HomeMy WebLinkAboutItem #6 Miller Park - All-wheels ParkAMERICANRAMPCOMPANY.COM
AMERICAN �eio olukion ®PROGRESSIVE
COMPANY S �BiKF R�MPs
Y
t
all
i1�U►�'���ii1i ?'- �;_114�L1_ i
8511 - ID, CHUBBUCK
RICAN-, d PR
P ".-Vcdo5oIution5
AMERICANRAMPCOMPANY.COM
A
.......
MSSIVF
?AMPS
16 *44444444S
8511 - ID, CHUBBUCK
OL
RICAN-, d PR
P ".-Vcdo5oIution5
AMERICANRAMPCOMPANY.COM
A
.......
MSSIVF
?AMPS
16 *44444444S
8511 - ID, CHUBBUCK
Ak
Ylk
Apr Are
OW
f
AMERICAN
PROGRESSIVE
RAMP *czlo3olution5L31KE RAMPS
-% w
WIMCOMPANY 8511 - ID, CHUBBUCK
AMERICANRAMPCOMPANY.COM
:fie t�
l
y
t t- N,
1 ►Ar
ir
r
AL
%
,, 1w
-A(
s
srt �
4
�.
r W r�
PROGRESSIVE ®S .r
8511 - ID, CHUBBUCK
AMERICANRAMPCOMPANY.COM
sambib.1—
0
IN
A05
V�.
.-., �-- .... ��� � J 1 1 1 I I I I I I i l l VyI
A AMERICAN
RAMP *dlo5olution5 1
P,,LPRKOGRAEs.5'pvsE
COMPANY 8511 - ID, CHUBBUCK
hW
I
AMERI
RAMP
lamcompA
AMERICANRAMPCOMPANY.COM
n�w
f � I
I � J
I �
1
CAN *dlo5olution5 pRKO,0,6A!Rs'pV,�-
a will
4D
L,4
8511 - ID, CHUBBUCK
AMERICANRAMPCOMPANY.COM
u yea'-. i 'rt" .... } ,: �' „� c- > _y - _ x •' _
WE
lion
- 1r �cy� - •r `^.�i 9L 4b
} - ',i s _'fit. 3
AMERICAN
COMPANY
*ilo)olution5
PS
it /�/
8511 - ID, CHUBBUCK
601 S. McKinley Ave
Joplin, MO 64801
Toll-free: 800 -RAMP -778
Local: 417-206-6816
Fax: 417-206-6888
sales@americanrampcompany.com
AMERICAN
COMPANY
Quote #
Design #
Customer
Date
Designer
Q28009.2
8511
Chubbuck
05-23-24
M. Bradley
Engineer's Estimate: $4,319,293.00 (Sourcewell Discount $302,350)
• Skatepark: $2,500,000 (Phase 1$410,000)
• Asphalt Pump Track: $875,000.00
• Asphalt Jump Lines: $499,238.00
• Asphalt Bicycle Playground: $123,253.00
• Asphalt Skills Course: $321,802.00
Bicycle Playground Feature List
Obstacle
Tunnel 8'
Double Nessy,
2' High, 36" Wide 2'
Berm Turn,
6' High, 135° 6'
Bicycle Playground Ring 71
A -Frame,
1' High, 36" Wide 1'
Cone (Concrete) 4'
Height Width Lenqth
96" 11'
36" 31.7'
29.8' 11.5'
96" -
36" 15'
30" 30"
Notes:
• This turnkey quote includes Equipment, Shipping, and Installation.
• This quote includes a Sourcewell discount (if procured through Sourcewell Purchasing Co -Op).
• This quote does not include prevailing wage, sales tax, or bonding. If applicable please call for revised quote.
• This quote is good for 30 days.
SCOPE OF WORK
1.1 INCLUDES:
• All labor, construction project management, supplies, tools, materials, and equipment required per scope of
work
• Site staking and layout
• Cutting and shaping grades within bike park footprint
• Place and install asphalt bike park and pump track tread
• Supply and installation of pre-engineered bike features
• Materials, supplies, and labor for custom bike features
• Topsoil and reseeding of disturbed areas
1.2 EXCLUDES*:
• Prevailing wage
• Sales tax
• Bonding
• Erosion and sediment control
• Stabilized construction entrance
• Landscaping, site and turf restoration post skatepark construction
• Sidewalks/walkways and site amenities of any kind
• Mass excavation or import
• Construction drawings
• Permits, fees and/or engineering and stamping.
• Utility, mechanical, electrical, plumbing work, relocation, or repairs of any kind.
• Toxic or hazardous material handling or removal.
• Removal and/or replanting of any trees or shrubs or protection of trees and shrubs.
1.3 CUSTOMER PROVIDES*:
• Sufficient water and electrical power within 100 feet of work areas.
• Unobstructed, safe, and continuous access to work area with heavy equipment. All weather roads for heavy
equipment.
• All necessary site information including topography, site surveying, and elevations.
*All items above can be provided for an additional fee.
Purchase through our competitively bid government Sourcewell contract.