Memo
To: Honorable Mayor and City Council
From: Bridger Morrison
Date: July 27, 2023
Re: 2023 Asphalt Maintenance Project — Bid Award
Public Works Department
290 E. Linden Avenue, Chubbuck, ID 83202
208.237.2430 — Fax 208.237.2409
www.CityofChubbuck.us
Based on the Street Department's pavement maintenance plan, a pavement maintenance project was
developed and put out for bid. The project includes milling and removal of existing asphalt pavement
and repaving several blocks of streets as shown on the attached map. Bids were opened on 7/27/2023
and the results are shown in the table below:
Contractor Total Bid
Sunroc Corporation DBA Depatco. $ 266,665.00
Mikelsen Construction $356,576.60
The City has not had a similar project in the past, so we were unsure of what the cost might be.
However, we anticipated that the cost may be between $300,000 and $400,000. Based on the bids
received, we are likely going to add additional street segments to the project to utilize as much of the
Street Department's pavement maintenance budget as possible.
The low bid appears to be responsive and meets the requirements of the bid documents. It is my
recommendation that the City Council approve the Mayor to award the project and execute a contract
with Depacto in the amount of $266,665.00 for the 2023 Pavement Maintenance Project.
Sincerely,
Bridger Morrison, P.E.
Public Works Director/City Engineer
J:�Streets�Maintenance �Pavement Management�2023 Pavement Management Project Plan �Award�Final Bid Award
Recommendation-Council—BM— 7-27-23.docx
w
0
U
NATALIE ST.
BOYD ST.
GLORIA ST.
TODD ST.
Lu
Q
F -
z
Lu
ry
z
Q
O
0
WEST CHUBBUCK ROAD
CHUBBUCK ELEMENTARY SCHOOL
H -
w
Lu
F-
U
r
Q
w
SURVEY MONUMENT
5/8" REBAR NOT CAPPED
RETAIN AND PROTECT
SCOTT STREET
I-_
Lu
w
I-
0
Q
d
a
Lu
U)
BOYD STREET
SYMBOLS - LEGEND:
MILL & OVERLAY AREA
2.5" THICKNESS
(7,560 S.Y. REQ'D)
MILL &OVERLAY AREA
3" THICKNESS
(1,440 S.Y. REQ'D)
SURVEY MONUMENT
RETAIN AND PROTECT,
0 PRIOR TO STARTING
CONTACT CITY OF
CHUBBUCK FOR
LOCATION
0 100' 200'
HORIZ. SCALE: 1" = 200'
Digitally signed by Bridger Morrison
VERA
ARMSTRONG
PARK
Date: 2023.07.06 17:22:34 -06'00'
GLORIA ST.
TODD ST.
Lu
Q
F -
z
Lu
ry
z
Q
O
0
WEST CHUBBUCK ROAD
CHUBBUCK ELEMENTARY SCHOOL
H -
w
Lu
F-
U
r
Q
w
SURVEY MONUMENT
5/8" REBAR NOT CAPPED
RETAIN AND PROTECT
SCOTT STREET
I-_
Lu
w
I-
0
Q
d
a
Lu
U)
BOYD STREET
SYMBOLS - LEGEND:
MILL & OVERLAY AREA
2.5" THICKNESS
(7,560 S.Y. REQ'D)
MILL &OVERLAY AREA
3" THICKNESS
(1,440 S.Y. REQ'D)
SURVEY MONUMENT
RETAIN AND PROTECT,
0 PRIOR TO STARTING
CONTACT CITY OF
CHUBBUCK FOR
LOCATION
0 100' 200'
HORIZ. SCALE: 1" = 200'
Digitally signed by Bridger Morrison
Date: 2023.07.06 17:22:34 -06'00'
nklA
\CENSFO
a� F
12510
LP o
63. P =
/OF OF
0 MORS
CONFIDENTIAL DOCUMENT-
This drawing may not be reproduced or disclosed or
used to construct or fabricate items shown on this
drawing without the prior written permission of
CITY OF CHUBBUCK, IDAHO ENGINEERING DEPT.
z
O
w
OfDwG.
NO. DATE DESCRIPTION CITY OF CHUBBUCK
290 E. Linden Ave, Chubbuck, Idaho 83202
Voice: (208)237-24309
CHUBBUCK Fax: (208)237-2409
I D H H 0 Website: http//vfww.cityofchubbuck.us/
DRAWN BY
D. KENNEDY �uLv2o2s
DWG. TITLE: PUBLIC WORKS`
2023 ASPHALT MAINTENANCE PROJECT
CHUBBUCK, IDAHO
DESIGNED
D. KENNEDY juLv2o2s
CHECKED BY:
ENG. APPROVAL:
NAME: J:\Stye...\Maim...\Pave...\2023 Pave ...\Des...\Auto...\Ove....dwg
STAFF APPROVAL:
PLOT SCALE: 1:200
SCALE: 1:200
SHEET 2 OF 2