Loading...
HomeMy WebLinkAboutItem #3 New Day Parkway/6470_t_\ CHUBBUCK 1 0 0 H 0 Memo To: Honorable Mayor and City Council From: Bridger Morrison Date: May 25, 2022 Public Works Department 290 E. Linden Ave., Chubbuck, ID 83202 208.237.2430 — Fax 208.237.2409 www.CityofChubbuck.us Re: New Day Parkway Extension Phase 3 — Change Order 2 Two recent changes have been required for the roadway contract for the New Day Parkway Project: 1) A portion of the storm drain system including a treatment box and infiltration bed were lowered to allow the system to better drain. 2) The City requested that an additional conduit be installed across New Day Parkway to allow for a connection to the city's city-wide fiber loop and traffic signal interconnect system. The proposed change order is for $3,895.00. The total amount for this change order and the previous Change Order No. 1 is $11,617.00. The proposed change order form is attached. I am requesting the Council approve Change Order 2 for the New Day Parkway Extension Phase 3 project in the amount of $3,895.00. J:lAdministration�Director�Memos to Council�New Day Parkway Phase 3 CO2 Memo to Council5-25-22.docx Change Order No. 2 Date of Issuance: 6/1/22 Effective Date: 6/1/22 Project: New Day Parkway Phase 3 Owner: City of Chubbuck Owner's Contract No.: RFB 2021-02-10 Whitaker to Yellowstone Contract: RFB 2021-02-10 Date of Contract: Contractor: Idaho Materials and Construction Engineer's Project No.: RFB 2021-02-10 The Contract Documents are modified as follows upon execution of this Change Order: Description: A) To make the south invert of Catch Manhole Sta. 26+75 function, the sediment and oil trap and infiltration bed had to be lowered by 1.70' ($1,750.00). B) Provide a utility trench and install city supplied conduit crossing New Day Parkway near the east side of Industry Way ($2,145.00) Attachments (list documents supporting change): See attached documents CHANGE IN CONTRACT PRICE: CHAN!''T. IN CONTRACT TIM Original Contract Price: Original Contract Times: ❑ Working days ❑ Calendar days Substantial completion (days or date): October 1, 2021 $1,961,428.00 Ready for final payment (days or date): November 20, 2021 Increase from previously approved Change Orders Increase from previously approved Change Orders No. 0 to No. 1: No. 0 to No. 1: $7,722.00 Contract Price prior to this Change Order: $1,969,150.00 Increase of this Change Order: $3,895.00 Contract Price incorporating this Change Order: $1,973,045.00 RECOMMENDED: By: Engineer (Authorized Signature) Name: Print Name Date: Substantial completion (days): 0 Ready for final payment (days): 0 Contract Times prior to this Change Order: Substantial completion (days or date): July 20, 2022 Ready for final payment (days or date): September 10, 2022 Increase of this Change Order: Substantial completion (days or date): July 20, 2022 Ready for final payment (days or date): September 10, 2022 Contract Times with all approved Change Orders: Substantial completion (days or date): July 20, 2022 Ready for final payment (days or date): September 10, 2022 ACCEPTED: By: Owner (Authorized Signature) Name: Print Name Date: Approved by Funding Agency (if applicable): 2010 ISPWC 00941- Modified From EJCDC C-941 Change Order Page 1 of 1 ACCEPTED: By: Contractor (Authorized Signature) Name: Date: Date: Print Name