No comment received.
ID Fish and Game
No comment received.
ID Transportation
No comment received.
Idaho Power
No comment received.
Intermountain Gas
No comment received.
School District 25
No comment received.
SE Idaho Public Health
No comment received.
US Postal Service
No comment received.
1940't-\
CHUBBUCK
I D A H D
290 E. Linden Avenue, Chubbuck, ID 83202
208.237.2430
www.CityofChubbuck.us
EXAMPLE MOTIONS
APPROVAL:
Having reviewed the petition materials, staff report, and all testimony presented before and by the City
in this hearing as part of the record against criteria established by City Code 17.12.100, and having
found that those criteria for approving a preliminary plat request are satisfied, I move to recommend
approval of the preliminary plat as described in the application materials to the City Council with the
following conditions and waiver recommendations:
1. (if found necessary by LUDC).
APPROVAL (NO CONDITIONS):
Having reviewed the petition materials, staff report, and all testimony presented before and by the City
in this hearing as part of the record against criteria established by City Code 17.12.100, and having
found that those criteria for approving a preliminary plat request are satisfied, I move to recommend
approval of the preliminary plat as described in the application materials.
DENIAL:
Having reviewed the petition materials, staff report, and all testimony presented before and by the City
in this hearing as part of the record against criteria established by City Code 17.12.100, and having
found that those criteria for approving a preliminary plat request are not satisfied, I move to
recommend denial of the preliminary plat request as described in the application materials.
I find that the petition fails to comply with... [CITE SPECIFIC STANDARD WHICH IS NOT MET AND
DESCRIBE WHY IT WAS NOT MET].
SPECIAL CONSIDERATIONS FROM IDAHO CODE:
• I.C. 67-6513: Denial of a subdivision permit or approval of a subdivision permit with conditions
unacceptable to the landowner may be subject to the regulatory taking analysis provided for
by section 67-8003, Idaho Code, consistent with the requirements established thereby.
REPORT: Sean Harris, Development Services Manager
sharris@cityofchubbuck.us
(208) 237-2430
DATE: February 13, 2025
1. Reference Map
2. Application for Preliminary Plat
3. Plat
4. Narrative for Preliminary Plat
5. Maps
a. Future Land Use
/94�4c\
CHUBBUCK
I D A H D
Staff comments in this report are based solely
upon evidence available at the time of the
report. Additional information may be
brought to light at or before the hearing.
EXHIBITS
290 E. Linden Avenue, Chubbuck, ID 83202
208.237.2430
www.CityofChubbuck.us
b. Current Zoning
6. Evidence of Notice
a. Site Postings
b. Agency notices on file w/staff
7. Affidavit of Legal Interest
8. Request to defer irrigation system & pump station to a future Division.
/944'C-\
CHUBBUCK
I D A H D
290 E. Linden Avenue, Chubbuck, ID 83202
208.237.2430
www.CityofChubbuck.us
Exhibit 1:
Reference Map - Chubbuck Village Division 1
Ilk
■ eft
E Lin den Are__ n�.*z...
F71
.,,■ t; u
E,ansLaned-
I
+Wmal '" ■
r
- r rr , � w'
CHUBBUCK
290 E. Linden Avenue, Chubbuck, ID 83202
208.237.2430
www.CityofChubbuck.us
CHUBBUCK
1 0
290 E. Linden Avenue Chubbuck, ID 83202
208.237.2430
www.CityofChubbuck.us
PRELIMINARY PLAT
APPLICATION
Oct. 2022 Form- Replaces Prior Versions
PAGE 1 OF 5
Requirements and procedures for Preliminary Plat applications are found in section 17.12.030 — 1712.190 of municipal code. The following
must be completed and submitted with all required documents in order to progress to the next stage of the review process; failure to submit a
complete application packet may result in additional fees.
DATE RECEIVED: INITIALS: FEES PAID? Y N AMOUNT:
SECTION A —DEVELOPER/APPLICANT INFORMATION
Al.
Name
Cornerstone Realty & Development
A2.
Mailing Address
722 Lucy
City State
Zip Code
Chubbuck ID
83202
A3.
Phone Number (including area code)
A4. Email Address
208.223.7117
ellijosh@msn.com
SECTION B — PROFESSIONAL SERVICES INFORMATION
B1.
Firm Name
Sunrise Engineering
B2.
Mailing Address
600 East Oak Street
City State
Zip Code
Pocatello ID
83201
B3.
Point of Contact (Name)
B4. Email Address
Robert Heuseveldt
rheuseveldt@sunrise-eng.com
SECTION C —SITE INFORMATION
Cl.
Site Address City Zip
C2. Tax Parcel #(s)
NE1/4 of S10,T6S,R34E Chubbuck Idaho
RPRCBBA004803, RPRCH91000300,
RPRCH91000400
C3.
Current Land Use
C4. Are there existing structures on-site?
VILLAGE (V) ZONE
0 Yes ❑ No
C5.
Is the site under contract or in the name of the developer/applicant?
C6. Approximate size of property
0 Yes ❑ No
1.90 ac
C7.
Are there any existing items of which Staff should be aware?
C8. Does the site contain irrigation water rights?
❑ Yes ® No If yes:
Q Yes ❑ No
If yes, which company/district:
CHUBBUCK
1 0
290 E. Linden Avenue Chubbuck, ID 83202
208.237.2430
www.CityofChubbuck.us
PRELIMINARY PLAT
APPLICATION
Oct. 2022 Form- Replaces Prior Versions
PAGE 2 OF 5
SECTION D — PROPOSED DEVELOPMENT INFORMATION
D1.
Plat Name
D2. Number of Lots
Chubbuck Village - Division 1
2
D3.
Type of Land Uses within development (residential, commercial, industrial, etc.)
D4. Water & Sewer Needs
Commercial and Mixed Use
I Services for 4 Lots
D5.
Are there any issues related to the development of which Staff should be aware prior to meeting?
❑ Yes ❑X No If yes:
Will the development contain any commonly -owned and/or maintained improvements (stormwater facilities, community mailboxes, streets,
D6.
parks/playgrounds, etc.)?
❑ Yes ❑X No If yes, what?
Will the development contain any land within a designated floodplain (FEMA or Chubbuck?
❑ Yes X❑ No If yes, what zone?:
D7.
If yes, how do you intend to minimize flood damage to structures, and public utilities and facilities such as sewer, gas, water, and electrical systems??
If yes and the proposal contains more than 50 lots or more than 5 acres, whichever is lesser, and there no base flood elevations
established for the floodplain, you must submit base flood elevation data with the application package.
Only for plat containing residential units: The City has adopted Parks Impact Fees with requirements that parks impact fees are due when building permits
for residential units are issued. There may be times when the developer proposes to dedicate land and/or construct park improvements to satisfy the parks
impact fee funding obligation in whole or in part. Which is anticipated with this development?
D6.
❑ No public parks/park land are proposed with this phase, or any public parks/park land will benefit only this development, parks
impact fees will be collected
❑ Public parks/park land are proposed that will benefit more than just this development, parks impact fees may be adjusted only by
agreement between the city and the developer prior to construction, fund, or contribution based on the present value of system
improvements and land in accordance with Chapter 17.28 of municipal code.
SECTION E — ADDITIONAL SUBMITTAL REQUIREMENTS
E1.
Preliminary Plat Application Fees: Total # of lots 2 X $20.00 + $550.00 base fee = $ 590 total
Public Notice Sign Deposit (full or partial refund at Director's discretion) = $ 100.00
❑ Traffic Impact Analysis Report Review fee (if required) = $ 500.00
$ 690 total due
E2.
Master Plan, for any preliminary plat that is a portion of a large parcel, part of a larger group of commonly held parcels, or
part of a larger development which has been, or shall be developed by the developer, shall be accompanied by a master plan
submitted during the preliminary platting process. A master plan must be submitted with each preliminary plat filed.
E3.
Preliminary codes, covenants, and restrictions (CC&Rs) addressing maintenance of commonly owned improvements and/or
land, if the development will contain any commonly owned improvements and/or land. For purposes of this requirement,
commonly owned improvements include stormwater facilities, cluster mailboxes, private open space/parks/amenities, etc.
E4.
Narrative indicating how the approval criteria for preliminary plats are addressed. Approval criteria are as follows (17.12.100):
1. The subdivision proposal complies with applicable provisions of this title.
2. The subdivision proposal complies in principle with all applicable city design standards and development regulations.
CHUBBUCK
1 0
290 E. Linden Avenue Chubbuck, ID 83202
208.237.2430
www.CityofChubbuck.us
PRELIMINARY PLAT
APPLICATION
Oct. 2022 Form- Replaces Prior Versions
PAGE 3 OF 5
3. The subdivision proposal complies with all applicable zoning requirements of the underlying zoning district, applicable
overlays, and other applicable development standards.
4. All public facilities including streets, sidewalks, curbs, gutters, secondary pressurized irrigation, water, sewer, fire
protection, and sanitation services can be provided to the newly created lots and accommodate future extension to
adjacent land. The use of a "control strip" intended to control or prevent the future extension of public facilities or
development of adjacent land is prohibited.
5. If city public works determines that the proposed subdivision will result in significant traffic impacts then a "traffic impact
study" will be required as part of the commission's review. A significant traffic impact is generally defined as occurring
when:
a. A proposed development or redevelopment of a site will generate 100 or more new peak hour trips; or
b. The added volume is equal to 1,000 vehicles per day.
6. The proposal provides for a continuation of a connected transportation system unless topography or natural features
prevents a connection to abutting streets or property.
7. The proposed subdivision provides for bicycle and pedestrian transportation routes and amenities in accordance with
Bannock Transportation Planning Organization's adopted bicycle and pedestrian plans.
8. Public utilities are provided to the newly created lots in public rights of way or in appropriately sized easements.
E5. If the development contains area with any FEMA or City of Chubbuck designated floodplains, the following must be
submitted:
1. If the development, either within a single phase or as part of a larger planned development, contains more than 50 lots or
5 acres, whichever is less, base flood elevations shall be determined prior to filing an application for a preliminary plat
and said determinations must be submitted with the application package.
2. If the development, either within a single phase or as part of a larger planned development, contains more than 50 lots or
5 acres, whichever is less, evidence must be submitted demonstrating that a CLOW application has been filed with
FEMA.
E6. Traffic Impact Analysis — Category A, Category B, or Statement. Follow the Traffic Impact Analysis Guidelines as adopted from
Bannock Transportation Planning Organization.
E7. Because every application is different, rules and regulations may differ and staff may require additional information or
submittals before an application can be deemed complete and ready for the review process beyond staff level.
290 E. Linden Avenue Chubbuck, ID 83202
lao�t-\ 208.237.2430
CHUBBUCK www.CityofChubbuck.us
10AH0
PRELIMINARY PLAT
APPLICATION
Oct. 2022 Form- Replaces Prior Versions
PAGE 4 OF 5
E8. PDF Drawings drawn according to municipal code containing the following:
Code Reference
Staff
Reviewers
Initials
Preparer's
Initials
Description
17.12.150 —17.12.160
Presentation & Descriptive Data
RMH
• Drawing Size (11"x22" minimum through 22"x34" maximum)
RMH
. Proposed Name
RMH
• Location of Development by Section, Township, Range
RMH
• Reference to Section or Quarter Corner (dist. & Bear.)
RMH
• Name, Address, Phone Number of Developer
RMH
• Name, Address, Phone Number of Engineer/Surveyor
RMH
• North Arrow
RMH
• Date of Preparation (Including Revisions)
RMH
• Vicinity Map
17.12.170
Existing Conditions
RMH
• Existing Contours @ adequate Interval
RMH
• Existing Features
RMH
• Existing Utilities
RMH
• Existing R -O -W, easements, public areas, corporation lines
RMH
• Instrument # for parcels with common boundaries
RMH
• Existing & proposed zoning
RMH
. Total acreage
RMH
• Boundary dimensions
17.12.180
Proposed Conditions
RMH
• Street layout (including width)
RMH
0 Street names
RMH
• Connections to existing streets
RMH
• Lot dimensions
RMH
. Lot numbers
RMH
• Total number of lots
RMH
• Location, width, and use of easements
RMH
• Designation of land for public use (parks and open space)
17.12.190
Proposed Utility Methods
RMH
• Proposed sewage disposal
RMH
• Proposed water supply
RMH
• Proposed storm water disposal
RMH
• Proposed secondary pressurized irrigation (if the site has irrigation
rights)
15.54 (adopted 6/3/20)
Floodplain requirements (N/A if there is no floodplain in the development)
RMH
0 Floodplain boundaries, type, and BFEs
290 E. Linden Avenue Chubbuck, ID 83202 PRELIMINARY PLAT
/l LLL//7L�x 208.237.2430
--'
CHUBBUCK wWw'CityofChubbuck.us APPLICATION
Oct. 2022 Form- Replaces Prior Versions
I O A A 0 PAGE 5 OF 5
SECTION F- CERTIFICATION
• I, the undersigned, hereby certify that the information herein and attached hereto is true and correct to the
best of my knowledge.
• 1 agree to comply with all provisions of ordinances and laws governing this type of work, whether specified
herein or not.
• 1 am aware that if this application is not complete, the preliminary plat review process will not continue until
it is so deemed by the City upon further submission of materials.
• 1 hereby authorize the filing of this application and grant approval of on-site review of the development
described herein.
• 1 certify that I am authorized to file this application.
F1. rSignature F2. Printed Name F3. Date
SECTION G -FOR STAFF USE ONLY
G1. COMPLETENESS REVIEW:
Deemed complete?
Reviewed by: Date:
❑ Yes ❑ No If no, list concern(s):
Applicant Notified?
❑ Yes ❑ No Comments:
NORTH 1/4 CORNER
3 SECTION 10, FOUND ITD
BRASS CAP MONUMENT IN
10 VAULT, PER CP&F
#21320172
HUX HOLDINGS LLC
INST. NO. 21910421
PRELIMINARY PLAT FOR:
CHUBBUCK VILLAGE - DIVISION 1
LOCATED IN THE NE 1/4 OF SECTION 10, TOWNSHIP 6 SOUTH, RANGE 34 EAST, B.M.,
BANNOCK COUNTY, IDAHO
MILLER, KENNETH MILLER, J JAMES MILLER, RUSTY B MILLWARD, LEIGH
INST. NO. 20502051 CORR INST. NO. 20308481 INST. NO. 21614488 INST. NO. 21601685
-- - -
----------- ---
-------------------
- E LINDEN AVE i
_N - -- -- - I I - -
-------------------- ---zft
---------------- ---------------------
-- --- ------------------------------------------
- -- ---As--- - --
L20 -
I
LEI, ZHUO HAO --
/A 5T NO. 97017318 I
I II I
II, I
4 BICYCLE
PARKING -
STALLS I z _
cyl-
LOT 7 �'
I
0.88 ACRES J I rn l I
38 280 SF � I
Lu
BAILEY FINANCIAL GROUP I D I
INST. NO. 20827117 I I
COMMERCIAL
DUMPSTER
/ENCLOSURE
NET PROPHET LLC
INST. NO. 22218945
N L13
wLoLOT 1
NJENSEN, CON
-� 0 2 N 0.78 ACRES �N INST. N0.20327501
� 33,805.5 SF w o `�
LOT 5 0 o o 0 LOT 6 o
0.19 ACRES p o BLOCK 1 0 0.19 ACRES I Ln � o \ �-
8,200 SF Z C:) z 8,200 SF o 1
00
N 1
p SNOW
to REMOVAL
HANDCART DUMPSTER STOCKPILE r ------
ENCLOSURE
ENCLOSURE
Y, L -� HARRIS, SCOTT
INST. N0. 21113219
L10
UNDERGROUND
PATIOINFILTRATION SYSTEM
I SPACE SPACEPATIO NO°04 36 W 26 72 - I -
BIKE RACK
)037'52" E 138.77 a ^ 145.40" 19.00' S 89037'52" E 177.22'
I
'- S 89°37'52" E 183.40' �
------------------ - - - - - - -------------------------- - ----- -- -----------
_I
I J
__- - --------- - - - - - - - - - - - - - --_ ------------------ _------ ---- -_= - _ L5
S-
- N 89037'52" W 484.58' - - - w - - - - w- - - - w- - - - w
--- --- I - I- i EVANS LN
_-__L
- - - - - - - - - - _ _- -_ - - - _ ----------- ------------�---------------------- - ---------------
PHASE 1 BOUNDARY
j TEMPORARY IRRIGATION SERVICE FOR LOT 2 AND TREES
ALONG EVANS LANE TO BE PULLED OFF OF WATER
IDAHO CENTRAL CREDIT UNION
�ISERVICE TO BUILDING. IT WILL BE ABANDONED ONCE THE
INST. N0.22009767 PERMENANT IRRIGATION SYSTEM FROM FORT HALL
CANAL HAS BEEN CONSTRUCTED WITH FUTURE PHASE.
I I
CURVE TABLE
NO.
RADIUS
�
�
- - - - - - - - - - - - - - - - - -
N
� p
N N INSTT, N0.
C1
,
J 0.19 ACRES
o 22208722
I
0
M
r-
0
Lq
242.50'
M
�
I
�
POINT OF
C3
PHASE 1 BOUNDARY
�
14°15'14"
U-)
MCKEE, JAMES C
o
�
N
8°54'05"
U)',
CENTER 1/4
17\1L18
INST. NO.
z
I
Ln
z I
SECTION 10,
N
/;
FOUND
22208722
o
I
ALUMINUM CAP
-
/-S 89°30'10" E 197.63 .. . . .
• i C�
�,.
I
IVP HOLDINGS LLC
85' I
ooC
t
CENTER -NORTH
220.00
L8
T
50.00
�,� N ,
ROW Qo INST, NO. 21814479
/v\
16TH CORNER
SO°22'06"W
�I
PATIO
L10
���
LOT 3
_ % r
COMPUTED PER
SNOW
-' LOT 2 '' F {y
SPACE
'�
N
0.68 ACRES UNDERGROUND
(V
J'�
SNOW
x REMOVAL
�.'�,ate`
STOCKPILE 0.65 ACRES
�'���
CABLE TV LINE
�?
_ I
INFILTRATION SYSTEM
L1�'�y
MMIL 00-- Em
����
,
_�,�
+`�� '; -��r
, L8
�
N L13
wLoLOT 1
NJENSEN, CON
-� 0 2 N 0.78 ACRES �N INST. N0.20327501
� 33,805.5 SF w o `�
LOT 5 0 o o 0 LOT 6 o
0.19 ACRES p o BLOCK 1 0 0.19 ACRES I Ln � o \ �-
8,200 SF Z C:) z 8,200 SF o 1
00
N 1
p SNOW
to REMOVAL
HANDCART DUMPSTER STOCKPILE r ------
ENCLOSURE
ENCLOSURE
Y, L -� HARRIS, SCOTT
INST. N0. 21113219
L10
UNDERGROUND
PATIOINFILTRATION SYSTEM
I SPACE SPACEPATIO NO°04 36 W 26 72 - I -
BIKE RACK
)037'52" E 138.77 a ^ 145.40" 19.00' S 89037'52" E 177.22'
I
'- S 89°37'52" E 183.40' �
------------------ - - - - - - -------------------------- - ----- -- -----------
_I
I J
__- - --------- - - - - - - - - - - - - - --_ ------------------ _------ ---- -_= - _ L5
S-
- N 89037'52" W 484.58' - - - w - - - - w- - - - w- - - - w
--- --- I - I- i EVANS LN
_-__L
- - - - - - - - - - _ _- -_ - - - _ ----------- ------------�---------------------- - ---------------
PHASE 1 BOUNDARY
j TEMPORARY IRRIGATION SERVICE FOR LOT 2 AND TREES
ALONG EVANS LANE TO BE PULLED OFF OF WATER
IDAHO CENTRAL CREDIT UNION
�ISERVICE TO BUILDING. IT WILL BE ABANDONED ONCE THE
INST. N0.22009767 PERMENANT IRRIGATION SYSTEM FROM FORT HALL
CANAL HAS BEEN CONSTRUCTED WITH FUTURE PHASE.
I I
CURVE TABLE
NO.
RADIUS
N � I MCKEE, JAMES C
- - - - - - - - - - - - - - - - - -
W'
N N INSTT, N0.
C1
,
J 0.19 ACRES
o 22208722
14°15'14"
8,200 SF
r-
0
Lq
242.50'
37.67'
ti
SNOW
POINT OF
C3
�
�I
14°15'14"
N7°12'W
MCKEE, JAMES C
REMOVAL
PATIO
31.07'
8°54'05"
U)',
CENTER 1/4
C5
INST. NO.
STOCKPILE
5°55'42"
;
SECTION 10,
(V'.
,
FOUND
22208722
o
N7°12'W
ALUMINUM CAP
-
N 89°3752" w 145.40'
• i C�
�,.
c(_-_ I
j N9°53'W
ooC
t
CENTER -NORTH
220.00
L8
12457 PER CP&F
50.00
�,� N ,
-IRR - I
/v\
16TH CORNER
SO°22'06"W
�I
�
L10
���
I
L11
COMPUTED PER
164.00
;��-�
'�
50.00
�� i
�,,;
- C
SNOW
ROS #21816647��
CABLE TV LINE
-------------- o-----^°----�
----------ti�------- ------------------J
--- o -----g
/
L3 I
SIDEWALK
REMOVAL
, L8
�L12
�
/
,_
'L16
I
�
STOCKPILE
S89. 24'05"E
m / 0
WATER METER / WATER SERVICE
I
-
LOT 1
370.46
/
IRRIGATION BOX/ IRRIGATION SERVICE
O
SNOW�- I
�_ I
0.04 ACRES
/
eeN
SEWER SERVICE
REMOVAL ,T
STOCKPILE
/ e
BLOCK 7
N L13
wLoLOT 1
NJENSEN, CON
-� 0 2 N 0.78 ACRES �N INST. N0.20327501
� 33,805.5 SF w o `�
LOT 5 0 o o 0 LOT 6 o
0.19 ACRES p o BLOCK 1 0 0.19 ACRES I Ln � o \ �-
8,200 SF Z C:) z 8,200 SF o 1
00
N 1
p SNOW
to REMOVAL
HANDCART DUMPSTER STOCKPILE r ------
ENCLOSURE
ENCLOSURE
Y, L -� HARRIS, SCOTT
INST. N0. 21113219
L10
UNDERGROUND
PATIOINFILTRATION SYSTEM
I SPACE SPACEPATIO NO°04 36 W 26 72 - I -
BIKE RACK
)037'52" E 138.77 a ^ 145.40" 19.00' S 89037'52" E 177.22'
I
'- S 89°37'52" E 183.40' �
------------------ - - - - - - -------------------------- - ----- -- -----------
_I
I J
__- - --------- - - - - - - - - - - - - - --_ ------------------ _------ ---- -_= - _ L5
S-
- N 89037'52" W 484.58' - - - w - - - - w- - - - w- - - - w
--- --- I - I- i EVANS LN
_-__L
- - - - - - - - - - _ _- -_ - - - _ ----------- ------------�---------------------- - ---------------
PHASE 1 BOUNDARY
j TEMPORARY IRRIGATION SERVICE FOR LOT 2 AND TREES
ALONG EVANS LANE TO BE PULLED OFF OF WATER
IDAHO CENTRAL CREDIT UNION
�ISERVICE TO BUILDING. IT WILL BE ABANDONED ONCE THE
INST. N0.22009767 PERMENANT IRRIGATION SYSTEM FROM FORT HALL
CANAL HAS BEEN CONSTRUCTED WITH FUTURE PHASE.
I I
CURVE TABLE
NO.
RADIUS
N � I MCKEE, JAMES C
DELTA
LOT 4
N N INSTT, N0.
C1
,
J 0.19 ACRES
o 22208722
14°15'14"
8,200 SF
39.08'
0
Lq
242.50'
37.67'
ti
N9°53'W
POINT OF
C3
L7
BEGINNING
14°15'14"
N7°12'W
49.63'
C4
PATIO
31.07'
8°54'05"
SPACES
CENTER 1/4
C5
8
CORNER
5°55'42"
;
SECTION 10,
(D
,
FOUND
N
N7°12'W
ALUMINUM CAP
-
J - _----_--L -_
IN SIDEWALK
j 8°54'05"
j N9°53'W
MARKED PLS
220.00
L8
12457 PER CP&F
50.00
L20
/v\ #21506574
/v\
CLARK, LANCE
SO°22'06"W
�I
INST. NO. 20622915
L10
I
N L13
wLoLOT 1
NJENSEN, CON
-� 0 2 N 0.78 ACRES �N INST. N0.20327501
� 33,805.5 SF w o `�
LOT 5 0 o o 0 LOT 6 o
0.19 ACRES p o BLOCK 1 0 0.19 ACRES I Ln � o \ �-
8,200 SF Z C:) z 8,200 SF o 1
00
N 1
p SNOW
to REMOVAL
HANDCART DUMPSTER STOCKPILE r ------
ENCLOSURE
ENCLOSURE
Y, L -� HARRIS, SCOTT
INST. N0. 21113219
L10
UNDERGROUND
PATIOINFILTRATION SYSTEM
I SPACE SPACEPATIO NO°04 36 W 26 72 - I -
BIKE RACK
)037'52" E 138.77 a ^ 145.40" 19.00' S 89037'52" E 177.22'
I
'- S 89°37'52" E 183.40' �
------------------ - - - - - - -------------------------- - ----- -- -----------
_I
I J
__- - --------- - - - - - - - - - - - - - --_ ------------------ _------ ---- -_= - _ L5
S-
- N 89037'52" W 484.58' - - - w - - - - w- - - - w- - - - w
--- --- I - I- i EVANS LN
_-__L
- - - - - - - - - - _ _- -_ - - - _ ----------- ------------�---------------------- - ---------------
PHASE 1 BOUNDARY
j TEMPORARY IRRIGATION SERVICE FOR LOT 2 AND TREES
ALONG EVANS LANE TO BE PULLED OFF OF WATER
IDAHO CENTRAL CREDIT UNION
�ISERVICE TO BUILDING. IT WILL BE ABANDONED ONCE THE
INST. N0.22009767 PERMENANT IRRIGATION SYSTEM FROM FORT HALL
CANAL HAS BEEN CONSTRUCTED WITH FUTURE PHASE.
I I
CURVE TABLE
NO.
RADIUS
LENGTH
DELTA
CHORD BEARING
CHORD LENGTH
C1
157.50'
39.18'
14°15'14"
N7°12'W
39.08'
C2
242.50'
37.67'
8°54'05"
N9°53'W
37.64'
C3
200.00'
49.76'
14°15'14"
N7°12'W
49.63'
C4
200.00'
31.07'
8°54'05"
N9°53'W
31.04'
C5
200.00'
20.69'
5°55'42"
N2°28'W
20.68'
C6
242.50'
60.33'
14°15'14"
N7°12'W
60.17'
C7
157.50'
j 24.47'
j 8°54'05"
j N9°53'W
j 24.44'
LINE TABLE
LINE TABLE
NO.
BEARING
LENGTH
NO.
BEARING
LENGTH
L1
S89°23'58"E
28.05
L13
SO°22'06"W
164.00
L2
N89°37'01"W
17.12
L14
S89°37'54"E
50.00
L3
S4°10'48"E
25.23
L15
NO°22'06"E
164.00
L4
NO°29'57"E
21.84
L16
N89°37'54"W
50.00
L5
SO°22'06"W
164.00
L17
SO°29'57"W
220.00
L6
NO°22'06"E
164.00
L18
S89°30'03"E
174.00
L7
S89°37'54"E
50.00
L19
NO°29'57"E
220.00
L8
N89°37'54"W
50.00
L20
N89°30'03"W
174.00
L9
SO°22'06"W
164.00
----
L10
S89°37'54"E
50.00
L11
NO°22'06"E
164.00
L12
N89°37'54"W
50.00
BOUNDARY LINE TABLE
#
BEARING
DISTANCE
L1
S 89024'03" E
34.77'
L2
N 00003'36" E
45.36'
L3
N 89°37'52" W
61.01'
L4
S 00°04'36" E
17.35'
L5
N 89°37'01" W
17.12'
L6
S 04°10'48" E
25.23'
L7
N 00036'04" E
42.50'
PRELIMINARY STORMWATER STORAGE VOLUME REQUIRED
• LOT 1, BLOCK 1= 1,416 CF
• LOT 2, BLOCK 1= 1,180 CF
NOTES CONT.
15. THE EXISTING WATER SERVICES ON EVANS LN. AND E. LINDEN AVE. WILL NEED TO BE REMOVED AND PLUGGED AT
THE WATER MAIN.
16. STORMWATER SYSTEM TO BE BUILT WITH PHASE 1.
17. ALL OTHER IMPROVEMENTS TO BE COMPLETED WITH LATER PHASE.
3
O
85' ROW
17.5' ANGLED 1310'
PARKING 45° RAVEL 30.5 SW
6•,1 CUT
SLOPE 2 2%
vi /vv/vvvvv vvvvvv vv��
STANDARD 611
\% VERTICAL CURB
(TYP.)
E. LINDEN AVE, EVANS LN.,
& CHINESE PEAK DR.
TYPICAL ROAD SECTION
24' PRIVATE ALLEY
15' 9'
TRAVEL PARALLEL
6:1 FILL LANE PARKING
6:1 CUT
SLOPE 2% 2%� SLOPE
6" SPILL CURBVX
STANDARD 6"
(TYP.) ,�\\j��/ VERTICAL CURB
(TYP.)
PRIVATE ALLEY
TYPICAL ROAD SECTION
S� � j II ■o
!Egm III 1 • ��I ■■J ---- ---
--...... ._
■111. . J a
Gam: ■1111►��. �•... •.� ��
N IN
0
LEGEND & NOTES
- -
- -
- -
PROPOSED BOUNDARY LINE
PROPOSED PROPERTY LINE
-
- PROPOSED EASEMENT LINE
PROPOSED CENTER LINE
SECTION LINE
EXISTING
PROPOSED
---------
COUNTOUR LINES
- W-/
W
WATER LINE
irr
/
IRR
IRRIGATION LINE
- - -
- S
/
S
SEWER LINE
- - -
-sd
/
SD
STORM LINE
ohe
uge
/
0L�-- UE
UNDERGROUND/ OVERHEAD POWER LIN
----
g
/
G
GAS LINE
t
fo
/
T FO
TELEPHONE/ FIBER LINE
- - -
- C
/
CATV CATV
CABLE TV LINE
-------------- o-----^°----�
----------ti�------- ------------------J
--- o -----g
/
SIDEWALK
STANDARD CURB / RIBBON CURB
/
♦ / •
FIRE HYDRANT/ WATER VALVE
m / 0
WATER METER / WATER SERVICE
/
0
/
IRRIGATION BOX/ IRRIGATION SERVICE
O
L
SEWER MANHOLE
o
SEWER SERVICE
C•` /
/ e
Q / B / •
STORM MANHOLE/ STORM CATCH BASIN
STORM INFILTRATION BED
0 / ® POWER POLE / POWER BOX
GAS METER
/ o / o TELEPHONE BOX/ FIBER OPTIC BOX
® CABLE TV BOX/STREET LIGHT
NOTES
1. EXISTING ZONING. VILLAGE (V) ZONE
2. TOTAL AREA OF SUBDIVISION: 1.2 ACRES
6'.1 FILL 3. LOT SIZE DATA
SLOPE PROPOSED MINIMUM: 28,314 SF (0.65 ACRE)
4. THE PROPOSED BUILDING CORNERS ARE THE PROPERTY CORNERS
S. SUBDIVISION STATS - 2 TOTAL LOTS
6. LOT 2 IS PROPOSED TO BE A COMMON LOT FOR STORM WATER RETENTION, PUBLIC UTILITIES, AND AN ALLEY WAY
ACCESS TO BE OWNED AND MAINTAINED BY THE HOMEOWNERS ASSOCIATION.
7. LOT 1, BLOCK 2 WILL BE A COMMON LOT FOR OPEN SPACE AND WILL BE USED FOR SNOW STORAGE AND T' IE
LOCATION
OFT' IE IRRIGATION PUMPING
STATION
8. GAS, POWER, CABLE TV ETC. TO BE PROVIDED.
9. CHINESE PEAK DRIVE IS TO BE DEDICATED TO THE CITY OF CHUBBUCK FOR PUBLIC USE. THE PROPOSED ALLEY IS TO
BE PRIVATE AND IS PROPOSED TO BE A ONE WAY ROAD WITH PARKING ON ONE SIDE.
10. SEWER AND WATER TO BE CONNECTED TO THE CITY OF CHUBBUCK COLLECTION AND DISTRIBUTION SYSTEMS
RESPECTIVELY.
11. STORMWATER WILL BE RETAINED THROUGH UNDERGROUND INFILTRATION SYSTEMS.
12. EXISTING OVERHEAD POWER TO BE RELOCATED UNDERGROUND.
13. 20 PARKING SPACES PROVIDED, 2 OF WHICH ARE ADA SPACES.
14. EVANS LANE TO BE DEDICATED TO THE PUBLIC FOR STREET RIGHT-OF-WAY.
PRELIMINARY PLAT FOR:
CHUBBUCK VILLAGE - DIVISION 1
LOCATED IN THE NE 1/4 OF SECTION 10, TOWNSHIP 6 SOUTH, RANGE 34 EAST, B.M.,
BANNOCK COUNTY, IDAHO
DEVELOPER INFORMATION
NAME CORNERSTONE REALTY & DEVELOPMENT
UCY
CONTACT JOSH ELLIS ADDRESS 722
PHONE 208.223.7117 CHUBBBUIBU
CK, ID 83202
SHEET INFORMATION
CREATEDI 11.16.2023 1 PROJECT#j 09377 1 DRAWN BYI RMH
REVISED 1 12.4.2023 1 REV#j 6 1 CHECKED BY1 RMH
HALF SIZE SCALE (B)
1 INCH = 80 FEET SS�pNAL FN
0 20 40 80 o�c�' \CENS6 ciy
1 40 /-)d,
.2
NRTH 0 20 40 80 0 co
VlX v
1 INCH = 40 FEET F 4 OF \�P A
FULL SIZE SCALE (D) �T ti1. HE\ S
L
,SUNRISE�Lu
ENGINEERING z
0
W
600 EAST OAK STREET, POCATELLO, ID 83201 = qrm
TELEPHONE 208.234.0110 `1
www.sunrise-eng.com
SUNRISE Pocatello Office
600 East Oak Street, Pocatello, ID 832011 Tel: 208.234.0110 1 Fax: 208.234.0111
November 17, 2023
Preliminary Plat Narrative
Chubbuck Village
7. The subdivision proposal complies with the applicable provisions of this title.
The current project as proposed meets the applicable provisions of this title. This project is in
response to a request by the Chubbuck Development Authority which consolidates several adjacent
projects in the downtown village zone.
2. The subdivision proposal complies in principle with all applicable City design standards and development
regulations.
The current project as proposed will follow the current city standards. The comments obtained from
City Staff through the Design Review have been addressed.
3. The subdivision proposal complies with all applicable zoning requirements of the underlying zoning district,
applicable overlays, and other applicable development standards.
The Subdivision complies with applicable zoning requirements.
4. All public facilities including streets, sidewalks, curbs, gutters, water, sewer, fire protection, and
sanitation services can be provided to the newly created lots and accommodate future extension to
adjacent land. The use of a "control strip" intended to control or prevent the future extension of public
facilities or development of adjacent land is prohibited.
All public facilities can be provided. A new road will connect Evan Ln to Linden Ave with a waterline
looping through the project.
5. If city public works determines that the proposed subdivision will result in significant traffic impacts
then a "traffic impact study" will be required as part of the commission's review. A significant traffic
impact is generally defined as occurring when
a. A Proposed development or redevelopment of a site will generate 700 or more new peak hour trips; or
b. The added volume is equal to 7,000 vehicles per day.
A traffic impact study has previously been submitted to the City.
6. The proposal provides for a continuation of a connected transportation system unless topography or
natural features prevent connection to abutting streets or property.
The proposed Subdivision provides for a continuation of connect transportation systems via Kinport
Crossing and a private one way alley. The alley meets the width standard and will be a one way alley
with parallel parking on one side.
7. The proposed subdivision provides for bicycle and pedestrian transportation routes and amenities in
accordance with Bannock Transportation Planning Organization's adopted bicycle and pedestrian plans.
The proposed subdivision will have sidewalks that will tie into existing sidewalks that have several
areas where bike paths intersect to allow both bicycle and pedestrian traffic to circulate throughout
the neighborhood with limited crossings at the streets. The design of the bulb outs provide safer and
shorter crossing distances at the main intersections. ADA Ramps and crosswalks will be provided.
8. Public utilities are provided to the newly created lots in public rights-of-way or in appropriately sized
easements (Ord. 773, 2078)
The proposed buildings are adjacent to existing rights of way with public utility access. Kinport
Crossing will be a new proposed right of way that will provide enough space within the platted
subdivision for public utilities to install their infrastructure to provide services to the new buildings
that will be built.
Exhibit 5a:
Comprehensive Plan Future Land Use Map
Chubbuck Village Division 1
W
At
4-4
r
t -
CHUBBUCK
I o A H 0
E Linden ;k e
C6
a -
a
U
� u
t
� t
Frans Lane
Future—Desi 9nation
Commercial
Emplovment
High Density
Low Density
Medium Density
Mixed Use
290 E. Linden Avenue, Chubbuck, ID 83202
208.237.2430
www.CityofChubbuck.us
4,
a
LI
ra ,
CHUBBUCK
I o A H 0
E Linden ;k e
C6
a -
a
U
� u
t
� t
Frans Lane
Future—Desi 9nation
Commercial
Emplovment
High Density
Low Density
Medium Density
Mixed Use
290 E. Linden Avenue, Chubbuck, ID 83202
208.237.2430
www.CityofChubbuck.us
Exhibit 5b:
Current Zoning and Requested Change
Chubbuck Village Division 1
L
CHUBBUCK
1DRH0
Lan duse_Category
W Agriculture (A)
County
_ Creative Community
Creative Co mmun ity-Ha west Springs (CC -HS)
- Creative Cnmmunity-Northside Crossing (CC -NC)
- Dense Residential (R-4)
- General Cammerual (C-2)
- Highway Cooridor (HC)
- Industrial (1)
Limited Commercial (C-1(
- Limited Residential (R-2)
- Limited Residential - P (R2P)
_ Planned Unit Development (PUD}
Single Family Reside ntial (R-1)
- Village (V}
290 E. Linden Avenue, Chubbuck, ID 83202
208.237.2430
www.CityofChubbuck.us
Exhibit 6:
Evidence of Notice
a. Site Posting
b. Agency notices on file with staff
/944'C-\
CHUBBUCK
I D A H D
Sign posted January 24, 2025
290 E. Linden Avenue, Chubbuck, ID 83202
208.237.2430
www.CityofChubbuck.us
AFFIDAVIT OF LEGAL INTEREST
STATE OF iDAHO J
:ss
County of Bannock )
Devin Hillam — CDA 152 Evans
Name
Chubbuck Idaho
City
State
Address
Being first duly sworn upon
Oath, depose and say:
Being the owner of the property described on the attached sheet, I grant permission to:
Josh Ellis or Sunrise Engineering
Name
Address
To submit the following application(s) pertaining that property and to allow City Staff the ability to do an on-site
review of the site to inspect, measure, and record information related to the application:
❑ Administrative Variance ❑ Conditional Use Permit or CUP Amendment
❑ Variance ❑ Comprehensive Plan Map Amendment
❑ Annexation & Initial Zoning Request ❑ Planned Unit Development Designation or Amendment
0 Preliminary Plat ❑ Creative Community Designation or Amendment
SZ Final Plat ❑ Title Map Amendment (Rezone) to
I agree to indemnify, defend and hold the City of Chubbuck and its employees harmless from any claims to liability
resulting from any dispute as to statements contained herein or as to the ownership of the property which is the
subject of the application.
DATED this 6th day of November 12023
Signature
I, the undersigned, a Notary Public in and for the above-named county and state, do hereby certify that on
this day of VM19V 20 L�, personally appeared before me
t known to me to be the person described in and SUBSCRIBED AND
SWORE to me the day and year first written above .
Given under my hand and official seal the day andlsllti/I�fear above
/written,
MCC
(sea ,
OS Any
pus
?�fi P
Mo 2 �.
STS TE
.,,•• OF ,�.
�3FA'
SUNRISE Pocatello Office
600 East Oak Street, Pocatello, ID 832011 Tel: 208.234.0110 1 Fax: 208.234.0111
1/22/2025
Sean Harris, Development Services Manager
City of Chubbuck
290 East Linden Avenue
Chubbuck, ID 83202
RE: Chubbuck Village Division 1 — Preliminary Plat
Dear Sean,
With the phasing plan submitted to the city, we request to have the irrigation pump station on Lot 1, Block 2
of the Chubbuck Village Project, to be constructed in a future phase. A temporary drip irrigation system will
be provided in this phase for the landscape along Evans Lane and abandoned at the completion of all phases.
X
,
san, PhD, PE
Project Engineer