Loading...
HomeMy WebLinkAboutItem #1 Yellowstone Commons Div. 2 Preliminary Plat/a 0�t\ CHUBBUCK I D A H O Community Services Department Development Services Division 290 E. Linden Avenue, Chubbuck, ID 83202 208.237.2430 — Fax 208.237.2409 www.CityofChubbuck.us YELLOWSTONE COMMONS DIVISION 2 FIRST AMENDMENT PRELIMINARY PLAT REQUEST - STAFF REPORT CITY OF CHUBBUCK LAND USE AND DEVELOPMENT COMMISSION REGULAR MEETING ON APRIL 12, 2022 STAFF FINDINGS SUMMARIZED After reviewing the proposed Yellowstone Commons Division 2 First Amendment preliminary plat, Staff finds that it appears to meet the code requirements with the following comments: • Secondary irrigation facilities will be required to be designed and constructed in accordance with section 16.12.230 of city code. • Preliminary Plat recommendations are conditional upon City Council approval of the preliminary plat for Yellowstone Commons Division 2 First Amendment. FACTS REQUEST: The applicant proposes a 1 lot Preliminary Plat for 1 multi -family residential building lot in the Yellowstone Commons Division 2 First Amendment subdivision. It includes extending potable water and sanitary sewer mainlines with services through the development. (see Exhibits 1 and 2). BACKGROUND: This is the 1 st division of the Yellowstone Common Division 2 First Amendment subdivision. TYPE OF COMMISSION ACTION: Quasi -Judicial (Subject to appeal; decisions must be supported by the evidence and by applying law to the facts; decisions shall be based on the standards for approval). Recommendation/approval of this preliminary plat shall be whether it meets the requirements of the City of Chubbuck ordinance and State of Idaho statutes. The Commission may recommend approval with or without conditions, may table a decision, or may recommend denial of the application. OWNER: Wright Development Group — LoganJohnson 1178 W Legacy Crossing Blvd. Ste. 100 Centerville, UT 84014 PROFESSIONAL SERVICES: Kunz Engineering 280 East 260 South Orem, UT 84058 LOCATION: NW 1/4 of Section 10, Township 6 South, Range 34 East, of the Boise Meridian. Generally located at SE corner of Hawthorne Rd. / Knudsen Blvd. intersection. SITE CHARACTERISTICS & ZONING: CURRENT ZONING: General Commercial (C-2) CURRENT LAND USE: Agricultural PROJECT SIZE: ±10 acres VIEWS: Generally visible from all directions TOPOGRAPHY: Generally flat EXISTING STRUCTURES: None RECENT TRAFFIC COUNTS: 2021: Knudsen Blvd at Hawthorne Rd, 4254/day 2021: Hawthorne Rd at Knudsen Blvd, 14550/day 2021: Chubbuck Rd at Hawthorne Rd, 15846/day SURROUNDING LAND USES AND ZONING NORTH: Agricultural; Agriculture (A) zone EAST: Agricultural; General Commercial (C-2) zone SOUTH: Agricultural; General Commercial (C-2) zone WEST: Residential; Limited Residential (R-2) zone SERVICES: ACCESS STREET: Current access from Knudsen Blvd. with 1 additional access from Hawthorne Rd. FIRE/EMS PROTECTION: City of Chubbuck Fire Department. SANITARY SEWER: City of Chubbuck Sewer Utility Department. CULINARY WATER: City of Chubbuck Water Utility Department. PROCEDURES: 1. In accordance with City Code 17.12.030-050 and Resolution 2020-03, a complete petition and fees for a preliminary plat were filed with the City and which contained the appropriate documents and waiver requests pursuant to 17.12.040. 2. In accordance with City Code 17.12.100, the application is scheduled to be heard at the April 12, 2022 Regular Meeting of the Land Use and Development Commission. 3. In accordance with City Code 17.12.080, notice were provided as follows: a. Notices posted on the subject property. b. Notices provided to City departments, other government agencies, and affected public utility providers. APPLICABLE LAWS AND PLANS: 1. Idaho Code a. §50-13, Plats and Vacations b. §67-6513, Subdivision Ordinance 2. Chubbuck Comprehensive Plan (as amended) 3. Chubbuck City Code a. Title 16, Land Improvement Standards b. Title 17, Land Development c. Title 18, Land Use PUBLIC COMMENTS: 1. No written comments were received as of this report. 1940�t-\ CHUBBUCK 1 0 290 E. Linden Avenue, Chubbuck, ID 83202 208.237.2430 — Fax 208.237.2409 www.CityofChubbuck.us STANDARDS FOR REVIEWING A PRELIMINARY PLAT 1. Does the Preliminary Plat comply with applicable laws and ordinances? CITY CODE TITLE 17- LAND DEVELOPMENT Compliant Standards and Staff Comments Yes No N/A City Code City Standard and Staff Comments x 17.12.030, Copies to be Submitted, Notice and Fee 17.12.050 Staff The applicant has completed the requirements of these Comments sections. Department Public Works: x Comments The department has reviewed the applicant's proposal for compliance and finds that it meets the code requirements. Concerns have been addressed by the applicant. x Department Maintenance / Operations: Comments The department has reviewed the applicant's proposal for compliance and finds that it meets the code requirements. Concerns have been addressed by the applicant. x Department Fire Department: Comments The department has reviewed the applicant's proposal for compliance and finds that it meets the code requirements. No concerns. x Department Police Department: Comments The department has reviewed the applicant's proposal for compliance and finds that it meets the code requirements. No concerns. CITY CODE TITLE 17 — PRELIMINARY PLAT STANDARDS Compliant Standards and Staff Comments Yes No N/A City Code City Standard and Staff Comments x 17.12.150 Form of Presentation Staff Applicant has provided all information required of this section. Comments x 17.12.160 Identification and Descriptive Data Staff Applicant has provided all information required of this section. Comments x 17.12.170 Existing Conditions Data Staff Applicant has provided a preliminary plat showing existing Comments contours, locations of existing water and sewer systems, street names and rights-of-way, and all other information required of this section. x 17.12.180 Proposed Conditions Data Staff Applicant has provided a preliminary plat showing proposed Comments conditions including lot dimensions, easement use and locations, and street layout including proposed dedication of additional right-of-way. 1940�t-\ CHUBBUCK 1 0 290 E. Linden Avenue, Chubbuck, ID 83202 208.237.2430 — Fax 208.237.2409 www.CityofChubbuck.us x 17.12.190 Proposed Utility Methods Staff Water and sewer will be extended into the development, Comments applicant has provided service locations shown on the Dreliminary plat. CITY CODE TITLE 78- LAND USE Compliant Standards and Staff Comments Yes No N/A City Code City Standard and Staff Comments 18.08.042A Height and area Regulations x Staff This is proposed in the C-2 zone and is limited to 70 ft high and Comments 0 minimum lot size. 18.08.044 Lot Width to depth ratio x Staff This is proposed in the C-2 zone, maximum ratio is 1:5 Comments PUBLIC IMPROVEMENT REQUIREMENTS Improvement Description Water mainlines with services will be constructed and connected to existing Water water mainlines. Sewer Sewer mainlines with services will be constructed and connected to existing sewer mainlines. Streets Right-of-way has been dedicated and the street has been constructed per 16.12.020C and in accordance with the comprehensive plan. Storm Drainage Storm water from the street will be retained in the roadway drainage Swale, while storm water from the lots will be required to be retained on site. Secondary irrigation facilities will be designed and constructed in accordance Pressurized Secondary with section 16.12.230 of city code. Applicant shall connect to the existing City Irrigation irrigation system and utilize irrigation water provided from Fort Hall Irrigation Project. Parks Park impact fees will be required for this development. OTHER AGENCY COMMENTS AND REQUIREMENTS Agency I Comment BTPO Bureau of Indian Affairs Cable One Century Link Direct Communications ID Fish and Game ID Transportation Idaho Power Intermountain Gas School District 25 SE Idaho Public Health US Postal Service 1940�t-\ CHUBBUCK 1 0 No comment received. No comment received. No comment received. No comment received. No comment received. No comment received. No comment received. No comment received. No comment received. No comment received. No comment received. No comment received. 290 E. Linden Avenue, Chubbuck, ID 83202 208.237.2430 — Fax 208.237.2409 www.CityofChubbuck.us EXAMPLE MOTIONS APPROVAL: Having reviewed the petition materials, staff report, and all testimony presented before and by the City in this hearing as part of the record against criteria established by City Code 17.12.100, and having found that those criteria for approving a preliminary plat request are satisfied, I move to recommend approval of the preliminary plat as described in the application materials to the City Council with the following conditions and waiver recommendations: 1. (if found necessary by LUDC). APPROVAL (NO CONDITIONS): Having reviewed the petition materials, staff report, and all testimony presented before and by the City in this hearing as part of the record against criteria established by City Code 17.12.100, and having found that those criteria for approving a preliminary plat request are satisfied, I move to recommend approval of the preliminary plat as described in the application materials. DENIAL: Having reviewed the petition materials, staff report, and all testimony presented before and by the City in this hearing as part of the record against criteria established by City Code 17.12.100, and having found that those criteria for approving a preliminary plat request are not satisfied, I move to recommend denial of the preliminary plat request as described in the application materials. I find that the petition fails to comply with... [CITE SPECIFIC STANDARD WHICH IS NOT MET AND DESCRIBE WHY IT WAS NOT MET]. SPECIAL CONSIDERATIONS FROM IDAHO CODE: • I.C. 67-6513: Denial of a subdivision permit or approval of a subdivision permit with conditions unacceptable to the landowner may be subject to the regulatory taking analysis provided for by section 67-8003, Idaho Code, consistent with the requirements established thereby. REPORT: Sean Harris, Development Services Staff comments in this report are based solely Manager sharris@cityofchubbuck.us (208) 237-2430 DATE: April 4, 2022 1. Reference Map 2. Application for Preliminary Plat 3. Plat 4. Narrative for Preliminary Plat 5. Maps a. Future Land Use CHUBBUCK 1 0 upon evidence available at the time of the report. Additional information may be brought to light at or before the hearing. EXHIBITS 290 E. Linden Avenue, Chubbuck, ID 83202 208.237.2430 — Fax 208.237.2409 www.CityofChubbuck.us b. Current Zoning 6. Evidence of Notice a. Site Postings b. Agency notices on file w/staff 1940�t-\ CHUBBUCK 1 0 290 E. Linden Avenue, Chubbuck, ID 83202 208.237.2430 — Fax 208.237.2409 www.CityofChubbuck.us Exhibit 1: Reference Map - Yellowstone Commons Division 2 First Amendment Interstate 86 CHUBBUCK 101HO 290 E. Linden Avenue, Chubbuck, ID 83202 208.237.2430 — Fax 208.237.2409 www.CityofChubbuck.us CHUBBUCK 1 0 290 E. Linden Avenue Chubbuck,ID 83202 208.237.2430 — Fax 208.237.2409 www.CityofChubbuck.us PRELIMINARY PLAT APPLICATION Aug. 2021 Form PAGE 1 OF 5 Requirements and procedures for Preliminary Plat applications are found in section 17.12.030 — 1712.190 of municipal code. The following must be completed and submitted with all required documents in order to progress to the next stage of the review process; failure to submit a complete application packet may result in additional fees. DATE RECEIVED: INITIALS: FEES PAID? Y N AMOUNT: SECTION A -DEVELOPER/APPLICANT INFORMATION Al. Name Wright Development Group - Logan Johnson A2. Mailing Address 1178 W Legacy Crossing Blvd Ste. 100 City State Zip Code Centerville UT 84014 A3. Phone Number (including area code) A4. Email Address 801.773.7339 logan@wrightdevelopment.com SECTION B - PROFESSIONAL SERVICES INFORMATION B1. Firm Name Kunz Engineering B2. Mailing Address 280 East 260 South City State Orem UT Zip Code 84058 33. Point of Contact (Name) 34. Email Address Robert Kunz robertdkunz@gmail.com SECTION C -SITE INFORMATION Cl. Site Address City Zip C2. Tax Parcel #(s) SEC of Knudsen and Hawthorne Chubbuck 83202 RPRCYC2000202 C3. Current Land Use C4. Are there existing structures on-site? Vacant/Commercial ❑ Yes ❑■ No C5. Is the site under contract or in the name of the developer/applicant? C6. Approximate size of property ❑■ Yes ❑ No 10 Acres C7. Are there any existing items of which Staff should be aware? C8. Does the site contain irrigation water rights? ❑ Yes Q No If yes: ❑■ Yes ❑ No If yes, which company/district: Fort Hall Irrigation Project CHUBBUCK 1 0 290 E. Linden Avenue Chubbuck,ID 83202 208.237.2430 — Fax 208.237.2409 www.CityofChubbuck.us PRELIMINARY PLAT APPLICATION Aug. 2021 Form PAGE 2 OF 5 SECTION D — PROPOSED DEVELOPMENT INFORMATION D1. Plat Name D2. Number of Lots YELLOWSTONE COMMONS - DIVISION 2 FIRST AMENDMENT 2 D3. Type of Land Uses within development (residential, commercial, industrial, etc.) D4. Water & Sewer Needs Residential (Multifamily) Yes D5. Are there any issues related to the development of which Staff should be aware prior to meeting? ❑ Yes ❑■ No If yes: Will the development contain any commonly -owned and/or maintained improvements (stormwater facilities, community mailboxes, streets, D6. parks/playgrounds, etc.)? ❑■ Yes ❑■ No If yes, what? stormwater facilities, community mailboxes, parking lots, etc. Will the development contain any land within a designated floodplain (FEMA or Chubbuck? ❑ Yes ❑■ No If yes, what zone?: D7. If yes, how do you intend to minimize flood damage to structures, and public utilities and facilities such as sewer, gas, water, and electrical systems?? If yes and the proposal contains more than 50 lots or more than 5 acres, whichever is lesser, and there no base flood elevations established for the floodplain, you must submit base flood elevation data with the application package. Only for plat containing residential units: The City has adopted Parks Impact Fees with requirements that parks impact fees are due when building permits for residential units are issued. There may be times when the developer proposes to dedicate land and/or construct park improvements to satisfy the parks impact fee funding obligation in whole or in part. Which is anticipated with this development? D6. ❑ No public arks/park land are proposed with this phase, or any public parks/park land will benefit only this development, parks impact fees will be collected ❑ Public parks/park land are proposed that will benefit more than just this development, parks impact fees may be adjusted only by agreement between the city and the developer prior to construction, fund, or contribution based on the present value of system improvements and land in accordance with Chapter 17.28 of municipal code. SECTION E — ADDITIONAL SUBMITTAL REQUIREMENTS E1. Preliminary Plat Application Fees: Total # of lots 2 X $5.00 + $203.00 base fee = $ 213 total due E2. Master Plan, for any preliminary plat that is a portion of a large parcel, part of a larger group of commonly held parcels, or part of a larger development which has been, or shall be developed by the developer, shall be accompanied by a master plan submitted during the preliminary platting process. A master plan must be submitted with each preliminary plat filed. E3. Preliminary codes, covenants, and restrictions (CC&Rs) addressing maintenance of commonly owned improvements and/or land, if the development will contain any commonly owned improvements and/or land. For purposes of this requirement, commonly owned improvements include stormwater facilities, cluster mailboxes, private open space/parks/amenities, etc. E4. Narrative indicating how the approval criteria for preliminary plats are addressed. Approval criteria are as follows (17.12.100): 1. The subdivision proposal complies with applicable provisions of this title. 2. The subdivision proposal complies in principle with all applicable city design standards and development regulations. CHUBBUCK 1 0 290 E. Linden Avenue Chubbuck,ID 83202 208.237.2430 — Fax 208.237.2409 www.CityofChubbuck.us PRELIMINARY PLAT APPLICATION Aug. 2021 Form PAGE 3 OF 5 3. The subdivision proposal complies with all applicable zoning requirements of the underlying zoning district, applicable overlays, and other applicable development standards. 4. All public facilities including streets, sidewalks, curbs, gutters, secondary pressurized irrigation, water, sewer, fire protection, and sanitation services can be provided to the newly created lots and accommodate future extension to adjacent land. The use of a "control strip" intended to control or prevent the future extension of public facilities or development of adjacent land is prohibited. 5. If city public works determines that the proposed subdivision will result in significant traffic impacts then a "traffic impact study" will be required as part of the commission's review. A significant traffic impact is generally defined as occurring when: a. A proposed development or redevelopment of a site will generate 100 or more new peak hour trips; or b. The added volume is equal to 1,000 vehicles per day. 6. The proposal provides for a continuation of a connected transportation system unless topography or natural features prevents a connection to abutting streets or property. 7. The proposed subdivision provides for bicycle and pedestrian transportation routes and amenities in accordance with Bannock Transportation Planning Organization's adopted bicycle and pedestrian plans. 8. Public utilities are provided to the newly created lots in public rights of way or in appropriately sized easements. E5. If the development contains area with any FEMA or City of Chubbuck designated floodplains, the following must be submitted: 1. If the development, either within a single phase or as part of a larger planned development, contains more than 50 lots or 5 acres, whichever is less, base flood elevations shall be determined prior to filing an application for a preliminary plat and said determinations must be submitted with the application package. 2. If the development, either within a single phase or as part of a larger planned development, contains more than 50 lots or 5 acres, whichever is less, evidence must be submitted demonstrating that a CLOW application has been filed with FEMA. E6. Because every application is different, rules and regulations may differ and staff may require additional information or submittals before an application can be deemed complete and ready for the review process beyond staff level. 290 E. Linden Avenue lao�t-\ Chubbuck,ID 83202 — Fax 208.237.2 CHUBBUCK 208.www.Cit www.CityofChubbuck.us 409 10AH0 PRELIMINARY PLAT APPLICATION Aug. 2021 Form PAGE 4 OF 5 E7. PDF Drawings drawn according to municipal code containing the following: Code Reference Staff Reviewers Initials Preparer's Initials Description 17.12.150 —17.12.160 Presentation & Descriptive Data • Drawing Size (11"x22" minimum through 22"x34" maximum) • Proposed Name • Location of Development by Section, Township, Range • Reference to Section or Quarter Corner (dist. & Bear.) • Name, Address, Phone Number of Developer • Name, Address, Phone Number of Engineer/Surveyor • North Arrow • Date of Preparation (Including Revisions) • Vicinity Map 17.12.170 Existing Conditions • Existing Contours @ adequate Interval • Existing Features • Existing Utilities • Existing R -O -W, easements, public areas, corporation lines • Instrument # for parcels with common boundaries • Existing & proposed zoning • Total acreage • Boundary dimensions 17.12.180 Proposed Conditions • Street layout (including width) • Street names • Connections to existing streets • Lot dimensions • Lot numbers • Total number of lots • Location, width, and use of easements • Designation of land for public use (parks and open space) 17.12.190 Proposed Utility Methods • Proposed sewage disposal • Proposed water supply • Proposed storm water disposal • Proposed secondary pressurized irrigation (if the site has irrigation rights) 15.54 (adopted 6/3/20) Floodplain requirements (N/A if there is no floodplain in the development) 0 Floodplain boundaries, type, and BFEs 290 E. Linden Avenue PRELIMINARY PLAT Chubbuck,ID 83202 CHUBBUCK 208.237.2430 — Fax 208.237.2409 APPLICATION www.CityofChubbuck.us Aug. 2021 Form loneo PAGE 5OF5 SECTION F- CERTIFICATION • I, the undersigned, hereby certify that the information herein and attached hereto is true and correct to the best of my knowledge. • 1 agree to comply with all provisions of ordinances and laws governing this type of work, whether specified herein or not. • 1 am aware that if this application is not complete, the preliminary plat review process will not continue until it is so deemed by the City upon further submission of materials. • 1 hereby authorize the filing of this application and grant approval of on-site review of the development described herein. • 1 certify that I am authorized to file this application. F1. Signature F2. Printed Name F3. Date Logan Johnson 3/11/2022 SECTION G -FOR STAFF USE ONLY G1. COMPLETENESS REVIEW: Deemed complete? Reviewed by: Date: ❑ Yes ❑ No If no, list concern(s): Applicant Notified? ❑ Yes ❑ No Comments: Chubbuck Property Traffic Impact Study Prepared for: Spencer Wright Wright Development Group 1178 West Legacy Crossing Blvd Ste 100 801.773.7339 Prepared by: Hunt Engineering, LLC 6619 Willow Creek Rd. Mountain Green, UT 84050 801.664.4724 Thomas Hunt, PE HINT EN-31NFERIN-G. LLC March 14, 2022 Updated: March 28, 2022 March 28, 2022 Chubbuck City 290 East Linden Ave. Chubbuck, ID 83202 (208) 237-2430 RE: Chubbuck Development — Chubbuck, ID — Traffic Impact Study As per your request, we are submitting to you this report of the traffic impact study for the proposed multi -family development located on the southeast corner of Knudsen Blvd and Hawthorne Rd in Chubbuck, ID. This land is currently undeveloped, and it is proposed that 5 apartment buildings with a total of 200 apartment units be built at this location. It is projected that this development will generate 200 AM, 200 PM peak hour trips with 2,400 total daily trips. The site is planning to utilize the two existing curb cuts on Knudsen Blvd and relocate the existing access on Hawthorne Rd. A traffic study was performed at the following intersections to determine the impact the development would have on the existing roadway and traffic patterns: - Hawthorne Rd / Knudsen Blvd - Knudsen Blvd / Zebe Ln - Yellowstone Ave / Knudsen Blvd - Hawthorne Rd / Chubbuck Rd To perform this report, manual traffic counts were obtained on multiple days during the AM and PM peak hours in February and March of 2022. Based on this information, an analysis for how the existing intersections currently function versus the proposed development conditions was completed. This analysis shows that the proposed development does not negatively impact the overall Level of Service at any of the existing intersections and no mitigation measures are needed. It is my professional opinion that upon completion of this project, it will not significantly alter the existing traffic patterns, and should be permitted per the traffic data and improvements contained within this report. If you have any questions, or we can be of further assistance, please let us know. Sincerely, Thomas Hunt, P.E. Hunt Engineering, LLC 6619 Willow Creek Road Mountain Green, UT 84050 thomas.hunt@hunt-engineering.com �IVMT E NG iN CEF ING. LLC ITEM Executive Summary Key Findings Introduction & Summary Area Conditions Analysis of Existing Conditions Projected Traffic - 2023 Results — 2023 Conclusions and Recommendations Appendix XTAAiTT,' Vicinity Map Site Layout Existing Peak Hours Traffic Volumes Trip Distribution 2023 Projected Traffic Conditions (2023) 3 Table of Contents — Chubbuck Hawthorne Blvd & Knudsen Rd — Chubbuck, ID 4 4 6 9 12 14 17 18 19 List of Figures — Chubbuck Hawthorne Blvd & Knudsen Rd — Chubbuck, ID T,Tf� T TT) T- 1 2 3 4 5 Traffic Impact Study Chubbuck Property, ID Executive Summary The Chubbuck Development is a proposed multi -family development that is planning to be open in 2023 at the southeast corner of Hawthorne Rd and Knudsen Blvd. The land is 10.0 acres in size and is currently undeveloped. It is proposed that 200 Apartment Units be built at this location. It is projected that this development will generate 200 AM, 200 PM peak hour trips with 2,400 total daily trips. The site is planning to utilize the two existing accesses on Knudsen Blvd and relocate the existing access on Hawthorne Rd to the property line to function as a shared access for any future development to the south. A traffic study was performed at the following intersections to determine the impact the development would have on the existing roadway and traffic patterns: o Hawthorne Rd / Knudsen Blvd o Knudsen Blvd / Zebe Ln o Yellowstone Ave / Knudsen Blvd o Hawthorne Rd / Chubbuck Rd The purpose of this study is to assess the existing traffic flow and distribution, forecast the additional traffic generated from the development on opening day (2023) with the surrounding developments being in place to determine the projected Level of Service to determine the impact these developments would have on the existing traffic flow and what mitigations may be needed. Key Findings • Existing 2022 Traffic conditions: o The existing Hawthorne Rd & Knudsen Blvd intersection is operating at a Level of Service B in the AM & PM Peak. ■ No mitigation measures are needed. o The existing Yellowstone Ave & Knudsen Blvd intersection is operating at a Level of Service D in the AM & PM Peak. ■ Left Turn movements currently have some delay that causes some queueing issues. In discussion with city staff, these are existing issues that will not affect our project approval. o The existing Hawthorne Rd & Chubbuck Rd intersection is operating at a Level of Service B in the AM & PM Peak ■ No mitigation measures are needed. • Development 2023: It is projected that this development will generate 200 AM, 200 PM peak hour trips with 2,400 total daily trips. There is a slight increase in delay at each intersection, but the Level of Service grade remains the same at each intersection. 0 0 4 Traffic Impact Study Chubbuck Property, ID o The projected Hawthorne Rd & Knudsen Blvd intersection has a slight increase in delay but remains at an operating Level of Service B in the AM & PM Peak. ■ No mitigation measures are needed. o The projected Yellowstone Ave & Knudsen Blvd intersection has a slight increase in delay but remains at an operating Level of Service D in the AM & PM Peak. ■ Left Turn movements currently have some delay that causes some queueing issues. In discussion with city staff, these are existing issues that will not affect our project approval. o The projected Hawthorne Rd & Chubbuck Rd intersection has a slight increase in delay but remains at an operating Level of Sercie B in the AM & PM Peak. ■ No mitigation measures are needed. o Site Accesses The two accesses on Knudsen Blvd will be utilized to service this site and they function at a Level of Service A and have a center two way left turn lane for all left turn movements. There is an existing curb cut/access on Hawthorne Rd. This curb cut will be relocated approximately 110' further south and away from the existing intersection, improving the overall functionality of the roadway. Traffic Impact Study Chubbuck Property, ID Introduction and Summary This report presents the findings of the Traffic Impact Study (TIS) performed for the Chubbuck Development. The proposed development is a multi -family project that is planning to be open in 2023 at the southeast corner of Hawthorne Rd and Knudsen Blvd. The land is 10.0 acres in size and is currently undeveloped. It is proposed that 200 Apartment Units be built at this location. It is projected that this development will generate 200 AM, 200 PM peak hour trips with 2,400 total daily trips. The site is planning to utilize the two existing accesses on Knudsen Blvd and relocate the existing access on Hawthorne Rd to the property line to function as a shared access for any future development to the south. A traffic study was performed at the following intersections to determine the impact the development would have on the existing roadway and traffic patterns: o Hawthorne Rd / Knudsen Blvd o Knudsen Blvd / Zebe Ln o Yellowstone Ave / Knudsen Blvd o Hawthorne Rd / Chubbuck Rd This report addresses the impacts based on Level of Service (LOS) values calculated by delay per vehicles. It is determined that all intersections function at an acceptable level of service with no required mitigation measures. This project location is shown in Figure #1 and the site plan is shown in Figure #2. Trak Impact Study Chubbuck Property, ID Figure #1 Vicinity Map Knudsen Blvd & Hawthorne Rd I Chubbuck, UT W Stphon Rd W > 1n' t" "kw-; r A 4 � C3 ip 4 4+ I '!l Stec �l r3 1{FIC Ya a 81 b 2 Boyd 5k# ,� rl lurk Re Chubbuck E Clrubbijik {ad E Venture' +f} p r7 L�i�J�l 8rt w Re6o n f Ore r o % -P16 i Project Site rF Ad 41 KC ngharn Rd ^. Z i 0 2 w 7 a n T � K � \ The �1 W Eldredge Rci 5 41 Cm � 15 a a poerrreroo freak y 7 mm Scale: 1 " = 40' Site Information LOCATED IN: CHUBBUCK CITY, CHUBBUCK COUNTY O LO ORIGINAL PROPERTY: 435,600 SF (10.0 ACRES) BUILDING AREA: 83,252 SF APARTMENTS (192 UNITS) zz � � 5,377 SF OFFICE/8 APT UNITS � 'Z N 16,712 SF GARAGES (74 GARAGES) z w r 01 200 TOTAL UNITS W � � 20 UNITS PER ACRE Cz 65 � HARD SURFACE AREA: 173,245 40.0% p LANDSCAPE AREA: 157,014 36.0% O PARKING: 325 STALLS PROVIDED 74 GARAGES 397 TOTAL STALLS 1.99 STALLS/UNIT mm Scale: 1 " = 40' ENGINEERS STAMP PROJECT INFO. Engineer: Drafter: T. HUNT T. HUNT Start Date: 03/14/2022 Name: CHUBBUCK PROPERTY SHEET 4 9 SHEETS 0 U O LO U U zz � � � 'Z N I z w r 01 W � � Cz 65 � o p O L O >1 ja CL O o 0 L Z am �dV ,C O V AMA ■ L a Revisions Date ENGINEERS STAMP PROJECT INFO. Engineer: Drafter: T. HUNT T. HUNT Start Date: 03/14/2022 Name: CHUBBUCK PROPERTY SHEET 4 9 SHEETS Traffic Impact Study Chubbuck Property, ID Study Area Conditions Yellowstone Ave / Knudsen Blvd: This is a 4 -way signalized intersection. Yellowstone Ave has two thru lanes, a dedicated left turn lane and a shared thru/right turn lane going northbound and a dedicated right turn lane going southbound. The posted speed limit is 35 mph and it carries just over 20,000 vehicles per day. Knudsen Blvd is a 2 -lane roadway and the eastbound direction at the intersection has one dedicated left turn lane, one thru lane and one dedicated right turn lane. West bound, this roadway has a dedicated left turn lane and a shared thru/right turn lane. The posted speed limit is 35 mph and it carries roughly 12,000 vehicles per day. Knudsen Blvd / Zebe Ln: This is a 2 -way stop controlled intersection. Knudsen Blvd is a 2 -lane roadway with a TWLTL in each direction. The posted speed limit is 35 mph and it carries roughly 12,000 vehicles per day. Zebe Lane is considered a minor roadway that serves a few businesses. It has a dedicated left turn lane and shared thru/right turn lane going north bound. The southbound direction of Zebe Ln is not currently developed. The posted speed limit is 25 mph and it carries roughly 500 vehicles per day. Hawthorne Rd / Knudsen Blvd: This is a 4 -way signalized intersection. Hawthorne Rd northbound is a 2 -lane roadway with a dedicated left turn lane and dedicated right turn lane. Hawthorne Rd southbound is a one -lane roadway with a dedicated left turn lane and shared thru/right turn lane. The posted speed limit is 35 mph and it carries roughly 6,000 vehicles per day. Knudsen Blvd westbound is a 2 -lane roadway and at the intersect has a dedicated left turn lane, dedicated thru lane and a dedicated right turn lane. Knudsen Blvd eastbound is a single lane roadway but has a dedicated left turn lane and a shared thru/right turn lane. The posted speed limit is 35 mph. Hawthorne Rd / Chubbuck Rd: This is a 4 -way signalized intersection. Hawthorne Rd northbound is a 2 -lane roadway with a dedicated left turn lane and dedicated right turn lane and one thru-lane. Hawthorne Rd southbound is a one -lane roadway with a dedicated left turn lane and shared thru/right turn lane. The posted speed limit is 35 mph and it carries roughly 6,000 vehicles per day. Chubbuck Rd westbound and eastbound is a single -lane roadway and at the intersect has a dedicated left turn lane, dedicated thru lane and a dedicated right turn lane. The posted speed limit is 35 mph and it carries roughly 8,000 vehicles per day. HUNT ENGINEERING. LLC Traffic Impact Study Chubbuck Property, ID Existing Traffic Volumes Both AM and PM Peak hours were observed on 5 different days in February and March 2022. The highest observed traffic counts during those peak hours were used during this study. The existing traffic volumes assisted in determining the existing LOS and studying future impact. The traffic volumes can be seen in Figure 3. HUNT to ENGINEERING. LLC AM Existing rrnuaaucK Blvd AM Existing T.Hunt ubbuck Rd0 • � ; ` _ ,' := Soh e/ r.c ss _V_ _ r fDN 'co C=) 0 NVV 220 2z_ ser 365 691 - 0 U3/14/1U11 PM Existing .. .. 1 1 E �G+ _ All, Lei KBISOIRM-re If •— - ,�r'�t_�r' 3�.� :�.�� `fin � `''' � � ...- � � _ 1 'tti ,- _ � 1 om PM Existing T.Hunt Traffic Impact Study Chubbuck Property, ID Analysis of Existing Conditions Level of Service Analysis For this traffic impact study, the LOS was determined by calculating the average delay time per vehicle in seconds using Synchro 11. Each LOS is associated with a designated range of delay times in seconds per vehicle. Table 1 (below) is used to determine the LOS for a signalized intersection based on the delay in seconds per vehicle. Table 2 (below) is used to determine the LOS for an unsignalized intersection based on the delay in seconds per vehicle. According to the Highway Capacity Manual, most facilities are designed for a service flow rate at LOS D or better to ensure acceptable operating conditions to users. Table 1 - Signalized Intersections Level of Service LUS on eneral Description Vehicle (sec/veh) A < 10 Free Flow B > 10 - 20 Stable Flow (slight delays) C > 20 - 35 Stable Flow (acceptable delays) D > 35 - 55 Approaching unstable (tolerable delay) > 55 - 80 Unstable Flow (intolerable delay) �j > 80 Forced Flow (congested and failure) Source: Highway Capacity Manual (HCM) 2010. Table 2 - Unsignalized Intersections Level of Service Intersection Delay per JWGeneral Description Vehicle A < 10 Free Flow B > 10 - 15 Stable Flow (slight delays) C > 15 - 25 Stable Flow (acceptable delays) D > 25 - 35 Approaching unstable (tolerable delay) E > 35 - 50 Unstable Flow (intolerable delay) ..i.j > 50 Forced Flow (congested and failure) Source: Highway Capacity Manual (HCM) 2010 Study Area Level of Service The existing intersection was analyzed using Synchro 11. The results, indicating the current level of service, are shown in Table 3 and the appendix. HUNT ENGINEERING. LLC 12 Traffic Impact Study Chubbuck Property, ID Table 3 — Existing Level of Service for Study Area Studied Intersection AM Peak Hour PM Peak Hours Delay (sec/veh) LOS Delay LOS (sec/veh) Hawthorne Rd/Knudsen Blvd 17.2 B 12.3 B Yellowstone Ave/Knudsen Blvd 43.2 D 52.2 D Knudsen BlvdlZebe Ln 0.5 A 0.8 A Hawthorne Rd/Chubbuck Rd 14.1 B 16.2 B Source: Delay times and LOS determined using Synchro 11. Summary of Existing Conditions During the AM Peak hours, the intersections function at an acceptable Level of Service, except there are times specifically in the PM Peak hour when the left turn movements at the Yellowstone Ave/Knudsen Blvd intersection that cause some longer delays and cause the left turn queueing to spill over into the thru lanes. These existing delays and conditions were discussed with the Chubbuck city staff and they are aware of these conditions and have noted that our development is not creating these delays and will not be required to mitigate these existing conditions. HUNT 13 ENGINEERING. LLC Traffic Impact Study Chubbuck Property, ID Projected Traffic 2023 Trip Generation The number of new trips generated for the proposed development was determined using the city of Chubbuck Residential Unit requirements. It is proposed that the development will consist of 200 Apartment Units. The number of new trips generated for the proposed development was determined using the guidance in the City of Chubbuck manual that each residential unit creates 1 trip in the AM & PM peak hours and 12 daily trips per unit. Note: The city manual does not determine how many of those trips are entering and exiting, so the percentages found in ITE were used for those numbers. In the AM 25% of the trips are entering while 75% are exiting, and in the PM 60% of the trips are entering while 40% are exiting. These results can be seen in Table 4 below. Table 4 — Project Trip Generation Trip Distribution The new trips estimated to be generated from the proposed development was distributed onto the roadway network based on the proposed site access locations, existing turning movements, existing traffic patterns, and proximity to major roadways. The Origin - Destination used for this site is: 0 55 percent to/from the Yellowstone Ave/Knudsen Blvd Intersection 0 30 percent to/from Hawthorne Rd from the South 0 15 percent to/from Hawthorne Rd from the North The estimated trip generation distribution is shown in Figure 4 below. The projected new trips were added to the existing 2022 background traffic to represent opening day of this project. The projected combined vehicle movements are shown in Figure 5 below. HUNT 14 ENGINEERING. LLC Land Weekday Weekday AM AM PM PM Use Trips Trips Trips Trips Trips Trips Entering Exitin Enterin Exiting Entering Exiting Apartments City 1200 1200 50 150 120 80 Trip Distribution The new trips estimated to be generated from the proposed development was distributed onto the roadway network based on the proposed site access locations, existing turning movements, existing traffic patterns, and proximity to major roadways. The Origin - Destination used for this site is: 0 55 percent to/from the Yellowstone Ave/Knudsen Blvd Intersection 0 30 percent to/from Hawthorne Rd from the South 0 15 percent to/from Hawthorne Rd from the North The estimated trip generation distribution is shown in Figure 4 below. The projected new trips were added to the existing 2022 background traffic to represent opening day of this project. The projected combined vehicle movements are shown in Figure 5 below. HUNT 14 ENGINEERING. LLC AM Distribution AM Distribution T.Hunt r3c Ej �. • '� � � � �; ,..• it .�• - � � wil i - I AM Distribution T.Hunt PM Distribution Chubbuck Prop 03/30/22 E Oa BIVd 0 `" 16 �rn \ rs6 m %9 7 n4dS�n %a p 78 PM Distribution T.Hunt - ' pr, i w _ I 1 Ev o C, F3 12 �Cn�dser 56 c CO G O D CD �' IE 3 CDQ 12 w co 3 7 03/30/22 E Oa BIVd 0 `" 16 �rn \ rs6 m %9 7 n4dS�n %a p 78 PM Distribution T.Hunt - ' pr, i w _ I 1 Ev o C, F3 12 �Cn�dser 56 c CO G O D CD �' IE AM Existing + AM Proposed Chubbuck Property 03/30/22 120 N�� 585 216 4328 3 co cc Chubbuck Rd 321 Y T ! _ _ i h A•:aT_ Q ! r .R.i Al W W o 108 Nom' 8 1007 9 36 714; 2Sp 6 -7 - isen Blvd 57 MMS 6 �N 2� m = ��0 33 Al 13 r ! ! 6 � � �0 59 - 00 - rnr 162 , � C:) oo � r22 - aS�n ejV - - - - ------_-_- - dsen 371 ��rn s'- d 772 00 0 �Cnu 315 rn N 30 20.::_ �M 20 _ :a m - ` ., 0 s. N a; " AM Existing + AM Proposed T.Hunt PM Existing + Proposed LnuDDUCK Knul Blvd bbuck 2 N a O CD ;U Q r w 335 N)-4 103 302 3j0� 5 288 3 NMS 16 35 co 29gy ^^ 18 PM Existing + Proposed T.Hunt a 3� 0 00 750 v _ g -kn4ds�n ei�d o - - - - - - 363--,W o W 20 I At -49 0 Ib E ;tea, 108 390 128 01dsen 216 CD 0 N O CD UJIMIZ1 0 Traffic Impact Study Chubbuck Property, ID Results — Full Development 2023 Based on current conditions, combined with the projected traffic flows from the proposed development at full build out, we have prepared a study of the studied intersection and new accesses. The results of the study are shown in Table 5. Table 5 — Existing and Proposed Level of Service for Study Area Peak Hour Studied Intersection Existin Development (2023) Delay LOS (sec/veh) Delay (sec/veh) LOS Hawthorne/Knudsen Blvd 17.2 B 17.7 B Yellowstone Ave/Knudsen Blvd 43.2 D 45.3 D Knudsen Blvd/Zebe Ln 0.5 A 0.5 A AMPeak Hawthorne Rd/Chubbuck Rd 14.1 B 14.7 B Hawthorne Access - - 0.4 A Knudsen Western Access - - 3.3 A Knudsen Eastern Access - - 1.0 A Hawthorne/Knudsen Blvd 12.3 B 12.5 B Yellowstone Ave/Knudsen Blvd 52.2 D 54.8 D Knudsen Blvd/Zebe Ln 0.8 A 0.8 A PM Peak Hawthorne RdIChubbuck Rd 16.2 B 16.5 B Hawthorne Access - - 0.3 A Knudsen Western Access - - 0.2 A Knudsen Eastern Access - - 0.5 A Source: Delay times and LOS determined using Synchro 11. Summary of Developed (2023) Conditions Based upon the results of the existing conditions versus the developed conditions, the proposed development has a slight increase in delay at the intersections, but the overall Level of Service remains the same with little to no impact on surrounding traffic. The left turn movements at Yellowstone Ave/Knudsen Blvd have some delay that causes some queueing issues, but as mentioned previously — these are existing conditions and not caused by our development. The existing curb cut on Hawthorne Ave will be improved with this development as it will be relocated 110' further away from the intersection and is designed as a shared access for future development to the south. HUNT 17 ENGINEERING. LLC Traffic Impact Study Chubbuck Property, ID Conclusions & Recommendations This land is currently undeveloped, and it is proposed that 200 Apartment Units will be built at this location. It is projected that this development will generate 200 AM, 200 PM peak hour trips with 2,400 total daily trips. The project will utilize the two existing curb cuts located on Knudsen Blvd and will relocate the existing access on Hawthorne Blvd approximately 110' further south from the intersection resulting in an improved Level of Service. Our principal findings from our traffic impact analysis have determined that during the AM and PM peak hours, all studied intersections and accesses operate at acceptable level of services with minimal increases in delay and no mitigation measures are needed. The Yellowstone Ave/Knudsen Blvd has some delay in the left turn movements at that causes some queueing issues, but as mentioned previously — these are existing conditions and not caused by our development and no mitigation measures are required with this project. Therefore, it is our professional opinion that this project with the requested mitigation methods will not significantly alter the existing traffic patterns the intersection and should be permitted per the traffic data contained within this report. HUNT 18 ENGINEERING. LLC Traffic Impact Study Chubbuck Property, ID Appendix HUNT 19 ENGINEERING. LLC AM Existing Chubbuck 03114/2022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4.5 1� 38.0 18.0 + r Max Q Clear Time (g_c+11), s tt r 35.5 13.5 Green Ext Time (p -c), s Traffic Volume (veh/h) 36 57 119 100 45 96 37 356 349 305 318 42 Future Volume (veh/h) 36 57 119 100 45 96 37 356 349 305 318 42 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped -Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/In 1863 1863 1900 1863 1863 1863 1863 1863 1863 1863 1863 1900 Adj Flow Rate, veh/h 39 62 129 109 49 104 40 387 379 332 346 46 Adj No. of Lanes 1 1 0 1 1 1 1 2 1 1 1 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 427 150 311 328 516 438 504 2069 926 484 942 125 Arrive On Green 0.28 0.28 0.28 0.28 0.28 0.28 0.58 0.58 0.58 0.19 0.19 0.19 Sat Flow, veh/h 1229 540 1124 1187 1863 1583 988 3539 1583 699 1611 214 Grp Volume(v), veh/h 39 0 191 109 49 104 40 387 379 332 0 392 Grp Sat Flow(s),veh/h/In 1229 0 1664 1187 1863 1583 988 1770 1583 699 0 1825 Q Serve(g_s), s 1.6 0.0 6.1 5.4 1.3 3.3 1.7 3.3 8.5 30.2 0.0 12.1 Cycle Q Clear(g_c), s 2.9 0.0 6.1 11.5 1.3 3.3 13.8 3.3 8.5 33.5 0.0 12.1 Prop In Lane 1.00 0.68 1.00 1.00 1.00 1.00 1.00 0.12 Lane Grp Cap(c), veh/h 427 0 461 328 516 438 504 2069 926 484 0 1067 V/C Ratio(X) 0.09 0.00 0.41 0.33 0.09 0.24 0.08 0.19 0.41 0.69 0.00 0.37 Avail Cap(c_a), veh/h 427 0 461 328 516 438 504 2069 926 484 0 1067 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.33 0.33 0.33 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 18.5 0.0 19.2 23.9 17.5 18.2 12.3 6.3 7.4 26.0 0.0 15.8 Incr Delay (d2), s/veh 0.4 0.0 2.7 2.7 0.4 1.3 0.3 0.2 1.3 7.7 0.0 1.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.6 0.0 3.1 2.0 0.7 1.6 0.5 1.7 4.0 6.9 0.0 6.4 LnGrp Delay(d),s/veh 18.9 0.0 21.9 26.6 17.8 19.5 12.6 6.5 8.7 33.8 0.0 16.8 LnGrp LOS B C C B B B A A C B Approach Vol, veh/h 230 262 806 724 Approach Delay, s/veh 21.4 22.1 7.8 24.6 Approach LOS C C A C Timer Assigned Phs 2 4 6 8 Phs Duration (G+Y+Rc), s 42.5 22.5 42.5 22.5 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 38.0 18.0 38.0 18.0 Max Q Clear Time (g_c+11), s 15.8 8.1 35.5 13.5 Green Ext Time (p -c), s 4.1 0.9 1.2 0.4 Intersection Summary HCM 2010 Ctrl Delay 17.2 HCM 2010 LOS B AM Existing Synchro 11 Light Report Chubbuck Pagel AM Existing Chubbuck 03114/2022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 10.4 + r 24.8 Change Period (Y+Rc), s 4.5 4.5 t 4.5 4.5 tt r Traffic Volume (veh/h) 127 365 259 162 56 33 108 964 296 207 997 72 Future Volume (veh/h) 127 365 259 162 56 33 108 964 296 207 997 72 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped -Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/In 1863 1863 1863 1863 1863 1900 1863 1863 1900 1863 1863 1863 Adj Flow Rate, veh/h 138 397 282 176 61 36 117 1048 322 225 1084 78 Adj No. of Lanes 1 1 1 1 1 0 1 2 0 1 2 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 445 424 361 222 248 146 285 1076 328 258 1538 688 Arrive On Green 0.07 0.23 0.23 0.07 0.23 0.23 0.07 0.40 0.40 0.10 0.43 0.43 Sat Flow, veh/h 1774 1863 1583 1774 1099 649 1774 2674 815 1774 3539 1583 Grp Volume(v), veh/h 138 397 282 176 0 97 117 691 679 225 1084 78 Grp Sat Flow(s),veh/h/In 1774 1863 1583 1774 0 1748 1774 1770 1719 1774 1770 1583 Q Serve(g_s), s 5.3 18.8 15.1 6.5 0.0 4.1 3.4 34.4 35.2 6.9 22.5 2.6 Cycle Q Clear(g_c), s 5.3 18.8 15.1 6.5 0.0 4.1 3.4 34.4 35.2 6.9 22.5 2.6 Prop In Lane 1.00 1.00 1.00 0.37 1.00 0.47 1.00 1.00 Lane Grp Cap(c), veh/h 445 424 361 222 0 394 285 712 691 258 1538 688 V/C Ratio(X) 0.31 0.94 0.78 0.79 0.00 0.25 0.41 0.97 0.98 0.87 0.70 0.11 Avail Cap(c_a), veh/h 445 424 361 222 0 394 285 712 691 258 1538 688 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 24.0 34.1 32.6 27.8 0.0 28.6 16.5 26.4 26.6 21.7 20.7 15.1 Incr Delay (d2), s/veh 1.8 30.2 15.5 24.4 0.0 1.5 4.3 27.2 30.3 30.9 2.7 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 2.8 13.3 8.1 4.8 0.0 2.1 2.0 22.1 22.4 7.8 11.4 1.2 LnGrp Delay(d),s/veh 25.8 64.3 48.1 52.2 0.0 30.1 20.8 53.5 56.9 52.6 23.5 15.5 LnGrp LOS C E D D C C D E D C B Approach Vol, veh/h 817 273 1487 1387 Approach Delay, s/veh 52.2 44.4 52.5 27.8 Approach LOS D D D C Timer Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 13.3 40.7 11.0 25.0 10.4 43.6 11.2 24.8 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 8.8 36.2 6.5 20.5 5.9 39.1 6.7 20.3 Max Q Clear Time (g_c+11), s 8.9 37.2 8.5 20.8 5.4 24.5 7.3 6.1 Green Ext Time (p -c), s 0.0 0.0 0.0 0.0 0.0 6.8 0.0 0.3 Intersection Summary HCM 2010 Ctrl Delay 43.2 HCM 2010 LOS D AM Existing Synchro 11 Light Report Chubbuck Page 2 AM Existing Chubbuck 1I0311412022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations tib t Traffic Volume (veh/h) 0 694 21 22 220 0 6 0 18 0 0 0 Future Volume (Veh/h) 0 694 21 22 220 0 6 0 18 0 0 0 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 0 754 23 24 239 0 7 0 20 0 0 0 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 239 777 933 1052 388 684 1064 120 vC1, stage 1 conf vol 766 766 287 287 vC2, stage 2 conf vol 168 287 397 777 vCu, unblocked vol 239 777 933 1052 388 684 1064 120 tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 100 97 98 100 97 100 100 100 cM capacity (veh/h) 1325 835 346 378 610 494 357 910 Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 NB 1 NB 2 SB 1 SB 2 Volume Total 0 503 274 24 159 80 7 20 0 0 Volume Left 0 0 0 24 0 0 7 0 0 0 Volume Right 0 0 23 0 0 0 0 20 0 0 cSH 1700 1700 1700 835 1700 1700 346 610 1700 1700 Volume to Capacity 0.00 0.30 0.16 0.03 0.09 0.05 0.02 0.03 0.00 0.00 Queue Length 95th (ft) 0 0 0 2 0 0 2 3 0 0 Control Delay (s) 0.0 0.0 0.0 9.4 0.0 0.0 15.6 11.1 0.0 0.0 Lane LOS A C B A A Approach Delay (s) 0.0 0.9 12.3 0.0 Approach LOS B A Intersection Summary Average Delay 0.5 Intersection Capacity Utilization 29.9% ICU Level of Service A Analysis Period (min) 15 AM Existing Synchro 11 Light Report Chubbuck Page 3 AM Existing Chubbuck 03114/2022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4.5 + r 36.5 + r Max Q Clear Time (g_c+11), s + r 8.0 31.6 Green Ext Time (p -c), s Traffic Volume (veh/h) 28 433 315 212 585 120 124 138 208 45 112 42 Future Volume (veh/h) 28 433 315 212 585 120 124 138 208 45 112 42 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped -Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/In 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1900 Adj Flow Rate, veh/h 30 471 342 230 636 130 135 150 226 49 122 46 Adj No. of Lanes 1 1 1 1 1 1 1 1 1 1 1 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 344 1046 889 387 1046 889 386 559 475 357 387 146 Arrive On Green 0.56 0.56 0.56 0.56 0.56 0.56 0.40 0.40 0.40 0.30 0.30 0.30 Sat Flow, veh/h 699 1863 1583 669 1863 1583 1212 1863 1583 1003 1290 487 Grp Volume(v), veh/h 30 471 342 230 636 130 135 150 226 49 0 168 Grp Sat Flow(s),veh/h/In 699 1863 1583 669 1863 1583 1212 1863 1583 1003 0 1777 Q Serve(g_s), s 1.9 9.6 7.9 20.0 14.8 2.5 5.9 3.5 6.9 2.5 0.0 4.8 Cycle Q Clear(g_c), s 16.7 9.6 7.9 29.6 14.8 2.5 10.7 3.5 6.9 6.0 0.0 4.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.27 Lane Grp Cap(c), veh/h 344 1046 889 387 1046 889 386 559 475 357 0 533 V/C Ratio(X) 0.09 0.45 0.38 0.59 0.61 0.15 0.35 0.27 0.48 0.14 0.00 0.32 Avail Cap(c_a), veh/h 344 1046 889 387 1046 889 386 559 475 357 0 533 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.33 1.33 1.33 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 15.1 8.4 8.0 17.1 9.5 6.8 18.8 14.7 15.7 19.4 0.0 17.6 Incr Delay (d2), s/veh 0.5 1.4 1.3 6.6 2.6 0.3 2.5 1.2 3.4 0.8 0.0 1.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.4 5.2 3.7 4.3 8.2 1.2 2.3 1.9 3.4 0.8 0.0 2.6 LnGrp Delay(d),s/veh 15.6 9.8 9.2 23.6 12.1 7.2 21.3 15.9 19.1 20.2 0.0 19.1 LnGrp LOS B A A C B A C B B C B Approach Vol, veh/h 843 996 511 217 Approach Delay, s/veh 9.8 14.1 18.8 19.4 Approach LOS A B B B Timer Assigned Phs 2 4 6 8 Phs Duration (G+Y+Rc), s 24.0 41.0 24.0 41.0 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 19.5 36.5 19.5 36.5 Max Q Clear Time (g_c+11), s 12.7 18.7 8.0 31.6 Green Ext Time (p -c), s 1.2 4.2 0.8 2.7 Intersection Summary HCM 2010 Ctrl Delay 14.1 HCM 2010 LOS B AM Existing Synchro 11 Light Report Chubbuck Page 4 PM Existing Knudsen Blvd & Hawthorne Rd Chubbuck 03114/2022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4.5 1� 18.0 18.0 + r Max Q Clear Time (g_c+11), s tt r 10.4 12.2 Green Ext Time (p -c), s Traffic Volume (veh/h) 5 30 35 295 100 323 20 374 177 88 389 15 Future Volume (veh/h) 5 30 35 295 100 323 20 374 177 88 389 15 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped -Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/In 1863 1863 1900 1863 1863 1863 1863 1863 1863 1863 1863 1900 Adj Flow Rate, veh/h 5 33 38 321 109 351 22 407 192 96 423 16 Adj No. of Lanes 1 1 0 1 1 1 1 2 1 1 1 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 497 316 364 655 745 633 362 1416 633 423 713 27 Arrive On Green 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 Sat Flow, veh/h 928 791 911 1324 1863 1583 946 3539 1583 816 1783 67 Grp Volume(v), veh/h 5 0 71 321 109 351 22 407 192 96 0 439 Grp Sat Flow(s),veh/h/In 928 0 1702 1324 1863 1583 946 1770 1583 816 0 1851 Q Serve(g_s), s 0.2 0.0 1.2 9.0 1.7 7.7 0.8 3.5 3.7 4.1 0.0 8.4 Cycle Q Clear(g_c), s 1.8 0.0 1.2 10.2 1.7 7.7 9.2 3.5 3.7 7.6 0.0 8.4 Prop In Lane 1.00 0.54 1.00 1.00 1.00 1.00 1.00 0.04 Lane Grp Cap(c), veh/h 497 0 681 655 745 633 362 1416 633 423 0 740 V/C Ratio(X) 0.01 0.00 0.10 0.49 0.15 0.55 0.06 0.29 0.30 0.23 0.00 0.59 Avail Cap(c_a), veh/h 497 0 681 655 745 633 362 1416 633 423 0 740 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 9.2 0.0 8.5 11.6 8.6 10.4 14.3 9.2 9.2 11.7 0.0 10.6 Incr Delay (d2), s/veh 0.0 0.0 0.3 2.6 0.4 3.5 0.3 0.5 1.2 1.2 0.0 3.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.0 0.0 0.6 3.7 0.9 3.9 0.3 1.8 1.8 1.1 0.0 5.0 LnGrp Delay(d),s/veh 9.2 0.0 8.8 14.3 9.0 13.9 14.6 9.7 10.4 13.0 0.0 14.1 LnGrp LOS A A B A B B A B B B Approach Vol, veh/h 76 781 621 535 Approach Delay, s/veh 8.8 13.4 10.1 13.9 Approach LOS A B B B Timer Assigned Phs 2 4 6 8 Phs Duration (G+Y+Rc), s 22.5 22.5 22.5 22.5 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 18.0 18.0 18.0 18.0 Max Q Clear Time (g_c+11), s 11.2 3.8 10.4 12.2 Green Ext Time (p -c), s 1.9 0.3 2.0 1.6 Intersection Summary HCM 2010 Ctrl Delay 12.3 HCM 2010 LOS B PM Existing Synchro 11 Light Report Chubbuck Pagel PM Existing Chubbuck Knudsen Blvd & Zebe Ln 03/14/2022 -11 --1. 4--- t t Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations tib t Traffic Volume (veh/h) 0 285 11 8 718 0 37 0 38 0 0 0 Future Volume (Veh/h) 0 285 11 8 718 0 37 0 38 0 0 0 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 0 310 12 9 780 0 40 0 41 0 0 0 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 780 322 724 1114 161 994 1120 390 vC1, stage 1 conf vol 316 316 798 798 vC2, stage 2 conf vol 408 798 196 322 vCu, unblocked vol 780 322 724 1114 161 994 1120 390 tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 100 99 92 100 95 100 100 100 cM capacity (veh/h) 833 1235 506 364 855 326 362 609 Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 NB 1 NB 2 SB 1 SB 2 Volume Total 0 207 115 9 520 260 40 41 0 0 Volume Left 0 0 0 9 0 0 40 0 0 0 Volume Right 0 0 12 0 0 0 0 41 0 0 cSH 1700 1700 1700 1235 1700 1700 506 855 1700 1700 Volume to Capacity 0.00 0.12 0.07 0.01 0.31 0.15 0.08 0.05 0.00 0.00 Queue Length 95th (ft) 0 0 0 1 0 0 6 4 0 0 Control Delay (s) 0.0 0.0 0.0 7.9 0.0 0.0 12.7 9.4 0.0 0.0 Lane LOS A B A A A Approach Delay (s) 0.0 0.1 11.1 0.0 Approach LOS B A Intersection Summary Average Delay 0.8 Intersection Capacity Utilization 29.8% ICU Level of Service A Analysis Period (min) 15 PM Existing Synchro 11 Light Report Chubbuck Page 3 PM Existing Chubbuck Property Yellowstone Ave & Knudsen Blvd 3/14/2022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 22.2 + r 34.1 Change Period (Y+Rc), s 4.5 4.5 t 4.5 4.5 tt r Traffic Volume (veh/h) 116 60 160 390 356 108 329 1196 78 64 1096 100 Future Volume (veh/h) 116 60 160 390 356 108 329 1196 78 64 1096 100 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped -Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/In 1863 1863 1863 1863 1863 1900 1863 1863 1900 1863 1863 1863 Adj Flow Rate, veh/h 126 65 174 424 387 117 358 1300 85 70 1191 109 Adj No. of Lanes 1 1 1 1 1 0 1 2 0 1 2 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 157 329 279 488 370 112 362 1582 103 200 1255 561 Arrive On Green 0.05 0.18 0.18 0.14 0.27 0.27 0.16 0.47 0.47 0.05 0.35 0.35 Sat Flow, veh/h 1774 1863 1583 1774 1374 415 1774 3373 220 1774 3539 1583 Grp Volume(v), veh/h 126 65 174 424 0 504 358 681 704 70 1191 109 Grp Sat Flow(s),veh/h/In 1774 1863 1583 1774 0 1789 1774 1770 1824 1774 1770 1583 Q Serve(g_s), s 5.7 3.3 11.2 15.9 0.0 29.6 17.4 36.5 36.7 2.7 36.0 5.2 Cycle Q Clear(g_c), s 5.7 3.3 11.2 15.9 0.0 29.6 17.4 36.5 36.7 2.7 36.0 5.2 Prop In Lane 1.00 1.00 1.00 0.23 1.00 0.12 1.00 1.00 Lane Grp Cap(c), veh/h 157 329 279 488 0 482 362 830 856 200 1255 561 V/C Ratio(X) 0.80 0.20 0.62 0.87 0.00 1.05 0.99 0.82 0.82 0.35 0.95 0.19 Avail Cap(c_a), veh/h 157 329 279 488 0 482 362 830 856 200 1255 561 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 38.8 38.7 41.9 34.1 0.0 40.2 33.1 25.2 25.3 23.8 34.5 24.6 Incr Delay (d2), s/veh 33.5 1.3 10.1 18.5 0.0 53.8 44.3 8.9 8.8 4.8 15.8 0.8 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 2.5 1.8 5.7 12.8 0.0 21.8 15.3 19.8 20.5 1.6 20.3 2.4 LnGrp Delay(d),s/veh 72.2 40.0 52.0 52.6 0.0 94.0 77.4 34.1 34.1 28.5 50.4 25.4 LnGrp LOS E D D D F E C C C D C Approach Vol, veh/h 365 928 1743 1370 Approach Delay, s/veh 56.8 75.0 43.0 47.3 Approach LOS E E D D Timer Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 9.6 56.1 20.4 23.9 22.2 43.5 10.2 34.1 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 5.1 51.6 15.9 19.4 17.7 39.0 5.7 29.6 Max Q Clear Time (g_c+11), s 4.7 38.7 17.9 13.2 19.4 38.0 7.7 31.6 Green Ext Time (p -c), s 0.0 7.4 0.0 0.4 0.0 0.7 0.0 0.0 Intersection Summary HCM 2010 Ctrl Delay 52.2 HCM 2010 LOS D PM Existing T. Hunt Page 2 PM Existing Chubbuck Hawthorne Rd &Chubbuck Rd 03114/2022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4.5 + r 37.5 + r Max Q Clear Time (g_c+11), s + r 9.3 39.5 Green Ext Time (p -c), s Traffic Volume (veh/h) 38 690 212 182 540 116 124 138 208 56 92 48 Future Volume (veh/h) 38 690 212 182 540 116 124 138 208 56 92 48 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped -Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/In 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1900 Adj Flow Rate, veh/h 41 750 230 198 587 126 135 150 226 61 100 52 Adj No. of Lanes 1 1 1 1 1 1 1 1 1 1 1 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 391 1075 913 278 1075 913 378 530 451 333 329 171 Arrive On Green 0.58 0.58 0.58 0.58 0.58 0.58 0.28 0.28 0.28 0.28 0.28 0.28 Sat Flow, veh/h 734 1863 1583 572 1863 1583 1230 1863 1583 1003 1156 601 Grp Volume(v), veh/h 41 750 230 198 587 126 135 150 226 61 0 152 Grp Sat Flow(s),veh/h/In 734 1863 1583 572 1863 1583 1230 1863 1583 1003 0 1757 Q Serve(g_s), s 2.4 18.5 4.7 19.0 12.7 2.4 6.3 4.1 7.7 3.3 0.0 4.4 Cycle Q Clear(g_c), s 15.0 18.5 4.7 37.5 12.7 2.4 10.7 4.1 7.7 7.3 0.0 4.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.34 Lane Grp Cap(c), veh/h 391 1075 913 278 1075 913 378 530 451 333 0 500 V/C Ratio(X) 0.10 0.70 0.25 0.71 0.55 0.14 0.36 0.28 0.50 0.18 0.00 0.30 Avail Cap(c_a), veh/h 391 1075 913 278 1075 913 378 530 451 333 0 500 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 13.1 9.7 6.8 24.5 8.5 6.3 22.4 18.1 19.4 20.9 0.0 18.2 Incr Delay (d2), s/veh 0.5 3.8 0.7 14.5 2.0 0.3 2.6 1.3 3.9 1.2 0.0 1.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.5 10.5 2.2 4.6 7.0 1.1 2.4 2.3 3.9 1.0 0.0 2.3 LnGrp Delay(d),s/veh 13.7 13.5 7.5 39.0 10.5 6.6 25.0 19.4 23.4 22.2 0.0 19.8 LnGrp LOS B B A D B A C B C C B Approach Vol, veh/h 1021 911 511 213 Approach Delay, s/veh 12.2 16.2 22.6 20.5 Approach LOS B B C C Timer Assigned Phs 2 4 6 8 Phs Duration (G+Y+Rc), s 23.0 42.0 23.0 42.0 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 18.5 37.5 18.5 37.5 Max Q Clear Time (g_c+11), s 12.7 20.5 9.3 39.5 Green Ext Time (p -c), s 1.1 5.9 0.7 0.0 Intersection Summary HCM 2010 Ctrl Delay 16.2 HCM 2010 LOS B PM Existing Synchro 11 Light Report Chubbuck Page 4 AM Existing + AM Proposed Chubbuck Hawthorne/Knudsen Blvd 3/30/2022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4.5 1� 38.0 18.0 + r Max Q Clear Time (g_c+11), s tt r 37.4 13.8 Green Ext Time (p -c), s Traffic Volume (veh/h) 36 57 119 107 48 108 39 374 349 314 321 42 Future Volume (veh/h) 36 57 119 107 48 108 39 374 349 314 321 42 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped -Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/In 1863 1863 1900 1863 1863 1863 1863 1863 1863 1863 1863 1900 Adj Flow Rate, veh/h 39 62 129 116 52 117 42 407 379 341 349 46 Adj No. of Lanes 1 1 0 1 1 1 1 2 1 1 1 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 421 150 311 328 516 438 501 2069 926 475 943 124 Arrive On Green 0.28 0.28 0.28 0.28 0.28 0.28 0.58 0.58 0.58 0.19 0.19 0.19 Sat Flow, veh/h 1211 540 1124 1187 1863 1583 985 3539 1583 686 1613 213 Grp Volume(v), veh/h 39 0 191 116 52 117 42 407 379 341 0 395 Grp Sat Flow(s),veh/h/In 1211 0 1664 1187 1863 1583 985 1770 1583 686 0 1825 Q Serve(g_s), s 1.6 0.0 6.1 5.7 1.3 3.8 1.7 3.5 8.5 31.9 0.0 12.2 Cycle Q Clear(g_c), s 3.0 0.0 6.1 11.8 1.3 3.8 14.0 3.5 8.5 35.4 0.0 12.2 Prop In Lane 1.00 0.68 1.00 1.00 1.00 1.00 1.00 0.12 Lane Grp Cap(c), veh/h 421 0 461 328 516 438 501 2069 926 475 0 1067 V/C Ratio(X) 0.09 0.00 0.41 0.35 0.10 0.27 0.08 0.20 0.41 0.72 0.00 0.37 Avail Cap(c_a), veh/h 421 0 461 328 516 438 501 2069 926 475 0 1067 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.33 0.33 0.33 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 18.6 0.0 19.2 24.0 17.5 18.3 12.4 6.3 7.4 26.9 0.0 15.8 Incr Delay (d2), s/veh 0.4 0.0 2.7 3.0 0.4 1.5 0.3 0.2 1.3 9.0 0.0 1.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.6 0.0 3.1 2.1 0.7 1.8 0.5 1.8 4.0 7.3 0.0 6.5 LnGrp Delay(d),s/veh 19.0 0.0 21.9 27.0 17.9 19.8 12.7 6.5 8.7 35.9 0.0 16.8 LnGrp LOS B C C B B B A A D B Approach Vol, veh/h 230 285 828 736 Approach Delay, s/veh 21.4 22.4 7.9 25.7 Approach LOS C C A C Timer Assigned Phs 2 4 6 8 Phs Duration (G+Y+Rc), s 42.5 22.5 42.5 22.5 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 38.0 18.0 38.0 18.0 Max Q Clear Time (g_c+11), s 16.0 8.1 37.4 13.8 Green Ext Time (p -c), s 4.2 0.9 0.3 0.4 Intersection Summary HCM 2010 Ctrl Delay 17.7 HCM 2010 LOS B AM Existing + AM Proposed T. Hunt Page 1 AM Existing + AM Proposed Yellowstone ellowstone Ave/Knudsen Blvd 3/30/2022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 10.4 + r 24.8 Change Period (Y+Rc), s 4.5 4.5 t 4.5 4.5 tt r Traffic Volume (veh/h) 139 371 315 162 59 33 125 964 296 207 997 84 Future Volume (veh/h) 139 371 315 162 59 33 125 964 296 207 997 84 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped -Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/In 1863 1863 1863 1863 1863 1900 1863 1863 1900 1863 1863 1863 Adj Flow Rate, veh/h 151 403 342 176 64 36 136 1048 322 225 1084 91 Adj No. of Lanes 1 1 1 1 1 0 1 2 0 1 2 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 442 424 361 219 253 142 284 1076 328 258 1538 688 Arrive On Green 0.07 0.23 0.23 0.07 0.23 0.23 0.07 0.40 0.40 0.10 0.43 0.43 Sat Flow, veh/h 1774 1863 1583 1774 1121 631 1774 2674 815 1774 3539 1583 Grp Volume(v), veh/h 151 403 342 176 0 100 136 691 679 225 1084 91 Grp Sat Flow(s),veh/h/In 1774 1863 1583 1774 0 1751 1774 1770 1719 1774 1770 1583 Q Serve(g_s), s 5.9 19.2 19.1 6.5 0.0 4.2 4.0 34.4 35.2 6.9 22.5 3.1 Cycle Q Clear(g_c), s 5.9 19.2 19.1 6.5 0.0 4.2 4.0 34.4 35.2 6.9 22.5 3.1 Prop In Lane 1.00 1.00 1.00 0.36 1.00 0.47 1.00 1.00 Lane Grp Cap(c), veh/h 442 424 361 219 0 395 284 712 691 258 1538 688 V/C Ratio(X) 0.34 0.95 0.95 0.81 0.00 0.25 0.48 0.97 0.98 0.87 0.70 0.13 Avail Cap(c_a), veh/h 442 424 361 219 0 395 284 712 691 258 1538 688 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 24.2 34.2 34.2 27.8 0.0 28.6 16.8 26.4 26.6 21.7 20.7 15.3 Incr Delay (d2), s/veh 2.1 32.8 36.0 26.2 0.0 1.5 5.7 27.2 30.3 30.9 2.7 0.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 3.1 13.7 11.9 4.9 0.0 2.2 2.4 22.1 22.4 7.8 11.4 1.4 LnGrp Delay(d),s/veh 26.3 67.0 70.2 54.1 0.0 30.2 22.5 53.5 56.9 52.6 23.5 15.7 LnGrp LOS C E E D C C D E D C B Approach Vol, veh/h 896 276 1506 1400 Approach Delay, s/veh 61.4 45.4 52.2 27.7 Approach LOS E D D C Timer Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 13.3 40.7 11.0 25.0 10.4 43.6 11.2 24.8 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 8.8 36.2 6.5 20.5 5.9 39.1 6.7 20.3 Max Q Clear Time (g_c+11), s 8.9 37.2 8.5 21.2 6.0 24.5 7.9 6.2 Green Ext Time (p -c), s 0.0 0.0 0.0 0.0 0.0 6.8 0.0 0.3 Intersection Summary HCM 2010 Ctrl Delay 45.3 HCM 2010 LOS D AM Existing + AM Proposed T. Hunt Page 2 AM Existing + AM Proposed Chubbuck Knudsen Blvd/Zebe Ln 3/30/2022 -11 --1. 4--- t t Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations tib t Traffic Volume (veh/h) 0 772 30 22 252 0 8 0 18 0 0 0 Future Volume (Veh/h) 0 772 30 22 252 0 8 0 18 0 0 0 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 0 839 33 24 274 0 9 0 20 0 0 0 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 274 872 1040 1178 436 762 1194 137 vC1, stage 1 conf vol 856 856 322 322 vC2, stage 2 conf vol 185 322 440 872 vCu, unblocked vol 274 872 1040 1178 436 762 1194 137 tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 100 97 97 100 96 100 100 100 cM capacity (vehlh) 1286 769 306 343 568 459 320 886 Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 NB 1 NB 2 SB 1 SB 2 Volume Total 0 559 313 24 183 91 9 20 0 0 Volume Left 0 0 0 24 0 0 9 0 0 0 Volume Right 0 0 33 0 0 0 0 20 0 0 cSH 1700 1700 1700 769 1700 1700 306 568 1700 1700 Volume to Capacity 0.00 0.33 0.18 0.03 0.11 0.05 0.03 0.04 0.00 0.00 Queue Length 95th (ft) 0 0 0 2 0 0 2 3 0 0 Control Delay (s) 0.0 0.0 0.0 9.8 0.0 0.0 17.1 11.6 0.0 0.0 Lane LOS A C B A A Approach Delay (s) 0.0 0.8 13.3 0.0 Approach LOS B A Intersection Summary Average Delay 0.5 Intersection Capacity Utilization 32.3% ICU Level of Service A Analysis Period (min) 15 AM Existing + AM Proposed T. Hunt Page 3 AM Existing + AM Proposed Chubbuck Hawthorne/Chubbuck Rd 3/30/2022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4.5 + r 36.5 + r Max Q Clear Time (g_c+11), s + r 7.7 32.5 Green Ext Time (p -c), s Traffic Volume (veh/h) 28 433 321 216 585 120 131 143 216 45 114 42 Future Volume (veh/h) 28 433 321 216 585 120 131 143 216 45 114 42 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped -Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/In 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1900 Adj Flow Rate, veh/h 30 471 349 235 636 130 142 155 235 49 124 46 Adj No. of Lanes 1 1 1 1 1 1 1 1 1 1 1 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 344 1046 889 385 1046 889 384 559 475 360 389 144 Arrive On Green 0.56 0.56 0.56 0.56 0.56 0.56 0.50 0.50 0.50 0.30 0.30 0.30 Sat Flow, veh/h 699 1863 1583 664 1863 1583 1210 1863 1583 990 1297 481 Grp Volume(v), veh/h 30 471 349 235 636 130 142 155 235 49 0 170 Grp Sat Flow(s),veh/h/In 699 1863 1583 664 1863 1583 1210 1863 1583 990 0 1778 Q Serve(g_s), s 1.9 9.6 8.1 20.9 14.8 2.5 5.9 3.1 6.4 2.5 0.0 4.8 Cycle Q Clear(g_c), s 16.7 9.6 8.1 30.5 14.8 2.5 10.7 3.1 6.4 5.7 0.0 4.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.27 Lane Grp Cap(c), veh/h 344 1046 889 385 1046 889 384 559 475 360 0 533 V/C Ratio(X) 0.09 0.45 0.39 0.61 0.61 0.15 0.37 0.28 0.49 0.14 0.00 0.32 Avail Cap(c_a), veh/h 344 1046 889 385 1046 889 384 559 475 360 0 533 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.67 1.67 1.67 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 15.1 8.4 8.0 17.3 9.5 6.8 15.9 12.1 12.9 19.1 0.0 17.6 Incr Delay (d2), s/veh 0.5 1.4 1.3 7.0 2.6 0.3 2.7 1.2 3.7 0.8 0.0 1.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.4 5.2 3.8 4.5 8.2 1.2 2.3 1.8 3.2 0.8 0.0 2.6 LnGrp Delay(d),s/veh 15.6 9.8 9.3 24.3 12.1 7.2 18.6 13.4 16.6 19.9 0.0 19.2 LnGrp LOS B A A C B A B B B B B Approach Vol, veh/h 850 1001 532 219 Approach Delay, s/veh 9.8 14.3 16.2 19.3 Approach LOS A B B B Timer Assigned Phs 2 4 6 8 Phs Duration (G+Y+Rc), s 24.0 41.0 24.0 41.0 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 19.5 36.5 19.5 36.5 Max Q Clear Time (g_c+11), s 12.7 18.7 7.7 32.5 Green Ext Time (p -c), s 1.3 4.2 0.8 2.3 Intersection Summary HCM 2010 Ctrl Delay 14.7 HCM 2010 LOS B AM Existing + AM Proposed T. Hunt Page 4 AM Existing + AM Proposed Chubbuck Knudsen Blvd Eastern Access 3/30/2022 Movement EBT EBR WBL WBT NBL NBR Lane Configurations tib tt r Traffic Volume (veh/h) 736 3 27 250 9 63 Future Volume (Veh/h) 736 3 27 250 9 63 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 800 3 29 272 10 68 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 680 pX, platoon unblocked vC, conflicting volume 803 996 402 vC1, stage 1 conf vol 802 vC2, stage 2 conf vol 194 vCu, unblocked vol 803 996 402 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s) 5.8 tF (s) 2.2 3.5 3.3 p0 queue free % 96 97 89 cM capacity (vehlh) 817 382 598 Direction, Lane # EB 1 EB 2 WB 1 WB 2 WB 3 NB 1 NB 2 Volume Total 533 270 29 136 136 10 68 Volume Left 0 0 29 0 0 10 0 Volume Right 0 3 0 0 0 0 68 cSH 1700 1700 817 1700 1700 382 598 Volume to Capacity 0.31 0.16 0.04 0.08 0.08 0.03 0.11 Queue Length 95th (ft) 0 0 3 0 0 2 10 Control Delay (s) 0.0 0.0 9.6 0.0 0.0 14.7 11.8 Lane LOS A B B Approach Delay (s) 0.0 0.9 12.2 Approach LOS B Intersection Summary Average Delay 1.0 Intersection Capacity Utilization 32.4% ICU Level of Service A Analysis Period (min) 15 AM Existing + AM Proposed T. Hunt Page 5 AM Existing + AM Proposed Chubbuck Hawthorne Access 3/30/2022 t Movement WBL WBR NBT NBR SBL SBT Lane Configurations r t t Traffic Volume (veh/h) 20 20 742 5 3 544 Future Volume (Veh/h) 20 20 742 5 3 544 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 22 22 807 5 3 591 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 558 pX, platoon unblocked 0.91 vC, conflicting volume 1406 406 812 vC1, stage 1 conf vol 810 vC2, stage 2 conf vol 597 vCu, unblocked vol 1397 406 812 tC, single (s) 6.8 6.9 4.1 tC, 2 stage (s) 5.8 tF (s) 3.5 3.3 2.2 p0 queue free % 93 96 100 cM capacity (vehlh) 328 594 810 Direction, Lane # WB 1 WB 2 NB 1 NB 2 SB 1 SB 2 Volume Total 22 22 538 274 3 591 Volume Left 22 0 0 0 3 0 Volume Right 0 22 0 5 0 0 cSH 328 594 1700 1700 810 1700 Volume to Capacity 0.07 0.04 0.32 0.16 0.00 0.35 Queue Length 95th (ft) 5 3 0 0 0 0 Control Delay (s) 16.8 11.3 0.0 0.0 9.5 0.0 Lane LOS C B A Approach Delay (s) 14.0 0.0 0.0 Approach LOS B Intersection Summary Average Delay 0.4 Intersection Capacity Utilization 38.6% ICU Level of Service A Analysis Period (min) 15 AM Existing + AM Proposed T. Hunt Page 6 AM Existing + AM Proposed Chubbuck Knudsen Blvd Western Access 3/30/2022 Movement EBT EBR WBL WBT NBL NBR Lane Configurations tib tt r Traffic Volume (veh/h) 714 6 250 9 13 25 Future Volume (Veh/h) 714 6 250 9 13 25 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 776 7 272 10 14 27 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 310 pX, platoon unblocked vC, conflicting volume 783 1328 392 vC1, stage 1 conf vol 780 vC2, stage 2 conf vol 549 vCu, unblocked vol 783 1328 392 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s) 5.8 tF (s) 2.2 3.5 3.3 p0 queue free % 67 95 96 cM capacity (vehlh) 831 283 607 Direction, Lane # EB 1 EB 2 WB 1 WB 2 WB 3 NB 1 NB 2 Volume Total 517 266 272 5 5 14 27 Volume Left 0 0 272 0 0 14 0 Volume Right 0 7 0 0 0 0 27 cSH 1700 1700 831 1700 1700 283 607 Volume to Capacity 0.30 0.16 0.33 0.00 0.00 0.05 0.04 Queue Length 95th (ft) 0 0 36 0 0 4 3 Control Delay (s) 0.0 0.0 11.4 0.0 0.0 18.4 11.2 Lane LOS B C B Approach Delay (s) 0.0 11.0 13.6 Approach LOS B Intersection Summary Average Delay 3.3 Intersection Capacity Utilization 47.1% ICU Level of Service A Analysis Period (min) 15 AM Existing + AM Proposed T. Hunt Page 7 PM Existing + Proposed 3: Knudsen Blvd & Hawthorne Rd 3/30/2022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4.5 1� 18.0 18.0 + r Max Q Clear Time (g_c+11), s tt r 10.5 12.5 Green Ext Time (p -c), s Traffic Volume (veh/h) 5 30 35 302 103 335 22 392 177 97 392 15 Future Volume (veh/h) 5 30 35 302 103 335 22 392 177 97 392 15 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped -Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/In 1863 1863 1900 1863 1863 1863 1863 1863 1863 1863 1863 1900 Adj Flow Rate, veh/h 5 33 38 328 112 364 24 426 192 105 426 16 Adj No. of Lanes 1 1 0 1 1 1 1 2 1 1 1 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 491 316 364 655 745 633 360 1416 633 415 714 27 Arrive On Green 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 Sat Flow, veh/h 914 791 911 1324 1863 1583 944 3539 1583 802 1784 67 Grp Volume(v), veh/h 5 0 71 328 112 364 24 426 192 105 0 442 Grp Sat Flow(s),veh/h/In 914 0 1702 1324 1863 1583 944 1770 1583 802 0 1851 Q Serve(g_s), s 0.2 0.0 1.2 9.3 1.7 8.1 0.9 3.7 3.7 4.6 0.0 8.5 Cycle Q Clear(g_c), s 1.9 0.0 1.2 10.5 1.7 8.1 9.4 3.7 3.7 8.3 0.0 8.5 Prop In Lane 1.00 0.54 1.00 1.00 1.00 1.00 1.00 0.04 Lane Grp Cap(c), veh/h 491 0 681 655 745 633 360 1416 633 415 0 740 V/C Ratio(X) 0.01 0.00 0.10 0.50 0.15 0.57 0.07 0.30 0.30 0.25 0.00 0.60 Avail Cap(c_a), veh/h 491 0 681 655 745 633 360 1416 633 415 0 740 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 9.2 0.0 8.5 11.7 8.6 10.5 14.3 9.2 9.2 12.0 0.0 10.6 Incr Delay (d2), s/veh 0.0 0.0 0.3 2.7 0.4 3.8 0.4 0.5 1.2 1.5 0.0 3.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.0 0.0 0.6 3.9 1.0 4.1 0.3 1.9 1.8 1.2 0.0 5.0 LnGrp Delay(d),s/veh 9.3 0.0 8.8 14.4 9.0 14.3 14.7 9.8 10.4 13.5 0.0 14.2 LnGrp LOS A A B A B B A B B B Approach Vol, veh/h 76 804 642 547 Approach Delay, s/veh 8.8 13.6 10.1 14.0 Approach LOS A B B B Timer Assigned Phs 2 4 6 8 Phs Duration (G+Y+Rc), s 22.5 22.5 22.5 22.5 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 18.0 18.0 18.0 18.0 Max Q Clear Time (g_c+11), s 11.4 3.9 10.5 12.5 Green Ext Time (p -c), s 1.9 0.3 2.0 1.6 Intersection Summary HCM 2010 Ctrl Delay 12.5 HCM 2010 LOS B Chubbuck Synchro 11 Light Report T.Hunt Pagel PM Existing + Proposed 9: Yellowstone & Knudsen 3/30/2022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 20.2 + r 31.0 Change Period (Y+Rc), s 4.5 4.5 t 4.5 4.5 tt r Traffic Volume (veh/h) 128 69 216 390 359 108 346 1196 78 64 1096 112 Future Volume (veh/h) 128 69 216 390 359 108 346 1196 78 64 1096 112 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped -Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/In 1863 1863 1863 1863 1863 1900 1863 1863 1900 1863 1863 1863 Adj Flow Rate, veh/h 139 75 235 424 390 117 376 1300 85 70 1191 122 Adj No. of Lanes 1 1 1 1 1 0 1 2 0 1 2 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 162 348 296 464 365 109 357 1528 100 205 1228 549 Arrive On Green 0.05 0.19 0.19 0.13 0.26 0.26 0.16 0.45 0.45 0.05 0.35 0.35 Sat Flow, veh/h 1774 1863 1583 1774 1377 413 1774 3373 220 1774 3539 1583 Grp Volume(v), veh/h 139 75 235 424 0 507 376 681 704 70 1191 122 Grp Sat Flow(s),veh/h/In 1774 1863 1583 1774 0 1790 1774 1770 1824 1774 1770 1583 Q Serve(g_s), s 5.1 3.4 14.2 12.9 0.0 26.5 15.7 34.2 34.4 2.5 33.1 5.5 Cycle Q Clear(g_c), s 5.1 3.4 14.2 12.9 0.0 26.5 15.7 34.2 34.4 2.5 33.1 5.5 Prop In Lane 1.00 1.00 1.00 0.23 1.00 0.12 1.00 1.00 Lane Grp Cap(c), veh/h 162 348 296 464 0 474 357 802 826 205 1228 549 V/C Ratio(X) 0.86 0.22 0.79 0.91 0.00 1.07 1.05 0.85 0.85 0.34 0.97 0.22 Avail Cap(c_a), veh/h 162 348 296 464 0 474 357 802 826 205 1228 549 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 36.2 34.4 38.8 32.4 0.0 36.8 29.9 24.3 24.4 22.3 32.1 23.1 Incr Delay (d2), s/veh 40.4 1.4 19.4 25.1 0.0 61.0 62.2 10.9 10.8 4.5 19.4 0.9 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 3.1 1.9 7.7 12.4 0.0 21.1 16.0 19.1 19.7 1.5 19.4 2.5 LnGrp Delay(d),s/veh 76.6 35.8 58.2 57.5 0.0 77.7 72.1 35.2 35.2 26.8 51.5 24.0 LnGrp LOS E D E E E E D C D C C Approach Vol, veh/h 449 931 1761 1383 Approach Delay, s/veh 60.1 79.4 47.4 47.8 Approach LOS E E D D Timer Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 9.6 49.8 17.4 23.2 20.2 39.2 9.6 31.0 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 5.1 45.3 12.9 18.7 15.7 34.7 5.1 26.5 Max Q Clear Time (g_c+11), s 4.5 36.4 14.9 16.2 17.7 35.1 7.1 28.5 Green Ext Time (p -c), s 0.0 5.6 0.0 0.3 0.0 0.0 0.0 0.0 Intersection Summary HCM 2010 Ctrl Delay 54.8 HCM 2010 LOS D Chubbuck Synchro 11 Light Report T.Hunt Page 2 PM Existing + Proposed 13: Knudsen Blvd & Zebe Ln 1I3/3012022 -11 --1. 4--- t t Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations tib t Traffic Volume (veh/h) 0 363 20 8 750 0 38 0 38 0 0 0 Future Volume (Veh/h) 0 363 20 8 750 0 38 0 38 0 0 0 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 0 395 22 9 815 0 41 0 41 0 0 0 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 815 417 832 1239 208 1072 1250 408 vC1, stage 1 conf vol 406 406 833 833 vC2, stage 2 conf vol 426 833 238 417 vCu, unblocked vol 815 417 832 1239 208 1072 1250 408 tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 100 99 91 100 95 100 100 100 cM capacity (veh/h) 808 1138 464 342 797 308 340 593 Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 NB 1 NB 2 SB 1 SB 2 Volume Total 0 263 154 9 543 272 41 41 0 0 Volume Left 0 0 0 9 0 0 41 0 0 0 Volume Right 0 0 22 0 0 0 0 41 0 0 cSH 1700 1700 1700 1138 1700 1700 464 797 1700 1700 Volume to Capacity 0.00 0.15 0.09 0.01 0.32 0.16 0.09 0.05 0.00 0.00 Queue Length 95th (ft) 0 0 0 1 0 0 7 4 0 0 Control Delay (s) 0.0 0.0 0.0 8.2 0.0 0.0 13.5 9.8 0.0 0.0 Lane LOS A B A A A Approach Delay (s) 0.0 0.1 11.6 0.0 Approach LOS B A Intersection Summary Average Delay 0.8 Intersection Capacity Utilization 30.7% ICU Level of Service A Analysis Period (min) 15 Chubbuck Synchro 11 Light Report T.Hunt Page 3 PM Existing + Proposed 16: Hawthorne Rd & Chubbuck Rd 3/30/2022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4.5 + r 37.5 + r Max Q Clear Time (g_c+11), s + r 9.6 39.5 Green Ext Time (p -c), s Traffic Volume (veh/h) 38 690 218 186 540 116 131 143 216 56 94 48 Future Volume (veh/h) 38 690 218 186 540 116 131 143 216 56 94 48 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped -Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/In 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1900 Adj Flow Rate, veh/h 41 750 237 202 587 126 142 155 235 61 102 52 Adj No. of Lanes 1 1 1 1 1 1 1 1 1 1 1 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 391 1075 913 276 1075 913 376 530 451 328 331 169 Arrive On Green 0.58 0.58 0.58 0.58 0.58 0.58 0.28 0.28 0.28 0.28 0.28 0.28 Sat Flow, veh/h 734 1863 1583 568 1863 1583 1228 1863 1583 990 1164 594 Grp Volume(v), veh/h 41 750 237 202 587 126 142 155 235 61 0 154 Grp Sat Flow(s),veh/h/In 734 1863 1583 568 1863 1583 1228 1863 1583 990 0 1758 Q Serve(g_s), s 2.4 18.5 4.8 19.0 12.7 2.4 6.7 4.2 8.1 3.3 0.0 4.5 Cycle Q Clear(g_c), s 15.0 18.5 4.8 37.5 12.7 2.4 11.1 4.2 8.1 7.6 0.0 4.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.34 Lane Grp Cap(c), veh/h 391 1075 913 276 1075 913 376 530 451 328 0 500 V/C Ratio(X) 0.10 0.70 0.26 0.73 0.55 0.14 0.38 0.29 0.52 0.19 0.00 0.31 Avail Cap(c_a), veh/h 391 1075 913 276 1075 913 376 530 451 328 0 500 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 13.1 9.7 6.8 24.7 8.5 6.3 22.6 18.1 19.5 21.1 0.0 18.2 Incr Delay (d2), s/veh 0.5 3.8 0.7 15.6 2.0 0.3 2.9 1.4 4.3 1.2 0.0 1.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.5 10.5 2.3 4.8 7.0 1.1 2.5 2.4 4.1 1.0 0.0 2.4 LnGrp Delay(d),s/veh 13.7 13.5 7.5 40.4 10.5 6.6 25.5 19.5 23.8 22.3 0.0 19.8 LnGrp LOS B B A D B A C B C C B Approach Vol, veh/h 1028 915 532 215 Approach Delay, s/veh 12.1 16.6 23.0 20.5 Approach LOS B B C C Timer Assigned Phs 2 4 6 8 Phs Duration (G+Y+Rc), s 23.0 42.0 23.0 42.0 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 18.5 37.5 18.5 37.5 Max Q Clear Time (g_c+11), s 13.1 20.5 9.6 39.5 Green Ext Time (p -c), s 1.1 6.0 0.7 0.0 Intersection Summary HCM 2010 Ctrl Delay 16.5 HCM 2010 LOS B Chubbuck Synchro 11 Light Report T.Hunt Page 4 PM Existing + Proposed 19: Knudsen Blvd East Access 3/3012022 Movement EBT EBR WBL WBT NBL NBR Lane Configurations tib tt r Traffic Volume (veh/h) 298 9 56 732 6 26 Future Volume (Veh/h) 298 9 56 732 6 26 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 324 10 61 796 7 28 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 680 pX, platoon unblocked vC, conflicting volume 334 849 167 vC1, stage 1 conf vol 329 vC2, stage 2 conf vol 520 vCu, unblocked vol 334 849 167 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s) 5.8 tF (s) 2.2 3.5 3.3 p0 queue free % 95 99 97 cM capacity (veh/h) 1222 476 848 Direction, Lane # EB 1 EB 2 WB 1 WB 2 WB 3 NB 1 NB 2 Volume Total 216 118 61 398 398 7 28 Volume Left 0 0 61 0 0 7 0 Volume Right 0 10 0 0 0 0 28 cSH 1700 1700 1222 1700 1700 476 848 Volume to Capacity 0.13 0.07 0.05 0.23 0.23 0.01 0.03 Queue Length 95th (ft) 0 0 4 0 0 1 3 Control Delay (s) 0.0 0.0 8.1 0.0 0.0 12.7 9.4 Lane LOS A B A Approach Delay (s) 0.0 0.6 10.0 Approach LOS B Intersection Summary Average Delay 0.7 Intersection Capacity Utilization 30.2% ICU Level of Service A Analysis Period (min) 15 Chubbuck Synchro 11 Light Report T.Hunt Page 5 PM Existing + Proposed 22: Hawthorne Access 3/30/2022 Movement WBL WBR NBT NBR SBL SBT Lane Configurations r t t Traffic Volume (veh/h) 18 5 526 5 7 713 Future Volume (Veh/h) 18 5 526 5 7 713 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 20 5 572 5 8 775 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 558 pX, platoon unblocked 0.71 vC, conflicting volume 1366 288 577 vC1, stage 1 conf vol 574 vC2, stage 2 conf vol 791 vCu, unblocked vol 1311 288 577 tC, single (s) 6.8 6.9 4.1 tC, 2 stage (s) 5.8 tF (s) 3.5 3.3 2.2 p0 queue free % 94 99 99 cM capacity (vehlh) 328 708 993 Direction, Lane # WB 1 WB 2 NB 1 NB 2 SB 1 SB 2 Volume Total 20 5 381 196 8 775 Volume Left 20 0 0 0 8 0 Volume Right 0 5 0 5 0 0 cSH 328 708 1700 1700 993 1700 Volume to Capacity 0.06 0.01 0.22 0.12 0.01 0.46 Queue Length 95th (ft) 5 1 0 0 1 0 Control Delay (s) 16.7 10.1 0.0 0.0 8.7 0.0 Lane LOS C B A Approach Delay (s) 15.4 0.0 0.1 Approach LOS C Intersection Summary Average Delay 0.3 Intersection Capacity Utilization 47.5% ICU Level of Service A Analysis Period (min) 15 Chubbuck Synchro 11 Light Report T.Hunt Page 6 PM Existing + Proposed 24: 3/30/2022 Movement EBT EBR WBL WBT NBL NBR Lane Configurations tib tt r Traffic Volume (veh/h) 288 16 31 707 6 19 Future Volume (Veh/h) 288 16 31 707 6 19 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 313 17 34 768 7 21 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 324 pX, platoon unblocked vC, conflicting volume 330 774 165 vC1, stage 1 conf vol 322 vC2, stage 2 conf vol 452 vCu, unblocked vol 330 774 165 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s) 5.8 tF (s) 2.2 3.5 3.3 p0 queue free % 97 99 98 cM capacity (vehlh) 1226 520 850 Direction, Lane # EB 1 EB 2 WB 1 WB 2 WB 3 NB 1 NB 2 Volume Total 209 121 34 384 384 7 21 Volume Left 0 0 34 0 0 7 0 Volume Right 0 17 0 0 0 0 21 cSH 1700 1700 1226 1700 1700 520 850 Volume to Capacity 0.12 0.07 0.03 0.23 0.23 0.01 0.02 Queue Length 95th (ft) 0 0 2 0 0 1 2 Control Delay (s) 0.0 0.0 8.0 0.0 0.0 12.0 9.3 Lane LOS A B A Approach Delay (s) 0.0 0.3 10.0 Approach LOS B Intersection Summary Average Delay 0.5 Intersection Capacity Utilization 29.5% ICU Level of Service A Analysis Period (min) 15 Chubbuck Synchro 11 Light Report T.Hunt Page 7 HUNT ENGINEEPING. LLC Hunt Engineering, LLC Thomas Hunt, PE 6619 Willow Creek Rd Mountain Green, UT 84050 801.664.4724 FOUND 2" RAC IN LID rd RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING PER CORNER SHEET C1 r r 138.28 #20520788 19-54'22 C2 M C" 60.41 85'29 24 E X77 C3 �383.00 .5 3 • 4 27 E 5'27 42 � m 16.90 16.90 IS 7414'45" E ; � o I ���1 ��L�p 7M SEM MH zw IX.I R- BURR - DARR- - - IX.II RIM EL • 4478.98 - J D > o _- SW FL EL - 4464.27 I �m�� EAST FL - 4465.38 TRAVELODGE BY7WYNDOMJ - (z Z oov '✓0 o O0000 o YELLOWSTONE COMMONS Z II w wQ cnm 0 It Ll A - II N1942 3 54 95` 160.69' II v� II I III ,N" II � II I'd uI 01 II 30' UTILITY SAN SEWER MH III III - 21314037 RIM EL • 4481.4r'- FL 481.42 FL EL - 4986.96 II I 11 IN u I ILILO II II ILO II I III N II I -III 0- 0 II I I Il�i� - - - - -- 284.93- CD II I II I z- - - - - -N88°24'22"W- - 25' CANAL EASEMENT FOR I III WILLIAMSON- - - 11 III I SIPHON LATERAL PER # II I 4 II II I 21314037 15' PUBLIC ILI 4MEf�T PER RECOR I i# 2 4037 - II II II I I III III � I III � f FOUND 2" RAC IN LID III I III PER CORNER SHEET 'Z,, I I� III j USAN SEWER MH RIM EL • 4478.98 7 n FL EL • 4467.27 YELLOWSTONE COMMONS - DIVISON 2 LOT 1 - BLOCK 1 RECORD #21314037 Yellowstone Commons - Division 2 Firstendment A PART OF LOT 1 BLOCK 2, YELLOWSTONE COMMONS SUBDIVISION - DIVISI 2 IN THE WEST 1/2 OF THE NW QUARTER OF SECTION 10, T.6S., R.34 E., BOISE ERIDIAN CHUBBUCK CITY, BANNOCK COUNTY, IDAHO. CUR RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C1 r r 138.28 1 7 800347 E 19-54'22 C2 M C" 60.41 85'29 24 E 9'02 12 C3 �383.00 .5 3 • 4 27 E 5'27 42 4 m 16.90 16.90 IS 7414'45" E 2'31 40' SEWER MH A RIM • 4479.48 FL EL 4468.94 CID M EL 4479.02 \ \ \ Yellowstone Commons - Division 2 First Amendment 6" IRR 601 Sq. Feet 10. 00 Acres 8. WA10 BLOCK 1 8o SAN SEWER 00 RIM EL • 4479.69 4% -50' CANAL ROW FOR WILLIAMSON / SIPHON LATERAL CANCELED BY 1 INSTRUMENT #21519113 \S °o S 89053'37" W 732.71' USAN SEWER 00 RIM EL • 4478.71 I USAN SEWER MH / RIM EL • 4478.78 Y FL EL • 4470.40 8' SAN SEWER GO- FUM 0.RIM EL • 4478.65 30' AND ROW ROW EASEMENT TO CHUBBUCK MEDICAL CENTER DIVISION 1 i 0= 2 86586 Sq. Feet SOUTH 72.72' 0 I CHUBBUCK MEDICAL - -- CENTER -DIVISION 2 \ R CPRD #230 S2101781 44 ISI / pl / I I V III I1 \ I I FEMA FLOOD PLANE FEMA FLOOD PLANE "X" PER CITY OF CHUBBUCK 1061262 16005CO236D DATED 7/7/2009 - NOT PRINTED NO CHUBBUCK FLOOD ZONES IN THIS AREA UTILITY SERVICE WATER, SEWER, PRESSURE IRRIGATION UTILITIES STUBBED INTO SIDE AND WILL BE UTILIZED FOR THIS PROJECT. PROPOSED ZONING EXISTING ZONING - GENERAL COMMERCIAL PROPOSED ZONING - GENERAL COMMERCIAL - CONDITION EN Q> OWNER/DEVELOPER WRIGHT DEVELOPMENT 1178 W. LEGACY CROSSING BLVD. SUITE 100 CENTERVILLE, UTAH 84014 VICINITY MAP LEGEND = SECTION CORNER E • = SET STREET MONUMENT • = SET 5/8" REBAR AND PLASTIC CAP II STAMPED "KUNZ ENGINEERING" JJJ = BOUNDARY LINE YELLOWSTONE COMMONS DIVISION 2 NEW BOUNDARY ADJOINING PROPERTY EASEMENTS ------------------- = SECTION TIE LINE -------- = SECTION LINE P.U.E. = PUBLIC UTILITY EASEMENT 80 0 80 160 240 Scale: 1 " = 80' BOUNDARY DESCRIPTION A PART OF LOT 1 BLOCK 2, YELLOWSTONE COMMONS SUBDIVISION - DIVISION 2 IN THE WEST 1/2 OF THE NW QUARTER OF SECTION 10, T.6S., R.34 E., BOISE MERIDIAN CHUBBUCK CITY, BANNOCK COUNTY, IDAHO. BEGINNING AT A POINT IN THE NW CORNER OF SAID LOT 1, WHICH LIES N00°17'27"W, 1249.10 FEET AND N89°42'33"W, 54.95 FROM THE WEST 1/4 CORNER OF SECTION 10, T.6S.,R.34 E., BOISE MERIDIAN AND IS ON THE EASTERLY RIGHT OF WAY LINE OF HAWTHORN AVENUE AS SHOWN ON THE PLAT OF YELLOWSTONE COMMONS SUBDIVISION - DIVISION 2 AND PROCEEDING N51°26'40"E, 50.57 FEET TO A POINT ON THE RIGHT OF WAY LINE OF KNUDSON BOULEVARD; THENCE N89°59'02"E, 150.81 FEET TO A CURVE TURNING TO THE RIGHT WITH AN ARC LENGTH OF 138.28', WITH A RADIUS OF 398.00 FEET, WITH A CHORD BEARING OF S80`03'47"E, WITH A CHORD LENGTH OF 137.58'; THENCE S70°06'36"E, 593.00 FEET TO THE NW CORNER OF CHUBBUCK MEDICAL CENTER - DIVISION 1; THENCE ALONG THE BOUNDARY OF SAID DIVISION, S17°10'46"W, 47.21 FEET AND S01°21'21"E, 85.58 FEET AND S19°40'10"W, 169.39 FEET; THENCE SOUTH, 72.72 FEET; THENCE S89°53'37"W, 811.74 FEET TO THE EAST RIGHT-OF-WAY LINE OF HAWTHORN AVENUE; THENCE ALONG SAID RIGHT OF WAY LINE N00°17'27"W, 558.32 FEET TO THE POINT OF BEGINNING, HAVING AN AREA OF 435597.6S.F., 10.000ACRES SURVEYOR'S CERTIFICATE I, ROBERT D. KUNZ, A REGISTERED LAND SURVEYOR OF THE STATE OF IDAHO, DO HEREBY CERTIFY THAT A SURVEY WAS MADE UNDER MY DIRECTION OF THE LAND DESCRIBED IN THE ACCOMPANYING BOUNDARY DESCRIPTION AND THAT THE PLAT UPON WHICH THIS CERTIFICATION APPEARS WAS MADE UNDER MY DIRECTION. I FURTHER CERTIFY THAT THE ACCOMPANYING MAP CORRECTLY DEPICTS THE DIVISION OF THE LAND AS MARKED UPON THE GROUND THE MONUMENTS SHOWN CONFORMS WITH THAT SET OR FOUND UPON THE GROUND, AND THAT THE PERTINENT PROVISIONS OF THE STATUTES OF THE STATE OF IDAHO TOGETHER WITH ALL LOCAL ORDINANCES PERTAINING THERETO HAVE BEEN COMPLIED WITH. ROBERT D. KUNZ DATE LAND 01 SG TE,pFo 11106 ��QOF 4WT D•�,"/ rn 00 0 I z o z°0o z � U Q= j J00'-, \ Q' CD w C M z z>> Qzo h4j _j J� J w w m U O z 00J \��� LLJao > w � Q � N V) w 00� N O N z=� O O LL -I U) W 0 w Z N O z� CD a - W w 0 00 Z CHUBBUCK ROAD U w Sheets � r r O_ M C" o IDEALYA L z w Z � O N�� >_- m BONANZA E kE!; w 0 N zw O �o Win= J D > o _- a I �m�� O Z7 TRAVELODGE BY7WYNDOMJ m (z Z oov '✓0 o O0000 o YELLOWSTONE COMMONS Z Eaz w wQ cnm 0 It Ll A Q�I O 0G✓ U L_j �Y Of W VICINITY MAP LEGEND = SECTION CORNER E • = SET STREET MONUMENT • = SET 5/8" REBAR AND PLASTIC CAP II STAMPED "KUNZ ENGINEERING" JJJ = BOUNDARY LINE YELLOWSTONE COMMONS DIVISION 2 NEW BOUNDARY ADJOINING PROPERTY EASEMENTS ------------------- = SECTION TIE LINE -------- = SECTION LINE P.U.E. = PUBLIC UTILITY EASEMENT 80 0 80 160 240 Scale: 1 " = 80' BOUNDARY DESCRIPTION A PART OF LOT 1 BLOCK 2, YELLOWSTONE COMMONS SUBDIVISION - DIVISION 2 IN THE WEST 1/2 OF THE NW QUARTER OF SECTION 10, T.6S., R.34 E., BOISE MERIDIAN CHUBBUCK CITY, BANNOCK COUNTY, IDAHO. BEGINNING AT A POINT IN THE NW CORNER OF SAID LOT 1, WHICH LIES N00°17'27"W, 1249.10 FEET AND N89°42'33"W, 54.95 FROM THE WEST 1/4 CORNER OF SECTION 10, T.6S.,R.34 E., BOISE MERIDIAN AND IS ON THE EASTERLY RIGHT OF WAY LINE OF HAWTHORN AVENUE AS SHOWN ON THE PLAT OF YELLOWSTONE COMMONS SUBDIVISION - DIVISION 2 AND PROCEEDING N51°26'40"E, 50.57 FEET TO A POINT ON THE RIGHT OF WAY LINE OF KNUDSON BOULEVARD; THENCE N89°59'02"E, 150.81 FEET TO A CURVE TURNING TO THE RIGHT WITH AN ARC LENGTH OF 138.28', WITH A RADIUS OF 398.00 FEET, WITH A CHORD BEARING OF S80`03'47"E, WITH A CHORD LENGTH OF 137.58'; THENCE S70°06'36"E, 593.00 FEET TO THE NW CORNER OF CHUBBUCK MEDICAL CENTER - DIVISION 1; THENCE ALONG THE BOUNDARY OF SAID DIVISION, S17°10'46"W, 47.21 FEET AND S01°21'21"E, 85.58 FEET AND S19°40'10"W, 169.39 FEET; THENCE SOUTH, 72.72 FEET; THENCE S89°53'37"W, 811.74 FEET TO THE EAST RIGHT-OF-WAY LINE OF HAWTHORN AVENUE; THENCE ALONG SAID RIGHT OF WAY LINE N00°17'27"W, 558.32 FEET TO THE POINT OF BEGINNING, HAVING AN AREA OF 435597.6S.F., 10.000ACRES SURVEYOR'S CERTIFICATE I, ROBERT D. KUNZ, A REGISTERED LAND SURVEYOR OF THE STATE OF IDAHO, DO HEREBY CERTIFY THAT A SURVEY WAS MADE UNDER MY DIRECTION OF THE LAND DESCRIBED IN THE ACCOMPANYING BOUNDARY DESCRIPTION AND THAT THE PLAT UPON WHICH THIS CERTIFICATION APPEARS WAS MADE UNDER MY DIRECTION. I FURTHER CERTIFY THAT THE ACCOMPANYING MAP CORRECTLY DEPICTS THE DIVISION OF THE LAND AS MARKED UPON THE GROUND THE MONUMENTS SHOWN CONFORMS WITH THAT SET OR FOUND UPON THE GROUND, AND THAT THE PERTINENT PROVISIONS OF THE STATUTES OF THE STATE OF IDAHO TOGETHER WITH ALL LOCAL ORDINANCES PERTAINING THERETO HAVE BEEN COMPLIED WITH. ROBERT D. KUNZ DATE LAND 01 SG TE,pFo 11106 ��QOF 4WT D•�,"/ rn 00 0 I z o z°0o z � U Q= j J00'-, \ Q' CD w C M z z>> Qzo h4j _j J� J w w m U O z 00J \��� LLJao > w � Q � N V) w 00� N O N z=� O O LL -I U) W 0 w Z N O z� CD a - W w 0 00 Z 1 w Sheets O_ - 0 N E w Z � O N�� >_- C �m w 0 N zw O �o Win= J •� pyo > o _- a �m�� U w� z N (z Z oov '✓0 o O0000 U U Z Z Eaz w wQ cnm 0 w J O 0G✓ U L_j �Y Of W �LL>- <� 0 N 000 a Yom= U ZU 3 O w 0 m� LL_ di Z >0 LL_ O 0 I- j]:� w a� N w Q 0 Prolect Info. Surveyor: R. KUNZ CREW CHIEF M. PRETL Begin Date: 2/23/2022 Name - Scale: 1 "=80' Checked - Number. 3050-01 Sheet 1 w Sheets Z Q - 0 N E w Z � O N�� >_- C �m 0 N zw O �o Win= J •� pyo > o _- a �m�� w� z N (z Z oov '✓0 o O0000 U U Z Z Eaz w wQ cnm 0 O� F- � J O 0G✓ U L_j �Y Of W �LL>- <� O N 000 a Yom= U ZU 3 O w 0 m� LL_ di ~ o O\ >0 LL_ O I- j]:� w a� Prolect Info. Surveyor: R. KUNZ CREW CHIEF M. PRETL Begin Date: 2/23/2022 Name - Scale: 1 "=80' Checked - Number. 3050-01 Sheet 1 1 Sheets 1� INV IF/77 �� A\ 1) INV IN \� ` �� 20 0 20 40 60 ota Scale: 1" = 20' X.SSMH ------ L'J--- EX.DITCH --------------- ---EX.DITCH I ----.:..--------.-_ -.----.--- -------------- ": I /V,;, / CONNECT TO EX.IRR r / LATERAL PER STD. Ff 1.- - DWG. NO. SD -902 --------------------- IRR: M 11 I I / EX.IRR� POND 1 EX.IRR- - TOP OF POND 79.50 WV EX.IRR- TOP OF WATER 78.50 / \ / / CONNECT TO \ \ .... . _ EX.IRR- BTM OF POND 74.75 � � _ EX.IRRIRR STORAGE PROVIDED 4,628 CUFT / 3� \ / / � Ey-WATER LINE 11 I /J 4474.75 INV / / / / % / / #33 / w 4'OSSMH \ 4478.32 RIM �. m / / 4469.32 INV IN 11 I o / 4468.82 INV OUT 15" ADS SD ; II 1 S=0.53% 38 L.F. ,h FXV TCS 3„WATER POND 1 �' PIV 6"FIRE 11 1 TOP OF POND 79.50 / TOP OF WATER 78.50 3 / / I BTM OF POND 74.50 FLARED END SECTION cV / Il. 1 STORAGE PROVIDED 13,350 CUFT W/TRASH RACK PER \ II { CITY STANDARDS %CJ / 4474.55 INV 2s „ 18 ADS SD S=1.49% 21 L.F. ,v 15" ADS SD CO / S=0.85% 82 L.F. , 9 �S :II 1 #20 SDCB WITH 24F SNOUT, 310 -SKIRT, AND 3' SUMP #41 4479.34 GRATE �� 4478.20 GRATE 11 11 11 I II 4474.86 INV 4475.56 INV 4471.86 BTM 18" ADS SID II 1 X / I S=0.49% 71 L.F. o / 80.2S 15" ADS SD FFE S=0.84% 171 L.F. Co l SS/6 S 6'p VC x ' Og SS 20FRq� # 19 / s e #21 4479.e49 GRATE / 4475! 21 INV / 4477.00 NV GRATE 11. / SS -6 18" ADS SD S=0.49% 126 L.F. #35 / I� 4'OSSMH / 4480.64 RIM / 4473.87 INV IN 3� 4473.67 INV OUT I / / W 82.15 FFELd w A 6"PVC SS LATERAL I / ss/s J � ,,/ / / / w S=1.0% MIN. 61 LF I / Il 1 I I .0 0 FE I FDC C Q 11 I I APT -4 FH #24 12"x12" BOX 4480.75 NYOPTGRATE CA 82.65 FFE i 4476.43 INV °° # 18 ' 4480.48 GRATE 6' PVC SD 1� I 4475.83 INV S=2.00% 30 L.F. /Ijj 1 I j 3 LL 8 .30E'.i'� LO II I /� N �) � I I l l c /I I I N 81.00 w FG I I I �IL o I z >PICKLE ALL CO RT a_I FQ 11 I I I 3Q 0081.50 OT LOT II I I 15" ADS SD 11 I Q S=0.50% 122 L.F. II I 83.15 FFE00 I I I I I MA CH INE EE S� EET 15� ENGINEERS STAMP PROJECT INFO. Engineer: T. HUNT Drafter: T. HUNT Start Date: 03/14/2022 Name: CHUBBUCK PROPERTY SHEET 13 1 9 SHEETS O U a O � a� ZLiz N Li N � Li U N O d' q w � O Co � � O O O 0 p� s L n i 0 � r O o 0 � m s V � � is r Revisions Date ENGINEERS STAMP PROJECT INFO. Engineer: T. HUNT Drafter: T. HUNT Start Date: 03/14/2022 Name: CHUBBUCK PROPERTY SHEET 13 1 9 SHEETS 4v J II ' k.W \ \ F\ jj 20 0 20 40 60 RN RN RN Scale: 1 " = 20' ENGINEERS STAMP PROJECT INFO. Engineer: T. HUNT Drafter: T. HUNT Start Date: 03/14/2022 Name: CHUBBUCK PROPERTY SHEET 14 SHEETS 0 U O LoU a� y LL]� � N W C\" i~ Z Wr i�-� � a Wco � • �q o O W > =11111 Lja O CL O V L = am V O w V ■ Revisions Date ENGINEERS STAMP PROJECT INFO. Engineer: T. HUNT Drafter: T. HUNT Start Date: 03/14/2022 Name: CHUBBUCK PROPERTY SHEET 14 SHEETS 11 { I bt LO I J I I If I U O U 0 IfIffII I`M` `:'`;,;-, .:I1I{{�fII�1111IIEf11{�III111I11{1I1 jI : :, . . LLIIIIILIIII1IIIIIIIIIIIIIIIII1IIII1IIIIII� IIIII IIIII1I III lIII1II III II IIII II a m II III IIIIIIIII II III 333 Qv � II zic Ji z N LO N V)W0-w00 81.00 FG Cu 15" ADS SD PICKLE BALL CURT S=0.50% 122 L.F. 65pdc o" �O T LOT SHE00 lit/ MATCH IN 13 M IIIOD rux III 83.15 FIFEPVC SLATERAL SS/6 S=1.0% MIN. 61LF N #17 LM ja °D 4481.36 GRATE 4476.44 INV CL x APT -4 °° O 6"PVC SS LATERAL S=1.0% MIN. 239 L sS/s SS/6 SS/6 iss/6 ss/s SS/ X #34 4'OSSMH yI , . IIIIIIIIIIIIi IIIIIIIIIIII1I�IIIIIIIIIIIIIII III1II�II II I II IIIIII II I II IIIIIII / / /3 -l- S --IIIIIII III wv 333 4481.91 481.9 1 RIM 4474.84 INV OUT m 83.65 FFE J to00 - - - - - --- 4 --—---- WW — — — s '�i m a X 15 ADS SD s=0.51% 96 L.F. 82.50 FFE AP -382.00 FFE 82.50 FFE 83.00 FFE i X N PIV "WATER w w/s s #16 6"FIRE 4480.86 GRATE 4476.93 INV 15" ADS S 15" ADS SID L S=0.40% 13 L.F.S=0.47% 19 L.F. 00SD/15#23 SD/15 GRATE sD/14480.91 X 4477.0INV SD, FDC FH J— - - - - - - - - - WV #3 4481.52 GRATE W 4481.52 GRATE 4478.97 IAV n w/s w/a w/s w/s w/s w/a ww/s w/s X 8"PVC WATER LINE 508 LF WV Ll ADS SD S0.49% 101 L.F. m I }rj — — — — — _— — — — — — — — — — — — — — — — — --- = ' ''�'11IlI{'IIJJ11`�}{1i1I��iI1 IjIII� l IIII I I IIIII I II III I III I II(I IILJII IIL -JII ILI JII IILJII ILI JII LII _ JII LII JII LII _JII LII JII ILI _JII IILJII IILJII IILJII ILI _J1I 1LI J1I 1LI _JII LII JII IILJII IILJI1 I1LJII IILJII IILJII IIL__JII LII JII I� LII _ / 481.25 GRATE 4477.42 INV Q x 82 2 F E JII IIL83JII IIL22 JII IILE . FFE �10 J1I 1IL JI ILJI Rev is io n s DateSTUB & BLOCK 8" WATER MAIN RELOCATE FH ENGINEERS STAMP X XX PROJECT INFO. Engineer:T. HUNT Drafter:T. HUNT Start Date: 03/14/2022 Name: CHUBBUCK PROPERTY 20 0 20 40 60 SHEET Scale: 1 20' 15 SHEETS — SS/6 APT -3 82.50 FFE GRATE W 08vw/e W w/e W Z U I I I I I I I I I I I I I I I I I I I I I I I I I I I J L—_J L --J L—J L --J L --J L__J L w/s ' ' w/s FA 8"PVC WATER LINE 508 LF ----------------- #5 4481.50 GRATE — — —4477.77 INV— \ 4477.02 INV \ X74.02 BTM ~—STUB & BLOCK \ 8" WATER MAIN \ 18" ADS SD \ �S=0.40% 26 L.F. \ #6 4481.57 GRATE 4477.13 INV 20 0 20 40 60 NN NN NN Scale: 1 " = 20' ENGINEERS STAMP PROJECT INFO. Engineer: T. HUNT 0 Drafter: T. HUNT Start Date: 03/14/2022 Name: CHUBBUCK PROPERTY U O Lo 00 U a� � Ld � N zC W L) r�Fc N i` r �..J O C"r co co o � O � LM O ja CLDC OL. � O am ' m � V �v Revisions Date ENGINEERS STAMP PROJECT INFO. Engineer: T. HUNT 0 Drafter: T. HUNT Start Date: 03/14/2022 Name: CHUBBUCK PROPERTY E4 — Preliminary Plat Application Narrative. 1. The Yellowstone Commons— Division 2 First Amendment Subdivision complies with the applicable provisions of Chubbuck City Code sections 17.12.030 through 140. a. Prior to the city review required by (17.12.080: F) we provide this statement as to the compliance of the preliminary plat with this title. b. Electronic copies were submitted to the city (17.12.030). c. The required fees were paid (17.12.050). d. 17.12.080: F i. There are no new streets being created by this subdivision. Existing curb gutter and sidewalk are utilized on Knudsen. Sufficient space is provided on the Plat for the needed sidewalk improvements on Hawthorne. ii. There are existing water and sanitary sewer lines in Knudsen and Hawthorne. The site is utilizing existing utility and access stubs off Knudsen as shown in the Preliminary Plat. The remaining portion of the proposed subdivision would retain approximately 700' of frontage on Hawthorne. Hawthorne is down slope from most of the parcel, which would facilitate any sewer connections required. The remainder property also maintains it's existing property line with the CHUBBUCK MEDICAL CENTER DIVISION 1 subdivision and can access additional utilities there. iii. Fire circulation has been discussed for the CUP site plan application and sufficient turn around space is provided. In terms of the parcel created by this plat, there is clear access along Knudsen and Hawthorne for fire access. Again, no new roads are created via this subdivision. iv. Storm Drain is handled on site through 100% retention into 3 basins. v. In years past, this proposed 10 acre lot has been encumbered by a 50' Canal ROW for the Williamson Siphon Canal (shown on preliminary plat). However, this has been canceled and relocated to the southern and eastern ends of the existing parcel (Instrument #21519113). Our plat and site plans have accounted for this relocation. vi. The site application is consistent with the C-2 zone so long as a CUP application is approved to allow the conditional use of Apartment Buildings. vii. There is not anticipated to be common ownership of any land or improvements. This is one lot and we plan on retaining full ownership. However, there is a shared access proposed on Hawthorne with the property to the South. We anticipated taking care of that with a simple access easement agreement but will provide draft covenants per staff's request. viii. We look forward to reviews from affected entities per 17.12.080: F 2-10. e. We look forward to comments from staff and the commission after their "review [of] the preliminary plat at a scheduled meeting" (17.12.100: A) and anticipate a positive recommendation to the Council. f. 17.12.180 i. No new streets are created. Existing width is utilized. ii. Existing street names are utilized. iii. Connections to existing streets are shown on the added pages in the preliminary plat PDF from our CUP application. iv. Lot dimensions are shown on the preliminary plat. Each side of the single parcel has a dimension called out. v. Lot 1 is called out. (Total number of lots is 1) vi. Location, width and use of easements are called out. vii. There is no designation of land for public use (parks and open space) g. 17.12.190 i. Proposed sewage disposal connection points shown on preliminary plat (stubs). More detail can be found in our CUP application CIVIL set. ii. Proposed water supply connection points shown on plat (stubs). More detail can be found in our CUP application CIVIL set. iii. Proposed storm water is to retain 100% on site. More detail can be found in our CUP application. iv. Proposed secondary irrigation connection point shown on plat (stubs). More detail can be found on our landscape plans in the CUP application. 2. The subdivision proposal complies in principle with all city designs standards as illustrated in our CUP application. 3. This subdivision application and its associated CUP application is consistent with the C-2 zone so long as a CUP application is approved to allow the conditional use of Apartment Buildings. Required building setbacks, landscaping requirements, building facades and connections are consistent with the C-2 Zone and harmonious with nearby development. 4. Repeating from above: There are existing water and sanitary sewer lines in Knudsen and Hawthorne. The site is utilizing existing utility and access stubs off Knudsen as shown in the Preliminary Plat. The remaining portion of the proposed subdivision would retain approximately 700' of frontage on Hawthorne. Hawthorne is down slope from most of the parcel, which would facilitate any sewer connections required. The remainder property also maintains it's existing property line with the CHUBBUCK MEDICAL CENTER DIVISION 1 subdivision and can access additional utilities there. No protection strip is being utilized. S. A traffic impact study was provided as part of our CUP application. 6. No new roads are proposed. This site utilized existing and continuous roadway connections. 7. Bicycle and pedestrian circulation clearly seen in the site plan application. There are no proposed changes to the existing pedestrian and bicycle circulation infrastructure along Knudsen. There is one additional curb cut on Hawthorne. 8. Public Utility Easements are established along all public right-of-way locations. There is only 1 lot. Exhibit 5a: Comprehensive Plan Future Land Use Map Yellowstone Commons Division 2 First Amendment rr CD 0 1940�t-\ CHUBBUCK 1 0 Interstate 86 Future_Designation Commercial Employment High Density Low Density Medium Density Mixed Use 290 E. Linden Avenue, Chubbuck, ID 83202 208.237.2430 — Fax 208.237.2409 www.CityofChubbuck.us 1940�t-\ CHUBBUCK 1 0 Exhibit 5b: Current Zoning and Requested Change Yellowstone Commons Division 2 First Amendment Subject Property Interstate 86 Landuse_Categor, MAgriculture (A) M Creative Community M Dense Residential (R-4) M General Commercial (C-2) M Industrial (1) M Limited Commercial (C-1) M Limited Residential (R-2) M Limited Residential - P (R -2P) M Planned Unit Development (PUD) M Single Family Residential (R-1) 290 E. Linden Avenue, Chubbuck, ID 83202 208.237.2430 — Fax 208.237.2409 www.CityofChubbuck.us CHUBBUCK 1 0 Exhibit 6: Evidence of Notice a. Site Posting b. Agency notices on file with staff a. Site Posting Sign posted March 16, 2022 South side of Knudsen Blvd. East of Hawthorne Rd. 290 E. Linden Avenue, Chubbuck, ID 83202 208.237.2430 — Fax 208.237.2409 www.CityofChubbuck.us