Loading...
HomeMy WebLinkAboutItem #1 Cross ConnectionAk Cross Connections Keeping Our Residents Safe � The purpose of this chapter is to protect the public health of water consumers by the control of actual and/or potential cross connections. This chapter shall apply throughout the city and in all other areas served by or connected to the municipal water system. (Ord. 222 §1, 1980) *DEQ requirement to have a program in place* What is Cross Connection? CROSS CONNECTION: Any physical arrangement whereby a public water supply is connected, directly or indirectly, with any other water supply system, sewer, drain, conduit, pool, storage reservoir, plumbing fixture, or other device which contains or may contain contaminated water, sewage, or other waste or liquids of unknown or unsafe quality which may be capable of imparting contamination to the public water supply as a result of backflow. Cross Connections due to Secondary Irrigation Who's at risk? • Homeowners with access to secondary irrigation. • All homeowners with previous or recently installed sprinkler systems. • Entire system (worst case scenario) Click a public irrigation area to see estimated turn onlaff dates (double -tap if using a mobile device). For more information on secondary irrigatran, including instructions, responsibilities, and city fade, didt here or seethe " Responsibilities" tab_ Areas in purple are private irrigation and not serviced by the city_ t_? Farquesuons or help, please use the follawingcontact information: Foll • Monday through Friday, lam to 5:30pm, call Carnemn Lusk at 208-239-3245. ■ For after hours or weekend ernergencres, call Chubbuck Police Dispatch at 208-237,0770. Public Irrigation • Currently 415 homes on public ■ Off irrigation (city maintained) On Private Irrigation • 259 homes on privately maintained Dry Lines L 0 Future 215+ lots with each new subdivision 1 br•,ok=t-mc: -phvn RU Oa ma St C, pperii!Id.rnestead Delmar •res a m BHlLoe Rd a Psrk HI2h*my Ave w EL u` � QC LVdrp &f 7 a � U 4 d Acres E tlhtlen Av* p •<>4rirrdsen#^ BIvC E,mr to Ave a `o a krw L $r RE a3rCtrt DF c J Antieidge n t � btrvCk Rfl � � d 4 e �+ p�p 'n 0 0 • Install a backflow prevention device • Obtain a Plumbing Permit • Install and test approved backflow prevention device (significant cost to homeowner) • Connect sprinkler system to irrigation service line • Have device tested yearly o nothing Educate & Ask for compliance •Educate and Enforce •Something else Depending upon magnitude of effort, additional staff or outsourcing may be needed. • Historical attempts have proved controversial: • Steve Smart tried to enforce in 2012 Sent letters notifying residents of testing requirements with compliance deadline. ("after 32 years of not enforcing") Potential liability to the City. • Risks of infecting residents with Giardia, Cryptosporidium, E. Coli, etc. • Idaho Administrative Code — IDAPA 58.o1.o8 "The water purveyor is responsible ... to take reasonable and prudent measures to protect the water system against contamination and pollution from cross connections... The water purveyor is responsible to enforce the system's cross connection control program." EDUCATION 4 4 IF ]I ED Website Letters Door Hangers Social Media Posts EducateTFsidents about risks and requirements. *Begin enforcement Spring 2023 or •l: Different Levels I. Notifications (in-person, letters, etc.) 2. Physical checks —requires database maintenance and manpower I Shut offs — requires database maintenance, and manpower for shut offs and turn -ons Independent contractor to facilitate: • Resident outreach & inventory • Inspection coordination & reporting • Education of installers • Annual tracking & reporting • Could include testing at the City's expense Potentially could relieve burden on homeowners Mayor & Council Decision and Support What's Needed Manpower Funding Other Cities • Meridian Burley Twin Falls Rexburg Idaho Falls