Memo
To: Honorable Mayor and City Council
From: Bridger Morrison
Date: June 1, 2026
Re: 2026 Pedestrian Ramp Project— Bid Results
Public Works Department
290 E. Linden Avenue, Chubbuck, ID 83202
208.237.2430 — Fax 208.237.2409
www.CityofChubbuck.us
As part of our upcoming pavement maintenance project, we intend to overlay pave portions of
Hawthorne Road, Galena Ave., and Alpine Ave. To meet ADA requirements, we will be replacing the
pedestrian ramps which do not meet current ADA standards. The City crews will replace 23 ramps in-
house but in order to accomplish all of the required work, we intend to hire a contractor to replace
another 12 ramps. The attached maps show the locations of the 12 ramps that we intend for the
contractor to replace.
We received the following three bids from interested contractors:
Contractor
Total Bid
D Co Concrete
$67,405.00
Dykman Construction
$92,240.00
M&S Development & Construction
$100,148.00
This project would be paid for from the Street Department's budget and was included in the pavement
maintenance and ADA improvement budget items. The city estimated the cost would be just over
$90,000. It is my recommendation and request that the City Council approve the Mayor to award the
oroiect and execute a contract with D Co Concrete in the amount of 867.405.00 for the 2026 Pedestrian
Ramp Project.
Sincerely,
Bridger Morrison, P.E.
Public Works Director/City Engineer
8: Public Works �Streets � Maintenance �2026 Pavement Management Plan�2026 Pedestrian Romps�Aword and Contract�Bid
Award Recommendation -Council BM 06.01.2026.docx
n
t L �-
W
M
CHU1 0B
Plq
Ali
p
a, 1
W Chubbuck Rd
ANN
i•4 -'v
Proposed Pedestrian Ramp Improvements
0 50 100 200 Feet
t�
SeAtO,2► 5
N
CHUBBUCK
1 0 A H 0
10
• i • 1.
• C � 1 1 L ^ t2'.
r
Proposed Pedestrian Ramp Improvements
0 50 100 200 Feet
. I.
Juliette Way
CHUBBUCK
1 0 A H 0
Proposed
Pedestrian
Ramp
Improvements
N
0 25 50 100 Feet