Fee Schedule Beginning Oct. 1,
2025 (until otherwise amended by
Council Resolution)
DEPARTMENT
CATEGORY
TYPE
Commercial Monthly
Changesfor
FEE FY25
Sanitation
Bannock County
Landfill
Per Ton Disposal Fee
$
35.00
$
15.58
Commercial Monthly
4 -Yard Container Rental (per
Sanitation
Residential Monthly
User Rate
Base Rate
$
18.44
Sanitation
Residential Monthly
User Rate
Additional Residential Cart
Base Rate
$
11.84
Sanitation
Residential Monthly
User Rate
Residential Recycle Cart
$
5.00
Sanitation
One Time Fee/per
Service
Residential Return Service Fee
(per dump)*
$
8.66
Added a daily
fee instead of
Residential 3 -Yard 3 -Yard Container Rental (per only a monthly
Sanitation Container day)** $ 0.52 fee
Added this to
Temporary show it's
Residential 3 -Yard 3 -Yard Container (Dump & available for
Sanitation Container Haul) $ 22.96 residential use
Note: The fee to replace or repair carts damaged from customer misuse or vandalism (paint,
stickers, etc.) will be the actual replacement or repair cost.
* A Return Service Fee will be charged if service is requested even if cart is unserviceable (such as
blocked, not out, etc.) and the cart is not dumped
** Container Rental does not include State sales tax.
Commercial Monthly
3 -Yard Container Rental (per
Sanitation
User Rate
month)*
$
15.58
Commercial Monthly
4 -Yard Container Rental (per
Sanitation
User Rate
month)*
$
16.96
Commercial Monthly
6 -Yard Container Rental (per
Sanitation
User Rate
month)*
$
18.71
Commercial Monthly
8 -Yard Container Rental (per
Sanitation
User Rate
month)*
$
22.95
Commercial Monthly
3 -Yard Container (Dump &
Sanitation
User Rate
Haul)**
$
91.84
Commercial Monthly
4 -Yard Container (Dump &
Sanitation
User Rate
Haul)**
$
122.46
Changesfor
DEPARTMENT CATEGORY TYPE FEE FY25
Commercial Monthly 6 -Yard Container (Dump &
Sanitation User Rate Haul)** $ 183.68
Commercial Monthly 8 -Yard Container (Dump &
Sanitation User Rate Haul)** $ 244.91
One Time Fee/per 3 -Yard Container (Extra
Sanitation Service Unscheduled one-time dump) $ 22.96
One Time Fee/per 4 -Yard Container (Extra
Sanitation Service Unscheduled one-time dump) $ 30.61
One Time Fee/per 6 -Yard Container (Extra
Sanitation Service Unscheduled one-time dump) $ 45.92
One Time Fee/per 8 -Yard Container (Extra
Sanitation Service Unscheduled one-time dump) $ 61.22
New fee when
Commercial Container Locks to be Installed by City as Actual Material requested by
Sanitation Locks Requested Costs plus $75.00 customer
Notes:
1. If Container is moved or repositioned without approval from the City Sanitation
Department, a $25 fee will be added to cover cost of moving the container to allow for
servicing.
2. The fee to replace or repair containers damaged from customer misuse or vandalism (paint,
stickers, etc.) will be the actual replacement or repair cost.
3. An extra one-time dump fee will be charged if an unscheduled service is requested even if
container is unserviceable (such as blocked, not out, etc.) and the container is not dumped
* Container Rental does not include State sales tax.
** Container service charge is based on one dump per week. For multiple services per week,
the monthly charge will be multiplied by the number of services. For example, a 4 -Yard
container serviced 3 times per week will have a charge of $122.46 x 3 plus rental fee
Sanitation Roll -Off User Rate Daily Container Rental $ 3.63
Sanitation Roll -Off User Rate Monthly Container Rental $ 108.70
Sanitation Roll -Off User Rate Dump/Haul Fee (per service) $ 175.10
Sanitation Roll -Off User Rate Per Ton Disposal Fee $ 35.00
Prohibited Items (tires, Actual disposal cost
Sanitation Roll -Off User Rate batteries, etc.) plus $10.00
Refrigeration Units
(Appliances with Freon,
freezers, refrigerators, AC
Sanitation Roll -Off User Rate units, etc.) $ 25.00
Notes:
1. The fee to replace or repair containers damaged from customer misuse or vandalism (paint,
stickers, etc.) will be the actual replacement or repair cost.
2. A $50 fee will be charged if service is requested but the container is unserviceable (such as
blocked, empty, etc.) and the container is not dumped
2
Changesfor
DEPARTMENT CATEGORY TYPE FEE FY25
Roll -Off Recycle User Pick-up and Haul Fee (per
Sanitation Rate service) $ 95.00
Current Disposal Fee
Roll -Off Recycle User from Receiving
Sanitation Rate Per Ton Disposal Fee Facility
Notes:
1. The fee to replace or repair containers damaged from customer misuse or vandalism (paint,
stickers, etc.) will be the actual replacement or repair cost.
2. A $50 fee will be charged if service is requested but the container is unserviceable (such as
blocked, empty, etc.) and the container is not dumped
Notes:
1. If Container is moved or repositioned without approval from the City Sanitation
Department, a $25 fee will be added to cover cost of moving the container to allow for
servicing.
2. The fee to replace or repair containers damaged from customer misuse or vandalism (paint,
stickers, etc.) will be the actual replacement or repair cost.
3
Cleanup Connection
3 Yard Container (per
Sanitation
Services
reservation/service)
$ 10.00
Cleanup Connection
15 -Yard Roll -off (per ton
Sanitation
Services
disposal fee only)
$ 35.00
Cleanup Connection
Prohibited Items (tires,
Actual disposal cost
Sanitation
Services
batteries, etc.)
plus $10.00
Refrigeration Units
(Appliances with Freon,
Cleanup Connection
freezers, refrigerators, AC
Sanitation
Services
units, etc.)
$ 25.00
Notes:
1. If Container is moved or repositioned without approval from the City Sanitation
Department, a $25 fee will be added to cover cost of moving the container to allow for
servicing.
2. The fee to replace or repair containers damaged from customer misuse or vandalism (paint,
stickers, etc.) will be the actual replacement or repair cost.
3
DEPARTMENT CATEGORY TYPE
Right of Way
Changesfor
FEE FY25
Increased from
$25 to cover a
larger portion of
Streets Construction Right of Way Permit $ 50.00 our costs
Right of Way Right of Way Contractor
Streets Construction License $ 25.00
Changesfor
DEPARTMENT CATEGORY TYPE FEE FY25
5
Residential Base Rate (per
Increased from
Wastewater
Monthly User Rate
single family equivalent/EDU)
$ 54.75
$2,550.00 per
North West Sewer Interceptor
Pocatello's fee
Wastewater
Pocatello Treatment
Wastewater Connection (1"
$ 10.45
(pass-through
Wastewater
Plant Capacity Fee
water service)
$ 2,640.00
fee)
Wastewater
Monthly User Rate
EDU)
$ 22.96
Increased from
Commercial Volumetric (North
$5,100.00 per
Wastewater
Monthly User Rate
of 1-86) per 1,000 gallons
$ 4.38
Pocatello's fee
Pocatello Treatment
Wastewater Connection (1.5"
(pass-through
Wastewater
Plant Capacity Fee
water service)
$ 5,280.00
fee)
Increased from
Wastewater
Monthly User Rate
Billing Fee
$ 1.74
$8,160.00 per
Customers outside City Limits
Pocatello's fee
Pocatello Treatment
Wastewater Connection (2"
1.5 Times Regular
(pass-through
Wastewater
Plant Capacity Fee
water service)
$ 8,450.00
fee)
Capacity Fee (per EDU
To be determined
Wastewater
Pocatello Treatment
Wastewater Connection N"
individually by
Wastewater
Plant Capacity Fee
water service)
Pocatello
5
Residential Base Rate (per
Increased 3.5%
Wastewater
Monthly User Rate
single family equivalent/EDU)
$ 54.75
per Rate Study
North West Sewer Interceptor
Wastewater
Monthly User Rate
(NWSI) per EDU
$ 10.45
Commercial Base Charge (per
Increased 3.5%
Wastewater
Monthly User Rate
EDU)
$ 22.96
per Rate Study
Commercial Volumetric (North
Increased 3.5%
Wastewater
Monthly User Rate
of 1-86) per 1,000 gallons
$ 4.38
per Rate Study
Commercial Volumetric (South
Increased 3.5%
Wastewater
Monthly User Rate
of 1-86) per 1,000 gallons
$ 5.72
per Rate Study
Increased 3.5%
Wastewater
Monthly User Rate
Billing Fee
$ 1.74
per Rate Study
Customers outside City Limits
(Base Rate, NWSI, Volumetric
1.5 Times Regular
Wastewater
Monthly User Rate
Charge)
Rates
Capacity Fee (per EDU
Wastewater
Capacity Fee
Equivalent) - One-time charge
$ 4,133.00
5
Changesfor
DEPARTMENT CATEGORY TYPE FEE FY25
Residential and Commercial Increased 5%
Monthly User Base Rate (3/4" and 1" Meter per Rate Study
Water
Rate
Size)
$
30.57
Monthly User
Residential and Commercial
Increased 5%
Water
Rate
Base Rate (1.5" Meter Size)
$
88.00
per Rate Study
Monthly User
Residential and Commercial
Increased 5%
Water
Rate
Base Rate (2" Meter Size)
$
136.20
per Rate Study
Monthly User
Residential and Commercial
Increased 5%
Water
Rate
Base Rate (3" Meter Size)
$
283.28
per Rate Study
Monthly User
Residential and Commercial
Increased 5%
Water
Rate
Base Rate (4" Meter Size)
$
464.28
per Rate Study
Monthly User
Residential and Commercial
Increased 5%
Water
Rate
Base Rate (6" Meter Size)
$
938.10
per Rate Study
Monthly User
Residential and Commercial
Increased 5%
Water
Rate
Base Rate (8" Meter Size)
$
1,469.18
per Rate Study
Monthly User
Residential and Commercial
Increased 5%
Water
Rate
Base Rate (10" Meter Size)
$
2,244.47
per Rate Study
Monthly User
Usage/Volume charge per
Increased 5%
Water
Rate
1,000 gal
$ 1.47
per Rate Study
Customers outside City Limits
Monthly User
(Base Rate, Usage/Volume
1.5 Times Regular
Water
Rate
Charge)
Rates
Increased 5%
Water Connection/Capacity to match user
Water Capacity Fee Fee (per 1" EDU) $ 2,600.00 rate increase
Water New Meter Fee Meter Fee 1" - Materials* Actual Material Cost
Meter Fee 2" Turbine -
Water New Meter Fee Materials* Actual Material Cost
Meter Fee 2" Compound -
Water New Meter Fee Materials* Actual Material Cost
To be determined
Water New Meter Fee Meter Fee >2" - Materials* individually
Added to fee
Actual Costs, resolution to
Customer including Materials cover
Requested and Current Labor customer -
Materials City Provided Materials and/or and Equipment requested
Water and/or Labor Labor Billing Rates** work
* Meter Fee is a one-time charge for the installation of a new meter on a new service line.
Clarification
** Charges will be billed to the requesti
0
Added
DEPARTMENT CATEGORY TYPE
Changesfor
FEE FY25
Pressurized Secondary Monthly User Residential Base Rate (per
Irrigation Rate EDU) $ 16.10
Commercial/Multi-
Pressurized Secondary Monthly User family/Non-typical Residential
Irrigation Rate Base Rate (per EDU)* $ 16.10
Notes:
1. The Pressurized Secondary Irrigation Rate will be charged to customers when irrigation
water is available in the system at the service connection/valve box on the property,
whether the customer utilizes the irrigation water or not.
2. The Pressurized Secondary Irrigation Rate will be charged once per month for the entire year
to provide a "flat rate", even when irrigation water is not available in the system such as
during winter.
* A single EDU will be based on an irrigated area of 6,235 square feet when determining Clarification
Commercial, Multi -family, or non -typical residential rates. added
7
Public Works Department
290 E Linden Ave., Chubbuck, ID 83202
CHUBBUCK
208.237.2430
www.CityofChubbuck.us
1 0 A H 0
Fee Schedule Beginning Oct. 1,
2025 (until otherwise amended by
Council
Resolution)
DEPARTMENT CATEGORY
TYPE
FEE
Bannock County
Sanitation Landfill
Per Ton Disposal Fee
$ 35.00
Residential Monthly
Sanitation User Rate
Base Rate
$ 18.44
Residential Monthly
Additional Residential Cart
Sanitation User Rate
Base Rate
$ 11.84
Residential Monthly
Sanitation User Rate
Residential Recycle Cart
$ 5.00
One Time Fee/per
Residential Return Service Fee
Sanitation Service
(per dump)*
$ 8.66
Residential 3-Yard
3-Yard Container Rental (per
Sanitation Container
day)**
$ 0.52
Temporary Residential 3-Yard Container (Dump &
Sanitation 3-Yard Container
Haul)
$ 22.96
Note: The fee to replace or repair carts damaged from customer misuse or vandalism (paint,
stickers, etc.) will be the actual replacement
or repair cost.
* A Return Service Fee will be charged if service is requested even if cart is unserviceable
(such as
blocked, not out, etc.) and the cart is not dumped
** Container Rental does not include State sales tax.
Commercial Monthly
3-Yard Container Rental (per
Sanitation User Rate
month)*
$ 15.58
Commercial Monthly
4-Yard Container Rental (per
Sanitation User Rate
month)*
$ 16.96
Commercial Monthly
6-Yard Container Rental (per
Sanitation User Rate
month)*
$ 18.71
Commercial Monthly
8-Yard Container Rental (per
Sanitation User Rate
month)*
$ 22.95
Commercial Monthly
3-Yard Container (Dump &
Sanitation User Rate
Haul)**
$ 91.84
Commercial Monthly
4-Yard Container (Dump &
Sanitation User Rate
Haul)**
$ 122.46
DEPARTMENT CATEGORY TYPE FEE
Commercial Monthly 6 -Yard Container (Dump &
Sanitation User Rate Haul)** $ 183.68
Commercial Monthly 8 -Yard Container (Dump &
Sanitation User Rate Haul)** $ 244.91
One Time Fee/per 3 -Yard Container (Extra
Sanitation Service Unscheduled one-time dump) $ 22.96
One Time Fee/per 4 -Yard Container (Extra
Sanitation Service Unscheduled one-time dump) $ 30.61
One Time Fee/per 6 -Yard Container (Extra
Sanitation Service Unscheduled one-time dump) $ 45.92
One Time Fee/per 8 -Yard Container (Extra
Sanitation Service Unscheduled one-time dump) $ 61.22
Commercial Container Locks to be Installed by City as Actual Material
Sanitation Locks Requested Costs plus $75.00
Notes:
1. If Container is moved or repositioned without approval from the City Sanitation
Department, a $25 fee will be added to cover cost of moving the container to allow for
servicing.
2. The fee to replace or repair containers damaged from customer misuse or vandalism (paint,
stickers, etc.) will be the actual replacement or repair cost.
3. An extra one-time dump fee will be charged if an unscheduled service is requested even if
container is unserviceable (such as blocked, not out, etc.) and the container is not dumped
* Container Rental does not include State sales tax.
** Container service charge is based on one dump per week. For multiple services per week,
the monthly charge will be multiplied by the number of services. For example, a 4 -Yard
container serviced 3 times per week will have a charge of $122.46 x 3 plus rental fee
Sanitation Roll -Off User Rate Daily Container Rental
$ 3.63
Sanitation Roll -Off User Rate Monthly Container Rental
$ 108.70
Sanitation Roll -Off User Rate Dump/Haul Fee (per service)
$ 175.10
Sanitation Roll -Off User Rate Per Ton Disposal Fee
$ 35.00
Prohibited Items (tires,
Actual disposal cost
Sanitation Roll -Off User Rate batteries, etc.)
plus $10.00
Refrigeration Units
(Appliances with Freon,
freezers, refrigerators, AC
Sanitation Roll -Off User Rate units, etc.)
$ 25.00
Notes:
1. The fee to replace or repair containers damaged from customer misuse or vandalism (paint,
stickers, etc.) will be the actual replacement or repair cost.
2. A $50 fee will be charged if service is requested but the container is unserviceable (such as
blocked, empty, etc.) and the container is not dumped
2
DEPARTMENT CATEGORY TYPE FEE
Roll -Off Recycle User Pick-up and Haul Fee (per
Sanitation Rate service) $ 95.00
Current Disposal Fee
Roll -Off Recycle User from Receiving
Sanitation Rate Per Ton Disposal Fee Facility
Notes:
1. The fee to replace or repair containers damaged from customer misuse or vandalism (paint,
stickers, etc.) will be the actual replacement or repair cost.
2. A $50 fee will be charged if service is requested but the container is unserviceable (such as
blocked, empty, etc.) and the container is not dumped
Cleanup Connection 3 Yard Container (per
Sanitation Services reservation/service) $ 10.00
Cleanup Connection 15 -Yard Roll -off (per ton
Sanitation Services disposal fee only) $ 35.00
Cleanup Connection Prohibited Items (tires, Actual disposal cost
Sanitation Services batteries, etc.) plus $10.00
Refrigeration Units
(Appliances with Freon,
Cleanup Connection freezers, refrigerators, AC
Sanitation Services units, etc.) $ 25.00
Notes:
1. If Container is moved or repositioned without approval from the City Sanitation
Department, a $25 fee will be added to cover cost of moving the container to allow for
servicing.
2. The fee to replace or repair containers damaged from customer misuse or vandalism (paint,
stickers, etc.) will be the actual replacement or repair cost.
3
DEPARTMENT CATEGORY TYPE
FEE
Right of Way
Streets Construction Right of Way Permit $ 50.00
Right of Way Right of Way Contractor
Streets Construction License $ 25.00
0
DEPARTMENT
CATEGORY
TYPE
FEE
Pocatello Treatment
Wastewater Connection (1"
Wastewater
Plant Capacity Fee
water service)
$ 2,640.00
Pocatello Treatment
Wastewater Connection (1.5"
Wastewater
Plant Capacity Fee
water service)
$ 5,280.00
Pocatello Treatment
Wastewater Connection (2"
Wastewater
Plant Capacity Fee
water service)
$ 8,450.00
To be determined
Pocatello Treatment
Wastewater Connection (>2"
individually by
Wastewater
Plant Capacity Fee
water service)
Pocatello
Residential Base Rate (per
Wastewater
Monthly User Rate
single family equivalent/EDU)
$ 54.75
North West Sewer Interceptor
Wastewater
Monthly User Rate
(NWSI) per EDU
$ 10.45
Commercial Base Charge (per
Wastewater
Monthly User Rate
EDU)
$ 22.96
Commercial Volumetric (North
Wastewater
Monthly User Rate
of 1-86) per 1,000 gallons
$ 4.38
Commercial Volumetric (South
Wastewater
Monthly User Rate
of 1-86) per 1,000 gallons
$ 5.72
Wastewater
Monthly User Rate
Billing Fee
$ 1.74
Customers outside City Limits
(Base Rate, NWSI, Volumetric
1.5 Times Regular
Wastewater
Monthly User Rate
Charge)
Rates
Capacity Fee (per EDU
Wastewater
Capacity Fee
Equivalent) - One-time charge
$ 4,133.00
5
DEPARTMENT
CATEGORY
TYPE
FEE
Residential and Commercial
Monthly User
Base Rate (3/4" and 1" Meter
Water
Rate
Size)
$ 30.57
Monthly User
Residential and Commercial
Water
Rate
Base Rate (1.5" Meter Size)
$ 88.00
Monthly User
Residential and Commercial
Water
Rate
Base Rate (2" Meter Size)
$ 136.20
Monthly User
Residential and Commercial
Water
Rate
Base Rate (3" Meter Size)
$ 283.28
Monthly User
Residential and Commercial
Water
Rate
Base Rate (4" Meter Size)
$ 464.28
Monthly User
Residential and Commercial
Water
Rate
Base Rate (6" Meter Size)
$ 938.10
Monthly User
Residential and Commercial
Water
Rate
Base Rate (8" Meter Size)
$ 1,469.18
Monthly User
Residential and Commercial
Water
Rate
Base Rate (10" Meter Size)
$ 2,244.47
Monthly User
Usage/Volume charge per
Water
Rate
1,000 gal
$ 1.47
Customers outside City Limits
Monthly User
(Base Rate, Usage/Volume
1.5 Times Regular
Water
Rate
Charge)
Rates
Water Connection/Capacity
Water
Capacity Fee
Fee (per 1" EDU)
$ 2,600.00
Water
New Meter Fee
Meter Fee 1" - Materials*
Actual Material Cost
Meter Fee 2" Turbine -
Water
New Meter Fee
Materials*
Actual Material Cost
Meter Fee 2" Compound -
Water
New Meter Fee
Materials*
Actual Material Cost
To be determined
Water
New Meter Fee
Meter Fee >2" - Materials*
individually
Actual Costs,
Customer
including Materials
Requested
and Current Labor
Materials
City Provided Materials and/or
and Equipment
Water
and/or Labor
Labor
Billing Rates**
* Meter Fee is a one-time
charge for the installation of a new meter on a new service
line.
** Charges will be billed to the requesting party.
6
DEPARTMENT CATEGORY TYPE FEE
Pressurized Secondary Monthly User Residential Base Rate (per
Irrigation Rate EDU) $ 16.10
Commercial/Multi-
Pressurized Secondary Monthly User family/Non-typical Residential
Irrigation Rate Base Rate (per EDU)* $ 16.10
Notes:
1. The Pressurized Secondary Irrigation Rate will be charged to customers when irrigation
water is available in the system at the service connection/valve box on the property,
whether the customer utilizes the irrigation water or not.
2. The Pressurized Secondary Irrigation Rate will be charged once per month for the entire year
to provide a "flat rate", even when irrigation water is not available in the system such as
during winter.
* A single EDU will be based on an irrigated area of 6,235 square feet when determining
Commercial, Multi -family, or non -typical residential rates.
7
COMMUNITY SERVICES DEPARTMENT
BUILDING DIVISION FEES
Building Division Fees shall be as follows:
BUILDING — RESIDENTIAL & COMMERCIAL
Inspections outside of regular City Hall hours - $100 for first hour,
Depends on Staff Availability: $47 per hour for
every addition hour
(in .5 hour
increments rounded
up). 1 hour minimum
billing.
Reinspection a second reinspection of a $90
required phase, per required inspection (i.e., a
3rd inspection). Charge is at the discretion of the
Building Official:
When work on a site that requires a permit Double the permit
commences without first obtaining the fee (per building
necessary permit: code)
Demolition:
$30
Additional Plan Review required by change,
$23.50 for first hour,
addition, or revision to approved plan:
$47 per hour for
every addition hour
(in .5 hour
increments rounded
up). 1 hour minimum
billing.
Floodplain Development Permit (when
$100
associated with a building permit):
Sign Permit (including refacing sign):
$25
Commented [DH1]: Clarification & Increase to account
for inspections which may take longer than 1 hour
Commented [DH2]: Modification to align with Building
Code. Starting work without a permit = double cost.
Commented [DH3]: Clarification & Increase to account
for reviews which may take longer than 1 hour
'Building Permit Fees kincluding for solar panels)) are calculated using the formula below: commented [DH4]: Modification to remove set solar
panel fee and to charge based on valuation. This aligns with
VALUE FROM: VALUE T0: BASE FEE: FOR THE FIRST: PLUS: FOR EACH Pocatello practice and Pocatello performs the plan review
and inspections per contract.
V
ADDITIONAL.
$1
$500
$27.00
$501
$2,000
$29.00
$501
$1.50
$100
$2,001
$25,000
$54.50
$2,001
$9.00
$1,000
$25,001
$50,000
$262.50
$25,001
$7.50
$1,000
$50,001
$100,000
$446.00
$50,001
$5.50
$1,000
$100,001
$500,000
$718.00
$100,001
$3.50
$1,000
$500,001
$2,500.00
$500,001
$3.70
$1,000
BUILDING — RESIDENTIAL
Residential Valuation shall be determined by using the following:
Residence, each floor:
Finished Basement:
Unfinished Basement:
Crawlspace:
Decks:
Covered Patio:
Carport:
Shed:
Garage:
$99 per square foot
$20 per square foot
$10 per square foot
$5 per square foot
$5 per square foot
$10 per square foot
$10 per square foot
$15 per square foot
$21 per square foot
BUILDING — COMMERCIAL (INCLUDES APARTMENTS WITH 5+ UNITS)
Plan Review Fee: 65% of the Building Permit Fee
Commercial Valuation: Valuation shall be the declared value, which shall include
the total value of the work for which a permit is being
issued, including materials and labor. The Building Official
may require documentation of the building permit
valuation as necessary to ensure correct valuation of the
project.
ELECTRICAL - RESIDENTIAL
Base Fee: $30
Temporary Service (each): $30
Permanent Service (each): $30
Service to 100 amps (each): $3
Service to 200 amps (each): $5
Service over 200 amps: $10
Number of Rooms (each): $2.50
Number of Circuits (each): $2.50
Space Heaters: $10
ELECTRICAL- COMMERCIAL (INCLUDES APARTMENTS WITH 5+ UNITS)
Base Fee:
$30
Temporary Service (each):
$30
Permanent Service (each):
$30
Fee based on Commercial Valuation up to $20,000:
2%bf wire costs up to $4001
-
Commented [DHS]: Modification to align with City of
Fee based on Commercial Valuation at and beyond $20,001:
Modification to align with City of
Pocatello since we contract with Pocatello for electrical
Pocatello since we contract with
permits
Pocatello for electrical permits)
--
Commented [DH6]: Modification to align with City of
Sign & Outlet Base:
$30
Pocatello since we contract with Pocatello for electrical
permits; increase from last year's due to scrivener's error
Sign (each):
$3
Carnival, Circus, or Similar Event: $50
MECHANICAL- RESIDENTIAL & COMMERCIAL
Base Fee: $30
Gas Piping - Up to 4 units: $5
High Pressure Gas Test: $10
Furnace up to 100k BTU: $5
3
Gas Water Heater, Flue Pipe (each):
$5
Unit Heaters (each):
$5
Fireplaces, Inserts, Stoves (each):
$5
Commercial - Rooftop (each):
$10
Commercial - Cooking Hood (each):
$10
Commercial —Other Regulated Device (each):
$10
PLUMBING - RESIDENTIAL
Base Fee:
$30
Plumbing Fixture (each):
$6
Water Heater Replacement:
$15
Lawn Sprinklers:
$15
Water Line (Separate):
$25
Sewer Line (Separate):
$25
Water & Sewer Line (together):
$40
PLUMBING — COMMERCIAL (INCLUDES APARTMENTS WITH 5+ UNITS)
Base Fee:
$30
Fee based on Commercial Valuation up to $20,000:
�% of the total plumbing costs
up to $20,000.000
Fee based on Commercial Valuation beyond $20,001:
I$2% of the total plumbing costs
valuation:
up to $20,000.000, plus 1.5% of
costs over $20,0011
Water Heater Replacement: $15
4
Commented [DH7]: Amended to align with Pocatello's
fees since we contract with Pocatello for plumbing review
and inspections
- Commented [DH8]: Amended to align with Pocatello's
fees since we contract with Pocatello for plumbing review
and inspections
EROSION & SEDIMENT CONTROL
Single-family Residential Waived
Development/Project less than 5 acre $50
Development/Project between 5-10 acres $100
Development/Project exceeding 10 acres: $150
CARD CONVENIENCE FEE & REFUNDS
• There is a 3% fee for credit/debit card use.
• Once a review has been commenced by City Staff, not including the application completeness
review, no refunds shall be given of fees paid.
• Where fees are billed at an hourly rate, 1 hour minimum is required and billed hours will be
rounded up to the nearest''/: hour.
o For example, a 2.3 hour long inspection will be charged for 2.5 hours.
OTHER FEES NOT FOUND IN THIS SECTION:
■ Please see the Public Works' Fee schedule for fees such as wastewater and water connection and
Commented [DH9]: Clarification about how we will
assess hourly rate fees
capacity fees, water meter fees, right-of-way permit fees, etc.
■ The City of Chubbuck has adopted Police, EMS, and Parks & Recreation Development Impact Fees.
Contact the Building Division for applicable fees set by separate action of the City Council.
5
COMMUNITY SERVICES DEPARTMENT
PLANNING DIVISION
LA
DEVELOPMENT SERVICES DIVISION
Planning Division and Development Services Division Fees shall be as follows:
PLANNING/LAND USE APPLICATIONS
Annexation (also require a separate Initial Zoning application & fee):
$165
Comprehensive Plan Amendment:
$700
Conditional Use Permit, Application or Amendment:
$585
Creative Community, Application or Amendment:
$1,000
Design Review Clearance:
$150
Initial Zoning Map Amendment (required with Annexation):
$535
Variance, Administrative:
$35
Variance, Application or Amendment:
$340
Zoning Development Agreement:
$200
Zoning Map Amendment (Title Map Amendment):
$535
Zoning Text Amendment (Any language subject to LLUPA provisions of Idaho Code):
$535
ZONING CERTIFICATION/COMPLIANCE LETTER
Standard: $75
Expedited: $200
1
PUBLIC HEARING FEES
Public Hearing Sign Deposit: $100; full or partial refund at Director's discretion
depending on condition of sign when collected.
Public Notice (if required by code Billed at cost of publication and $1.50 for each mailed
for plat review): notice
PLATS/PROJECTS & VACATIONS
Preliminary Plat: $550 base plus $20 per lot
Final Plat: $258 base plus $15 per lot
Short Plat: $550 base plus $20 per lot
Vacation (ROW, subdivision, easement, public $320
utilities):
Traffic Impact Analysis Report Review: $500
Subdivision Public Improvement Warranty: 25% of estimated or actual costs for public
improvements; to be submitted at the time that
dedicated to City is requested. See section 17.16.070 of
City Code. Commented [DH7]: From code, added into this list
Water and/or Sewer System Distribution $5001 Commented [DH2]: New fee to account for consultant
Modeling (as needed): review costs
Concurrent Construction Agreement
Substantial Completion Guarantee Agreement
Development Agreement (When Required)
APPEALS & REQUESTS FOR RECONSIDERATION:
$1,500 � 150% of estimated cost of project completion.
Guarantee subject to return in accordance with section
17.16.050 of City Code.l Commented [DH3]: From code, added in to this list
$300 agreement fee � 150% of estimated cost of
completion. Guarantee subject to return in accordance
with section 17.16.050 of City Code.l Commented [DH4]: From code, added in to this list
$200
Appeal of LUDC decision to the City Council: $150
Request for Reconsideration of City Council $150 each request Commented [DH5]: Added clarification
Decision:
2
EROSION & SEDIMENT CONTROL
Single-family Residential Waived
Development/Project less than 5 acre $50
Development/Project between 5-10 acres $100
Development/Project exceeding 10 acres: $150
PLAN REVIEW & INSPECTIONS
• Stormwater Plans
Less than 1.5 acres 1.5 to 10 acres 10 to 20 acres Greater than 20 acres
$48 $96 $136 $192
• IPublic Improvement Plan Review
o Initial Review: $500 plus $20 per lot
• Additional Reviews: $150 per additional review to be paid prior to review
occurring.
• For County Inspections: Add 10% to fees
• Inspections (When Associated with a Plat or Commercial/Multi-Family Project)
o Primary Inspection: Consisting of inspection and preparation of what is commonly
referred to as a "punch list" of unsatisfactory items, if any, and one (1) follow-up
inspection for the items on the punch list.
1-3 lots 4-10 lots 11-20 lots 21+ lots
$500 $185 per lot $175 per lot $165 per lot
o Subsequent Inspections: $150 per trip to the site
o For County Inspections: Add 15% to fees)
• Floodplain Development Permit (when associated with a development/plat): $200
• Single Lot (Residential or Commercial) Construction Inspections:
o Sidewalk: $20
• Subsequent Inspection: $15
• For County Inspections: Add 15% to fees
3
Commented [DH6]: New fees to account for staff time &
equipment
o Pressurized Secondary Irrigation: $20
• Subsequent Inspection: $15
• For County Inspections: Add 15% to fees
Water Service: $20
• Subsequent Inspection: $15
• For County Inspections: Add 15% to fees
o Swale Irrigation: $20
• Subsequent Inspection: $15
• For County Inspections: Add 15% to fees
LATECOMER FEE:
• $350
o For developers who request that the City assess and collect a pro -rated reimbursement
from adjoining landowners of costs of the public improvements which said developers are
required to install and which directly benefit the adjoining land; Fee includes the cost of
preparing and recording releases when owners of adjoining lands have paid their share of
the assessed costs.
CARD CONVENIENCE FEE & REFUNDS
Commented [DH7]: New fees to account for staff time
and equipment use
• There is a 3% fee for credit/debit card use.
• Once a review has been commenced by City Staff, not including the application completeness
review, no refunds shall be given of fees paid. Commented [DH8]: Clarification pertaining to refunds
COMMUNITY SERVICES DEPARTMENT
PARKS & RECREATION DIVISION FEES
Parks & Recreation Fees shall be as follows:
SHELTER/PAVILION RENTAL (WATER & POWER AVAILABLE):
o Cancellation Fee: Cancellations are subject to a $10 fee to be withheld from refund.
o Clean Up Fee: All shelters & pavilions are subject to a Clean Up Fee ($50 minimum) if the
reserved space is left messy or in disrepair.) Commented [DHt]: Newfee to accountfor staff costs
o All other shelters/pavilions first come, first served.
FACILITY RESERVATIONS & USE
• Osborn Tennis Complex at Capell Park
0 48-hour key rental to Chubbuck Resident: Free
o Annual Key Rental, April 1st— October 31't: $20
o Annual Key Rental, April 1"— October 31't , if key not returned in the prior
o Court use for private organization: $2 per court, per hour{
o All fees are non-refundable
• Cotant Park Baseball Complex (6 fields): $330 per day
o INon-refundable unless cancelled 10 days prior to reservation
o If eligible for refund upon cancellation, $10/day is non-refundablel
• Capell Park Softball Complex (3 fields): $165 per day
o INon-refundable unless cancelled 10 days prior to reservation
o If eligible for refund upon cancellation, $10/day is non-refundablel
LEAGUE, EVENT, & COURSE REGISTRATION
• Recreational Leagues
Commented [DH2]: First increase in years, to help
account for court maintenance costs
Commented [DH3]: First increase in years, to help
account for court maintenance costs
Commented [DH4]: New fee; aligns with what local
tennis club has paid us for use, historically, however.
Commented [DHS]: Clarification of cost. Tournaments
use all fields; in the past the fee was based on a per field
basis; the new fee is a reservation of all fields as one
complex.
Commented [DH6]: Clarifying refunds to account for city
costs w/ staffing and materials preparation
Commented [DH7]: Clarification of cost. Tournaments
use all fields; in the past the fee was based on a per field
basis; the new fee is a reservation of all fields as one
complex.
Commented [DH8]: Clarifying refunds to account for city
costs w/ staffing and materials preparation
M -Th
10AM-4PM
M -Th
4PM-9 PM
M—Th
10AM-4PM
F—Su
10 AM -4 PM
F—Su
4PM-9 PM
F—Su
LOAM -9 PM
Bicentennial
Shelter/Pavilion
$30
$50
$75
$40
$60
$85
Cotant Gazebo
$35
$55
$80
$45
$55
$90
Heritage
$30
$50
$75
$40
$60
$85
o Cancellation Fee: Cancellations are subject to a $10 fee to be withheld from refund.
o Clean Up Fee: All shelters & pavilions are subject to a Clean Up Fee ($50 minimum) if the
reserved space is left messy or in disrepair.) Commented [DHt]: Newfee to accountfor staff costs
o All other shelters/pavilions first come, first served.
FACILITY RESERVATIONS & USE
• Osborn Tennis Complex at Capell Park
0 48-hour key rental to Chubbuck Resident: Free
o Annual Key Rental, April 1st— October 31't: $20
o Annual Key Rental, April 1"— October 31't , if key not returned in the prior
o Court use for private organization: $2 per court, per hour{
o All fees are non-refundable
• Cotant Park Baseball Complex (6 fields): $330 per day
o INon-refundable unless cancelled 10 days prior to reservation
o If eligible for refund upon cancellation, $10/day is non-refundablel
• Capell Park Softball Complex (3 fields): $165 per day
o INon-refundable unless cancelled 10 days prior to reservation
o If eligible for refund upon cancellation, $10/day is non-refundablel
LEAGUE, EVENT, & COURSE REGISTRATION
• Recreational Leagues
Commented [DH2]: First increase in years, to help
account for court maintenance costs
Commented [DH3]: First increase in years, to help
account for court maintenance costs
Commented [DH4]: New fee; aligns with what local
tennis club has paid us for use, historically, however.
Commented [DHS]: Clarification of cost. Tournaments
use all fields; in the past the fee was based on a per field
basis; the new fee is a reservation of all fields as one
complex.
Commented [DH6]: Clarifying refunds to account for city
costs w/ staffing and materials preparation
Commented [DH7]: Clarification of cost. Tournaments
use all fields; in the past the fee was based on a per field
basis; the new fee is a reservation of all fields as one
complex.
Commented [DH8]: Clarifying refunds to account for city
costs w/ staffing and materials preparation
o (Boys Baseball: $110
• Fee waived for 1 child of a league commissioner
• $80 refund if requested between registration date and 1 day prior to tryouts; no
refund thereafter.)
o Oirls Fastpitch Softball: $85
• Fee waived for 1 child of a league commissioner
• $55 refund if requested between registration date and 1 day prior to tryouts; no
refund thereafter.
o (Backyard Baseball: (T -ball & pitching machine): $70
• Fee waived for 1 child of a league commissioner
■ $45 refund if requested during regular registration period.)
o Late Registration Fee, all leagues; $40 (non-refundable)
• Chubbuck Days:
o Festival Vendor Space (non-refundable)
• Power: $40 (limited amount available)
• No Power: $25I
• Instructional Courses: Billed at City's cost
EVENT & TOURNAMENT SERVICES/FACILITIES:
100 — 300 people 301— 500 people
Restroom maintenance and $25/hour, 1 hour $50/hour, 1 hour
garbage removal for events & minimum minimum
tournaments:
501+ people
$75/hour, 1 hour
minimum
At least 1 hour of cleanup time after an event will be added for events lasting longer than
4 hours.,
• Additional Picnic Tables (not already on a site): $5 per table per day
o Depends on staff and table availability
o (Non-refundable if canceled within 3 days of requested date)
• Additional Trash Cans (not already on a site): $3 per trash can per day
0 1 can is required for every 40 persons in attendance.
o Non-refundable if canceled within 3 days of requested datel
Commented [DH9]: Increased fee from $93 to $110 to
account for maintenance costs and increased ballfield
staffing costs; codifying the league's practice of waiving 1
child per commissioner and clarifying the refund policy
based on program costs.
Commented [DH10]: Increased fee from $53 to $85 to
account for maintenance costs and increased ballfield
staffing costs; codifying the league's practice of waiving 1
child per commissioner and clarifying the refund policy
based on program costs.
Commented [DH71]: Increased fee from $43 to $70 to
account for maintenance costs and increased ballfield
staffing costs; codifying the league's practice of waiving 1
child per commissioner and clarifying the refund policy
based on program costs.
Commented [DH12]: Increased fees to account for
limited number of spaces available and market demand, and
to account for some staff and materials costs in
administering the festival.
Commented [DH13]: Our current fees are much too low,
particularly on day long/weekend long events. This fee will
include tournaments and events and will help account for
short events and long events fairly.
Commented [DH14]: Clarifies refund policy to account
for workload changes
Commented [DH1 S]: Clarifies refund policy to account
for workload changes, and sets a standard for trash cans (in
Water Use at City Park (For water not associated with a reservable pavilion or shelter): the past, reservation holders haven't requested enough and
the result is trash overflowing in parks)
0 5 hour period: $25
o Full Day: $50
o (Non-refundable if canceled within 3 days of requested date) Commented [DH16]: Clarifies refund policy to account
for workload changes
Portable toilets as required or requested: Billed at City's cost
o 11 bathroom stall is required for every 50 people
Example: If an event will have 300 people in attendance and 2 permanent bathroom stalls
are on site, 4 additional portable toilets will be required.
o Non-refundable if cancelled within 7 days of a reservation start date)
• (Ball Field Preparation prior to tournament start, including striping: $30 per field
o Fields will be prepped by City the night before non -City tournaments and the fee will be
automatically assessed unless the reservation holder agreed in writing that the field prep
is not necessary.)
• Ball Field Preparation during tournament, including striping: Service not available
(Portable Pitching Mound Use (Cotant Park Complex; red field and orange field): $100 per day,
per mound, if on a field already.
o During the Chubbuck Boys Baseball season and tournament, there are portable pitching
mounds on 2 fields in Cotant Park. Due to the large weight and size of the mounds, they
will not be moved during the dates in which the City league plays; if a non -city league or
organization wishes to use a field with either of the portable pitching mounds, the
payment of the fee is required to account for usage.
0 100% refundable.
o Pitching mounds will not be relocated from where they are placed during the season.
Portable Pitching Mound Use (Cotant Park Complex; red field and orange field): $200 per day,
per mound, if not on a field already.
o If the mounds are not a field already and a non -city organization wishes to use the
portable pitching mounds, due to the large weight and size of the mounds, the fee is
increased to account for usage and transportation from storage.
Depends on staff availability
Non-refundable if cancelled within 3 days of a reservation)
• penalty for Metal Cleats: No metal cleats are permitted on the portable pitching mound; if
damage occurs to a mound, the reserving party is responsible for repair/replacement, or a penalty
of $1,000, whichever is greater.
• Ball Field Maintenance Tool Use (Cotant Park Complex & Capell Park Complex): $25/day and a
$500 deposit.
o Full or partial deposit refund available at Director's discretion depending on condition of
tools/building after use.
o The Director has the right to refuse anyone tool use based on prior history.
SPONSORSHIP OPPORTUNITIES
• (Movies in the Park: Based on City's Cost
• Recreational Leagues/Facilities (Levels):
o Silver: $50 - $249
Commented [DH17]: Clarifying how many restrooms are
required based on the expected attendance so that facilities
do not get overwhelmed
Commented [DH18]: This has been provided in the past
without cost but to prep a field can take between .75 and 2
hours. This will account for staff time to ensure that when a
tournament begins, it is in great shape.
Commented [DH19]: New fee to reflect wear and tear on
expensive mounds
Commented [DH20]: New fee to reflect wear and tear on
expensive mounds and transportation costs (very heavy and
awkwardly shaped)
Commented [DH21]: Newfee/penaltytoreflectcosts
borne to repair/replace damaged mounds
o Gold: $250/300 - $799
• ($300 minimum for first year Gold sponsors to account for sign costs)
o Platinum: $800-$1,500
o Diamond: $1,501-$9,9999
o Mayor's Club: $10,000+
• May sponsor league(s) or facility)
ADDITIONAL FEES AS NOT LISTED ABOVE
• The Community Services Director shall have the authority to set rates for additional programs,
special programs, group events, or uses, and other occasional activities not listed above as the
need arises in consideration of City costs. Decisions of the Director may be appealed to the City
Council at a regular meeting.
CARD CONVENIENCE FEE, SALES TAX, & MISCELLANEOUS:
• All fees listed herein include sales tax, where applicable.
• There is a 3% fee for credit/debit card use.
• rVhere fees are billed at an hourly rate, 1 hour minimum is required and billed hours will be
rounded up to the nearest''/: hour.
o For example, a 2.3 hour long event will be charged for 2.5 hours.
Commented [DH22]: Not new but rather, adding to this
list to codify the minimum sponsorship levels
Commented [DH23]: Clarification about how we will
assess hourly rate fees