HomeMy WebLinkAbout2022-07 City FeesRESOLUTION NO. 20122- 07
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHUBBUCK, A MUNICIPAL
CORPORATION OF IDAHO, RENEWING AND AMENDING FEES PREVIOUSLY SET FORTH
IN RESOLUTION 2021-09 BY CHUBBUCK MUNICIPAL CODE FOR CITY SERVICES,
INCLUDING ALCOHOLIC BEVERAGE LICENSES, ANIMAL SERVICES, BUSINESS
LICENSES, PARKS, CHILD CARE LICENSES, DEVELOPMENT, ENGINEERING SERVICES,
FIRE SERVICES, PUBLIC WORKS SERVICES, PARKS AND RECREATION SERVICES,
PARKS AND RECREATION FACILTIES, PLANNING AND DEVELOPMENT SERVICES,
POLICE SERVICES, PUBLIC RECORDS, SANITATION SERVICES, CONSTRUCTION,
UTILITY BILLING, COMMUNITY SERVICES, WATER SERVICES, AND WATER
POLLUTION CONTROL SERVICES, THESE FEES SHALL BE EFFECTIVE OCTOBER 1, 2022.
WHEREAS, the City of Chubbuck City Council regularly sets fees for City provided
services, licenses, permits, and programs available to the public, pursuant to Chubbuck Municipal
Code; and
WHEREAS, City department managers and superintendents have reviewed the fees
charged for City provided services, licenses, permits, and programs for their respective departments,
and made recommendations to the City Council for amendment of said fees for Fiscal Year 2023;
r"8I
WHEREAS, the City Council has determined that said recommended fees be renewed
and/or amended,
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF CHUBBUCK AS FOLLOWS:
1. That fees for City provided services, licenses, permits, and programs for Fiscal
Year 2023 shall be adopted and charged as they are more specifically delineated on Exhibits A
through G, which Exhibits are attached to this Resolution and incorporated herein.
2. That the amendment or repeal of any one of the Exhibits attached to and
incorporated in this Resolution shall in no way affect the remaining Exhibits to this Resolution,
which shall remain in full force and affect.
3. That the fees provided for in Exhibits A through G shall be effective October
1, 2022.
PASSED AND APPROVED BY THE MAYOR AND COUNCIL OF THE CITY OF CHUBBUCK,
THIS 21ST DAY OF SEPTEMBER, 2022.
ATTEST:
J o ers, City Clerk
Kevin B. England, Mayor
EXHIBIT A
PUBLIC RECORD FEES
After the first one hundred (100) pages, the City of Chubbuck will charge a
standard fee of $0.05 (five cents) per page, single sided for standard black and
white photocopied 8 A" X 11" paper (without any redactions), plus the actual
costs of postage; standard color copies on regular paper shall be charged at the
rate of $0.50 (fifty cents) per page. Black and white single -sided copies on ledger
size paper (11" X 17") shall be charged at the rate of $0.10 (ten cents) per page,
and color single -sided copies on ledger size paper (11" X 17") shall be charged
at the rate of $1.00 (one dollar) per page. ANSI Copies, shall be charged at the
rate of $10.00 (ten dollars) each for black and white copies, and $25.00 (twenty-
five dollars) each for color copies. If copies are to be faxed, the requesting
person shall be charged $0.50 (fifty cents) per page.
If the requestor requests a computer tape, computer disc, or similar or analogous record
system containing public record information, the City of Chubbuck shall charge the
City's costs of copying the information in that form and the standard cost, if any, for
selling the same information in the form of a publication.
In addition to the standard copying fee, the City may charge an additional fee of
$3.00 (three dollars) per item if the Records Custodian is asked by the requesting
person to certify a public record.
In addition to other fees authorized or prescribed by this Resolution, the City may
charge fees for labor costs at the per hour pay rate of the lowest paid administrative
staff employee or public official who is necessary and qualified to process the request,
and copying costs associated with locating and copying requested public record
where:
a. The request is for more than 100 pages of paper records; or
b. The request includes records from which non-public (exempt)
information must be deleted; or
c. The actual labor associated with responding to requests for public
records in compliance with Idaho Code Title 74, Chapter 1 exceeds two
person hours. I.C. §74-102 (10) (b) and (e).
Estimated Costs to be Paid in Advance: For purposes of this subsection, the Records
Custodian shall, whenever possible, provide the requestor with an estimate of the actual
costs which will be incurred to locate, segregate and duplicate the City records. The
Records Custodian shall provide the requesting person with an estimate of the actual
costs in writing, and require payment from the requesting person prior to undertaking
the obligation to locate, segregate and duplicate such City records. Upon delivery of the
requested copy(s) of City records, the Records Custodian shall provide the requesting
person with a full accounting of the actual costs incurred by the City, in locating,
segregating, and duplicating such City records. The requesting person shall pay the
additional actual costs incurred by the City, if any, in excess of the estimated amount
paid, or the City shall provide the requesting person a refund if the actual costs in
locating, segregating and duplicating the City records do not exceed the estimated costs
paid by the requesting person.
If copying resources and/or equipment are not available, the Custodian may elect to
have an outside source copy the City records requested and assess any applicable
charges of the outside source in addition to the labor costs, as provided by subsection
5 above.
The City will not charge costs or fees for copies when the number of pages copied is
less than one hundred (100) pages, or the cost of the copies is less than $1.00 (one
dollar), or the Requestor demonstrates that the Requestor's examination and/or
copying of public records:
a. Is likely to contribute significantly to the public's understanding of the
operations or activities of the City;
b. Is not primarily in the individual interest of the Requestor including, but not
limited to, the Requestor's interest in litigation in which the Requestor is or
may become a party; and
c. Will not occur if fees are charged because the Requestor has insufficient
financial resources to pay such fees. I.C. § 74-102(10) (f).
d. Sales tax shall be assessed and collected on all copying fees.
e. Copies of large city maps will have a $5.00 printing fee.
EXHIBIT B
CHUBBUCK POLICE DEPARTMENT
FEESCHEDULE
BICYCLE LICENSE: $ 1.50
COPIES: Accident/ Police Reports/ Public Records 1-4 pages
$ 1.00
Each additional page
$ 0.50
Copies of pictures/ page
$ 1.00
CD
$ 1.00
FINGERPRINTS: Up to three cards
$ 10.00
Each additional card after three
$ 5.00
Reprints
$ 5.00
LICENSES:
Behavioral/Mental Health Initial Fee
$75.00
Renewal
$25.00
Cab Initial Fee
$75.00
Renewal
$25.00
Child Care (Provider/ emp. / vol. /res. 12 &over) Initial
$75.00
Renewal
$25.00
Child Care Provider Every 5" year renewal fee.
$75.00
ICCP doing Relative Care ONLY
$75.00
Renewal
$25.00
Private Investigators Initial Fee
$75.00
Renewal
$25.00
PET LICENSES:
Cat $ 2.00
Spayed/neutered $ 1.00
Dog $10.00
Spayed/neutered $ 6.00
Kennel Fee for each dog after 2- includes license $20.00
Duplicate Dog License $ 5.00
From February 1St to May 3111 licenses will be half price
PET FINES:
Running at Large
Owner Release
Adoption
V offense
2" offense
Litter, under 8 weeks
Dog
Cat
VEHICLE IDENTIFICATION CHECK (VIN):
$40.00
$80.00
$30.00
$60.00
$35.00
$15.00
$ 5.00
EXHIBIT C
CHUBBUCK FIRE DEPARTMENT
FEE SCHEDULE
Master Services Inspections $15.00
EXHIBIT D
PUBLIC WORKS DEPARTMENT FEES
DEPARTMENT
CATEGORY
TYPE
$ 4.09
FEE
Base Rate (1.5" Meter Size) $ 79.81
Pocatello Treatment
Wastewater Connection (1"
Wastewater
Monthly User Rate
Wastewater
Plant Capacity Fee
water service)
$
2,370.00
$ 1.62
Pocatello Treatment
Wastewater Connection (1.5"
Customers outside City Limits
Wastewater
Plant Capacity Fee
water service)
$
4,740.00
Monthly User Rate
Pocatello Treatment
Wastewater Connection (2"
Wastewater
Plant Capacity Fee
water service)
$
7,580.00
$ 4,133.00
To be determined
Pocatello Treatment Wastewater Connection (>2" individually by
Wastewater Plant Capacity Fee water service) Pocatello
Residential Base Rate (per
Wastewater Monthly User Rate single family equivalent/EDU) $ 51.11
North West Sewer Interceptor
Wastewater Monthly User Rate (NWSI) per EDU $ 10.45
Commercial Base Charge (per
Wastewater Monthly User Rate EDU) $ 21.43
Commercial Volumetric (North
Wastewater
Monthly User Rate
of 1-86) per 1,000 gallons
$ 4.09
Water Monthly User Rate
Base Rate (1.5" Meter Size) $ 79.81
Commercial Volumetric (South
Residential and Commercial
Wastewater
Monthly User Rate
of 1-86) per 1,000 gallons
$ 5.34
Wastewater
Monthly User Rate
Billing Fee
$ 1.62
Customers outside City Limits
(Base Rate, NWSI, Volumetric
1.5 Times Regular
Wastewater
Monthly User Rate
Charge)
Rates
Capacity Fee (per EDU
Wastewater
Capacity Fee
Equivalent) - One-time charge
$ 4,133.00
Residential and Commercial
Base Rate (3/4" and 1" Meter
Water Monthly User Rate
Size) $ 27.72
Residential and Commercial
Water Monthly User Rate
Base Rate (1.5" Meter Size) $ 79.81
Residential and Commercial
Water Monthly User Rate
Base Rate (2" Meter Size) $ 123.53
Residential and Commercial
Water Monthly User Rate Base Rate (3" Meter
Water
Water
Residential and Commercial
User Rate Base Rate (4" Meter
Residential and Commercial
User Rate Base Rate (6" Meter
256.94
421.11
Residential and Commercial
Water Monthly User Rate Base Rate (8" Meter Size) $ 1,332.59
Pressurized
Secondary Residential Base Rate (per
Irrigation Monthly User Rate EDU) $ 16.10
Pressurized
Secondary Commercial Base Rate (per
Irrigation Monthly User Rate EDU) S 16.10
Notes:
1. The Pressurized Secondary Irrigation Rate will be charged to customers when irrigation
water is available in the system at the service connection/valve box on the property,
whether the customer utilizes the irrigation water or not.
2. The Pressurized Secondary Irrigation Rate will be charged once per month for the entire year
to provide a "flat rate", even when irrigation water is not available in the system such as
during winter.
Bannock County
Sanitation Landfill Per Ton Disposal Fee $ 35.00
Residential Monthly
Sanitation User Rate Base Rate $ 18.44
Residential Monthly Additional Residential Cart
Sanitation User Rate Base Rate $ 11.84
Residential Monthly
Sanitation User Rate Residential Recycle Cart $ 5.00
One Time Fee/per Residential Return Service Fee
Sanitation Service (per dump)* $ 8.66
Note: The fee to replace or repair carts damaged from customer misuse or vandalism (paint,
stickers, etc.) will be the actual replacement or repair cost.
Residential and Commercial
Water
Monthly User Rate
Base Rate (10" Meter Size)
$ 2,035.80
Usage/Volume charge per
Water
Monthly User Rate
1,000 gal
$ . 1.33
Customers outside City Limits
(Base Rate, Usage/Volume
1.5 Times Regular
Water
Monthly User Rate
Charge)
Rates
Water Connection/Capacity
Water
Capacity Fee
Fee (per 1" EDU)
$ 2,360.00
Water
New Meter Fee
Meter Fee 1" - Materials*
$ 505.00
Meter Fee 2" Turbine -
Water
New Meter Fee
Materials*
$ 1,130.00
Meter Fee 2" Compound -
Water
New Meter Fee
Materials*
$ - 2,925.00
To be determined
Water
New Meter Fee
Meter Fee >2" - Materials*
individually
* Meter Fee is
a one-time charge for the installation of a new meter on a new service line.
Pressurized
Secondary Residential Base Rate (per
Irrigation Monthly User Rate EDU) $ 16.10
Pressurized
Secondary Commercial Base Rate (per
Irrigation Monthly User Rate EDU) S 16.10
Notes:
1. The Pressurized Secondary Irrigation Rate will be charged to customers when irrigation
water is available in the system at the service connection/valve box on the property,
whether the customer utilizes the irrigation water or not.
2. The Pressurized Secondary Irrigation Rate will be charged once per month for the entire year
to provide a "flat rate", even when irrigation water is not available in the system such as
during winter.
Bannock County
Sanitation Landfill Per Ton Disposal Fee $ 35.00
Residential Monthly
Sanitation User Rate Base Rate $ 18.44
Residential Monthly Additional Residential Cart
Sanitation User Rate Base Rate $ 11.84
Residential Monthly
Sanitation User Rate Residential Recycle Cart $ 5.00
One Time Fee/per Residential Return Service Fee
Sanitation Service (per dump)* $ 8.66
Note: The fee to replace or repair carts damaged from customer misuse or vandalism (paint,
stickers, etc.) will be the actual replacement or repair cost.
* A Return Service Fee will be charged if service is requested even if cart is unserviceable (such as
blocked, not out, etc.) and the cart is not dumped
Notes:
1. If Container is moved or repositioned without approval from the City Sanitation
Department, a $25 fee will be added to cover cost of moving the container to allow for
servicing.
2. The fee to replace or repair containers damaged from customer misuse or vandalism (paint,
stickers, etc.) will be the actual replacement or repair cost.
3. An extra one-time dump fee will be charged if an unscheduled service is requested even if
container is unserviceable (such as blocked, not out, etc.) and the container is not dumped
* Container Rental does not include State sales tax.
** Container service charge is based on one dump per week. For multiple services per week,
the monthly charge will be multiplied by the number of services. For example, a 4 -Yard
container serviced 3 times per week will have a charge of $122.46 x 3 plus rental fee
Sanitation
Commercial Monthly
3 Yd Container Rental (per
$ 3.63
Sanitation
Sanitation
User Rate
month)*
$
15.58
Dump/Haul Fee (per service)
Commercial Monthly
4 Yd Container Rental (per
Roll -Off User Rate
Per Ton Disposal Fee
Sanitation
User Rate
month)*
$
16.96
Commercial Monthly
6 Yd Container Rental (per
Sanitation
User Rate
month)*
$
18.71
Commercial Monthly
8 Yd Container Rental (per
Sanitation
User Rate
month)*
$
22.95
Commercial Monthly
3 Yd Container (Dump &
Sanitation
User Rate
Haul)**
$
91.84
Commercial Monthly
4 Yd Container (Dump &
Sanitation
User Rate
Haul)**
$
122.46
Commercial Monthly
6 Yd Container (Dump &
Sanitation
User Rate
Haul)**
$
183.68
Commercial Monthly
'8 Yd Container (Dump &
Sanitation
User Rate
Haul)**
$
244.91
One Time Fee/per
3 Yd Container (Extra
Sanitation
Service
Unscheduled one-time dump)
$
22.96
One Time Fee/per
4 Yd Container (Extra
Sanitation
Service
Unscheduled one-time dump)
$
30.61
One Time Fee/per
6 Yd Container (Extra
Sanitation
Service
Unscheduled one-time dump)
$
45.92
One Time Fee/per
8 Yd Container (Extra
Sanitation
Service
Unscheduled one-time dump)
$
61.22
Notes:
1. If Container is moved or repositioned without approval from the City Sanitation
Department, a $25 fee will be added to cover cost of moving the container to allow for
servicing.
2. The fee to replace or repair containers damaged from customer misuse or vandalism (paint,
stickers, etc.) will be the actual replacement or repair cost.
3. An extra one-time dump fee will be charged if an unscheduled service is requested even if
container is unserviceable (such as blocked, not out, etc.) and the container is not dumped
* Container Rental does not include State sales tax.
** Container service charge is based on one dump per week. For multiple services per week,
the monthly charge will be multiplied by the number of services. For example, a 4 -Yard
container serviced 3 times per week will have a charge of $122.46 x 3 plus rental fee
Sanitation
Roll -Off User Rate
Daily Container Rental
$ 3.63
Sanitation
Roll -Off User Rate
Monthly Container Rental
$ 108.70
Sanitation
Roll -Off User Rate
Dump/Haul Fee (per service)
$ 175.10
Sanitation
Roll -Off User Rate
Per Ton Disposal Fee
$ 35.00
Prohibited Items (tires, Actual disposal cost
Sanitation Roll-Off User Rate batteries, etc.) plus $10.00
Refrigeration Units
(Appliances with Freon,
freezers, refrigerators, AC
Sanitation Roll-Off User Rate units, etc.) $ 25.00
Notes:
1. The fee to replace or repair containers damaged from customer misuse or vandalism (paint,
stickers, etc.) will be the actual replacement or repair cost.
2. A $50 fee will be charged if service is requested but the container is unserviceable (such as
blocked, empty, etc.) and the container is not dumped
Roll-Off Recycle User Pick-up and Haul Fee (per
Sanitation Rate service) $ 95.00
Current Disposal Fee
Roll-Off Recycle User from Receiving
Sanitation Rate Per Ton Disposal Fee Facility
Notes:
1. The fee to replace or repair containers damaged from customer misuse or vandalism (paint,
stickers, etc.) will be the actual replacement or repair cost.
2. A $50 fee will be charged if service is requested but the container is unserviceable (such as
blocked, empty, etc.) and the container is not dumped
Cleanup Connection 3 Yard Container (per
Sanitation Services reservation/service) $ 10.00
Cleanup Connection 15 Yd Roll-off (per ton disposal
Sanitation Services fee only) $ 35.00
Cleanup Connection Prohibited Items (tires, Actual disposal cost
Sanitation Services batteries, etc.) plus $10.00
Refrigeration Units
(Appliances with Freon,
Cleanup Connection freezers, refrigerators, AC
Sanitation Services units, etc.) $ 25.00
Notes:
1. If Container is moved or repositioned without approval from the City Sanitation
Department, a $25 fee will be added to cover cost of moving the container to allow for
servicing.
2. The fee to replace or repair containers damaged from customer misuse or vandalism (paint,
stickers, etc.) will be the actual replacement or repair cost.
Right of Way
Streets Construction Right of Way Permit $ 25.00
Right of Way Right of Way Contractor
Streets Construction License $ 25.00
EXHIBIT E
COMMUNITY SERVICES DEPARTMENT
DIVISION(S) CATEGORY TYPE FEE
All- Building;
Development
Services; Parks &
Recreation;
Planning
All- Building;
Development
Services; Parks &
Recreation;
Erosion & Sediment
Control
Erosion & Sediment
Single -Family Residential
when submitted with a
Waived
Planning Control Less than 5 acres $50
All- Building;
Development
Services; Parks &
Recreation;
Erosion & Sediment
Planning Control Between 5 and 10 acres $100
All- Building;
Development
Services; Parks &
Recreation;
Erosion & Sediment
Planning
Control
More than 10 acres
$150
When work on a site that
requires a permit commences
without first obtaining the
Building, Plumbing,
necessary permit, and after
Double the permit
Electrical, and/or
notice, the person continues
fee (per building
Building
Mechanical
performing the work
code)
Building, Plumbing, Inspections outside of regular
Electrical, and/or office hours (depending on
Building Mechanical inspector availability) $100/hr.
Re -inspections beyond a 2nd
Building, Plumbing,
Electrical, and/or
Mechanical
re -inspection of a required
process; per required
inspection (i.e., a 3rd
inspection if necessary to
determine if corrections have
been made). Charge is at
discretion of the Building
Official.
Commercial Base Fee $ 30.00
Electrical -
Building
Commercial
Building Permit Fees &
Per Resolution
Building
Building
Valuations
2021-04
Building
Commercial
Building
65% of building
Permanent Service (each)
$
30.00
permit cost; due at
Building
Building
Commercial Plan Review
application
Building
Commercial
Structure- Floodplain
$
Building
Building
Development Permit
$ 100.00
Building
Building
Sign Permit Application
$ 25.00
Building
Building
Reface Sign Permit Application
$ 25.00
Electrical -
Electrical -
Commercial Base Fee $ 30.00
Electrical -
Building
Commercial
Temporary Service (each)
$
30.00
Electrical -
Electrical -
Temporary Service (each)
Building
Commercial
Building
Commercial
Permanent Service (each)
$
30.00
Building
Electrical -
Commercial valuation up to
Event
$ 50.00
Building
Commercial
$20,000valuation
$
2%
Building
Electrical -
Commercial valuation at and
$
10.00
Building
Commercial
beyond $20,001
$
0.00
Electrical -
Building
Commercial
Sign & Outlet Base
$ 30.00
30.00
Electrical -
Electrical - Residential
Temporary Service (each)
Building
Commercial
Sign (each)
$ 3.00
Permanent Service (each)
Electrical -
Carnival, Circus, or Similar
Building
Building
Commercial
Event
$ 50.00
Building
Electrical - Residential
Base Fee
$
30.00
Building
Electrical - Residential
Temporary Service (each)
$
30.00
Building
Electrical - Residential
Permanent Service (each)
$
30.00
Building
Electrical - Residential
Service to 100 amps (each)
$
3.00
Building
Electrical - Residential
Service to 200 amps (each)
$
5.00
Building
Electrical - Residential
Service over 200 amps (each)
$
10.00
Building
Electrical - Residential
Number of Rooms (each)
$
2.50
Building
Electrical - Residential
Number of Circuits (each)
$
2.50
Building
Electrical - Residential
Space Heaters
$
10.00
Building
Electrical - Residential
Solar Panel
$
70.00
Mechanical -
Residential &
Building
Commercial
Base Fee
$
30.00
Mechanical -
Residential &
Building
Commercial
Commercial Rooftop (each)
$
10.00
Mechanical -
Residential &
Commercial Unit Heater
Building
Commercial
(each)
$
10.00
Building
Mechanical -
Fireplaces, Inserts, Stoves
(each)
$
5.00
Residential &
Residential &
Commercial Cooking Hood
Building
Commercial
Building
Commercial
(each)
$
10.00
Building
Mechanical -
Residential &
$
0.02
Building
Residential &
Commercial Other Regulated
$ 5.00
15.00
Building
Commercial
Device (each)
$
10.00
Gas Water Heater, Flue Pipe
Mechanical -
Building
Commercial
(each)
$ 5.00
Residential &
Water Heater Replacement
$
15.00
Building
Commercial
Gas Piping - up to 4 units
$
5.00
Building
Mechanical -
Water Line (separate)
$
25.00
Building
Residential &
Sewer Line (separate)
$
25.00
Building
Commercial
High Pressure Gas Test
$
10.00
Building
Mechanical -
Fireplaces, Inserts, Stoves
(each)
$
5.00
Residential &
Plumbing -
Commercial
Base Fee
Building
Commercial
Furnace up to 100k BTU
$ 5.00
Commercial valuation up to
$20,000
Mechanical -
0.02
Building
Plumbing -
Commercial
Residential &
$
0.02
Building
Commercial
Unit Heaters (each)
$ 5.00
15.00
Mechanical -
Plumbing- Residential
Base Fee
$
Residential &
Gas Water Heater, Flue Pipe
Plumbing - Residential
Building
Commercial
(each)
$ 5.00
Building
Mechanical -
Residential &
Commercial
Fireplaces, Inserts, Stoves
(each)
$
5.00
Building
Plumbing -
Commercial
Base Fee
$
30.00
Building
Plumbing -
Commercial
Commercial valuation up to
$20,000
$
0.02
Building
Plumbing -
Commercial
Commercial valuation at and
beyond $20,001
$
0.02
Building
Plumbing -
Commercial
Water Heater Replacement
$
15.00
Building
Plumbing- Residential
Base Fee
$
30.00
Building
Plumbing - Residential
Plumbing Fixture (each)
$
6.00
Building
Plumbing - Residential
Water Heater Replacement
$
15.00
Building
Plumbing - Residential
Lawn Sprinklers
$
15.00
Building
Plumbing- Residential
Water Line (separate)
$
25.00
Building
Plumbing - Residential
Sewer Line (separate)
$
25.00
Building
Plumbing - Residential
Water & Sewer (together)
$
40.00
Building Dept. Notes:
1. Please see Public Works' Fees schedule such as wastewater and water connection
and capacity fees, water meter fees, right-of-way permits, etc.
2. The City of Chubbuck has adopted Police, EMS, and Parks & Recreation
Development Impact Fees. Contact the Building Department for applicable rates
based on fees set by a separate action of the City Council.
Platting/Development,
Infrastructure Plan
Review and/or
Inspections,
Development Development, Site Concurrent Construction.
Services Development Guarantee/Agreement $ 1,500.00
nt,
Infrastructure Plan
Review and/or
Inspections,
Development Development, Site Substantial Completion
Services Development Guarantee/Agreement $ 300.00
Platting/Development,
Infrastructure Plan
Review and/or
Inspections,
Development Development, Site Plat/Improvement
Services Development Development Agreement $ 200.00
Platting/Development,
Infrastructure Plan
Review and/or
Inspections,
Development Development, Site
Services Development Planning Conference None
Platting/Development,
Infrastructure Plan _
Development
Services
Review and/or
Inspections,
Development, Site
Development
Preliminary Plat
$550 base fee plus
$20/lot
Platting/Development,
Infrastructure Plan
Review and/or
Inspections,
Development Development, Site $258 base fee plus
Services Development Final Plat $15/lot
Platting/Development,
Infrastructure Plan
Development Review and/or
Services Inspections,
Development, Site
$550 base fee plus
Development
Short Plat
$20/lot
Platting/Development,
Public Notice Sign Deposit
Infrastructure Plan
(when required by city code).
Review and/or
Deposit will be returned if,
Inspections,
after the posting timeline, the
$100; Full or partial
Development Development, Site
sign is in the same condition
refund at Director's
Services Development
that it was delivered in.
discretion.
Platting/Development,
Infrastructure Plan
Review and/or
Inspections,
Development Development, Site
Services Development
If a public hearing is required
by code for a plat review,
applicant responsible for cost
Cost of public
hearing publication
and $1.50 for each
mailing notice
Platting/Development,
Infrastructure Plan
Review and/or
Inspections,
Development Development, Site Stormwater Plan Review < 1.5
Services I Development acres $ 48.00
Platting/Development,
Infrastructure Plan
Review and/or
Inspections,
Development Development, Site Stormwater Plan Review 1.5
Services Development to 10 acres $ 96.00
Development
Services
Development
Services
Development
Services
Platting/Development,
Infrastructure Plan
Review and/or
Inspections,
Development, Site
Platting/Development,
Infrastructure Plan
Review and/or
Inspections,
Development, Site
Platting/Development,
Infrastructure Plan
Review and/or
Inspections,
Stormwater Plan Review 10 to
20 acres
Stormwater Plan Review>20
acres
Plan review beyond a second
re -review of a required phase
(i.e., a 3rd review is necessary
to determine if corrections
136.00
192.00
$ 90.00
Development, Site have been made. Charge is at
Development discretion of Community
Services Director.
Platting/Development,
Infrastructure Plan
Review and/or
Inspections, Vacation (ROW, subdivision,
Development Development, Site easements, and other public
Services Development utilities) $ 320.00
Platting/Development,
Infrastructure Plan
Review and/or
Inspections, Appeals or Requests for
Development Development, Site Reconsideration of decisions
Services Development made by LUDC or City Council $ 150.00
Platting/Development,
Infrastructure Plan
Review and/or
Inspections, Traffic Impact Analysis Report
Development Development, Site Review (associated with
Services Development development/plat) $ 500.00
For developers who request
that the City assess and collect
Development Latecomer Agreement
Services Fee
Bicentennial &
Heritage
Shelter/Pavilion
Parks & Reservations (water
a pro -rated reimbursement
from adjoining landowners of
costs of the public
improvements said developers
are required to install and
which directly benefit the
adjoining land; includes cost
of preparing and recording
releases when lands when the
adjoining landowners have
paid their share of the
assessed costs
350.00
Recreation and power available) M -Th 10 am - 4 pm $ 30.00
Bicentennial &
Heritage
Shelter/Pavilion
Parks & Reservations (water M -Th 4 pm - 4 pm $ 50.00
Recreation and power available)
Cotant Gazebo
Parks & Reservations (water
Recreation and power available) F- Sa 4 pm - 9 pm $ 55.00
Bicentennial &
Heritage
Shelter/Pavilion
,Parks &
Reservations (water
Recreation
and power available) All Day M -Th 10 am -9 pm $ 75.00
Bicentennial &
Heritage
Shelter/Pavilion
Parks &
Reservations (water
Recreation
and power available) F -Su 10 am - 4 pm $ 40.00
Cotant Gazebo
Parks & Reservations (water
Recreation and power available) F- Sa 4 pm - 9 pm $ 55.00
Bicentennial &
Heritage
Shelter/Pavilion
Parks &
Reservations (water
Recreation
and power available)
F- Su 4 pm - 9 pm
$
50.00
Bicentennial &
Heritage
Shelter/Pavilion
Parks &
Reservations (water
Recreation
and power available)
F - Sun 10 am - 9 pm
$
85.00
Bicentennial &
Heritage
Shelter/Pavilion
Parks &
Reservations (water
Recreation
and power available)
Cancellation Fee
$
10.00
Cotant Gazebo
Parks &
Reservations (water
Recreation
and power available)
M -Th 10 am - 4 pm
$
35.00
Cotant Gazebo
Parks &
Reservations (water
Recreation
and power available)
M -Th 4 pm - 9 pm
$
55.00
Cotant Gazebo
Parks &
Reservations (water
Recreation
and power available)
All Day M -Th 10 am -9 pm
$
80.00
Cotant Gazebo
Parks &
Reservations (water
Recreation
and power available)
F- Sa 10 am -4 pm
$
45.00
Cotant Gazebo
Parks & Reservations (water
Recreation and power available) F- Sa 4 pm - 9 pm $ 55.00
Cotant Gazebo
Parks & Reservations (water
Recreation and power available) F - Sun 10 am - 9 pm $ 90.00
Cotant Gazebo
Parks & Reservations (water
Recreation
and power available)
Cancellation Fee
$ 10.00
Recreation
Baseball/Softball sanctioned leagues/events) $ 65.00
Capell Softball Complex Rental
Garbage/Bathroom Services
Parks &
for Leagues/Tournaments,
- Per field per day (except
Over 16 teams (except
Recreation
Baseball/Softball
sanctioned leagues/events)
$ 55.00
Baseball depends on availability
$150/request
Cotant Baseball Complex
Field Maintenance Tool Use
$500 deposit; Full
Parks &
Rental- Per field per day
or partial refund at
Parks &
Baseball/Softball organizations)
(except sanctioned
Recreation
Baseball/Softball
leagues/events)
$ 55.00
Hourly Reservations: Ball Field
Parks &
individual (except sanctioned
Recreation
Baseball/Softball
leagues/events)
$10/hr
Ball field deposit, per field
(except sanctioned
leagues/events). Deposit will
be returned, in whole or in
part at the discretion of the
Director, depending on
whether there is abnormal
damage to city facilities, $100 single
excessive litter, etc., resulting reservation; $300
Parks & from the group's use of city league use (multiple
Recreation Baseball/Softball facilities. days' use)
Garbage/Bathroom Services
for Leagues/Tournaments, Up
Parks &
to 16 teams (except
Recreation
Baseball/Softball sanctioned leagues/events) $ 65.00
Parks &
Garbage/Bathroom Services
for Leagues/Tournaments,
Parks &
Over 16 teams (except
Recreation
Baseball/Softball sanctioned organizations) $ 97.50
Ball Field Striping/Field Prep
per request per field (except
Parks &
sanctioned organizations);
Recreation
Baseball/Softball depends on availability
$40.00
Parks &
Pitcher Mound Rebuild;
Recreation
Baseball depends on availability
$150/request
Field Maintenance Tool Use
$500 deposit; Full
Parks &
(except sanctioned
or partial refund at
Recreation
Baseball/Softball organizations)
director's discretion.
Additional portable toilet
Parks & requested or required by
Recreation Baseball/Softball Director at their discretion Billed at City's cost
Parks & Osborn Tennis Key Rental, April 1- October Free for 48 hours/
Recreation Complex 31 annually $10 for season
Parks &
Osborn Tennis
Key Rental, Key(s) not
Recreation
Complex
returned from prior year(s) $ 20.00
that require it
recipient/mailing
Additional Picnic Tables
Conditional Use Permit
beyond what available at
Parks &
Misc. water Use at
facility, includes delivery
Recreation
Picnic Tables
to/from park, when available $5 table/day
Comprehensive Plan
Additional Trash Cans,
Parks &
Amendment
includes delivery to/from
Recreation
Trash Cans
park, when available $3 trash can/day
The Community Services Director shall have the
authority to set rates for additional programs, special
programs, group events, or uses, and other
occasional activities not listed above as the need
Additional Fees for arises in consideration of costs to the City. Decisions
Parks & Services or Uses Not of the Director may be appealed to the City Council at
Recreation Listed a regular Council meeting.
Use of water at city park for
$1.50/mailing
Planning
activity not directly related to
that require it
recipient/mailing
pavilion -shelter use (such as
Conditional Use Permit
water slides/slip-n-slides,
Parks &
Misc. water Use at
dunk tanks, etc.): 5 -hour
Recreation
City Park
period $ 25.00
Comprehensive Plan
Use of water at city park for
Applications
Amendment
activity not directly related to
pavilion -shelter use (such as
Parks &
Misc. water Use at
water slides/slip-n-slides,
Recreation
Citv Park
dunk tanks, etc.): All Dav S 50.00
The Community Services Director shall have the
authority to set rates for additional programs, special
programs, group events, or uses, and other
occasional activities not listed above as the need
Additional Fees for arises in consideration of costs to the City. Decisions
Parks & Services or Uses Not of the Director may be appealed to the City Council at
Recreation Listed a regular Council meeting.
Planning Applications Amendment (Map or Text) $ 535.00
Zoning Development
Planning Applications Agreement $ 200.00
Creative Community
Planning Applications Application $ 1,000.00
Notification Mailings for any
$1.50/mailing
Planning
Applications
that require it
recipient/mailing
Conditional Use Permit
Planning
Applications
Application or Amendment
$ 585.00
Comprehensive Plan
Planning
Applications
Amendment
$ 700.00
Planned Unit Development
Planning
Applications
Application or Amendment
$ 700.00
Initial Zoning or Title Text
Planning Applications Amendment (Map or Text) $ 535.00
Zoning Development
Planning Applications Agreement $ 200.00
Creative Community
Planning Applications Application $ 1,000.00
Annexation (Annexations also
require a separate Initial
Planning
Applications
Zoning application and fee)
$ 165.00
Variance Application or
Planning
Applications
Amendment
$ 340.00
Planning
Applications
Variance, Administrative
$ 35.00
Public Notice Sign Deposit.
Deposit will be returned if,
after the posting timeline, the
$100; Full or partial
sign is in the same condition
refund at director's
Planning
Applications
that it was delivered in.
discretion.
Public Hearings in excess of
amount required by City or
state regulations (regardless
of who requests it) or if an
application has been noticed
Cost of public
and then the hearing
hearing publication
postponed at the applicant's
and $1.50 for each
Planning
Applications
request
mailing notice
Appeals or Requests for
Reconsideration of decisions
Planning
Applications
made by LUDC or City Council
$ 150.00
Zoning
Certification/Compliance
Planning
Services
Letter -Standard
$ 75.00
Zoning
Certification/Compliance
Planning
Services
Letter -Expedited
$ 200,00
EXHIBIT F
UTILITY BILLING DEPARTMENT FEES
The processing and administrative fees for the Utility Billing Department shall be as follows:
Deposit (New account / Good Standing)
Deposit (Delinquent / Collection Accounts)
Fire Hydrant Meter Rental:
Permit
Rental
Water Usage
Account Name Change/Transfer
After Hours/Holiday. turn off
Special requests turn off/on (extended absence,
seasonal)
Emergency turn off
Return Item Fee
On -Site Collection
Delinquent Fee
Collection Fee
Out for Shut Off
Unauthorized Obtainment of Water:
First Offense
Second Offense
Third Offense
Property Replacement Fees:
Locks
Electronic Radio Transmitters
Meter
$120.00
$360.00
$25.00
$1.00 per day
Usage Rate as set by the Water Dept.
No Fee
$25.00
$25.00
No Fee
Actual Cost of Service
$30.00
Not Allowed
5% of Outstanding Balance
30% of Outstanding Balance/Interest
$50.00
$300.00
$350.00
Misdemeanor Citation
Actual Cost of Replacement
Actual Cost of Replacement
Actual Cost of Replacement
Persons who qualify for Circuit Breaker through Bannock County shall receive a 30%
reduction on their utility bill. The reduction shall be available to those who own and
occupy a single-family dwelling. The reduction is not available for multi -family units
including duplexes. The Utility Billing department will add the reduction to each account
upon receipt of the Circuit Breaker Exemption list from Bannock County.
Persons who pay their bill electronically as an ACH direct payment will receive a $5.00 discount
on their utility bill.
EXHIBIT G
CITY CLERK DEPARTMENT FEES
Alcohol Licenses
Liquor
$
562.50
Beer (On -premises)
$
200.00
Design Review Application
$
50.00
$150.00
Public Space Vendor Application
100.00
Wine (Off -premises)
$150.00
Business License Application & Renewal
$
25.00
Expired Business License
$
25.00
Temporary Vendor
$
150.00
Fireworks Booth
$
25.00
Fireworks Booth Investigation Fee
$
100.00
Child Group Treatment Centers (Initial)
$
250.00
Child Group Treatment Centers (Renewal)
$
150.00
Home Occupation
$
10.00
Catering Permit Application
$
20.00
Alcohol Licenses
Liquor
$
562.50
Beer (On -premises)
$
200.00
Beer (Off- remises)
$
50.00
Wine (On -premises)
$
100.00
Wine (Off -premises)
$
100.00