HomeMy WebLinkAboutPH #2 Chapter 17 Code RevisionsCommunity Services Department
Development Services Division
290 E. Linden Avenue, Chubbuck, ID 83202
208.237.2430
www.CityofChubbuck.us
J:\Engineering\Development\3 Code Revisions\Ready for LUDC\3 Memo to LUDC ‐ Title 17 Code
Changes.docx
Memo to File
To: Land Use and Development Commission
From: Sean Harris
Date: November 3, 2022
Re: Title 17 City Code Revision
Commission,
Attached is a copy of the proposed revisions with comments addressed from City Council at
their Council Study Session meeting on November 2, 2022.
17.16.070: WARRANT AGAINST DEFECTS:
All structures or improvements dedicated to the public, and accepted, shall be warranted
against defects by the person(s) making the dedication and by the person(s) constructing or
placing said structures or improvements upon the land, for a period of three two (32) years from
the date the City Council approves the acceptance of offer of dedications.
A. Extension of Term: Any repairs or replacements to the public infrastructure shall
automatically extend the warranty period twelve (12) additional months beyond the initial
twenty-four (24) months; in unusual circumstances, the Community Services Director
may extend the warranty period beyond the aforementioned twenty-four (24) month
period.
B. Financial Guarantee Required: A financial guarantee of twenty-five percent (25%) of the
total estimated costs for public improvements.
C. Financial Guarantee Required; Form: The public improvements associated with
warrantee are financially guaranteed for performance by a surety bond, cash deposit,
cashier’s check, or irrevocable letter of credit in the city’s name in accordance with
following terms through written agreement:
1. Surety Bond: The bond shall be with a surety company authorized to do
business in the State of Idaho and acceptable to the City.
2. Cash Deposit, Cashier’s Check, or Irrevocable Letter of Credit: A cash deposit,
cashier’s check, or irrevocable letter of credit in the City’s name, shall be
deposited with an escrow agent, City Treasurer, or trust company.
3. The financial guarantee shall accrue to the City of Chubbuck covering all costs
of construction of the public improvements.
4. Repairs Required: If during the warranty period the durability, condition,
materials, or workmanship of the infrastructure or improvements fails or shows
unusual deterioration, the Public Works Director, or their designee, shall provide
written notice to the developer detailing the issues and required corrections and
establish a reasonable timeline for repair work to be completed. If the
infrastructure has failed in such a way that a repair is needed immediately, the
Public Works Director may execute and use the financial guarantee to defray the
cost of the required emergency work.
5. If the Developer fails to make the required corrections within the reasonable
time set per section 17.16.070.C.4, the Public Works Director, or their designee,
may declare such developer in default and initiate execution of the warranty bond
to defray the cost of the required work.
a. In the event that the warranty bond is insufficient to cover the cost of
making such corrections, the Developer shall be responsible for all
additional costs.
The City, or its designee, may bring an action in any court of competent jurisdiction to
compel the warrantor(s) to remedy any such defects or to obtain reimbursement for the
cost of remedying such defects. (Ord. 754, 2016)
I. ENFORCEMENT
17.20.010: RECORDING OF PLATS:
No plat of any development shall be recorded, nor shall such recording be valid, unless the plat
has received final approval from the city council in the manner prescribed by this title and any
public improvements, either on-site or off-site, as defined herein and as applicable to the
development, are guaranteed in accordance with section 17.20.015 of this title or completed
and inspected and found to meet the City’s requirements. Public improvements for purposes of
this section are those which are either intended to be turned over to the City or other
government agency or those which serve as common improvements for lots within the
development and shall include but not be limited to: roads, electric, water, sewer, fire protection,
lighting, required recreational or other amenities, required landscaping and/or open space, curb,
gutter, sidewalks, parking lots, pressurized secondary irrigation systems, and drainage systems.
If an unapproved, or otherwise unlawful, plat is recorded, the city may institute proceedings to
have the plat stricken from the records maintained by the county recorder. (Ord. 206 §4-1(A),
1979)
17.20.015: GUARANTEE OF COMPLETION REQUIRED PRIOR TO RECORDING PLATS;
GUARANTEE MAINTAINED UNTIL WARRANTY EXPIRES FOR IMPROVEMENTS
DEDICATED TO PUBLIC AGENCY:
No plat shall be recorded until:
A. Financial Guarantee Required; Form: The public improvements associated with the plat
are financially guaranteed for performance by a surety bond, cash deposit, cashier’s
check, or irrevocable letter of credit in the city’s name in accordance with following terms
through written agreement:
1. Surety Bond: The bond shall be with a surety company authorized to do
business in the State of Idaho and acceptable to the City.
2. Cash Deposit, Cashier’s Check, or Irrevocable Letter of Credit: A cash deposit,
cashier’s check, or irrevocable letter of credit in the City’s name, shall be
deposited with an escrow agent, City Treasurer, or trust company.
3. Accrual: The financial guarantee shall accrue to the City of Chubbuck covering
all costs of construction of the public improvements.
4. Amount: The financial guarantee shall in the amount one hundred fifty percent
(150%) of the total estimated costs based on the development cost estimate in
this section, for completing construction of the public improvements, as approved
by the Director.
5. Term Length: The financial guarantee shall be in force for a minimum period of
twenty-four (24) months with automatic renewal until the improvements have
been deemed completed by the Director and accepted by the City and shall
continue until all contractual warranty periods are completed in accordance with
section 17.16.070 of this title. Once all public improvements have been accepted
by the City, at the Developer’s request, seventy-five percent (75%) of the surety
or guarantee may be released and the remaining twenty-five percent (25%) will
remain in effect for the warrantee period of the public improvements in
accordance with section 17.16.070.
6. Development Cost Estimate: The Development Cost Estimate shall be
provided by the developer’s engineer of record for review and approval by the
Director.
7. Penalty for Case of Failure to Complete Construction of Public Improvements:
If the developer fails to complete construction of the public improvements within
the period of time required by the conditions of the guarantee, the city may at the
city’s discretion, either enter into longer terms with the developer or determine
and take necessary action in order to accomplish completion of the required
public improvements. The city may reimburse itself for the cost and expense
thereof by appropriating the financial guarantee in whichever form provided and if
costs to complete the public improvements exceed the financial guarantee, the
city may seek additional monies from the developer or owners of the property
through all legal means. Longer terms to accomplish completion of the required
public improvements will only be considered if all owners within the bounds of the
development provide their written consent to the extension’s term.
8. Release of Guarantee for Improvements Not to be Dedicated to a Public
Agency: Public improvements which are not dedicated to a public agency yet
which require a financial guarantee in accordance with this section are not
subject to the section 17.16.070 warranty period. Following completion of the
public improvements which are not to be dedicated to a public agency, the
developer may submit a written request to the Director for final inspection. To
receive approval, the improvements must be fully functional and able to be
utilized by lot owners within the development. If the Director determines that the
developer completed the work in accordance with the development agreement
requirements, the Director may consider the inspection final and authorize
release of the financial guarantee covering those improvements. If the inspection
discloses work not completed in accordance with requirements of the
development agreement, the Director shall not declare that portion of the project
complete until such time that noncompliant issues are addressed to the
satisfaction of the Director.
B. Sidewalk Exception: For subdivisions where the City determines it to be in the best
interest of the property owners to install sidewalks at the time of building rather than at
the time of subdivision development, the following procedure will be followed regarding
the installation of sidewalks:
1. Building Permit/Certificate of Occupancy: A building permit may be issued on a
building occupying a lot when the required sidewalk has not been installed under
the following conditions:
a. The building permit will clearly note that the sidewalks shall be installed
prior to the receipt of a final Certificate of Occupancy.
b. Prior to issuance of a temporary Certificate of Occupancy, a cashier’s
check or cash shall be deposited and held in escrow by the City until such
time that the sidewalks are installed. It shall be the responsibility of the
property owner to request an inspection of the installation and request a
refund of the escrowed funds from the City. All refunds of such escrowed
funds shall be subject to the accounts-payable cycle of the city. An
inspection by the Director showing acceptance and compliance of the
sidewalks shall be completed prior to any request for a refund of the
escrowed funds.
c. From time-to-time, buildable lots may be purchased by an adjoining
landowner, or a non-adjoining landowner, who does not either intend to
build on the lot or who does not intend to build on the lot in a pace
consistent with the development’s build-out. In such cases, to connect the
pedestrian infrastructure in the development, the City may compel
construction of the sidewalk by the property owner within ninety calendar
days (90), weather-permitting, and if not completed, the city may
construct the sidewalk and/or seek remedy in accordance with section
17.20.050.
17.20.030: LOCATION OF STRUCTURES AND IMPROVEMENTS:
No structures or improvements, except those to be dedicated to the public as provided in this
title, shall be built, installed or placed upon any lands within a development until:
A. The final plat of the development has been approved and recorded, and
B. All required dedications have been made by the developer and accepted by the city, or
bond, check or line of credit furnished as provided in section 17.16.050 and/or 17.20.010 of this
title. (Ord. 754, 2016)
17.20.040: PERMITS AND MUNICIPAL SERVICES:
The city will not issue permits to build, install, place, repair or remove any structures or
improvements upon lands within a development, nor will the city maintain streets or furnish
water, sewer or sanitation services within the development, until:
A. The final plat (if not waived) of the development has been approved and recorded, and
B. All required dedications have been made by the developer and accepted by the city.
Neither will the city issue such permits or furnish such services to completed developments that
do not conform to the finally approved and recorded plat. (Ord. 206 §4-1(D), 1979)
/a 0�t\
CHUBBUCK
I D 0 H 0
Memo
Community Services Department
Development Services Division
290 E. Linden Avenue, Chubbuck, ID 83202
208.237.2430
www.CityofChubbuck.us
To: City of Chubbuck Land Use and Development Commission
From: Sean Harris, Development Service Manager
Date: October 31, 2022
Re: A proposal by City Staff to update several sections of City Code in Title 17: Title 17.16.070, Warrant
Against Defects, Reducing warranty period to 2 years and requiring financial guarantee through
warranty period; Title 17.20.010, Recording Of Plats, Requiring a financial guarantee prior to
recording plat; Title 17.20.015, Guarantee Of Completion Required Prior To Recording Plats,
Guarantee Maintained Until Warranty Expires For Improvements Dedicated To Public Agency,
Adding a new section that requires financial guarantee prior to recording plats maintained through
warranty period; Title 17.20.030 Location Of Structures And Improvements, providing addition
referenced section; Title 17.20.040 Permits And Municipal Services, remove stricken through text
addressed in section 17.16.050, Undedicated Structure On Land In Proposed Development
Prohibited Unless Certain Conditions Are Satisfied.
BACKGROUND
As conditions in the region and community have changed with new developments and other activities,
needs have arose for alterations in City Code. The proposed changes are limited to minor updates and
clarifications and one section addition.
Attachments to this memo are separated between staff explanation/rational (Exhibit 1), existing code
showing the changes proposed in iunderline (Exhibit 2), and existing code texts (Exhibit 3) without
changes.
FACTS
PETITIONER:
City of Chubbuck 290 E Linden Avenue
Attn: Community Services Department Chubbuck, ID 83202
208) 237-2430
APPLICABLE LAWS AND PLANS:
1. Chubbuck Comprehensive Plan (as amended)
2. Chubbuck City Code
9 Notices of the hearing provided in accordance with City Code Chapter 18.28.010.6.
Standards for approving a title text or map amendment per City Code Chapter
18.28.050.B.8.
STANDARDS FOR APPROVING A TITLE TEXT AMENDMENT
The review and action by the Land Use & Development Commission is a recommendation to the
City Council based on three criteria for proposed text amendments in City Code:
1. The proposed text amendment would be in the community's best interest.
Each of the proposed changes bring the code in better alignment with existing
community conditions, and/or clarify sections of code so that they are easier for the
public to understand. See exhibit 1.
2. The proposed text amendment is consistent with the existing provisions of the land use and
development ordinance.
The proposed amendments do not conflict with the existing provisions of the land use and
development ordinance but enhance the code for clarity and better alignment with existing
conditions.
3. The proposed text amendment is generally not in conflict with the goals, objectives, and
policies of the adopted Plan and furthers them more than the adopted zoning text.
No specific goals, objectives, or policies in the Comprehensive Plan appear to apply to
this proposal; decision makers should evaluate the proposals to determine if there are
applicable goals, objectives, or policies in the Plan.
STAFF RECOMMENDATION
Based on the evidence and analysis above, staff finds that the draft code satisfies the criteria
necessary to recommend approval of the title text amendment to the City Council, with the criteria
being:
A. The proposed text amendment would be in the community's best interest.
B. The proposed text amendment is consistent with the existing provisions of the land use and
development ordinance.
C. The proposed text amendment is generally not in conflict with the goals, objectives, and
policies of the adopted Plan.
1940�t-\
CHUBBUCK
1 0 R H 0
290 E Linden Avenue, Chubbuck, ID 83202
208.237.2430
www.CityofChubbuck.us
Updates to Municipal Code — Page 2
Disclaimer.• The information presented in this document is based solely upon evidence available at the time of
the report. Additional information may be brought to light at or before the hearing.
Report Prepared by.- Sean Harris, Development Services
Email: sharris@cityofchubbuck.us
Phone: 208-239-3208
EXHIBITS
1. Staff Explanation/Rational
a. Chapter 17.16.070 Warrant Against Defects
b. Chapter 17.20.010 Recording Of Plats
c. Chapter 17.20.015 Guarantee Of Completion Required Prior To Recording Plats,
Guarantee Maintained Until Warranty Expires For Improvements Dedicated to Public
Agency
d. Chapter 17.20.030 Location Of Structures And Improvements
e. Chapter 17.20.040 Permits And Municipal Services
2. Proposed Amendments
a. Chapter 17.16.070 Warrant Against Defects
b. Chapter 17.20.010 Recording Of Plats
c. Chapter 17.20.015 Guarantee Of Completion Required Prior To Recording Plats,
Guarantee Maintained Until Warranty Expires For Improvements Dedicated to Public
Agency
d. Chapter 17.20.030 Location Of Structures And Improvements
e. Chapter 17.20.040 Permits And Municipal Services
3. Current Chapters
a. Chapter 17.16.070 Warrant Against Defects
a. Chapter 17.20.010 Recording Of Plats
b. Chapter 17.20.030 Location Of Structures And Improvements
c. Chapter 17.20.040 Permits And Municipal Services
194�yt\
CHUBBUCK
1 0 R H 0
290 E Linden Avenue, Chubbuck, ID 83202
208.237.2430
www.CityofChubbuck.us
Updates to Municipal Code — Page 2
Exhibit 1
Staff Explanation/Rational
17.16.070: WARRANT AGAINST DEFECTS:
The City has never required a financial guarantee for the 3 year warranty period and has had to
fight with developers to get deficiencies that have arose during the warranty period addressed
and/or repaired. Staff feels that by requiring a financial guarantee throughout the warranty
period, it could be reduced to two (2) years instead of three (3). Our records show that most
deficiencies have occurred in the first two (2) years
L ENFORCEMENT
17.20.010: RECORDING OF PLATS:
Past policy has been to not allow recording of plats until all improvements have been completed
and accepted. Staff has recently had a couple of developers challenge the policy, and found
that it was not supported by City Code. After researching other municipal entities, staff has
found that some are also requiring financial guarantee prior to recording of plats. This will be
extremely helpful if a developer defaults on their construction obligations but has recorded the
plat and sold lots.
17.20.015: GUARANTEE OF COMPLETION REQUIRED PRIOR TO RECORDING PLATS;
GUARANTEE MAINTAINED UNTIL WARRANTY EXPIRES FOR IMPROVEMENTS
DEDICATED TO PUBLIC AGENCY:
This section is being requested by staff to provide any/all requirements needed to financially
guarantee the development improvements through the recording of the plat and proposed 2
year warranty period.
17.20.030: LOCATION OF STRUCTURES AND IMPROVEMENTS:
Providing additional referenced section.
17.20.040: PERMITS AND MUNICIPAL SERVICES:
Staff is requesting the removal of the stricken through text as it is addressed in section
17.16.050 of City Code.
Exhibit 2
Proposed Amendments
17.16.070: WARRANT AGAINST DEFECTS:
All structures or improvements dedicated to the public, and accepted, shall be warranted
against defects by the person(s) making the dedication and by the person(s) constructing or
placing said structures or improvements upon the land, for a period of three two (32) years from
the date the City Council approves the acceptance of offer of dedications. Any repairs or
replacements to the public infrastructure shall automatically extend the warranty period twelve
(12) additional months beyond the initial twenty-four (24) months; in unusual circumstances, the
Community Services Director may extend the warranty period beyond the aforementioned
twenty-four (24) month period. A financial guarantee shall be provided to the City of Chubbuck
for public improvements in accordance with section 17.20.015 of this Title. The Gity, or ,+s
te remedy any suGh defeGts er to ebtain reimbursement fer the Gest ef remedying SuGh defeGtS.
L ENFORCEMENT
17.20.010: RECORDING OF PLATS:
No plat of any development shall be recorded, nor shall such recording be valid, unless the plat
has received final approval from the city council in the manner prescribed by this title and any
public improvements, either on-site or off-site, as defined herein and as applicable to the
development, are guaranteed in accordance with section 17.20.015 of this title. Public
improvements for purposes of this section are those which are either intended to be turned over
to the City or other government agency or those which serve as common improvements for lots
within the development and shall include but not be limited to: roads, electric, water, sewer, fire
protection, lighting, required recreational or other amenities, required landscaping and/or open
space, curb, putter, sidewalks, parking lots, pressurized secondary irrigation systems, and
drainage systems. If an unapproved, or otherwise unlawful, plat is recorded, the city may
institute proceedings to have the plat stricken from the records maintained by the county
recorder. (Ord. 206 §4-1(A), 1979)
17.20.015: GUARANTEE OF COMPLETION REQUIRED PRIOR TO RECORDING PLATS
GUARANTEE MAINTAINED UNTIL WARRANTY EXPIRES FOR IMPROVEMENTS
DEDICATED TO PUBLIC AGENCY:
No plat shall be recorded until:
A. Financial Guarantee Required; Form: The public improvements associated with the
plat are financially guaranteed for performance by a surety bond, cash deposit,
cashier's check. or irrevocable letter of credit in the citv's name in accordance with
following terms through written agreement:
1. Surety Bond: The bond shall be with a surety company authorized to do
business in the State of Idaho and acceptable to the City.
2. Cash Deposit, Cashier's Check, or Irrevocable Letter of Credit: A cash deposit,
cashier's check, or irrevocable letter of credit in the City's name, shall be
deposited with an escrow agent, city treasurer, or trust company.
3. Accrual: The financial guarantee shall accrue to the City of Chubbuck covering
all costs of construction of the public improvements.
4. Amount: The financial guarantee shall in the amount one hundred fifty percent
(150%) of the total estimated costs based on the development cost estimate in
this section, for completing construction of the public improvements, as approved
by the Director.
5. Term Length: The financial guarantee shall be in force for a minimum period of
twenty-four (24) months with automatic renewal until the improvements have
been deemed completed by the Director and accepted by the City and shall
continue until all contractual warranty periods are completed in accordance with
section 17.16.070 of this title.
4. Development Cost Estimate: The Development Cost Estimate shall be
provided by the developer's engineer of record for review and approval by the
Director.
5. Penalty for Case of Failure to Complete Construction of Public Improvements:
In the event that the developer fails to complete construction of the public
improvements within the period of time required by the conditions of the
guarantee, the city may at the city's discretion, either enter into longer terms with
the developer or determine and take necessary action in order to accomplish
completion of the required public improvements. The city may reimburse itself for
the cost and expense thereof by appropriating the financial guarantee in
whichever form provided and if costs to complete the public improvements
exceed the financial guarantee, the city may seek additional monies from the
developer or owners of the property through all legal means. Longer terms to
accomplish completion of the required public improvements will only be
considered if all owners within the bounds of the development provide their
written consent to the extension's term.
6. Release of Guarantee for Improvements Not to be Dedicated to a Public
Agency:
a. Public improvements which are not dedicated to a public agency yet
which require a financial guarantee in accordance with this section are not
subject to the section 17.16.070 warranty period. Following completion of the
public improvements which are not to be dedicated to a public agency, the
developer may submit a written request to the Director for final inspection. To
receive approval, the improvements must be fully functional and able to be
utilized by lot owners within the development. If the Director determines that the
developer completed the work in accordance with the development agreement
requirements, the Director may consider the inspection final and authorize
release of the financial guarantee covering those improvements. If the inspection
discloses work not completed in accordance with requirements of the
development agreement, the Director shall not declare that portion of the project
complete until such time that noncompliant issues are addressed to the
satisfaction of the Director.
C. Sidewalk Exception: For subdivisions where the Citv determines it to be in the best
interest of the property owners to install sidewalks at the time of building rather
than at the time of subdivision development, the following procedure will be
followed regarding the installation of sidewalks:
1. Building Permit/Certificate of Occupancy: A building permit may be issued on a
building occupying a lot when the required sidewalk has not been installed under
the following conditions:
a. The building permit will clearly note that the sidewalks shall be installed
prior to the receipt of a final Certificate of Occupancy.
b. Prior to issuance of a temporary Certificate of Occupancy, a cashier's
check or cash shall be deposited and held in escrow by the City until such time
that the sidewalks are installed. It shall be the responsibility of the property owner
to request an inspection of the installation and request a refund of the escrowed
funds from the City. All refunds of such escrowed funds shall be subject to the
accounts -payable cycle of the city. An inspection by the Director showing
acceptance and compliance of the sidewalks shall be completed prior to any
request for a refund of the escrowed funds.
c. From time -to -time, buildable lots may be purchased by an adjoining
landowner, or a non -adjoining landowner, who does not either intend to build on
the lot or who does not intend to build on the lot in a pace consistent with the
development's build -out. In such cases, to connect the pedestrian infrastructure
in the development, the City may compel construction of the sidewalk by the
property owner within ninety calendar days (90), weather -permitting, and if not
completed, the city may construct the sidewalk and/or seek remedy in
accordance with section 17.20.050.
17.20.030: LOCATION OF STRUCTURES AND IMPROVEMENTS:
No structures or improvements, except those to be dedicated to the public as provided in this
title, shall be built, installed or placed upon any lands within a development until:
A. The final plat of the development has been approved and recorded, and
B. All required dedications have been made by the developer and accepted by the city, or
bond, check or line of credit furnished as provided in section 17.16.050 and/or 17.20.010 of this
title. (Ord. 754, 2016)
17.20.040: PERMITS
MUNICIPAL
I SERVICES:
The city will not issue permits to b ii .sT.tai's, piace,,epaiui. e. iemeve any StrUG ir�or
i mnreyernen+c upon lands within a development, ,,,in„r ,ii the i+.,o rmaintain streets or furnish
water, sewer or sanitation services within the development, until:
A. The final plat (if not waived) of the development has been approved and recorded, and
B. All required dedications have been made by the developer and accepted by the city.
Neither will the city issue such permits or furnish such services to completed developments that
do not conform to the finally approved and recorded plat. (Ord. 206 §4-1(D), 1979)
Exhibit 3
Current Chapters
17.16.070: WARRANT AGAINST DEFECTS:
All structures or improvements dedicated to the public, and accepted, shall be warranted
against defects by the person(s) making the dedication and by the person(s) constructing or
placing said structures or improvements upon the land, for a period of three (3) years from the
date the City Council approves the acceptance of offer of dedications. The City, or its designee,
may bring an action in any court of competent jurisdiction to compel the warrantor(s) to remedy
any such defects or to obtain reimbursement for the cost of remedying such defects. (Ord. 754,
2016)
L ENFORCEMENT
17.20.010: RECORDING OF PLATS:
No plat of any development shall be recorded, nor shall such recording be valid, unless the plat
has received final approval from the city council in the manner prescribed by this title . If an
unapproved plat is recorded, the city may institute proceedings to have the plat stricken from the
records maintained by the county recorder. (Ord. 206 §4-1(A), 1979)
17.20.030: LOCATION OF STRUCTURES AND IMPROVEMENTS:
No structures or improvements, except those to be dedicated to the public as provided in this
title, shall be built, installed or placed upon any lands within a development until:
A. The final plat of the development has been approved and recorded, and
B. All required dedications have been made by the developer and accepted by the city, or
bond, check or line of credit furnished as provided in section 17.16.050 of this title. (Ord. 754,
2016)
17.20.040: PERMITS AND MUNICIPAL SERVICES:
The city will not issue permits to build, install, place, repair or remove any structures or
improvements upon lands within a development, nor will the city maintain streets or furnish
water, sewer or sanitation services within the development, until:
A. The final plat (if not waived) of the development has been approved and recorded, and
B. All required dedications have been made by the developer and accepted by the city.
Neither will the city issue such permits or furnish such services to completed developments that
do not conform to the finally approved and recorded plat. (Ord. 206 §4-1(D), 1979)