HomeMy WebLinkAboutMeeting PresentationPublic Works Department Proposed Fees for FY23 Water and Wastewater Fees Pocatello Treatment Plant Capacity Fees Pocatello Treatment Plant Capacity Fees FY22 FY23 (Proposed) Increase Wastewater Connection (1" service) $2,250.00 $2,370.00 5% Pass through increase from Pocatello Wastewater Connection (1.5" service) $4,500.00 $4,740.00 5% Pass through increase from Pocatello Wastewater Connection (2" service) $7,200.00 $7,580.00 5% Pass through increase from Pocatello Wastewater Connection (>2" service) to be determined individually Pass through increase from Pocatello • Increase for direct pass-through without any markup Wastewater Rates Wastewater Rate (Monthly Charge) FY22 FY23 (Proposed) Increase Residential Base Rate (per single family Rate increase from rate study including pass equivalent/EDU) $49.14 $51.11 4% through increase from Pocatello North West Sewer Interceptor (NWSI) per EDU $10.45 $10.45 0% Rate increase from rate study including pass Commercial Base Charge (per EDU) $20.61 $21.43 4% through increase from Pocatello Commercial Volumetric (North of 1-86) per Rate increase from rate study including pass 1,000 gallons $3.93 $4.09 4% through increase from Pocatello Commercial Volumetric (South of 1-86) per Rate increase from rate study including pass 1,000 gallons $5.13 $5.34 4% through increase from Pocatello Billing Fee $1.56 $1.62 4% Rate increase from rate study Capacity Fee (per EDU Equivalent) - One- time charge $4,133.00 $4,133.00 0% Customers outside City Limits (Base Rate, 1.5 Times Regular NWSI, Volumetric Charge) Rates Existing fee missing from previous resolution. • Increase in accordance with Rate Study • Outside City Limits Charge Wastewater Rate Study Exhibit 1.2: Detailed 5 -Yr [:IP (Escalated ) alenty Lifttation Upgrade 112,000 $1,878,000 $ - $ - - Tyhee Lift Station - - - 260,000 2,505,000 Hiline Trunk Extension - - - 37,100 38,300 Gravity Sewer Rehabilitation Phase I - 323,000 1,064,999 1,095,000 1,128,000 CCTV Evaluation 123,300 127,000 130,966 134,800 - Ellis Lift Station Rehabilitation - 61,000 913,999 - - Total 235,300 $2,187,000 $2,l07,900 $1,526,900 $ 3,671,300 Wastewater Rate Study (cont.) - CIP Reservation LS Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community City of Chubbuck Cit a 2020 Sewer Master CHUBBUCK Plan Update 1 o B H o (:'/ /:! 7,13777 777 Master Plan Existing Pipe Pipe Size (in) Sizes (in) 30 C% 42 27 I 36 t44V24 27 04V21 24 V �iJ 18 21 �15 v 6//V18 12 15 ^Of10 12 Checkline / \� 10 Forcemain /v� 8 CIP Projects 6 OCurrent ra-1 Existing LS O0-5 Years IN Abandoned LS 5-20 Years Cog Master Plan LS CMAs Needed With Growth Wastewater Treatment Plant ��1to Study Boundary �LLL1111 NOTE C.# - Capacity Projects K.#- Key Infrastructure Projects R.# - Rehabilitation and Replacement Projects LS.#- Master Plan Lift Station EA- Master Plan Extension 0 3,000 6,000 ft A Master Plan is conceptual in nature and intended for planning purposes only. Field verification, survey, utility locates, and investigation of other potential upstream and downstream conflicts should be completed prior to preliminary and final design. N �tptp, // WQ�E NUB ��SVVVS Date, 918/2027 J.U•B ENGINEERS, INC. Wastewater Rate Study (cont.) $8,000,000 $7,000,000 $6,000,000 $5,000,000 $4,000,000 $3,000,000 $2,000,000 $1,000,000 FY', Exhibit IA: Financial Plan Summary Before Rate Increases f 0&M Expenses D Pocatello Treatment f New FTEs � Existing Debt Service System Reinvestment -Total Revenue Before Rate Increase Wastewater Rate Study (cont.) Exhibit 1.6; Existing and Proposed N 'astewater Rates Base Rate ($/mo.) $ 19.82 $ 20.61 $ 21.43 $ 22.18 $ 22.96 23.76 Billing Fee (}rno.) 1.50 1.56 1.62 1.88 1.74 1.80 NWSI Charge {$/mo.} 10.45 10.45 10.45 10.45 10.45 10.45 Volumetric Rate (lkgal) North of Interstate 3.13 3.93 5 4.09 4.23 4.35 $ 4.53 South of Interstate 4.93 5.13 5.34 5.53 5.72 5.92 Notes: Circuit Breaker rate are available CURRENT AND PROJECTED RATES The City's current rate structure includes a fixed component (base rate) and a variable consumption charge per 1,000 gallons (kgals) of usage. The analysis in this financial plan indicates a need for a 4.00 percent increases in FY2022. & FY2023, followed by 3.50 percent annual increases from FY2024 through FY2036, and then 3.25 percent increases thereafter. It is assumed that the proposed rate adjustments would apply equally to both the fixed and variable rates as well as to all types of customer classes. Exhibit 1.6 shows the existing rates as well as the proposed rates under the selected scenario through FY2026. This includes the monthly N SI charge of $10.45 which does not increase with the overall rate adjustment. Water Rates Water Rate (Monthly Charge) FY22 FY23 (Proposed) Meter Size Residential Base Rate $1.33 5% 3/4" and 1" $26.40 $27.72 5% Rate increase from rate study Rate increase supported by rate study Existing fee missing from previous resolution, 1.5" $76.01 $79.81 5% rate increase from rate study Existing fee missing from previous resolution, 2" $117.65 $123.53 5% rate increase from rate study Existing fee missing from previous resolution, 3" $244.70 $256.94 5% rate increase from rate study Existing fee missing from previous resolution, 4" $401.06 $421.11 5% rate increase from rate study Existing fee missing from previous resolution, 6" $810.37 $850.89 5% rate increase from rate study Existing fee missing from previous resolution, 8" $1,269.13 $1,332.59 5% rate increase from rate study Existing fee missing from previous resolution, 10" $1,938.86 $2,035.80 5% rate increase from rate study Usage/Volume charge per 1,000 gal $1.27 $1.33 5% Rate increase from rate study Water Connection/Capacity Fee (per 1" EDU) $2,250.00 $2,360.00 5% Rate increase supported by rate study • Increase in accordance with Rate Study • Connection/Capacity Fee Water Rates (cont.) FY23 Water Rate (continued) FY22 (Proposed) Meter Fee 1" - Materials* $470.00 $505.00 7% Current material price quote Meter Fee 2" Turbine - Materials* $1,062.00 $1,130.00 6% Current material price quote Meter Fee 2" Compound - Materials* $2,432.00 $2,925.00 20% Current material price quote Meter Fee >2" - Materials* to be determined individually Customers outside City Limits (Base Rate, Usage/Volume Charge) 1.5 Times Regular Rates Existing fee missing from previous resolution. • Meter Fees -Increase to cover material costs only • Outside City Limits Charge Water Rate study Exhibit 1.2: Detailed 5 -Yr CIP (Escalated Priority 1 Improvements (Population 15,500 —17,000) 18 -Inch Line from Siphon Interchange to Buffalo Creek 18 -Inch Line from Buffalo geek to Tyhee Alignment 18 -Inch Line from Siphon Interchange to Chubbuck Rd 8 -Inch Connection from Tree Valley Rd to 10 10 -Inch Connection from Garden Dr to 1O 10 -Inch Connection from Leonidas St to 1 C 18 -Inch Line in Ria Vista Rd torn Canal to Siphon Rd Dedicated 18 -Inch Line from Hill Tank tib Bench Booster Priority 2 Improvements (Population 17,000 — 20,000) 18 -Inch Line tom Siphon Interchange east to Olympus Dr 18 -Inch Line in Siphon Rd from Well #6 to Philhin Rd 18 -Inch Line in Philhin Rd from Existing Line to Siphon Rd 18 -inch Line in Siphon Rd horn Philhin Rd to Rio Vist Rd Well #7 Complex (We 11. 1.5 MG Tank, & Boaster) 18 -Inch Line from Siphon Rd to Well #7 Complex Bench Boaster Station Improvements $ 20.389 $ 83,921 - - - 41,375 170,465 - - - 106.090 - - - - 3.183 - - - - 2.652 - - - - - 25.788 106.248 - - 17.399 71.683 - - - S 33.524 108.121 $ - - S - - - 86.016 148.387 - - 88.256 157:615 - - 69.783 1.264:941 8.257.222 2.012.064 - 78.335 822.742 - 51`95 213.396 - - Repair & Replacement 1.0�'.--0 ' .' 8.303 1.800.814 $1.854.839 51.910,484 Total S1.922,033 S3,555,078 S5,492.033 $4,377.187 $ 2,137,831 Water Rate Study (cont.) - CIP Existing water rights are sufficient until a population of —40,000 unles per capita wateruse continues to increase. m L 0 1 I 1 EIFED dl a' d c Q to .� m LUDeveloper Well J Z�m (By'Developer) W o o" ............ o x V o E a o U Legend: m N w Municipal Wells: Transmission: z 00)? aLL tL .� m LUDeveloper Well J Z�m (By'Developer) W o o" ............ Y V L � O n<, Legend: 1 In w L � O n<, Legend: 1 In lents Municipal Wells: Transmission: 00)? ,, j' Existing Population 16,000 tL U Population 17,000 Population 17,000 U 9 L Population 20,000 • Population 20,000 Population 26,000+ L d d V% 1 • Population 26,000 2019 Existing System N N Booster Stations: �� iAp,ro,imato City Limit Y 4 Existing Population 17,000 Q .3 ■ Population 20,000 L N Storage Tanks: U Existing E Population 17,000 0 Q Population 20,000 FIGURE NO. 1 _Service Boundary 4 Water Rate Study (cont.) $7,000,000 $6,000,000 $5,000;000 $4,000;000 $3,000,000 $2,000;000 $1,000.000 Exhibit 1.4: Financial Plan Summary Before Rate Increases 4&M Expenses New Ff E� o=xisting Debt Service System Reinvestment —Total Revenue Before Rate Increase Water Rate Study (cont.) Exhibit 1.7: Existing and Proposed Fater Rates Base Fate S 24.00 26.40 S 27.72 $ 29.11 30.57 32.1 C - Usage Bale ($/kgal) 1.15 1.27 1.33 1.40 1.47 1.54 (Votes, 1. Circuit Breaker rates are available. 2. Base rata represents /87314 1" meter sizes. . Base rata includes bilying fee. CURRENT AND PROJECTED RATES The City's current rate structure includes a fixed component (base rate) and a variable consumption charge per 1,000 gallons (kgals) of usage. Elcluded lil the fixed component is a bitting fee assessed to all customers. The analysis in this financial plan indicates a need for a 10.00 percent increases in F 2022 followed by 5.00 percent annual increases thereafter. It is assumed that the proposed late actiustments would apply equally to both the fixed and variable rates as well as to all types of customer classes. Exhibit 1,7 shoes the existing rates as well as the proposed rates under the selected scenario through FY2026. Water Rates (cont.) Pressurized Secondary Irrigation Rate FY23 (Monthly Charge) FY22 (Proposed) Residential Base Rate (per EDU) $16.10 $16.10 0% Existing fee missing from previous resolution. Commercial Base Rate (per EDU) $16.10 $16.10 0% Existing fee missing from previous resolution. Notes: 1. The Pressurized Secondary Irrigation Rate will be charged to customers when irrigation water is available in the system at the service connection/valve box on the property, whether the customer utilizes the irrigation water or not. 2. The Pressurized Secondary Irrigation Rate will be charged once per month for the entire year to provide a "flat rate", even when irrigation water is not available in the system such as during winter. • Irrigation Fees — No increase —adding to resolution • Clarifying how rate is charged Sanitation Fees Sanitation Fees Bannock County Landfill FY22 FY23 (Proposed) Per Ton Disposal Fee $35.00 $35.00 0% Residential Services (Monthly Charge) Base Rate $18.44 $18.44 0% Additional Residential Cart $11.84 $11.84 0% Recycle Cart $5.00 $5.00 0% Return Service Fee* $8.50 $8.66 2% Due to pass through increase from County from previous increase Note: The fee to replace or repair carts damaged from customer misuse or vandalism (paint, stickers, etc.) will be the actual replacement or repair cost. * A Return Service Fee will be charged if service is requested even if cart is unserviceable (such as blocked, not out, etc.) and the cart is not dumped • Increase for due to Landfill Increase from FY22 Sanitation Fees (cont.) - Commercial Commercial Services (Monthly Charge) FY22 FY23 (Proposed) 3 Yd Container Rental (per month)* $15.58 $15.58 0% 4 Yd Container Rental (per month)* $16.96 $16.96 0% 6 Yd Container Rental (per month)* $18.71 $18.71 0% 8 Yd Container Rental (per month)* $22.95 $22.95 0% 3 Yd Container (Dump & Haul)** $91.84 $91.84 0% 4 Yd Container (Dump & Haul)** $122.46 $122.46 0% 6 Yd Container (Dump & Haul)** $183.68 $183.68 0% 8 Yd Container (Dump & Haul)** $244.91 $244.91 0% 3 Yd Container (Extra Unscheduled one- time dump) $22.96 $22.96 0% Existing fee missing from previous resolution. 4 Yd Container (Extra Unscheduled one- time dump) $30.61 $30.61 0% Existing fee missing from previous resolution. 6 Yd Container (Extra Unscheduled one- time dump) $45.92 $45.92 0% Existing fee missing from previous resolution. 8 Yd Container (Extra Unscheduled one- time dump) $61.22 $61.22 0% Existing fee missing from previous resolution. • Addition of existing fees to resolution Sanitation Fees (cont.) - Commercial Notes: 1. If Container is moved or repositioned without approval from the City Sanitation Department, a $25 fee will be added to cover cost of moving the container to allow for servicing. 2. The fee to replace or repair containers damaged from customer misuse or vandalism (paint, stickers, etc.) will be the actual replacement or repair cost. 3. An extra one-time dump fee will be charged if an unscheduled service is requested even if container is unserviceable (such as blocked, not out, etc.) and the container is not dumped * Container Rental does not include State sales tax. ** Container service charge is based on one dump per week. For multiple services per week, the monthly charge will be multiplied by the number of services. For example, a 4 -Yard container serviced 3 times per week will have a charge of $122.46 x 3 plus rental fee and sales tax. • Notes added to clarify charges Sanitation Fees (cont.) — Roll -off Roll -Off Services FY22 FY23 (Proposed) Daily Container Rental $3.63 $3.63 0% Monthly Container Rental $108.70 $108.70 0% Dump / Haul Fee $175.10 $175.10 0% Per Ton Disposal Fee $35.00 $35.00 0% Prohibited Items (tires, batteries, etc.) $ - Actual Disposal Cost + $10 New fee to consider Refrigeration Units (Appliances with Freon, freezers, refrigerators, AC units, etc.) $10.00 $25.00 New fee to consider (Landfill disposal fee of $15) Notes 1. The fee to replace or repair containers damaged from customer misuse or vandalism (paint, stickers, etc.) will be the actual replacement or repair cost. 2. A $50 fee will be charged if service is requested but the container is unserviceable (such as blocked, empty, etc.) and the container is not dumped • Fees for prohibited items and refrigeration units • Notes added to cover fees for damage, misuse, etc. Sanitation Fees (cont.) — Roll -off Recycle Roll -Off Recvcle Services FY22 FY23 (Proposed) Notes: 1. The fee to replace or repair containers damaged from customer misuse or vandalism (paint, stickers, etc.) will be the actual replacement or repair cost. 2. A $50 fee will be charged if service is requested but the container is unserviceable (such as blocked, empty, etc.) and the container is not dumped • Existing fee added to resolution • Change to disposal fee to cover costs • Notes added to cover fees for damage, misuse, etc. Existing fee missing from previous Pick-up and Haul Fee (per service) $95.00 $95.00 resolution. Current Disposal Fee from Receiving Per Ton Disposal Fee $35.00 Facility Adjustment to cover pass-through fees Notes: 1. The fee to replace or repair containers damaged from customer misuse or vandalism (paint, stickers, etc.) will be the actual replacement or repair cost. 2. A $50 fee will be charged if service is requested but the container is unserviceable (such as blocked, empty, etc.) and the container is not dumped • Existing fee added to resolution • Change to disposal fee to cover costs • Notes added to cover fees for damage, misuse, etc. Sanitation Fees (cont.) — Cleanup Connection Services Cleanup Connection Services FY22 FY23 (Proposed) 3 Yd Container $0.00 $10.00 New fee to consider Previously only charge for weight over 4 15 Yd Roll -off (per ton disposal fee only) $0.00 $35.00 tons. New fee to consider $ Actual Disposal Cost Prohibited Items (tires, batteries, etc.) - +$10 New fee to consider Refrigeration Units (Appliances with Freon, freezers, refrigerators, AC units, New fee to consider (Landfill disposal fee of etc.) $10.00 $25.00 150% $15) Notes: 1. If Container is moved or repositioned without approval from the City Sanitation Department, a $25 fee will be added to cover cost of moving the container to allow for servicing. 2. The fee to replace or repair containers damaged from customer misuse or vandalism (paint, stickers, etc.) will be the actual replacement or repair cost. • Seeking Council Input • Proposing fee to cover cost charged by landfill • Notes added to cover fees for damage, misuse, etc. Streets Fees Streets Fees Right of Way Construction FY22 FY23 (Proposed) Right of Way Permit $25.00 $25.00 --7 0% Contractor License $25.00 $25.00 0% • No proposed changes /6470_t_\ CHUBBUCK 1 0 0 H 0 Memo To: Honorable Mayor & City Council Community Services Department 290 E Linden Ave., Chubbuck, ID 83202 208.237.2430 www.CityofChubbuck.us From: Devin Hillam, Community Services Director Date: June 28, 2022 Re: Discussion on Community Services Department Fees As the new budget year arrives and City Staff reviews and assembles fee proposals for Council consideration, I'm seeking guidance from the Council about how much, if any, of the services/programs within the Community Services Department should be subsidized by property taxes compared with user/applicant fees. With some guidance from Council, I will be able to bring our recommendations to you as part of the larger City fee resolution public hearing and discussion. For your information, the divisions within the department and their general functions are: Development Services: Plats, Public Infrastructure Inspections • Planning: Planning & Zoning related applications • Building: Residential and Commercial Building Permits • Parks & Recreation: City Parks and certain other City -owned properties For a few years, the City has been using an electronic timesheet program which gives us the ability to track time spent on various categories. Now with enough time, we've been able to create reports to find on average, how much time and personnel hours are spent doing X, Y, or Z types of functions. On the attachment, I provide information about time spent, personnel costs, the number of permits, the currently adopted fee, and breakeven fees considering benefits and without benefits over the past year. None of the cost calculations consider costs such as time by the City Attorney and Clerk, administrative staff, or other J:\Administration\Community Services Dept Admin\Fiscal Year Fee Proposals\6.28.22 Fee Discussion with Council at 7.6 Study Session.docx 1 costs related to the building, power, computers, vehicles, fuel, etc. There are clearly deficiencies in what we are collecting now via fees versus what our actual costs are, and State law would allow us to adopt such reasonable fees associated with actual costs and so, if the Council would like, we could propose fees to ask development to pay for itself, we could keep fees the same, or we could go somewhere in the middle. After having reviewed fees from jurisdictions around Idaho, the vast majority appear to cover the costs of the application review/function and that is my recommendation for the Council to consider. Parks & Recreation. By function, there's a broad community benefit to offering parks and recreation facilities and services to the public- there is an economic benefit to our businesses as out -of -area visitors attend tournaments or the splash pad, there's a placemaking component to providing great public space and programs, and there's simply an expectation of the residents for good parks and recreation offerings. That said, there certainly are department costs associated with those functions and this year, as the department has been short-staffed, we've learned where certain events place a significant burden on our resources, such as for-profit leagues and tournaments at the ball fields who require use of city equipment and who have enough visitors that several rented portable toilets are required, in addition to frequent restroom restocking. Moreover, there are some services that the City provides in the parks system that many other jurisdictions charge for, such a fees for additional picnic tables, fees for additional trash cans for large events, fees for water use at parks with hills, or other ad hoc requests. Finally, other parks facilities, such as the tennis courts, are maintained to excellent levels of service thanks to members of the community putting in hundreds of hours of work per year and if they ever could not continue to do so, the City may be in a bind wondering how to maintain a similar level of expected services without adopting some fees. Recognizing that the Council cannot make a decision at the study session, I'm seeking your general thoughts and input so that we can finalize our proposal and bring it back before you. THANK YOU! 2 CUPS Rezones Annexations Pre -Plats Final Plats Plans Dev Agreements Guarantees Director 17.25 37.25 12.5 41.5 30.5 10.75 9.5 32 Plan Mng 154.75 142 102.5 25.5 22.5 2.5 Dev Sery Mng 287.25 149 463.25 89.5 89 Attorney Not incorporated Admin Assist Not incorporated Ancillary Costs (building, power, computers, vehicles, etc) Not incorporated # of Type 11 13 7 16 24 17 24 12 Fees Collected $ 3,740.00 $ 6,955.00 $ 4,900.00 $ 4,094.00 $ 10,275.00 $ - $ 1,200.00 0.00 Salary Cost Only $ 6,438.22 $ 7,009.68 $ 4,319.68 $ 12,850.42 $ 7,459.88 $ 16,359.07 $ 3,632.10 $ 4,682.76 $203 base fee plus $258 base fee plus Current Fee $ 340.00 $ 535.00 $ 700.00 $15/lot $15/lot $ - $ 50.00 - Break Even Fee w/o benefits $ 585.29 $ 539.21 $ 617.10 $ 803.15 $ 310.83 $ 962.30 $ 151.34 $ 390.23 Break Even Fee w/ benefits (-60% of wage) $ 936.47 $ 862.73 $ 987.35 $ 1,285.04 $ 497.33 $ 1,539.68 $ 242.14 $ 624.37