Loading...
HomeMy WebLinkAboutItem #5 City FeesCHUBBUCK 1 0 0 H 0 Public Works Department 290 E Linden Ave., Chubbuck, ID 83202 208.237.2430 www.CityofChubbuck.us Fee Schedule Beginning Oct. 1, 2025 (until otherwise amended by Council Resolution) DEPARTMENT CATEGORY TYPE Commercial Monthly Changesfor FEE FY25 Sanitation Bannock County Landfill Per Ton Disposal Fee $ 35.00 $ 15.58 Commercial Monthly 4 -Yard Container Rental (per Sanitation Residential Monthly User Rate Base Rate $ 18.44 Sanitation Residential Monthly User Rate Additional Residential Cart Base Rate $ 11.84 Sanitation Residential Monthly User Rate Residential Recycle Cart $ 5.00 Sanitation One Time Fee/per Service Residential Return Service Fee (per dump)* $ 8.66 Added a daily fee instead of Residential 3 -Yard 3 -Yard Container Rental (per only a monthly Sanitation Container day)** $ 0.52 fee Added this to Temporary show it's Residential 3 -Yard 3 -Yard Container (Dump & available for Sanitation Container Haul) $ 22.96 residential use Note: The fee to replace or repair carts damaged from customer misuse or vandalism (paint, stickers, etc.) will be the actual replacement or repair cost. * A Return Service Fee will be charged if service is requested even if cart is unserviceable (such as blocked, not out, etc.) and the cart is not dumped ** Container Rental does not include State sales tax. Commercial Monthly 3 -Yard Container Rental (per Sanitation User Rate month)* $ 15.58 Commercial Monthly 4 -Yard Container Rental (per Sanitation User Rate month)* $ 16.96 Commercial Monthly 6 -Yard Container Rental (per Sanitation User Rate month)* $ 18.71 Commercial Monthly 8 -Yard Container Rental (per Sanitation User Rate month)* $ 22.95 Commercial Monthly 3 -Yard Container (Dump & Sanitation User Rate Haul)** $ 91.84 Commercial Monthly 4 -Yard Container (Dump & Sanitation User Rate Haul)** $ 122.46 Changesfor DEPARTMENT CATEGORY TYPE FEE FY25 Commercial Monthly 6 -Yard Container (Dump & Sanitation User Rate Haul)** $ 183.68 Commercial Monthly 8 -Yard Container (Dump & Sanitation User Rate Haul)** $ 244.91 One Time Fee/per 3 -Yard Container (Extra Sanitation Service Unscheduled one-time dump) $ 22.96 One Time Fee/per 4 -Yard Container (Extra Sanitation Service Unscheduled one-time dump) $ 30.61 One Time Fee/per 6 -Yard Container (Extra Sanitation Service Unscheduled one-time dump) $ 45.92 One Time Fee/per 8 -Yard Container (Extra Sanitation Service Unscheduled one-time dump) $ 61.22 New fee when Commercial Container Locks to be Installed by City as Actual Material requested by Sanitation Locks Requested Costs plus $75.00 customer Notes: 1. If Container is moved or repositioned without approval from the City Sanitation Department, a $25 fee will be added to cover cost of moving the container to allow for servicing. 2. The fee to replace or repair containers damaged from customer misuse or vandalism (paint, stickers, etc.) will be the actual replacement or repair cost. 3. An extra one-time dump fee will be charged if an unscheduled service is requested even if container is unserviceable (such as blocked, not out, etc.) and the container is not dumped * Container Rental does not include State sales tax. ** Container service charge is based on one dump per week. For multiple services per week, the monthly charge will be multiplied by the number of services. For example, a 4 -Yard container serviced 3 times per week will have a charge of $122.46 x 3 plus rental fee Sanitation Roll -Off User Rate Daily Container Rental $ 3.63 Sanitation Roll -Off User Rate Monthly Container Rental $ 108.70 Sanitation Roll -Off User Rate Dump/Haul Fee (per service) $ 175.10 Sanitation Roll -Off User Rate Per Ton Disposal Fee $ 35.00 Prohibited Items (tires, Actual disposal cost Sanitation Roll -Off User Rate batteries, etc.) plus $10.00 Refrigeration Units (Appliances with Freon, freezers, refrigerators, AC Sanitation Roll -Off User Rate units, etc.) $ 25.00 Notes: 1. The fee to replace or repair containers damaged from customer misuse or vandalism (paint, stickers, etc.) will be the actual replacement or repair cost. 2. A $50 fee will be charged if service is requested but the container is unserviceable (such as blocked, empty, etc.) and the container is not dumped 2 Changesfor DEPARTMENT CATEGORY TYPE FEE FY25 Roll -Off Recycle User Pick-up and Haul Fee (per Sanitation Rate service) $ 95.00 Current Disposal Fee Roll -Off Recycle User from Receiving Sanitation Rate Per Ton Disposal Fee Facility Notes: 1. The fee to replace or repair containers damaged from customer misuse or vandalism (paint, stickers, etc.) will be the actual replacement or repair cost. 2. A $50 fee will be charged if service is requested but the container is unserviceable (such as blocked, empty, etc.) and the container is not dumped Notes: 1. If Container is moved or repositioned without approval from the City Sanitation Department, a $25 fee will be added to cover cost of moving the container to allow for servicing. 2. The fee to replace or repair containers damaged from customer misuse or vandalism (paint, stickers, etc.) will be the actual replacement or repair cost. 3 Cleanup Connection 3 Yard Container (per Sanitation Services reservation/service) $ 10.00 Cleanup Connection 15 -Yard Roll -off (per ton Sanitation Services disposal fee only) $ 35.00 Cleanup Connection Prohibited Items (tires, Actual disposal cost Sanitation Services batteries, etc.) plus $10.00 Refrigeration Units (Appliances with Freon, Cleanup Connection freezers, refrigerators, AC Sanitation Services units, etc.) $ 25.00 Notes: 1. If Container is moved or repositioned without approval from the City Sanitation Department, a $25 fee will be added to cover cost of moving the container to allow for servicing. 2. The fee to replace or repair containers damaged from customer misuse or vandalism (paint, stickers, etc.) will be the actual replacement or repair cost. 3 DEPARTMENT CATEGORY TYPE Right of Way Changesfor FEE FY25 Increased from $25 to cover a larger portion of Streets Construction Right of Way Permit $ 50.00 our costs Right of Way Right of Way Contractor Streets Construction License $ 25.00 Changesfor DEPARTMENT CATEGORY TYPE FEE FY25 5 Residential Base Rate (per Increased from Wastewater Monthly User Rate single family equivalent/EDU) $ 54.75 $2,550.00 per North West Sewer Interceptor Pocatello's fee Wastewater Pocatello Treatment Wastewater Connection (1" $ 10.45 (pass-through Wastewater Plant Capacity Fee water service) $ 2,640.00 fee) Wastewater Monthly User Rate EDU) $ 22.96 Increased from Commercial Volumetric (North $5,100.00 per Wastewater Monthly User Rate of 1-86) per 1,000 gallons $ 4.38 Pocatello's fee Pocatello Treatment Wastewater Connection (1.5" (pass-through Wastewater Plant Capacity Fee water service) $ 5,280.00 fee) Increased from Wastewater Monthly User Rate Billing Fee $ 1.74 $8,160.00 per Customers outside City Limits Pocatello's fee Pocatello Treatment Wastewater Connection (2" 1.5 Times Regular (pass-through Wastewater Plant Capacity Fee water service) $ 8,450.00 fee) Capacity Fee (per EDU To be determined Wastewater Pocatello Treatment Wastewater Connection N" individually by Wastewater Plant Capacity Fee water service) Pocatello 5 Residential Base Rate (per Increased 3.5% Wastewater Monthly User Rate single family equivalent/EDU) $ 54.75 per Rate Study North West Sewer Interceptor Wastewater Monthly User Rate (NWSI) per EDU $ 10.45 Commercial Base Charge (per Increased 3.5% Wastewater Monthly User Rate EDU) $ 22.96 per Rate Study Commercial Volumetric (North Increased 3.5% Wastewater Monthly User Rate of 1-86) per 1,000 gallons $ 4.38 per Rate Study Commercial Volumetric (South Increased 3.5% Wastewater Monthly User Rate of 1-86) per 1,000 gallons $ 5.72 per Rate Study Increased 3.5% Wastewater Monthly User Rate Billing Fee $ 1.74 per Rate Study Customers outside City Limits (Base Rate, NWSI, Volumetric 1.5 Times Regular Wastewater Monthly User Rate Charge) Rates Capacity Fee (per EDU Wastewater Capacity Fee Equivalent) - One-time charge $ 4,133.00 5 Changesfor DEPARTMENT CATEGORY TYPE FEE FY25 Residential and Commercial Increased 5% Monthly User Base Rate (3/4" and 1" Meter per Rate Study Water Rate Size) $ 30.57 Monthly User Residential and Commercial Increased 5% Water Rate Base Rate (1.5" Meter Size) $ 88.00 per Rate Study Monthly User Residential and Commercial Increased 5% Water Rate Base Rate (2" Meter Size) $ 136.20 per Rate Study Monthly User Residential and Commercial Increased 5% Water Rate Base Rate (3" Meter Size) $ 283.28 per Rate Study Monthly User Residential and Commercial Increased 5% Water Rate Base Rate (4" Meter Size) $ 464.28 per Rate Study Monthly User Residential and Commercial Increased 5% Water Rate Base Rate (6" Meter Size) $ 938.10 per Rate Study Monthly User Residential and Commercial Increased 5% Water Rate Base Rate (8" Meter Size) $ 1,469.18 per Rate Study Monthly User Residential and Commercial Increased 5% Water Rate Base Rate (10" Meter Size) $ 2,244.47 per Rate Study Monthly User Usage/Volume charge per Increased 5% Water Rate 1,000 gal $ 1.47 per Rate Study Customers outside City Limits Monthly User (Base Rate, Usage/Volume 1.5 Times Regular Water Rate Charge) Rates Increased 5% Water Connection/Capacity to match user Water Capacity Fee Fee (per 1" EDU) $ 2,600.00 rate increase Water New Meter Fee Meter Fee 1" - Materials* Actual Material Cost Meter Fee 2" Turbine - Water New Meter Fee Materials* Actual Material Cost Meter Fee 2" Compound - Water New Meter Fee Materials* Actual Material Cost To be determined Water New Meter Fee Meter Fee >2" - Materials* individually Added to fee Actual Costs, resolution to Customer including Materials cover Requested and Current Labor customer - Materials City Provided Materials and/or and Equipment requested Water and/or Labor Labor Billing Rates** work * Meter Fee is a one-time charge for the installation of a new meter on a new service line. Clarification ** Charges will be billed to the requesti 0 Added DEPARTMENT CATEGORY TYPE Changesfor FEE FY25 Pressurized Secondary Monthly User Residential Base Rate (per Irrigation Rate EDU) $ 16.10 Commercial/Multi- Pressurized Secondary Monthly User family/Non-typical Residential Irrigation Rate Base Rate (per EDU)* $ 16.10 Notes: 1. The Pressurized Secondary Irrigation Rate will be charged to customers when irrigation water is available in the system at the service connection/valve box on the property, whether the customer utilizes the irrigation water or not. 2. The Pressurized Secondary Irrigation Rate will be charged once per month for the entire year to provide a "flat rate", even when irrigation water is not available in the system such as during winter. * A single EDU will be based on an irrigated area of 6,235 square feet when determining Clarification Commercial, Multi -family, or non -typical residential rates. added 7 Public Works Department 290 E Linden Ave., Chubbuck, ID 83202 CHUBBUCK 208.237.2430 www.CityofChubbuck.us 1 0 A H 0 Fee Schedule Beginning Oct. 1, 2025 (until otherwise amended by Council Resolution) DEPARTMENT CATEGORY TYPE FEE Bannock County Sanitation Landfill Per Ton Disposal Fee $ 35.00 Residential Monthly Sanitation User Rate Base Rate $ 18.44 Residential Monthly Additional Residential Cart Sanitation User Rate Base Rate $ 11.84 Residential Monthly Sanitation User Rate Residential Recycle Cart $ 5.00 One Time Fee/per Residential Return Service Fee Sanitation Service (per dump)* $ 8.66 Residential 3-Yard 3-Yard Container Rental (per Sanitation Container day)** $ 0.52 Temporary Residential 3-Yard Container (Dump & Sanitation 3-Yard Container Haul) $ 22.96 Note: The fee to replace or repair carts damaged from customer misuse or vandalism (paint, stickers, etc.) will be the actual replacement or repair cost. * A Return Service Fee will be charged if service is requested even if cart is unserviceable (such as blocked, not out, etc.) and the cart is not dumped ** Container Rental does not include State sales tax. Commercial Monthly 3-Yard Container Rental (per Sanitation User Rate month)* $ 15.58 Commercial Monthly 4-Yard Container Rental (per Sanitation User Rate month)* $ 16.96 Commercial Monthly 6-Yard Container Rental (per Sanitation User Rate month)* $ 18.71 Commercial Monthly 8-Yard Container Rental (per Sanitation User Rate month)* $ 22.95 Commercial Monthly 3-Yard Container (Dump & Sanitation User Rate Haul)** $ 91.84 Commercial Monthly 4-Yard Container (Dump & Sanitation User Rate Haul)** $ 122.46 DEPARTMENT CATEGORY TYPE FEE Commercial Monthly 6 -Yard Container (Dump & Sanitation User Rate Haul)** $ 183.68 Commercial Monthly 8 -Yard Container (Dump & Sanitation User Rate Haul)** $ 244.91 One Time Fee/per 3 -Yard Container (Extra Sanitation Service Unscheduled one-time dump) $ 22.96 One Time Fee/per 4 -Yard Container (Extra Sanitation Service Unscheduled one-time dump) $ 30.61 One Time Fee/per 6 -Yard Container (Extra Sanitation Service Unscheduled one-time dump) $ 45.92 One Time Fee/per 8 -Yard Container (Extra Sanitation Service Unscheduled one-time dump) $ 61.22 Commercial Container Locks to be Installed by City as Actual Material Sanitation Locks Requested Costs plus $75.00 Notes: 1. If Container is moved or repositioned without approval from the City Sanitation Department, a $25 fee will be added to cover cost of moving the container to allow for servicing. 2. The fee to replace or repair containers damaged from customer misuse or vandalism (paint, stickers, etc.) will be the actual replacement or repair cost. 3. An extra one-time dump fee will be charged if an unscheduled service is requested even if container is unserviceable (such as blocked, not out, etc.) and the container is not dumped * Container Rental does not include State sales tax. ** Container service charge is based on one dump per week. For multiple services per week, the monthly charge will be multiplied by the number of services. For example, a 4 -Yard container serviced 3 times per week will have a charge of $122.46 x 3 plus rental fee Sanitation Roll -Off User Rate Daily Container Rental $ 3.63 Sanitation Roll -Off User Rate Monthly Container Rental $ 108.70 Sanitation Roll -Off User Rate Dump/Haul Fee (per service) $ 175.10 Sanitation Roll -Off User Rate Per Ton Disposal Fee $ 35.00 Prohibited Items (tires, Actual disposal cost Sanitation Roll -Off User Rate batteries, etc.) plus $10.00 Refrigeration Units (Appliances with Freon, freezers, refrigerators, AC Sanitation Roll -Off User Rate units, etc.) $ 25.00 Notes: 1. The fee to replace or repair containers damaged from customer misuse or vandalism (paint, stickers, etc.) will be the actual replacement or repair cost. 2. A $50 fee will be charged if service is requested but the container is unserviceable (such as blocked, empty, etc.) and the container is not dumped 2 DEPARTMENT CATEGORY TYPE FEE Roll -Off Recycle User Pick-up and Haul Fee (per Sanitation Rate service) $ 95.00 Current Disposal Fee Roll -Off Recycle User from Receiving Sanitation Rate Per Ton Disposal Fee Facility Notes: 1. The fee to replace or repair containers damaged from customer misuse or vandalism (paint, stickers, etc.) will be the actual replacement or repair cost. 2. A $50 fee will be charged if service is requested but the container is unserviceable (such as blocked, empty, etc.) and the container is not dumped Cleanup Connection 3 Yard Container (per Sanitation Services reservation/service) $ 10.00 Cleanup Connection 15 -Yard Roll -off (per ton Sanitation Services disposal fee only) $ 35.00 Cleanup Connection Prohibited Items (tires, Actual disposal cost Sanitation Services batteries, etc.) plus $10.00 Refrigeration Units (Appliances with Freon, Cleanup Connection freezers, refrigerators, AC Sanitation Services units, etc.) $ 25.00 Notes: 1. If Container is moved or repositioned without approval from the City Sanitation Department, a $25 fee will be added to cover cost of moving the container to allow for servicing. 2. The fee to replace or repair containers damaged from customer misuse or vandalism (paint, stickers, etc.) will be the actual replacement or repair cost. 3 DEPARTMENT CATEGORY TYPE FEE Right of Way Streets Construction Right of Way Permit $ 50.00 Right of Way Right of Way Contractor Streets Construction License $ 25.00 0 DEPARTMENT CATEGORY TYPE FEE Pocatello Treatment Wastewater Connection (1" Wastewater Plant Capacity Fee water service) $ 2,640.00 Pocatello Treatment Wastewater Connection (1.5" Wastewater Plant Capacity Fee water service) $ 5,280.00 Pocatello Treatment Wastewater Connection (2" Wastewater Plant Capacity Fee water service) $ 8,450.00 To be determined Pocatello Treatment Wastewater Connection (>2" individually by Wastewater Plant Capacity Fee water service) Pocatello Residential Base Rate (per Wastewater Monthly User Rate single family equivalent/EDU) $ 54.75 North West Sewer Interceptor Wastewater Monthly User Rate (NWSI) per EDU $ 10.45 Commercial Base Charge (per Wastewater Monthly User Rate EDU) $ 22.96 Commercial Volumetric (North Wastewater Monthly User Rate of 1-86) per 1,000 gallons $ 4.38 Commercial Volumetric (South Wastewater Monthly User Rate of 1-86) per 1,000 gallons $ 5.72 Wastewater Monthly User Rate Billing Fee $ 1.74 Customers outside City Limits (Base Rate, NWSI, Volumetric 1.5 Times Regular Wastewater Monthly User Rate Charge) Rates Capacity Fee (per EDU Wastewater Capacity Fee Equivalent) - One-time charge $ 4,133.00 5 DEPARTMENT CATEGORY TYPE FEE Residential and Commercial Monthly User Base Rate (3/4" and 1" Meter Water Rate Size) $ 30.57 Monthly User Residential and Commercial Water Rate Base Rate (1.5" Meter Size) $ 88.00 Monthly User Residential and Commercial Water Rate Base Rate (2" Meter Size) $ 136.20 Monthly User Residential and Commercial Water Rate Base Rate (3" Meter Size) $ 283.28 Monthly User Residential and Commercial Water Rate Base Rate (4" Meter Size) $ 464.28 Monthly User Residential and Commercial Water Rate Base Rate (6" Meter Size) $ 938.10 Monthly User Residential and Commercial Water Rate Base Rate (8" Meter Size) $ 1,469.18 Monthly User Residential and Commercial Water Rate Base Rate (10" Meter Size) $ 2,244.47 Monthly User Usage/Volume charge per Water Rate 1,000 gal $ 1.47 Customers outside City Limits Monthly User (Base Rate, Usage/Volume 1.5 Times Regular Water Rate Charge) Rates Water Connection/Capacity Water Capacity Fee Fee (per 1" EDU) $ 2,600.00 Water New Meter Fee Meter Fee 1" - Materials* Actual Material Cost Meter Fee 2" Turbine - Water New Meter Fee Materials* Actual Material Cost Meter Fee 2" Compound - Water New Meter Fee Materials* Actual Material Cost To be determined Water New Meter Fee Meter Fee >2" - Materials* individually Actual Costs, Customer including Materials Requested and Current Labor Materials City Provided Materials and/or and Equipment Water and/or Labor Labor Billing Rates** * Meter Fee is a one-time charge for the installation of a new meter on a new service line. ** Charges will be billed to the requesting party. 6 DEPARTMENT CATEGORY TYPE FEE Pressurized Secondary Monthly User Residential Base Rate (per Irrigation Rate EDU) $ 16.10 Commercial/Multi- Pressurized Secondary Monthly User family/Non-typical Residential Irrigation Rate Base Rate (per EDU)* $ 16.10 Notes: 1. The Pressurized Secondary Irrigation Rate will be charged to customers when irrigation water is available in the system at the service connection/valve box on the property, whether the customer utilizes the irrigation water or not. 2. The Pressurized Secondary Irrigation Rate will be charged once per month for the entire year to provide a "flat rate", even when irrigation water is not available in the system such as during winter. * A single EDU will be based on an irrigated area of 6,235 square feet when determining Commercial, Multi -family, or non -typical residential rates. 7 COMMUNITY SERVICES DEPARTMENT BUILDING DIVISION FEES Building Division Fees shall be as follows: BUILDING — RESIDENTIAL & COMMERCIAL Inspections outside of regular City Hall hours - $100 for first hour, Depends on Staff Availability: $47 per hour for every addition hour (in .5 hour increments rounded up). 1 hour minimum billing. Reinspection a second reinspection of a $90 required phase, per required inspection (i.e., a 3rd inspection). Charge is at the discretion of the Building Official: When work on a site that requires a permit Double the permit commences without first obtaining the fee (per building necessary permit: code) Demolition: $30 Additional Plan Review required by change, $23.50 for first hour, addition, or revision to approved plan: $47 per hour for every addition hour (in .5 hour increments rounded up). 1 hour minimum billing. Floodplain Development Permit (when $100 associated with a building permit): Sign Permit (including refacing sign): $25 Commented [DH1]: Clarification & Increase to account for inspections which may take longer than 1 hour Commented [DH2]: Modification to align with Building Code. Starting work without a permit = double cost. Commented [DH3]: Clarification & Increase to account for reviews which may take longer than 1 hour 'Building Permit Fees kincluding for solar panels)) are calculated using the formula below: commented [DH4]: Modification to remove set solar panel fee and to charge based on valuation. This aligns with VALUE FROM: VALUE T0: BASE FEE: FOR THE FIRST: PLUS: FOR EACH Pocatello practice and Pocatello performs the plan review and inspections per contract. V ADDITIONAL. $1 $500 $27.00 $501 $2,000 $29.00 $501 $1.50 $100 $2,001 $25,000 $54.50 $2,001 $9.00 $1,000 $25,001 $50,000 $262.50 $25,001 $7.50 $1,000 $50,001 $100,000 $446.00 $50,001 $5.50 $1,000 $100,001 $500,000 $718.00 $100,001 $3.50 $1,000 $500,001 $2,500.00 $500,001 $3.70 $1,000 BUILDING — RESIDENTIAL Residential Valuation shall be determined by using the following: Residence, each floor: Finished Basement: Unfinished Basement: Crawlspace: Decks: Covered Patio: Carport: Shed: Garage: $99 per square foot $20 per square foot $10 per square foot $5 per square foot $5 per square foot $10 per square foot $10 per square foot $15 per square foot $21 per square foot BUILDING — COMMERCIAL (INCLUDES APARTMENTS WITH 5+ UNITS) Plan Review Fee: 65% of the Building Permit Fee Commercial Valuation: Valuation shall be the declared value, which shall include the total value of the work for which a permit is being issued, including materials and labor. The Building Official may require documentation of the building permit valuation as necessary to ensure correct valuation of the project. ELECTRICAL - RESIDENTIAL Base Fee: $30 Temporary Service (each): $30 Permanent Service (each): $30 Service to 100 amps (each): $3 Service to 200 amps (each): $5 Service over 200 amps: $10 Number of Rooms (each): $2.50 Number of Circuits (each): $2.50 Space Heaters: $10 ELECTRICAL- COMMERCIAL (INCLUDES APARTMENTS WITH 5+ UNITS) Base Fee: $30 Temporary Service (each): $30 Permanent Service (each): $30 Fee based on Commercial Valuation up to $20,000: 2%bf wire costs up to $4001 - Commented [DHS]: Modification to align with City of Fee based on Commercial Valuation at and beyond $20,001: Modification to align with City of Pocatello since we contract with Pocatello for electrical Pocatello since we contract with permits Pocatello for electrical permits) -- Commented [DH6]: Modification to align with City of Sign & Outlet Base: $30 Pocatello since we contract with Pocatello for electrical permits; increase from last year's due to scrivener's error Sign (each): $3 Carnival, Circus, or Similar Event: $50 MECHANICAL- RESIDENTIAL & COMMERCIAL Base Fee: $30 Gas Piping - Up to 4 units: $5 High Pressure Gas Test: $10 Furnace up to 100k BTU: $5 3 Gas Water Heater, Flue Pipe (each): $5 Unit Heaters (each): $5 Fireplaces, Inserts, Stoves (each): $5 Commercial - Rooftop (each): $10 Commercial - Cooking Hood (each): $10 Commercial —Other Regulated Device (each): $10 PLUMBING - RESIDENTIAL Base Fee: $30 Plumbing Fixture (each): $6 Water Heater Replacement: $15 Lawn Sprinklers: $15 Water Line (Separate): $25 Sewer Line (Separate): $25 Water & Sewer Line (together): $40 PLUMBING — COMMERCIAL (INCLUDES APARTMENTS WITH 5+ UNITS) Base Fee: $30 Fee based on Commercial Valuation up to $20,000: �% of the total plumbing costs up to $20,000.000 Fee based on Commercial Valuation beyond $20,001: I$2% of the total plumbing costs valuation: up to $20,000.000, plus 1.5% of costs over $20,0011 Water Heater Replacement: $15 4 Commented [DH7]: Amended to align with Pocatello's fees since we contract with Pocatello for plumbing review and inspections - Commented [DH8]: Amended to align with Pocatello's fees since we contract with Pocatello for plumbing review and inspections EROSION & SEDIMENT CONTROL Single-family Residential Waived Development/Project less than 5 acre $50 Development/Project between 5-10 acres $100 Development/Project exceeding 10 acres: $150 CARD CONVENIENCE FEE & REFUNDS • There is a 3% fee for credit/debit card use. • Once a review has been commenced by City Staff, not including the application completeness review, no refunds shall be given of fees paid. • Where fees are billed at an hourly rate, 1 hour minimum is required and billed hours will be rounded up to the nearest''/: hour. o For example, a 2.3 hour long inspection will be charged for 2.5 hours. OTHER FEES NOT FOUND IN THIS SECTION: ■ Please see the Public Works' Fee schedule for fees such as wastewater and water connection and Commented [DH9]: Clarification about how we will assess hourly rate fees capacity fees, water meter fees, right-of-way permit fees, etc. ■ The City of Chubbuck has adopted Police, EMS, and Parks & Recreation Development Impact Fees. Contact the Building Division for applicable fees set by separate action of the City Council. 5 COMMUNITY SERVICES DEPARTMENT PLANNING DIVISION LA DEVELOPMENT SERVICES DIVISION Planning Division and Development Services Division Fees shall be as follows: PLANNING/LAND USE APPLICATIONS Annexation (also require a separate Initial Zoning application & fee): $165 Comprehensive Plan Amendment: $700 Conditional Use Permit, Application or Amendment: $585 Creative Community, Application or Amendment: $1,000 Design Review Clearance: $150 Initial Zoning Map Amendment (required with Annexation): $535 Variance, Administrative: $35 Variance, Application or Amendment: $340 Zoning Development Agreement: $200 Zoning Map Amendment (Title Map Amendment): $535 Zoning Text Amendment (Any language subject to LLUPA provisions of Idaho Code): $535 ZONING CERTIFICATION/COMPLIANCE LETTER Standard: $75 Expedited: $200 1 PUBLIC HEARING FEES Public Hearing Sign Deposit: $100; full or partial refund at Director's discretion depending on condition of sign when collected. Public Notice (if required by code Billed at cost of publication and $1.50 for each mailed for plat review): notice PLATS/PROJECTS & VACATIONS Preliminary Plat: $550 base plus $20 per lot Final Plat: $258 base plus $15 per lot Short Plat: $550 base plus $20 per lot Vacation (ROW, subdivision, easement, public $320 utilities): Traffic Impact Analysis Report Review: $500 Subdivision Public Improvement Warranty: 25% of estimated or actual costs for public improvements; to be submitted at the time that dedicated to City is requested. See section 17.16.070 of City Code. Commented [DH7]: From code, added into this list Water and/or Sewer System Distribution $5001 Commented [DH2]: New fee to account for consultant Modeling (as needed): review costs Concurrent Construction Agreement Substantial Completion Guarantee Agreement Development Agreement (When Required) APPEALS & REQUESTS FOR RECONSIDERATION: $1,500 � 150% of estimated cost of project completion. Guarantee subject to return in accordance with section 17.16.050 of City Code.l Commented [DH3]: From code, added in to this list $300 agreement fee � 150% of estimated cost of completion. Guarantee subject to return in accordance with section 17.16.050 of City Code.l Commented [DH4]: From code, added in to this list $200 Appeal of LUDC decision to the City Council: $150 Request for Reconsideration of City Council $150 each request Commented [DH5]: Added clarification Decision: 2 EROSION & SEDIMENT CONTROL Single-family Residential Waived Development/Project less than 5 acre $50 Development/Project between 5-10 acres $100 Development/Project exceeding 10 acres: $150 PLAN REVIEW & INSPECTIONS • Stormwater Plans Less than 1.5 acres 1.5 to 10 acres 10 to 20 acres Greater than 20 acres $48 $96 $136 $192 • IPublic Improvement Plan Review o Initial Review: $500 plus $20 per lot • Additional Reviews: $150 per additional review to be paid prior to review occurring. • For County Inspections: Add 10% to fees • Inspections (When Associated with a Plat or Commercial/Multi-Family Project) o Primary Inspection: Consisting of inspection and preparation of what is commonly referred to as a "punch list" of unsatisfactory items, if any, and one (1) follow-up inspection for the items on the punch list. 1-3 lots 4-10 lots 11-20 lots 21+ lots $500 $185 per lot $175 per lot $165 per lot o Subsequent Inspections: $150 per trip to the site o For County Inspections: Add 15% to fees) • Floodplain Development Permit (when associated with a development/plat): $200 • Single Lot (Residential or Commercial) Construction Inspections: o Sidewalk: $20 • Subsequent Inspection: $15 • For County Inspections: Add 15% to fees 3 Commented [DH6]: New fees to account for staff time & equipment o Pressurized Secondary Irrigation: $20 • Subsequent Inspection: $15 • For County Inspections: Add 15% to fees Water Service: $20 • Subsequent Inspection: $15 • For County Inspections: Add 15% to fees o Swale Irrigation: $20 • Subsequent Inspection: $15 • For County Inspections: Add 15% to fees LATECOMER FEE: • $350 o For developers who request that the City assess and collect a pro -rated reimbursement from adjoining landowners of costs of the public improvements which said developers are required to install and which directly benefit the adjoining land; Fee includes the cost of preparing and recording releases when owners of adjoining lands have paid their share of the assessed costs. CARD CONVENIENCE FEE & REFUNDS Commented [DH7]: New fees to account for staff time and equipment use • There is a 3% fee for credit/debit card use. • Once a review has been commenced by City Staff, not including the application completeness review, no refunds shall be given of fees paid. Commented [DH8]: Clarification pertaining to refunds COMMUNITY SERVICES DEPARTMENT PARKS & RECREATION DIVISION FEES Parks & Recreation Fees shall be as follows: SHELTER/PAVILION RENTAL (WATER & POWER AVAILABLE): o Cancellation Fee: Cancellations are subject to a $10 fee to be withheld from refund. o Clean Up Fee: All shelters & pavilions are subject to a Clean Up Fee ($50 minimum) if the reserved space is left messy or in disrepair.) Commented [DHt]: Newfee to accountfor staff costs o All other shelters/pavilions first come, first served. FACILITY RESERVATIONS & USE • Osborn Tennis Complex at Capell Park 0 48-hour key rental to Chubbuck Resident: Free o Annual Key Rental, April 1st— October 31't: $20 o Annual Key Rental, April 1"— October 31't , if key not returned in the prior o Court use for private organization: $2 per court, per hour{ o All fees are non-refundable • Cotant Park Baseball Complex (6 fields): $330 per day o INon-refundable unless cancelled 10 days prior to reservation o If eligible for refund upon cancellation, $10/day is non-refundablel • Capell Park Softball Complex (3 fields): $165 per day o INon-refundable unless cancelled 10 days prior to reservation o If eligible for refund upon cancellation, $10/day is non-refundablel LEAGUE, EVENT, & COURSE REGISTRATION • Recreational Leagues Commented [DH2]: First increase in years, to help account for court maintenance costs Commented [DH3]: First increase in years, to help account for court maintenance costs Commented [DH4]: New fee; aligns with what local tennis club has paid us for use, historically, however. Commented [DHS]: Clarification of cost. Tournaments use all fields; in the past the fee was based on a per field basis; the new fee is a reservation of all fields as one complex. Commented [DH6]: Clarifying refunds to account for city costs w/ staffing and materials preparation Commented [DH7]: Clarification of cost. Tournaments use all fields; in the past the fee was based on a per field basis; the new fee is a reservation of all fields as one complex. Commented [DH8]: Clarifying refunds to account for city costs w/ staffing and materials preparation M -Th 10AM-4PM M -Th 4PM-9 PM M—Th 10AM-4PM F—Su 10 AM -4 PM F—Su 4PM-9 PM F—Su LOAM -9 PM Bicentennial Shelter/Pavilion $30 $50 $75 $40 $60 $85 Cotant Gazebo $35 $55 $80 $45 $55 $90 Heritage $30 $50 $75 $40 $60 $85 o Cancellation Fee: Cancellations are subject to a $10 fee to be withheld from refund. o Clean Up Fee: All shelters & pavilions are subject to a Clean Up Fee ($50 minimum) if the reserved space is left messy or in disrepair.) Commented [DHt]: Newfee to accountfor staff costs o All other shelters/pavilions first come, first served. FACILITY RESERVATIONS & USE • Osborn Tennis Complex at Capell Park 0 48-hour key rental to Chubbuck Resident: Free o Annual Key Rental, April 1st— October 31't: $20 o Annual Key Rental, April 1"— October 31't , if key not returned in the prior o Court use for private organization: $2 per court, per hour{ o All fees are non-refundable • Cotant Park Baseball Complex (6 fields): $330 per day o INon-refundable unless cancelled 10 days prior to reservation o If eligible for refund upon cancellation, $10/day is non-refundablel • Capell Park Softball Complex (3 fields): $165 per day o INon-refundable unless cancelled 10 days prior to reservation o If eligible for refund upon cancellation, $10/day is non-refundablel LEAGUE, EVENT, & COURSE REGISTRATION • Recreational Leagues Commented [DH2]: First increase in years, to help account for court maintenance costs Commented [DH3]: First increase in years, to help account for court maintenance costs Commented [DH4]: New fee; aligns with what local tennis club has paid us for use, historically, however. Commented [DHS]: Clarification of cost. Tournaments use all fields; in the past the fee was based on a per field basis; the new fee is a reservation of all fields as one complex. Commented [DH6]: Clarifying refunds to account for city costs w/ staffing and materials preparation Commented [DH7]: Clarification of cost. Tournaments use all fields; in the past the fee was based on a per field basis; the new fee is a reservation of all fields as one complex. Commented [DH8]: Clarifying refunds to account for city costs w/ staffing and materials preparation o (Boys Baseball: $110 • Fee waived for 1 child of a league commissioner • $80 refund if requested between registration date and 1 day prior to tryouts; no refund thereafter.) o Oirls Fastpitch Softball: $85 • Fee waived for 1 child of a league commissioner • $55 refund if requested between registration date and 1 day prior to tryouts; no refund thereafter. o (Backyard Baseball: (T -ball & pitching machine): $70 • Fee waived for 1 child of a league commissioner ■ $45 refund if requested during regular registration period.) o Late Registration Fee, all leagues; $40 (non-refundable) • Chubbuck Days: o Festival Vendor Space (non-refundable) • Power: $40 (limited amount available) • No Power: $25I • Instructional Courses: Billed at City's cost EVENT & TOURNAMENT SERVICES/FACILITIES: 100 — 300 people 301— 500 people Restroom maintenance and $25/hour, 1 hour $50/hour, 1 hour garbage removal for events & minimum minimum tournaments: 501+ people $75/hour, 1 hour minimum At least 1 hour of cleanup time after an event will be added for events lasting longer than 4 hours., • Additional Picnic Tables (not already on a site): $5 per table per day o Depends on staff and table availability o (Non-refundable if canceled within 3 days of requested date) • Additional Trash Cans (not already on a site): $3 per trash can per day 0 1 can is required for every 40 persons in attendance. o Non-refundable if canceled within 3 days of requested datel Commented [DH9]: Increased fee from $93 to $110 to account for maintenance costs and increased ballfield staffing costs; codifying the league's practice of waiving 1 child per commissioner and clarifying the refund policy based on program costs. Commented [DH10]: Increased fee from $53 to $85 to account for maintenance costs and increased ballfield staffing costs; codifying the league's practice of waiving 1 child per commissioner and clarifying the refund policy based on program costs. Commented [DH71]: Increased fee from $43 to $70 to account for maintenance costs and increased ballfield staffing costs; codifying the league's practice of waiving 1 child per commissioner and clarifying the refund policy based on program costs. Commented [DH12]: Increased fees to account for limited number of spaces available and market demand, and to account for some staff and materials costs in administering the festival. Commented [DH13]: Our current fees are much too low, particularly on day long/weekend long events. This fee will include tournaments and events and will help account for short events and long events fairly. Commented [DH14]: Clarifies refund policy to account for workload changes Commented [DH1 S]: Clarifies refund policy to account for workload changes, and sets a standard for trash cans (in Water Use at City Park (For water not associated with a reservable pavilion or shelter): the past, reservation holders haven't requested enough and the result is trash overflowing in parks) 0 5 hour period: $25 o Full Day: $50 o (Non-refundable if canceled within 3 days of requested date) Commented [DH16]: Clarifies refund policy to account for workload changes Portable toilets as required or requested: Billed at City's cost o 11 bathroom stall is required for every 50 people Example: If an event will have 300 people in attendance and 2 permanent bathroom stalls are on site, 4 additional portable toilets will be required. o Non-refundable if cancelled within 7 days of a reservation start date) • (Ball Field Preparation prior to tournament start, including striping: $30 per field o Fields will be prepped by City the night before non -City tournaments and the fee will be automatically assessed unless the reservation holder agreed in writing that the field prep is not necessary.) • Ball Field Preparation during tournament, including striping: Service not available (Portable Pitching Mound Use (Cotant Park Complex; red field and orange field): $100 per day, per mound, if on a field already. o During the Chubbuck Boys Baseball season and tournament, there are portable pitching mounds on 2 fields in Cotant Park. Due to the large weight and size of the mounds, they will not be moved during the dates in which the City league plays; if a non -city league or organization wishes to use a field with either of the portable pitching mounds, the payment of the fee is required to account for usage. 0 100% refundable. o Pitching mounds will not be relocated from where they are placed during the season. Portable Pitching Mound Use (Cotant Park Complex; red field and orange field): $200 per day, per mound, if not on a field already. o If the mounds are not a field already and a non -city organization wishes to use the portable pitching mounds, due to the large weight and size of the mounds, the fee is increased to account for usage and transportation from storage. Depends on staff availability Non-refundable if cancelled within 3 days of a reservation) • penalty for Metal Cleats: No metal cleats are permitted on the portable pitching mound; if damage occurs to a mound, the reserving party is responsible for repair/replacement, or a penalty of $1,000, whichever is greater. • Ball Field Maintenance Tool Use (Cotant Park Complex & Capell Park Complex): $25/day and a $500 deposit. o Full or partial deposit refund available at Director's discretion depending on condition of tools/building after use. o The Director has the right to refuse anyone tool use based on prior history. SPONSORSHIP OPPORTUNITIES • (Movies in the Park: Based on City's Cost • Recreational Leagues/Facilities (Levels): o Silver: $50 - $249 Commented [DH17]: Clarifying how many restrooms are required based on the expected attendance so that facilities do not get overwhelmed Commented [DH18]: This has been provided in the past without cost but to prep a field can take between .75 and 2 hours. This will account for staff time to ensure that when a tournament begins, it is in great shape. Commented [DH19]: New fee to reflect wear and tear on expensive mounds Commented [DH20]: New fee to reflect wear and tear on expensive mounds and transportation costs (very heavy and awkwardly shaped) Commented [DH21]: Newfee/penaltytoreflectcosts borne to repair/replace damaged mounds o Gold: $250/300 - $799 • ($300 minimum for first year Gold sponsors to account for sign costs) o Platinum: $800-$1,500 o Diamond: $1,501-$9,9999 o Mayor's Club: $10,000+ • May sponsor league(s) or facility) ADDITIONAL FEES AS NOT LISTED ABOVE • The Community Services Director shall have the authority to set rates for additional programs, special programs, group events, or uses, and other occasional activities not listed above as the need arises in consideration of City costs. Decisions of the Director may be appealed to the City Council at a regular meeting. CARD CONVENIENCE FEE, SALES TAX, & MISCELLANEOUS: • All fees listed herein include sales tax, where applicable. • There is a 3% fee for credit/debit card use. • rVhere fees are billed at an hourly rate, 1 hour minimum is required and billed hours will be rounded up to the nearest''/: hour. o For example, a 2.3 hour long event will be charged for 2.5 hours. Commented [DH22]: Not new but rather, adding to this list to codify the minimum sponsorship levels Commented [DH23]: Clarification about how we will assess hourly rate fees