Re: Discussion about Policy for City Utility Connections Outside of City Limits
Summary Request
Please have reviewed the drafted requirements on pages 3-4 of this memo and come with guidance and
direction for whether you agree in concept with the drafted requirements and whether you'd like to see the
requirements put into a resolution for formal consideration. If you have any questions prior to the meeting,
please contact me.
Background Information
From time -to -time, the City is approached by developers or existing homeowners in the County
who desire to connect to one or more City utilities. For developers, connecting to City utilities often means
higher densities that they could otherwise have in the County. For existing homeowners or one -of type
residential lots, connecting to an available sanitary sewer line is often a required of the DEQ/Health District
when reasonably close. Staff is very supportive of seeing as many connections to the sewer system as
possible to protect the aquifer's drinking water and staff is supportive of sewer and water connections,
when properties are developed in a manner that considers long-term regional growth, so that a higher
density of lots can be created to promote long-term efficiencies and fiscal sustainability for the rate and
taxpayers.
In the past, City staff have worked with developers to ensure that the City's goals and needs are
met as a condition of providing City utilities. Examples include agreements for Westfield Estates, Rio Estates,
Jaxon Subdivision, and recently, for a minor land division near the City boundary on W Chubbuck Road
which was not able to be annexed. To provide clarity for those who seek our utility connections and for the
J:\Administration\Community Services Dept Admin\Memos to Council\11.28.22 Memo to Council—re
conditions to receive city utilities outside of city limits.docx
1
City's staff, the Mayor, Public Works Director, City Attorney, and I have drafted a list of requirements for
connections based on the types of requested connections for the Council's consideration with the hopes
that Council would be willing to adopt them in an upcoming meeting as city policy via City Resolution.
Chapter 2.20 of Chubbuck City Code authorizes the Mayor to enter into written agreements for
furnishing municipal services outside of City limits. It reads:
2.20.010: AUTHORITY:
The mayor of the city is authorized to enter into written agreements for the furnishing of
municipal services outside the corporate boundaries of the city. Such written agreements
shall define the scope of services to be provided and the consideration to be paid therefor.
Services which may be furnished pursuant to such agreements may include, without
limitation, police protection, fire protection, animal control, sanitation services, water supply
and sewer services. (Ord. 154 §1, 1975)
2.20.020: PRIORITY:
The furnishing of services pursuant to such agreements shall be subject to the first priority
accorded to adequate provision of services within the corporate boundaries of the city.
(Ord. 154 §2, 1975)
REMAINDER OF PAGE LEFT INTENTIONALLY BLANK
J:\Administration\Community Services Dept Admin\Memos to Council\11.28.22 Memo to Council—re
conditions to receive city utilities outside of city limits.docx 2
Recommended Criteria for City Utility Connections For Council Consideration
Single Lot County- Requesting City Sewer (replacing septic only):
1. Consent to Annex (recorded)
2. Agree that if the parcel redevelops or further develops in the future whether in County or City,
that City development and planning standards will be followed as closely as possible in
coordination with City staff.
3. Obtain letter from City of Pocatello indicating that the connection will not count against City
capacity.
4. Same connection fee and monthly rate as city rate payers (to incentivize connections).
Subdivision or Minor Land Division in County- Requesting City Sewer Only (New lots w/ private or
community wells):
1. Consent to Annex (recorded)
2. Agree that if the parcel redevelops or further develops in the future, that City standards will be
followed where not followed under this policy.
3. Design development so that when water is available, developments with lots larger than 1 acre on
average can develop in a consistent and efficient manner
4. Follow BTPO/City access management policy
5. Provide rights-of-way (and streets, if building) of such width and locations to meet City of
Chubbuck's standards.
6. Follow most strict setbacks of Chubbuck and County for all structures
7. Obtain letter from City of Pocatello indicating that the connection will not count against City
capacity.
8. Same connection fee and monthly rate as city rate payers (to incentivize connections).
Subdivision in County- Requesting City Water Only (likely will be rare/never)
1. Consent to Annex (recorded)
2. Streets to City minimum standards as if in City
a. Typical Sections- curb, gutter, sidewalk, asphalt, striping
b. ROW widths
c. Road curves, block lengths, etc.
d. Future Road class map road locations, including stubbed roads
e. Fire hydrants
3. Follow BTPO/City access management policy
4. Follow most strict setbacks of Chubbuck and County for all structures
5. Provide canal public recreational easements
J:\Administration\Community Services Dept Admin\Memos to Council\11.28.22 Memo to Council—re
conditions to receive city utilities outside of city limits.docx 3
6. If surface water irrigation rights and source, to build and operate a private distribution system,
HOA funded, maintained
7. Consent to meet all city standards when annex
a. Trash enclosures
8. Same connection fee and 1.5 times the monthly rate as city rate payers.
Subdivision in County- Requesting City Water & Sewer
1. Consent to Annex (recorded)
2. Streets to City minimum standards as if in City
a. Typical Sections- curb, gutter, sidewalk, asphalt, striping
b. ROW widths
c. Road curves, block lengths, etc.
d. Future Road class map road locations, including stubbed roads
e. Fire hydrants
3. Follow BTPO/City access management policy
4. Abandon all wells and septics on the property. If any buildings are connected to septic or well,
they need to connect to City utilities.
5. Provide canal public recreational easements
6. If surface water irrigation rights and source, to build and operate a private distribution system,
HOA funded, maintained
7. Consent to meet all city standards when annex
a. Trash enclosures
b. Streetlights
c. Land uses
8. Obtain letter from City of Pocatello indicating that the connection will not count against City
capacity.
9. Same connection fee and monthly rate as city rate payers (to incentivize connections).