HomeMy WebLinkAboutItem #3 Development and Project Design Standards/ ao", t*- \ CHUBBUCK 1 A A H A Memo To: Honorable Mayor and City Council From: Bridger Morrison Date: March 23, 2026 Re: Adoption of City Construction Standards Public Works Department 290 E. Linden Avenue, Chubbuck, ID 83202 208.237.2430 — Fax 208.237.2409 www.CityofChubbuck.us Over the last several years, the Public Works Department has been working to develop a comprehensive construction standards document. For a very long time, the City has had the Idaho Standards for Public Works Construction (ISPWC) as the City's adopted construction standards. That is not changing. That document was created such that it could be used by all cities in the state. However, it is intended that each city make adjustments to fit their specific needs. Over the years, Chubbuck has developed those preferences and specific requirements that might be unique to Chubbuck. The challenge has been that many of those Chubbuck-specific standards and requirements have existed in a variety of formats and documents. Some are notes and drawings that the City requires to be added to construction plans. Some are documents that have been provided to parts and material suppliers, while others have been included in design manuals and ordinances. Keeping all of that straight has been a challenge for developers, designers, contractors, and even our own staff. The attached document, titled "Development and Project Design Standards and Revisions to the Idaho Standards for Public Works Construction, Current Edition," is the result of this dedicated effort to compile all of that historical information into a single document. In addition, we identified some areas where additional improvements are needed. This includes problems that have arisen in the past or new methods or technology that will provide a better product for the city and reduce future maintenance efforts and costs. We also reviewed the City of Pocatello's construction standards to identify areas where we can add consistency for Contractors who may work in both cities. For the most part, these standards are familiar to designers and contractors. There are a few new things we've added to get a better product and reduce future maintenance costs and challenges, but we do not believe there is anything substantial in these standards that will affect the end cost of construction. All of the standards have been developed with the goal of balancing the long-term performance of our infrastructure and the maintenance costs of the city with the initial cost of construction. I understand that the format of these construction standards is a little strange and may not be fully understood without reviewing the ISPWC at the same time. If you have any questions about specific sections of these standards, our public works staff would be happy to review the ISPWC and the standards with you. C:�Users Vbowers�AppData�Local �Microsoft �Windows �lNetCache�Content. Outlook�98L01ABQ�Recommendation for Standards Adoption -Council BM 03.21.2026.docx I am requesting the opportunity to review these recommended construction standards with you at the upcoming Council Meeting and am asking you to consider adopting these construction standards. Please reach out if you have any questions you would like to discuss prior to the meeting. If not, I look forward to the discussion on April V Sincerely, Bridger Morrison, P.E. Public Works Director/City Engineer CHUBBUCK 1 0 R H 0 290 E. Linden Avenue, Chubbuck, ID 83202 208.237.2430 — Fax 208.237.2409 www.CityofChubbuck.us zaa�, CHUBBUCK 1 0 A H O CITY OF CHUBBUCK Development and Project Design Standards FM Revisions to the Idaho Standards for Public Works Construction Current Edition April 2026 This Page Left Intentionally Blank Table of Contents Introduction........................................................ Design Requirements and General Information Construction Standards ....................................... 1 2 3 Division300 —Trenching ...................................................................................................................... 3 Section 301— Trench Excavation: ..................................................................................................... 3 Section305 — Pipe Bedding: ............................................................................................................. 3 Section 306 —Trench Backfill: .......................................................................................................... 3 Section 307 — Street Cuts and Surface Repairs: ............................................................................... 4 City of Chubbuck Standard Drawings................................................................................................5 CSD -301— Typical Trench.......................................................................................................... 6 CSD -302 — Flowable Fill Utility Crossing...................................................................................7 Division400 — Potable Water...............................................................................................................8 General Information: DistributionPipe: ...................................................................................................................... 8 MainlineValve: ......................................................................................................................... 9 FireHydrant: ........................................................................................................................... 10 ServiceLine: ............................................................................................................................. 10 Section 401— Water Pipe and Fittings: .......................................................................................... 11 Section 402 — Hydraulic Valves: .....................................................................................................17 Section403 — Hydrants: .................................................................................................................19 Section 404 — Water Service Line and Meters: .............................................................................. 19 City of Chubbuck Standard Drawings..............................................................................................22 CSD -401-1" Potable Water Service...................................................................................... 23 CSD -402 — 2" Potable Water Service...................................................................................... 26 CSD -403 — 3" to 12" Potable Water Service........................................................................... 29 CSD -404 — Fire Hydrant ...... CSD -405 — Valve Box and Lid CSD -406 — Flush Hydrant .... 32 34 35 Division500 — Sanitary Sewer............................................................................................................ 36 General Information: SanitarySewer Pipe: ............................................................................................................... 36 SanitarySewer Manhole: .......................................................................................................37 SewerService Line: ................................................................................................................. 37 Section 501— Gravity Sewers: ........................................................................................................ 38 Section502 — Manholes: ................................................................................................................ 38 Section 504 — Sewer Services: ........................................................................................................ 39 Division700 — Concrete...................................................................................................................... 41 General Information: ConcreteMix: .........................................................................................................................41 Section 703 — Cast -In -Place Concrete: ...........................................................................................41 Section 706 — Other Concrete Construction: ................................................................................. 42 City of Chubbuck Standard Drawings..............................................................................................43 CSD -701— Concrete Ribbon Curb...........................................................................................44 CSD -702 — Concrete Scupper..................................................................................................45 CSD -703 — Commercial Approach...........................................................................................47 Division 800 — Aggregates and Asphalt.............................................................................................48 General Information: AsphaltMix: ............................................................................................................................ 48 Section 810— Plant Mix Pavement: ................................................................................................ 48 Division 900 — Pressure Irrigation......................................................................................................50 General Information: Requirement: .......................................................................................................................... 50 Pressure Irrigation Pipe: ......................................................................................................... 50 Pressure Irrigation Valve: .......................................................................................................51 PressureIrrigation Drian:.......................................................................................................52 Pressure Irrigation Service: ..................................................................................................... 52 Backflow Prevention Device: .................................................................................................. 53 Section 901— Pressure Irrigation Pipe and Fittings: ...................................................................... 53 Section 902 — Pressure Irrigation Valves: ....................................................................................... 56 Section 903 — Pressure Irrigation Service Lines and Appurtenances: ............................................. 58 City of Chubbuck Standard Drawings..............................................................................................61 CSD -901-1" Pressure Irrigation Service................................................................................ 62 CSD -902 — Pressure Irrigation Drain....................................................................................... 64 CSD -903 —1" Backflow Prevention Device............................................................................. 66 Division 1100 —Traffic ..................................... Section 1102 — Street Lighting: ................... Section 1105 — Permanent Traffic Signing: . City of Chubbuck Standard Drawings........... CSD -1101— Street Light Installation..... CSD -1102 — Street Name Sign .............. 68 68 69 70 71 72 Division2000 — Miscellaneous........................................................................................................... 73 Section 2060 — Neighborhood Mailbox: ......................................................................................... 73 Section 2070 — Garbage Dumpster Enclosure: ............................................................................... 74 City of Chubbuck Standard Drawings..............................................................................................76 CSD -2001— Neighborhood Mailbox....................................................................................... 77 CSD -2002 —Garbage Dumpster Enclosure CSD -2003 — Sanitation Truck Turnaround Division 2100 — QC Division Supplement Field QC Manual 79 80 81 81 Introduction The purpose of this document is to provide additional design requirements for developments and projects in the City of Chubbuck. In addition, this document modifies the latest edition of Idaho Standard for Public Works Construction (ISPWC). The ISPWC and these modifications, referred to as the City of Chubbuck Revisions to the ISPWC, are to be used as the City's standards and specifications for construction of public improvements within the City of Chubbuck. In the event of a conflict between ISPWC and City of Chubbuck Revisions to the ISPWC, the City of Chubbuck Revisions shall govern unless the contrary is approved in writing by City of Chubbuck City Engineer for a specific circumstance. The terms "Engineer" and "City' in the latest edition of ISPWC and City of Chubbuck Revisions, shall refer to the City of Chubbuck City Engineer. Design Requirements and General Information In addition to construction standards, the following information includes limited design requirements and clarifications, along with other general information related to the design and construction of development projects and other improvement projects. This is not a complete design guide as the city ordinances and other adopted design guides and policies contain the majority of the City's design requirements. The following information is intended to supplement and clarify some of those other requirements. Construction Standards The current edition of the Idaho Standards for Public Works Construction (ISPWC) has been adopted as the City's construction standards. The following revisions supplement or modify the current edition of the ISPWC and apply where the City's construction standards apply. Amend the ISPWC as follows: Division 300 —Trenching Section 301— Trench Excavation: Replace Section 3.1.A with the followi 3.1— General Requirements: A. Excavate, as necessary, at the locations indicated in the Contract Documents and staked in the field for the installation of pipelines, services, utilities, and ancillary items. Excavate trenches per City of Chubbuck Standard Drawings CSD -301 (Typical Trench) or CSD -302 (Flowable Fill Utility Crossing), or ISPWC Standard Drawing SD -306 (Utility Trench). Section 305 — Pipe Bedding: Add Section 2.7 as follows: 2.7 — Type V Bedding A. Acceptable bedding material for pressure water pipe also includes sand with 100% passing the 1/2 -inch sieve, 80% or more passing the No. 4 Sieve, and less than 6% passing the No.200 Sieve. B. Compact Type V bedding in accordance with ISPWC Section 3.10. Section 306 —Trench Backfill: Replace Section 3.1.E with the followi 3.1—General Requirements: E. Backfill per City of Chubbuck Standard Drawing CSD -301 (Typical Trench). Section 307 — Street Cuts and Surface Repairs Add Section 3.14 as follows: 3.14— Mastic Sealant A. Hot applied, pourable, aggregate filled, polymer modified asphalt pavement repair mastic (Mastic Sealant), shall be used where required by the City. Product to be approved by the City prior to use. B. Installation of Mastic Sealant in the public right-of-way, shall be installed from March 1 to October 31 and when the temperature requirements as specified by the manufacturer are met. An exception may be allowed with written approval from City Engineer. 4 Division 300 — Trenching City of Chubbuck Standard Drawings CSD -301 Typical Trench CSD -302 Flowable Fill Utility Crossing RADE OR NATO �l I SP OIL NATURAL GROUND FINISH GRADE 1 U 1 O 01 0 1 12 1 1111- l uJ <nz� www Q�o LU N U)U) ww Fy o- Qn 6" MIN. SEE NOTE B 12" MIN EACH SIDE OUTSIDE DIA. OF PIPE PLUS 2'-0" A. TRENCH EXCAVATION PER SECTION -301 OF ISPWC B. PIPE BEDDING MATERIAL 4" BELOW THE BOTTOM OF THE PIPE, 6" FOR PIPES 30 INCHES AND LARGER. C. BACKFILL AND COMPACTION PER SECTION -306 OF ISPWC FOR PUBLIC WORKS CHUBBUCK CONSTRUCTION STANDARDS 1 9 A H 0 18" MIN. MATERIAL LIST: 1. LOCAL CUT BACK, 12" MIN BOTH SIDES TYPICAL 2. SURFACE REPAIR WIDTH 3. EXISTING SURFACE 4. EXISTING BASE 5. TRENCH BACK SLOPE PER O.S.H.A. OR SUITABLE SHORING 6. TRENCH BACKFILL PER SECTION -306 OF ISPWC 7. VERTICAL TRENCH WALLS SHORING PER O.S.H.A. 8. TYPE I PIPE BEDDING PER SECTION -305 OF ISPWC 9. FOUNDATION STABILIZATION MAY VARY PER SOIL TYPE AND STABILITY (PER SECTION -304 OF ISPWC) 10. UNDISTURBED SOIL (TYP) 11. SURFACE REPAIR AND BASE PER SECTION -307 OF ISPWC 12. UPPER COMPACTION ZONE 13. LOWER COMPACTION ZONE 14. 6" WIDE METALLIC WARNING TAPE, POLYETHYLENE VINYL, COLOR AND LABELED ACCORDINGLY TO TYPE OF PIPE INSTALLATION (SEE MATERIAL SPECIFICATIONS) LAST REVISED 3/24/2026 STANDARD DRAWING NO: TYPICAL TRENCH CSD -301 1 OF 1 D (D C� z 13 14 <O 18"-24" 0 sLo 7 12" MIN EACH SIDE OUTSIDE DIA. OF PIPE PLUS 2'-0" A. TRENCH EXCAVATION PER SECTION -301 OF ISPWC B. PIPE BEDDING MATERIAL 4" BELOW THE BOTTOM OF THE PIPE, 6" FOR PIPES 30 INCHES AND LARGER. C. BACKFILL AND COMPACTION PER SECTION -306 OF ISPWC FOR PUBLIC WORKS CHUBBUCK CONSTRUCTION STANDARDS 1 9 A H 0 18" MIN. MATERIAL LIST: 1. LOCAL CUT BACK, 12" MIN BOTH SIDES TYPICAL 2. SURFACE REPAIR WIDTH 3. EXISTING SURFACE 4. EXISTING BASE 5. TRENCH BACK SLOPE PER O.S.H.A. OR SUITABLE SHORING 6. TRENCH BACKFILL PER SECTION -306 OF ISPWC 7. VERTICAL TRENCH WALLS SHORING PER O.S.H.A. 8. TYPE I PIPE BEDDING PER SECTION -305 OF ISPWC 9. FOUNDATION STABILIZATION MAY VARY PER SOIL TYPE AND STABILITY (PER SECTION -304 OF ISPWC) 10. UNDISTURBED SOIL (TYP) 11. SURFACE REPAIR AND BASE PER SECTION -307 OF ISPWC 12. UPPER COMPACTION ZONE 13. LOWER COMPACTION ZONE 14. 6" WIDE METALLIC WARNING TAPE, POLYETHYLENE VINYL, COLOR AND LABELED ACCORDINGLY TO TYPE OF PIPE INSTALLATION (SEE MATERIAL SPECIFICATIONS) LAST REVISED 3/24/2026 STANDARD DRAWING NO: TYPICAL TRENCH CSD -301 1 OF 1 8" MAX FOR COLD MIX ASPHALT REPAIR ry CHUBBUCK IDDH0 FOR PUBLIC WORKS CONSTRUCTION STANDARDS 4DE TING ASHPALT MATERIAL LIST: 1. COLD MIX ASPHALT COULD BE USED FOR POTHOLES THAT DO NOT EXCEED EIGHT INCHES (8") IN DIAMETER. THICKNESS SHALL BE 3/8" GREATER THAN EXISTING ASPHALT AND SHALL PROTRUDE ABOVE FINISH GRADE. 2. FLOWABLE FILL 300 PSI AS PER SECTION -703 OF ISPWC 3. 3/4" MINUS CRUSHED AGGREGATE OR SAND BEDDING 4. PIPE OR CONDUIT A I f -%T r C+ . A. USE THIS DETAIL FOR POTHOLES OVER ALL UTILITIES. B. SAWCUT ALL ASPHALT IN NEAT LINES. LAST REVISED 3/24/2026 FLOWABLE FILL STANDARD DRAWING NO: UTILITY CROSSING I CSD -302 1 OF 1 Division 400 — Potable Water General Information: Distribution Pipe: A. All such distribution pipe extensions and installations shall be in dedicated public right of way areas and shall extend the full length of the frontage of the property being served. All distribution pipe extensions/installations shall conform in all respects to the standards, specifications, and material requirements set forth in these standards and the ISPWC. B. Sizing: Distribution pipe shall be minimum of eight inches (8") nominal diameter and may require to be upsized in areas such as near arterial and collector streets, in accordance with the current Water System Facility Planning Study or Master Plan. In areas with new development, the City of Chubbuck may require a hydraulic analysis to verify adequate system pressure and flows. If a proposed water system will be a part of a larger phased development, it is required that the larger development be considered in the hydraulic evaluation. A hydraulic analysis that includes a larger development may be satisfactory to meet the hydraulic analysis requirement for a multi -phase development. Hydraulic model boundary conditions including water supply and flow controls shall be clearly defined. Summary of design criteria used, including water demands, peaking factors, pipe roughness, etc. shall be included. The distribution system shall be designed so that it will provide a minimum fire flow of one thousand five hundred (1,500) gallons per minute in addition to system domestic demands. Additional fire flow demands may be required in industrial and commercial areas. C. Dead End: Dead end distribution pipe shall be avoided whenever possible and should not exceed eight hundred (800) feet in length. Each dead-end distribution pipe shall have a hydrant, or a flushing device installed at its termination. Two-inch flush hydrants rather than a fire hydrant are not desirable but may be warranted under special circumstances, as determined by City Engineer. N D. Inside Easements: The City of Chubbuck may require or allow water mains to be installed in utility easements if it is deemed necessary for the good of the water delivery system. Depending upon site specific conditions, distribution pipe located in an easement outside of road right-of-way may be required to be fused HDPE pipe as determined by the City Engineer. Access to all water structures shall be provided by easements of no less than twenty feet (20') in width, centered over the water structure to maintain ten feet (10') minimum from the easement sideline. Greater easement width may be required in special circumstances. E. Pipe Cover: The top of pipe to finish grade for all distribution pipe and service lines shall be a maximum of six feet (6') and minimum of five feet (5'). In some special cases, with the approval of the City Engineer, the distribution pipe may be installed deeper below other utilities or in areas where air entrapment might otherwise occur, given the extents of the pipe greater than six feet (6') deep is minimized. F. Mainline Coupling: Mainline couplings should be used to a minimum and only following approval of the City Engineer or Water Superintendent. G. Utility Separation: Distribution Pipe shall be no closer than five feet (5') feet horizontal separation and no closer than twelve inches (12") of vertical separation from any other utility. All non -potable water line separation requirements apply. Mainline Valve: A. All mainline valves and fittings located near other fittings shall be required to be flanged. B. Location: Valves shall be installed on all directions of the distribution pipe including all crosses or tees unless otherwise approved by the City. 0 C. Spacing: The maximum distance between valves shall be five hundred feet (500') in commercial districts and eight hundred feet (800') in other districts as measured following the distribution pipe. D. At all high points in the water main where air entrapment is likely to occur, combination air release / air vacuum valves shall be required. Valve sizing calculations will need to be provided by the design engineer, and the size and model indicated on construction plans. Adequate space shall be provided inside a standard manhole to allow for easy access and maintenance. The size and height of all fittings shall be verified. Fire Hydrant: A. Location: Fire hydrants shall be located at the street intersection or at the lot line between adjacent properties, behind the street right of way in the utility easement with the bottom flange located not less than 2 inches and not greater than 8 inches above finished grade. B. Spacing: No lot frontage shall be located more than two hundred fifty feet (250') from a fire hydrant as measured in the street right of way. Service Line: A. Sizing: Water service lines shall be sized in accordance with requirements of the latest edition of the Idaho plumbing code adopted by the city, but shall not be smaller than one inch (1") nominal size. Applicants for commercial developments requiring water service in excess of one inch (1") shall be required to submit, pursuant to their application, and as directed by the public works director, the fixture count for the structure, or their normal and maximum intermittent flow rates to department staff to establish the size of meter required, regardless of the inlet and outlet pipe size. Upsizing the service line beyond the meter box may be allowed at the expense of the property owner. The connection shall be outside the meter box on the property owner's side of the service line. B. Installation: All service installations connected to the water system that have been or will be abandoned or that have not been used for three (3) years or that for any reason have 10 become useless for further service, shall be disconnected at the main by the property owner or the City of Chubbuck - Public Works Department, at the property owner's expense, and all pipe and appurtenances removed shall be the property of the City of Chubbuck. Exceptions may be granted by the Chubbuck Public Works Department for special circumstances, including recent installations awaiting building construction. C. Separate Lines Required: Each premises for which title may be transferred, whether connected to another structure under one roof, or standing separately on a single parcel of land shall be required to have its own separate water service line, except condominium associations under separate agreement with the City of Chubbuck. Each water service shall have an individual meter box, separated from any other water service. D. Maintenance: The City of Chubbuck owns and the Public Works Department shall maintain all completed service lines after installation from the point of connection at the water main through the meter vault to the outside edge of the meter vault in cases where the meter vault is set at the nearest property line abutting the main, or to the nearest property line abutting the main in cases where the meter vault or metering equipment is situated in a building or otherwise not adjacent to the nearest property line abutting the main. E. Repairs: If repairs or replacement of any water service line is rendered necessary by the act, neglect, or carelessness of the owner or occupant of the premises, any expense incurred thereby by the City of Chubbuck shall be charged against and collected from the owner or occupant. Section 401— Water Pipe and Fittings: Replace Sections 2.2.A and 2.2.13 with the followi 2.2 — Polyvinyl Chloride (PVC) Pipe and Fittings: A. PVC Pressure Pipe Sizes 4 inch through 36 inch for Water Distribution: ANSI/AWWA C 900-16 Pressure Class: Minimum DR -18 2. Outside Diameter Basis: Cast Iron (CI) pipe equivalent 3. Joints: Bell and spigot end with ASTM F 477 elastomeric gaskets 4. Color: Blue Remove Section 2.2.C.3 in its entire 11 Replace Section 2.9.0 with the following: 2.9 — Mechanical Restraint: C. Application: Approved for above -grade installation. All mechanical joint fittings below grade shall be mechanically restrained using mechanical restraints meeting the requirements of ISPWC Section 401.2.9. Mechanical restraints shall be in addition to thrust blocks. Add Section 2.9.D as follows: D. As an alternative to installing mechanical restraints on fittings, an Alpha Restrained Joint Fitting manufactured by American Flow Control will be allowed where prior approval by the City is provided. Replace Section 2.10 with the following: 2.10 — Locate Wire: A. Type: (No 12 AWG) single strand 12 -gauge copper clad steel (CCS) wire with blue high- density polyethylene (HDPE) insulated jacket coating for direct bury. B. Splicing: 3M DBR direct bury splice kit or City approved equivalent and shall be watertight to provide electrical continuity. C. Locate Wire Access Point: Snakepit tracer box style CD14*TP with blue locking cover located behind the fire hydrant in accordance with City of Chubbuck Standard Drawing CSD -404 (Fire Hydrant). Add Section 2.13 and 2.14 as follows: 2.13 — Warning Tape: A. Type: 6" wide metallic warning tape, blue polyethylene vinyl labelled "POTABLE WATER". 2.14 — Mainline Tapping Saddle: A. Tapping saddle shall conform to AWWA C223. B. Pressure Class: Minimum 175 psi C. Connection: Flange D. Manufacture and Model: Romac SST, Mueller H304, or Ford FAST Replace Section 3.2.0 with the followi 3.2 — Pipe Installation: O. Locate wire shall be secured with suitable tape every 8 to 10 feet along the buried distribution pipe. 12 Add Sections 3.2.R and 3.2.S as follows: R. Install 6" wide metallic warning tape, blue polyethylene vinyl labelled "POTABLE WATER" shall be placed between 18 to 24 inches above the distribution pipe. S. Where fittings are located adjacent to other fittings, all fittings shall have flanged connections between fittings. Add Section 3.4.G as follows: G. In addition to thrust blocks, all valves and fittings shall be restrained to the pipe with the use of mechanical restraints per Section 2.9. Replace Section 3.7 with the followi 3.7 — Locate Wire: A. Locate wire shall be secured with suitable tape every 8 to 10 feet along the buried distribution pipe. The locate wire shall interconnect to the locate wire of each service line and hydrant lateral with 3M DBR direct bury splice kit or City approved equivalent and shall be watertight to provide electrical continuity. B. Locate wire shall be tested for continuity prior to road subgrade preparation. Any wire found not to be continuous after testing shall be repaired or replaced to City satisfaction by the contractor prior to roadway construction. Replace Sections 3.9.A and 3.9.13 with the following: 3.9 — Flushing and Disinfection: A. Flushing and Prior to Disinfection: 1. The water infrastructure shall be fully constructed prior to scheduling the City to witness the pressure test, chlorination, or to take bacteriological (Bac-T) test. This shall include all water mains, fittings and thrust blocks, hydrants, services, and all components in the meter pit/box. 2. A minimum of five (5) business days prior to disinfection, the contractor shall submit to the City, for approval, the chlorination plan. This plan shall include the locations of chlorine injection points, flow direction, sample locations, and drainage areas. In certain looped water systems, valves shall be labeled on the chlorination plan as open or closed to direct the heavy chlorine mixture solution fully through the new water infrastructure. This plan shall include all actions required to chlorinate the entirety of the new potable water mains, hydrant laterals, and service lines. 3. Before the main is chlorinated, Contractor shall perform a preliminary flush of the line by filling all lines with potable water and removing all air pockets, then thoroughly flushing the main to scour and to remove contaminates or debris that may have been introduced during construction. The City shall be onsite to operate the valve(s) that 13 feeds the potable water into the newly installed main, and to witness the preliminary flush. The contractor shall provide enough drainage area and storage volume to meet the minimum flushing velocity of 3.0 feet/second following AWWA C651-23, with two to three volumes of the new water infrastructure, until the flush water is free of debris and visibly clear. It is prohibited to discharge the flush water into any sanitary sewer or storm drain infrastructure. 4. Table 1 shows the rates of flow required to produce a velocity of 3.0 feet/second in various size pipes. Table 1 Required flow and openings to flush pipelines 40 psi residual pressure in water main* Pipe Diameter Flow Required to Produce 3.0 ft/s (approx.) Velocity in Main Size of Tap Used, in. (mm) Number of Hydrants Outlets in. (mm) gpm (L/s) 1-1/2 1 (25) (38) 2 (51) 2-1/2 in. 4-1/2 in. (64 mm) (114 mm) 4 (100) 120 (7.4) 1 - - 1 1 6 (150) 260 (16.7) - 1 - 1 1 8 (200) 470 (29.7) - 2 - 1 1 10 (250) 730 (46.3) - 3 2 1 1 12 (300) 1,060 (66.7) - - 3 2 1 16 (400) 1,880 (118.6) - - 5 2 1 *With a 40 -psi (276 -kPa) pressure in the main with the hydrant flowing to atmosphere, a 2-1/2 in (64 -mm) hydrant outlet will discharge approximately 1,000 gpm (63.1 L/s) and a 4-1/2" (114 -mm) hydrant outlet will discharge approximately 2,500 gpm (160 L/s). *Number of taps on pipe based on 3.0 ft/s discharge through 5 ft (1.5 m) of galvanized iron pipe with one 90° elbow. B. Disinfection of Water Pipe: 1. General: a. Comply with ANSI/AWWA C 651-23, Disinfecting Water Mains, these specifications, and Engineer's direction. b. The contractor shall provide 48-hour minimum advance notice to allow the City to operate any necessary feeding valve(s), observe flushing, or to take the Bac-T test. Valves that are utilized to flush or direct potable water or chlorine mixture solution shall be readily accessible to the City. 14 d. During the chlorination process, the City shall be present to verify the water main, service lines, and hydrant laterals are fully disinfected. The City will routinely check the chlorine residual to ensure it is potent enough to thoroughly disinfect the pipe. e. The contractor shall be responsible for flushing the line and for any impact caused by the water. The City shall operate all valves for the flushing operation following the contractor's direction. 2. Forms of Chlorine used to be pre -approved by the Engineer: a. Liquid chlorine (gas) usually packaged in large steel containers is not allowed to be used. b. Acceptable form of chlorine is sodium hypochlorite in liquid form containing approximately 5 to 15% available chlorine per ANSI / AWWA B300. c. Calcium hypochlorite in the form of tablets or granules is not allowed to be used. Replace Section 3.9.B.3.a with the following: 3. Methods of Chlorination used to be pre -approved by the Engineer: a. Tablet or Granule Method Not Allowed Replace Section 3.9.B.3.b.4 as follows: b. Continuous Feed Method: 4. Critical points to inject chlorine shall be as close as possible to the source of water, beginning at the new water main. Injection could be through a hydrant or meter setter if within (10') ten feet from the source of water. If not attainable, a chlorination injection tap will be required at the Contractor's expense. The injection tap shall be installed within (10') ten feet of the source water. Once the City has acceptable water quality results, the chlorination injection tap shall be replaced with a threaded brass plug, to be witnessed by the City to verify that no leaks occur. The flow shall be at a constant rate with the City routinely checking the chlorine residual is potent enough to thoroughly disinfect the pipe. The flow shall be continued until the end of each branch has constant levels of heavily chlorinated water. The chlorine mixture shall remain in the newly installed water infrastructure for 24 hours minimum prior to the final flush. Replace Section 3.9.B.3.c with the following: c. Slug Method: 1. Slug Method Not Allowed 15 Replace Section 3.9.0 with the following: C. Final Flushing: Upon removal of heavily chlorinated water, the Contractor shall use a dechlorinating diffuser or device to reduce the chlorinated waste discharge. The City shall be present, verifying chlorine residual levels are thoroughly neutralized, minimizing contamination to the environment. 2. After the removal of the heavily chlorinated water, and prior to the first bacteriological (Bac-T) test, with the City onsite operating the valve(s) that feeds the potable water into the newly installed main, the contractor shall perform the final flush from the main, valves, and branches right before the City takes the first Bac-T test. Replace Section 3.9.D as follows: D. Bacteriological Tests: Bacteriological (Bac-T) test shall be collected from each 600 feet of the newly installed water main with one (1) sample taken from each main branch. Samples are typically taken from a fire hydrant, at or near the dead end of the new water main. 2. The bacteriological (Bac-T) testing shall be performed by the City, scheduled by the contractor. The contractor shall coordinate with the City, to take two (2) Bac-T tests back-to-back, 24 hours from each other. The timing shall be planned such that the results do not come back from the laboratory on a weekend or holiday. Samples are only collected on Monday thru Thursday, between 7:30 am to 4:30 pm, excluding Holidays. Samples will NOT be collected on Fridays, Saturdays, Sundays, Holidays or the day preceding a Holiday (if such holiday falls during the week). Under special approval from the Water Superintendent, if a sample absolutely needs to be collected outside of the approved dates and times, the contractor will be charged all extra costs associated with the sampling and laboratory costs. If results come back positive with unacceptable water quality, the water infrastructure shall be disinfected and flushed again following the complete process above. The Contractor shall be responsible for the testing costs required due to failing tests. Add Section 3.12 as follows: 3.12 — Mainline Tapping: A. For live taps onto a charged portion of the city's potable water system, all materials shall be provided and installed by the contractor or customer. For taps of 12" or less in size, the tapping will be performed by City staff. In no case shall a non -City of Chubbuck personnel operate any part of the City's water system without prior written authorization of the City of Chubbuck - Water Superintendent. 16 When a new mainline tap is required, the contractor shall excavate around the existing main and the trench shall be sufficient to allow the City's tapping crew enough space at each location to safely make the tap without any additional excavation. The adequacy and safety of the excavation shall be at the sole discretion of the City's tapping crew. If the City's tapping crew determines that any excavation does not meet City standards, the crew shall have the option to refuse to make the tap and will reschedule at least 2 days hence. C. The contractor shall provide all needed materials to make the connection to the existing water system. The City shall perform the tap connection for all new distribution pipe of twelve inches (12") or less. Live tap connections for all new distribution pipe larger than twelve inches (12") shall require a third -party contractor with qualifications approved by the City. This connection will be at the expense of the developer or contractor and must be observed and inspected by the City's Water Department personnel. D. Prior to the City making the hot tap connection, a tapping sleeve with a test plug shall be tested following all manufacturer requirements and recommendations, including but not limited to a hydrostatic test to verify the seal between the gasket and pipe. E. It shall be the contractor's responsibility to install the tapping sleeve according to the approved Plans. Any variation from the approved plans, such as a different location or size, shall be requested through the Design Engineer, and approved by the City. Work by the City's tapping crew shall not be construed to represent compliance with the Plans or inspection or approval by the City for any variations from the approved Plans. Section 402 — Hydraulic Valves: Add Sections 2.1.D through 2.1.1-1 as follows: 2.1—Valve Size, Type, and Strength: D. Between the private fire suppression system and the City's potable water system. The division valve shall be rated at or above 200 psi. E. Gate valves are required for distribution pipe less than 12 inches in diameter. F. Butterfly valves are required for distribution pipe of 12 inches in diameter or larger. G. If system operating pressures are expected to exceed 100 psi, a valve with a working pressure equal to or greater than the test pressure shall be required. H. Under special circumstances a 12 -inch gate valve may replace the butterfly valve, under approval of City Engineer. 17 Add Sections 2.2.A.7 and 2.2.A.8 as follows: 2.2 — Resilient Seated Gate Valves: A. Resilient Seated Gate Valves and Reduced Wall Resilient Seated Gate Valves for Water Supply Service: ANSI/AWWA C 509 and/or ANSI/AWWA C 515 (ductile iron only): 7. Pressure Class: Minimum 250 psi 8. Manufacturer: Kennedy Valve Co., Mueller, Clow Valve Co., or City approved equivalent. Add Section 2.3.A.10 as follows: 2.3 — Butterfly Valves: A. Rubber Seated Butterfly Valves: ANSI/AWWA C 504 10. Manufacturer: Kennedy Valve Co., Mueller, Clow Valve Co., or City approved equivalent. Add Section 2.4.A.5 as follows: 2.4 — Air Release, Air/Vacuum and Combination Air Valves: A. Air Release/Air Vacuum and Combination Air Valves for Waterworks Service: ANSI/AWWA C 512. 5. Manufacturer and Model: Val -Matic 200 Series Single Body Combination Valve 20xC.xx or DeZURIK/APCO series 14xC Single Body Combination Valve or City approved equivalent. Replace Section 2.7.E with the followi 2.7 — Valve Boxes: E. Detail: City of Chubbuck Standard Drawing CSD -405 (Valve Box and Lid) Add Section 2.9 as follows: 2.9 — Mechanical Restraints: A. Application: All mechanical joint valves below grade shall be mechanically restrained using mechanical restraints meeting the requirements of ISPWC Section 401.2.9. Mechanical restraints shall be in addition to thrust blocks. Replace Sections 3.2.A and 3.2.13 with the following: 3.2 — Installation: A. Install valves and appurtenances in accordance with manufacturer's recommendations and the Standard Drawings and the City of Chubbuck Standard Drawings. 18 B. Install valves plumb and vertical. Set valve box centered and plumb over wrench nut and flush with ground or street surface. Install box per City of Chubbuck Standard Drawing CSD -405 (Valve Box and Lid). Section 403 — Hydrants: Add Sections 2.2.A.8 and 2.2.A.9 as follows: 2.2 — Fire Hydrant: A. Dry Barrel Fire Hydrants: ANSI/AWWA C 502 8. Manufacture: Clow Medallion, Mueller Centurion, Kennedy K81 -D, or 5-1/4" Waterous Pacer. 9. Fire hydrants shall be furnished with a five -inch (5") by four -half inch (4-1/2") NST "Hydra Storz" Adapter or approved equal, compete with a self-closing butterfly valve assembly. Add Section 2.3.13 as follows: 2.3 — Color: B. Fire hydrants shall be factory painted yellow Rer lace Section 3.2.13 with the followi 3.2 — Installation: B. Install fire hydrant in accordance with manufacturer's recommendations and City of Chubbuck Standard Drawing CSD — 404 (Fire Hydrant) with pumper outlet nozzle facing the street. Add Section 3.2.H as follows: H. Locate wire along the fire hydrant lateral shall interconnect to the locate wire of the distribution pipe with 3M DBR direct bury splice kit or City approved equivalent and shall be watertight to provide electrical continuity. The locate wire shall terminate behind the fire hydrant connecting to a Snakepit tracer box style CD14*TP with blue locking cover. Section 404 — Water Service Line and Meters: Add Sections 2.1.D as follows: 2.1— Pipe and Fittings Size, Type and Strength: D. Pipe larger than two inches (2") in diameter shall meet the requirements of the water pipe and fittings specified ISPWC Section 401. 19 Replace Section 2.2.A.4 with the following: 2.2 —Service Pipe: A. Polyethylene (PE) Pressure Pipe for Water Service: ANSI/AWWA C 901 4. Standard PE Code Designation: PE 4710 or ASTM D 3350 Add Section 2.2.A.5 as follows: 5. Color: Blue Replace Sections 2.2.13 and 2.2.0 with the followi B. Seamless Copper Water Tube Not Allowed C. Polyvinyl Chloride (PVC) Service Pipe Not Allowed Replace Section 2.4.A with the followine: 2.4 — Appurtenances: A. Service Saddles: 1. One inch (1") to two-inch (2") service line fittings (service saddle, corporation stop, meter setter, etc.) shall be manufactured by Ford or Romac as detailed in the City of Chubbuck Standard Drawings CSD -401 and CSD -402 (Potable Water Services). 2. All service saddles shall include double strap stainless steel bands. Saddle bodies shall be iron or brass. Iron service saddle bodies shall be lined and coated with fusion - bonded epoxy, nylon, or approved substitution per manufacturer's specifications. Replace Section 2.4.13.3 with the followi B. Corporation Stops: 3. Product: Per City of Chubbuck Standard Drawings CSD -401 and CDS 402. Replace Section 2.4.D.5 with the following: D. Meter Setters: 5. Product: Per City of Chubbuck Standard Drawings CSD -401 and CDS 402. Replace Section 2.4.F with the following: F. Locate Wire: 1. Type: (No 12 AWG) single strand 12 -gauge copper clad steel (CCS) wire with blue high density polyethylene (HDPE) insulated jacket coating for direct bury. 20 Replace Section 3.2.0 with the following: 3.2 — Installation: C. Install service line, fittings, and meters, and meter boxes in accordance with the manufacturer's recommendations and City of Chubbuck Standard Drawings CSD -401 and CSD -402 (Potable Water Services). Add Sections 3.2.M and 3.2.N as follows: M. Locate wire shall be secured with suitable tape every 8 to 10 feet along the buried service pipe. Locate wire shall interconnect to the locate wire of the distribution pipe with 3M DBR direct bury splice kit or City approved equivalent and shall be watertight to provide electrical continuity. Locate wire shall be wrapped multiple times around the vertical portion of the meter setter with a minimum of 24" of excess wire beyond the upper most wrap as shown on the City of Chubbuck Standard Drawings CSD -401 and CSD -402 (Potable Water Services). N. When service lines are required to be abandoned, the service line shall be disconnected at the point of connection to the distribution pipe and shall be threaded plugged with a brass plug. The City shall witness that no leaks occur prior to any placement of bedding material. 21 Division 400 — Potable Water City of Chubbuck Standard Drawings CSD -401 1" Potable Water Service CSD -402 2" Potable Water Service CSD -403 3" to 12" Potable Water Service CSD -404 Fire Hydrant CSD -405 Valve Box and Lid CSD -406 Flush Hydrant 22 Z_ N EASEMENT LINE PROPERTY OWNERS RESPONSIBILITY CITY'S RESPONSIBILITY w 0 J Lu Ow 2 D W 0 J w 0 m 1^ zQ N uS z Z 0 J oC o �Z�z� wozoo C) U C7�uJw 5;z zco OZF- ()f QOO 0-Iia_UZ FOR PUBLIC WORKS CHUBBUCK CONSTRUCTION I D R H O STANDARDS 1" POTABLE WATER SERVICE zU) �o _ Q N W Z O Lu U) LAST REVISED 3/24/2026 STANDARD DRAWING NO: CSD -401 1 OF 3 SERVICE FOR ACROSS THE STREET 18" MIN. BETWEEN STAGGERED CORPORATION STOPS, UNLESS RECOMMENDED BY MANUFACTURER WATER MAIN CURB DRAINAGE SWALE PROPERTY LINE SIDEWALK 36" MIN. BETWEEN INLINE CORPORATION STOPS, UNLESS RECOMMENDED BY MANUFACTURER 24" MIN. BETWEEN CORPORATION STOP TO SPIGOT INSERTION LINE OR BELL TRANSITION OF THE PIPE, UNLESS RECOMMENDED BY MANUFACTURER TWO SERVICES PER TRENCH INDIVIDUAL METER BOX REQUIRED 'v' CITY'S RESPONSIBILITY PROPERTY OWNER EASEMENT LINE ' RESPONSIBILITY 45° TYP. z_ S MAX. N PLAN VIEW FOR PUBLIC WORKS CHUBBUCK CONSTRUCTION STANDARDS IORH0 LAST REVISED 3/24/2026 1" POTABLE STANDARD DRAWING NO: WATER SERVICE I CSD -401 201`3 MATERIAL LIST: 1. WATER MAIN (PVC, HDPE, OR DUCTILE IRON) 2. CORPORATION STOP W/ CC THREADS (FORD F1001 -4 -G -NL) 3. SERVICE LINE (BLUE POLYETHYLENE SIDR-7, SEE MATERIALS SPECIFICATIONS) NO SPLICES OR FITTINGS ALLOWED BETWEEN CORPORATION STOP AND METER SETTER 4. 1" METER SETTER (FORD VBHC84W-66-44-G W/ STAINLESS STEEL INSERT - FORD 53-72) 5. 1" METER (SUPPLIED BY CITY) 6. SERVICE SADDLE FOR PVC MAIN: 8" PVC (FORD FCD202-905-TAP-CC4) OR (ROMAC 202S - 905 x 1" CC) 10" PVC (FORD FCD202-1 11 0-TAP-CC4) OR (ROMAC 202S - 1110 x 1" CC) 12" PVC (FORD FCD202-1320-TAP-CC4) OR (ROMAC 202S - 1320 x 1" CC) 7. METER BOX - 24" DIA. ADS (CORRUGATED) OR C.M.P. 8. TYPE I PIPE BEDDING PER SECTION -305 OF ISPWC 9. 2 - (8" X 8" X 12") CONCRETE BLOCKS 10. 1" CAP 11. FOR LANDSCAPE AREAS THE METER BOX LID SHALL BE RING, ADAPTER, AND COVER MARKED "WATER" WITH READ HOLE FOR NEPTUNE R900 V3, MANUFACTURED BY D&L SUPPLY, MODEL L-2242, OR CITY APPROVED EQUIVALENT. FOR CONCRETE AREAS THE METER BOX LID SHALL BE A 24" O.D. HEAVY DUTY MANHOLE RING AND COVER MARKED "WATER" WITH READ HOLE FOR NEPTUNE R900 V3, MANUFACTURED BY D&L SUPPLY, MODEL B-5024, OR CITY APPROVED EQUIVALENT. A SEPARATE CONCRETE POUR OR EXPANSION BOARD, LEAVING A 3'x3' SQUARE CENTERED WITH THE LID SHALL BE REQUIRED. 12. LOCATE WIRE (NO. 12 AWG. COPPER CLAD STEEL (CCS) W/ BLUE INSULATED JACKET COATING) 13. 2x4 WOOD MARKER OR 4" - 5" PEELER CORE POST WITH LOCATE WIRE 14. LOCATE WIRE SPLICE CONNECTER (3M DBR DIRECT BURY SPLICE KIT) SEE MATERIAL SPECIFICATIONS NOTES: A. CUL-DE-SAC SERVICE LATERALS MUST FOLLOW THE MOST DIRECT ROUTE POSSIBLE BETWEEN CORPORATION STOP AND METER BOX. B. SERVICE LINE CONNECTION MUST BE A MIN. OF 2 FT. BEHIND EASEMENT LINE. C. METER BOX SLOT MUST NOT REST ON SERVICE LINE. D. ALL CONSTRUCTION SHALL CONFORM TO THE REQUIREMENTS OF THE CITY OF CHUBBUCK AND THE IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION (ISPWC). E. THE CITY OF CHUBBUCK SHALL INSPECT MAIN LINE AND METER BOX INSTALLATION PRIOR TO BACKFILLING. F. WHEN USING ROADSIDE DRAINAGE SWALE TYPICAL STREET SECTION SET TOP OF METER BOX 3" TO 4" ABOVE TOP BACK OF CURB. CHUBBUCK IDDH0 FOR PUBLIC WORKS CONSTRUCTION STANDARDS 1" POTABLE WATER SERVICE LAST REVISED 3/24/2026 STANDARD DRAWING NO: CJD -401 3 01` 3 o Z J 0 LU Q W C(co)) U) Z — o N Z � 3N1I 1N3W3Sb'3 >- z W z m �O0 PROPERTY OWNERS 9 z v RESPONSIBILITY a CITY'S RESPONSIBILITY o cl) U) z 0 0 LLI owwW oU) .8L >zZ0 Lu �00� Oz dUUQ �� a - <Lo d M OY J N J Z W Q Q 2 � a w � N � � Z �o� ) Z � 0H Z)oW U U Q M W z_ Lua- w U) Q Z X g in �o M W 0 Q � N r J Q U) z Z W LL U) (.0Z_ _ N CO CD + r r FOR PUBLIC Cn WORKS CHUBBUCK CONSTRUCTION LAST REVISED 3/24/2026 1 D R H 0 STANDARDS 1-1/2" OR 2" POTABLE STANDARD DRAWING NO: WATER SERVICE CSD -402 1 OF 3 TRENCH LINE m: m: U� Zp 24" MIN. TO CORPORATION STOP FROM SPIGOT INSERTION LINE OR WHERE BELL TRANSITIONS TO THE BARREL OF THE PIPE UNLESS OTHERWISE RECOMMENDED BY MANUFACTURER PROPERTY LINE SIDEWALK' ° � °•e .. l.. . .°all.°,, ° �` ° °°�� ° i 4" TYP. / I - 64 �(t CA - CHUBBUCK I D R H 0 \ GROUT AROUND PIPE TYP. EASEMENT LINE Jp 2' MIN. FOR PUBLIC WORKS CONSTRUCTION STANDARDS 1-1/2" OR 2" POTABLE WATER SERVICE 6" MIN. ni A K I Xnrini Z CITY'S RESPONSIBILITY PROPERTY OWNERS RESPONSIBILITY LAST REVISED 3/24/2026 STANDARD DRAWING NO: CSD -402 2OF3 z_ 9 u \ GROUT AROUND PIPE TYP. EASEMENT LINE Jp 2' MIN. FOR PUBLIC WORKS CONSTRUCTION STANDARDS 1-1/2" OR 2" POTABLE WATER SERVICE 6" MIN. ni A K I Xnrini Z CITY'S RESPONSIBILITY PROPERTY OWNERS RESPONSIBILITY LAST REVISED 3/24/2026 STANDARD DRAWING NO: CSD -402 2OF3 MATERIAL LIST: 1. WATER MAIN (PVC, HDPE, OR DUCTILE IRON) 2. 1-1/2" CORPORATION STOP W/ CC THREADS (FORD FB1001-6-G-NL) 2" CORPORATION STOP W/ CC THREADS (FORD FB1001-7-G-NL) 3. SERVICE LINE (BLUE POLYETHYLENE SIDR-7, SEE MATERIALS SPECIFICATIONS) NO SPLICES OR FITTINGS ALLOWED BETWEEN CORPORATION STOP AND METER SETTER 4. 1-1/2" METER SETTER SET FOR 13-1/8" LAY LENGTH (FORD VH76-18-11-66-NL) W/ STAINLESS STEEL INSERT (FORD 74-DR11) 2" METER SETTER SET FOR 17" LAY LENGTH (FORD VH77-18-11-77-NL) W/ STAINLESS STEEL INSERT (FORD 75-DR11). 5. 1-1/2" METER W/ 13-1/8" LAY LENGTH (SUPPLIED BY CITY) 2" METER W/ 17" LAY LENGTH (SUPPLIED BY CITY) 6. 1-1/2" SERVICE SADDLE FOR PVC MAIN: 8" PVC (FORD FCD202-905-TAP-CC6) OR (ROMAC 101 S - 905 x 1.5" CC) 10" PVC (FORD FCD202-1 1 10-TAP-CC6) OR (ROMAC 101S - 1110 x 1.5" CC) 12" PVC (FORD FCD202-1320-TAP-CC6) OR (ROMAC 101 S - 1320 x 1.5" CC) 2" SERVICE SADDLE FOR PVC MAIN: 8" PVC (FORD FCD202-905-TAP-CC7) OR (ROMAC 202S - 905 x 2" CC) 10" PVC (FORD FCD202-1 11 0-TAP-CC7) OR (ROMAC 202S - 1110 x 2" CC) 12" PVC (FORD FCD202-1320-TAP-CC7) OR (ROMAC 202S - 1320 x 2" CC) 7. CONCRETE VAULT (HS20 RATED) OR 48" STANDARD MANHOLE W/ FLAT LID & NO CONE (HS20 RATED) OR 48" CORRUGATED HDPE PIPE OR APPROVED EQUAL MAY BE USED IN LANDSCAPE AREAS. 8. TYPE I OR TYPE III BEDDING PER SECTION 305 OF ISPWC 9. 24" MANHOLE LID AND RING 10. 2" CAP 11. GRADE RINGS 12. LOCATE WIRE (NO. 12 AWG. COPPER CLAD STEEL (CCS) W/ BLUE INSULATED JACKET COATING) 13. (2) 2"x8"x12" CONCRETE BLOCKS 14. (6) 4"x8"x16" CONCRETE BLOCKS EVENLY SPACED AROUND AND BELOW THE VAULT 15. 2x4 WOOD MARKER OR 4" - 5" PEELER CORE POST WITH LOCATE WIRE 16. LOCATE WIRE SPLICE CONNECTER (3M DBR DIRECT BURY SPLICE KIT) SEE MATERIAL SPECIFICATIONS CHUBBUCK IDDH0 FOR PUBLIC WORKS CONSTRUCTION NnTFS- A. CUL-DE-SAC SERVICE LATERALS MUST FOLLOW THE MOST DIRECT ROUTE POSSIBLE BETWEEN CORPORATION STOP AND METER BOX. B. SERVICE LINE CONNECTION MUST BE A MIN. OF 2 FEET BEHIND EASEMENT LINE. C. ALL CONSTRUCTION SHALL CONFORM TO THE REQUIREMENTS OF THE CITY OF CHUBBUCK AND THE IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION (ISPWC). D. THE CITY OF CHUBBUCK SHALL INSPECT MAIN LINE AND METER BOX INSTALLATION PRIOR TO BACKFILLING. LAST REVISED 3/24/2026 STANDARDS 1-1 /2" OR 2" POTABLE STANDARD DRAWING NO: WATER SERVICE I CSD -402 3 OF 3 z O zp � M w Q = LL ww w > Z z U W O LLJ � Z p O Q W �- LJ � � Z � � � w U Y n - W 2 J U > p O Qwz� m p Q � , M w m z O — O_wZ p O Lu U) z ocl �0W W Z 2 �UL� w ao LL w Y Z J O Z O > mOU>0 % LV Z M Z PROPERTY OWNERS Q RESPONSIBILITY CITY'S RESPONSIBILITY W U) co Lo L CD Q - Y I— w > Z QO> p W zX }m PROPERTY LIN in 'NIN ..9 LU � p Q � N (� N z ti r N FOR PUBLIC WORKS LAST REVISED 3/24/2026 CHUBBUCK CONSTRUCTION STANDARDS 3" TO 12" POTABLE STANDARD DRAWING NO: D R H O WATER SERVICE CSD -403 1 OF 3 z O zp � ww w > Z z � Z p O Q W �- � � Z � � � w U Y n - U > p O Qwz� m p Q � , w U WO LLJ 0 p F Z �5 0 LLJ W — ❑ O m wOzaz w -—� d U _j W �z<� O0>� Y U W W U ❑ � z W mQ�;O Ml z ❑ } (If O z m z zQLu�: Lu z O LU Lu U Q W O > � LuCL Y ❑ U Q m * * z z PROPERTY OWNERS RESPONSIBILITY } CITY'S RESPONSIBILITY W_ w0� Q — W J / < Z L p U a °/ �0LL H U co ® ** Q Q 3' MIN. **3'MIN.** ❑ > IM wD x�* No �inih O O❑x W ~ Z PROPERTY LINEW z_ >- a U) J J ch zmJz } * w(-na W H Z H 2 N z 0 W W U) Or,0p L \ w w0}Z > p z W �- o Z z_ %—❑�� ❑ LL J z 2 W w r W LU J (n Z L) ❑ _ Q U �= 0U Q N W W U W m U Z z H 4. FOR PUBLIC N WORKS CHUBBUCK CONSTRUCTION STANDARDS IORH0 LAST REVISED 3/24/2026 3" TO 12" POTABLE STANDARD DRAWING NO: WATER SERVICE CSD -403 2OF3 T MIN. T MIN. z ❑ } (If O z m z zQLu�: Lu z O LU Lu U Q W O > � LuCL Y ❑ U Q m * * z z PROPERTY OWNERS RESPONSIBILITY } CITY'S RESPONSIBILITY W_ w0� Q — W J / < Z L p U a °/ �0LL H U co ® ** Q Q 3' MIN. **3'MIN.** ❑ > IM wD x�* No �inih O O❑x W ~ Z PROPERTY LINEW z_ >- a U) J J ch zmJz } * w(-na W H Z H 2 N z 0 W W U) Or,0p L \ w w0}Z > p z W �- o Z z_ %—❑�� ❑ LL J z 2 W w r W LU J (n Z L) ❑ _ Q U �= 0U Q N W W U W m U Z z H 4. FOR PUBLIC N WORKS CHUBBUCK CONSTRUCTION STANDARDS IORH0 LAST REVISED 3/24/2026 3" TO 12" POTABLE STANDARD DRAWING NO: WATER SERVICE CSD -403 2OF3 MATERIAL LIST: 1. WATER MAIN (PVC, HDPE, OR DUCTILE IRON). 2. TAPPING VALVE OR FLANGED X M.J. VALVE (SEE MATERIAL SPECIFICATIONS) 3. 4" TO 12" SERVICE LINE (PVC OR DUCTILE IRON) 4. 4" TO 12" FLANGED GATE VALVES 5. 3" TO 12" METER (SUPPLIED BY CITY) ...T' METER SHALL REQUIRE 4"x3" FLANGED REDUCERS EACH SIDE OF THE METER. ADJUST THE SIZE OF VAULT TO ACCOMMODATE THESE EXTRA FITTINGS. SEE SHEET 2 OF 3 FOR SEPARATION REQUIREMENTS"" 6. 3" TO 12" STRAINER 7. CONCRETE VAULT, SIZED TO ACCOMMODATE METER AND FITTINGS AS SHOWN ON SHEET 2 OF 3. 8. 3/4" MINUS AGGREGATE BEDDING 9. SUPPORT JACKS 10. 4" TO 12" ROMAC COUPLING OR APPROVED EQUIVALENT CONNECTION 11. 24" MANHOLE LID AND RING 12. TAPPING SLEEVE (ROMAC SST, MUELLER H304, OR FORD FAST) OR FLANGED X M.J. TEE. 13. VALVE BOX 14. FLANGED COUPLING ADAPTERS WITH MECHANICAL RESTRAINT 15. FLOOR DRAIN 16. LOCATE WIRE (NO. 12 AWG. COPPER CLAD STEEL (CCS) W/ BLUE INSULATED JACKET COATING) 17. LOCATE WIRE SPLICE CONNECTER (3M DBR DIRECT BURY SPLICE KIT) SEE MATERIAL SPECIFICATIONS 18. CONCRETE THRUST BLOCK PER ISPWC SPECIFICATIONS A I/'1TC C'. A. CUL-DE-SAC SERVICE LATERALS MUST FOLLOW THE MOST DIRECT ROUTE POSSIBLE BETWEEN TAPPING TEE AND METER VAULT. B. SERVICE LINE CONNECTION MUST BE 2 FT. BEHIND METER VAULT C. POSITION SUPPORT JACKS TO ALLOW FOR MAINTENANCE. D. SIZE ON SIZE REQUIRE A MUELLER TAPPING SLEEVE OR APPROVED EQUIVALENT. CHUBBUCK IDDH0 FOR PUBLIC WORKS CONSTRUCTION STANDARDS LAST REVISED 3/24/2026 3" TO 1211 POTABLE STANDARD DRAWING NO: WATER SERVICE I CSD -403 3 OF 3 vi � �_ Z W W}❑ N U= 2 W r O H W W U¢JO Z U ~w U) W Q W Z ❑ O J p= d m Q of =) QOL`3: Xi MATERIAL LIST: 1. TEE (FLG X MJ) 2. GATE VALVE (FLG X MJ) 3. (2" X 8" X 12") CONCRETE BLOCK 4. CONCRETE THRUST BLOCK PER ISPWC SPECIFICATIONS 5. FIRE HYDRANT, FACTORY PAINTED YELLOW COMPRESSION TYPE (M.J.) PRODUCTS SUCH AS CLOW - MEDALLION, OR MUELLER - CENTURION, KENNEDY - K81 -D, OR 5-1/4" WATEROUS PACER 6. TYPE I BEDDING PER SECTION 305 OF ISPWC 7. CAST IRON VALVE BOX (SEE CITY OF CHUBBUCK STANDARD DRAWING CSD -405) 8. FIRE HYDRANT SERVICE LINE LATERAL (6" DIAMETER PIPE, DUCTILE IRON OR PVC) 9. LOCATE WIRE (NO. 12 AWG. COPPER CLAD STEEL (CCS) W/ BLUE INSULATED JACKET COATING) 10. LOCATE WIRE ACCESS POINT (SNAKEPIT TRACER BOX STYLE CD14- TP W/ BLUE LOCKING COVER) 11. LOCATE WIRE SPLICE CONNECTER (3M DBR DIRECT BURY SPLICE KIT) SEE MATERIAL SPECIFICATIONS 12. MECHANICAL RESTRAINT IN ADDITION TO THRUST BLOCKS A. HYDRANTS SHALL BE LOCATED AT THE STREET INTERSECTION OR AT THE LOT LINE BETWEEN ADJACENT PROPERTIES. THE HYDRANT SHALL BE INSTALLED SO THAT THE FLANGE IS 2" MIN. AND 8" MAX. ABOVE FINISHED GRADE. B. CUL-DE-SAC SERVICE LATERALS MUST FOLLOW THE MOST DIRECT ROUTE POSSIBLE BETWEEN TAPPING TEE AND HYDRANT. C. ALL ANCHORS AND BLOCKING TO BEAR AGAINST UNDISTURBED SOIL. CHUBBUCK IDDH0 FOR PUBLIC WORKS CONSTRUCTION STANDARDS FIRE HYDRANT LAST REVISED 3/24/2026 STANDARD DRAWING NO: CSD -404 2 OF 2 - / I - 64-�-4 c \ — CHUBBUCK I D R H 0 24" DIA. FOR PUBLIC WORKS CONSTRUCTION STANDARDS MATERIAL LIST: 1. 5-1/4" VALVE BOX LID ACCORDINGLY MARKED "WATER" OR "IRRIGATION" 2. CONCRETE COLLAR (24" DIA. x 6" TALL) 3. (2) #4 REBAR HORIZONTAL HOOPS W/ (4) #4 REBAR VERTICALS 4. VALVE 5. CAST IRON VALVE BOX RISER 6. LOCATE WIRE (NO. 12 AWG. COPPER CLAD STEEL (CCS) W/ INSULATED JACKET COATING) 7. LOCATE WIRE SPLICE CONNECTER AT MAINLINE TEE OR CROSS LOCATIONS (3M DBR DIRECT BURY SPLICE KIT) SEE MATERIAL SPECIFICATIONS 8. IN LIEU OF #4 REBAR IN CONCRETE COLLARS, 3 -POUNDS OF FIBRILLATED POLYPROPYLENE FIBER PER CUBIC YARD OF CONCRETE MAY BE USED FOLLOWING ISPWC 703.2.2.E. VALVE BOX AND LID LAST REVISED 3/24/2026 STANDARD DRAWING NO: CSD -405 1 OF 1 FINISH GRADE 5' MIN. 6' MAX. PROVIDE T OF EXTRA LOCATE WIRE INSIDE OR BELOW ACCESS POINT v �J as ° UNDISTURBED , 6 ' % EARTH OR THRUST 1 2 4 8 BLOCK PER ISPWC SPECIFICATIONS SECTION VIEW MATERIAL LIST: 1. WATER MAIN (SIZE AND TYPE VARIES) 2. UNI -FLANGE PIPE RESTRAINT SERIES 1300 3. (2) 3/4" ANCHOR BOLTS ON 6" WATER MAIN OR SMALLER, NOTES: OR (4) 3/4" ANCHOR BOLTS ON 8" WATER MAIN, SECURELY FASTENED TO EYE BOLTS. A. FLUSHING HYDRANT SHALL BE ONLY USED AS TEMPORARY BASIS UNTIL 4. MAIN SIZE X 2" FL REDUCER DEVELOPMENT CONTINUES CONNECTING TO THE EXISTING 5. 2" GALVANIZED 90° ELBOW WATERLINE. 6. 2" GALVANIZED PIPE, THREADED ON BOTH ENDS 7. 2" MAINGUARD NO. 77 BLOW -OFF HYDRANT W/ 2-1/2" NST NOZZLE OR APPROVED EQUAL. LOCATE OUT OF ROADWAY BEHIND NEW CURB & GUTTER. 8. 2" COMPANION FLANGE CAP TAPPED 2" F.I.P. 9. HAMMERHEAD THRUST BLOCK, MIN 10.3 SQ. FT. 10. EYE BOLTS SECURELY FASTENED TO PIPE RESTRAINT 11. LOCATE WIRE (NO. 12 AWG. COPPER CLAD STEEL (CCS) W/ BLUE INSULATED JACKET COATING) 12. LOCATE WIRE ACCESS POINT (SNAKEPIT TRACER BOX STYLE CD14* TP W/ BLUE LOCKING COVER) FOR PUBLIC WORKS LAST REVISED 3/24/2026 CHUBBUCK CONSTRUCTION STANDARDS STANDARD DRAWING NO: I D D H O FLUSH HYDRANT CSD -406 1 OF 1 Division 500 — Sanitary Sewer General Information: Sanitary Sewer Pipe: A. All such sanitary sewer pipe extension and installations shall be in dedicated public right of way areas. All sanitary sewer pipe extensions/installations shall conform in all respects to the standards, specifications, and material requirements set forth in these standards and the ISPWC. B. Sizing: In areas with new development, the City of Chubbuck may require an engineering report to verify adequate wastewater flows. The sewer system shall be designed for the estimated ultimate build -out flow. The anticipated design shall include the average and design peak flows of residential, industrial, or commercial areas. The plan shall show the location, size, and direction of flow of relevant existing and proposed sanitary and combined wastewater draining. Sewer systems shall be designed in compliance with the "Recommended Standards for Wastewater Facilities" promulgated by the Great Lakes - Upper Mississippi River board of state public health and environmental managers and published by the Health Education Services, Albany, New York. Gravity sewer pipe shall follow City of Chubbuck current facility planning study and/or master plan. Sewer pipe larger than 8 inches shall be based on flows, not to justify flatter slopes. C. Dead End: Gravity sewer pipe stubbed for future use shall provide a sewer cleanout to perform all required testing procedures per the ISPWC. In areas where the sewer cleanout could be damaged by either snow removal or any other means, a traffic rated cleanout shall be required. D. Inside Easements: The City of Chubbuck may require or allow sanitary sewer mains to be installed in utility easements if it is deemed necessary for the good of the sewer system. Access to all public sanitary sewer pipe and manholes deeper than eight feet (8') shall provide an easement of no less than thirty feet (30') in width, centered over the sewer structure to maintain fifteen feet (15') from the easement sideline. Easement width may be reduced to twenty feet (20') if the sewer structures are shallower than eight feet (8'), unless they are located within areas dedicated to the public. Narrower easements may be 36 allowed by the City in special circumstances when it can be demonstrated that the pipes and/or manholes can be properly maintained by the City without introducing additional risk to the City. E. Pipe Cover: All public gravity sewer pipe shall have a minimum depth of four feet (4') from top of pipe to finish grade. Sanitary Sewer Manhole: A. Location: All public sewer manholes must be accessible for operations and maintenance. Location of each sewer manhole should be in the public road right of way or must be accessible with a heavy truck / cleaning equipment either by path or private roadway requiring approval from the City Engineer and Sewer Superintendent. B. Pipe Orientation: Manhole design shall require that the angle between any incoming (inlet) pipe and the outgoing (outlet) pipe be 90 degrees or greater. C. Channel: At all sewer pipe connections to the sewer manhole, a concrete channel shall be formed in the base of the manhole to ensure smooth and efficient, sanitary sewage flow from the inlet pipe to the outlet pipe, with no sharp angles, using a consistent, large -radius curve if a change in direction is required. Sewer Service Line: A. Sizing: All sewer service connections to public sanitary sewer shall be a minimum of four inches (4") in diameter. B. Separate Lines Required: A separate and independent private sewer shall be provided for every building, residence, or property unless specific permission is obtained from City of Chubbuck. It shall be unlawful for any person to extend any private sewer beyond the limits of the building or property for which a permit has been given without obtaining permission from City of Chubbuck. The existence of a private sewer permit shall in no way be construed as making permissible any work for which an excavation permit may be required. 37 C. Repairs: When any private sewer connected with any public sewer becomes obstructed, broken or out of order, the owner, agent, or tenant of such premises shall repair same at the owner's expense. This cost shall include the service tap or connection to the main public sewer as well as the total length of service line or private sewer from such service tap or connection to the point at which sewage is introduced into the service for the premises. This cost shall also include the replacement of street, curb and gutter, sidewalk or any other improvement disturbed by the repair of any private sewer or service connection. No person shall construct, relay, repair or extend any private sewer until the person making the same shall obtain a private sewer permit from the proper issuing agency or department of the City of Chubbuck. Section 501— Gravity Sewers: Replace Section 2.2 with the following: 2.2 — Gravity Sewer Pipe and Fittings: A. Solid Wall PVC Pipes Sizes 4 inch through 15 inch: ASTM D 3034 5. Minimum Wall Thickness: SDR 35 6. Joints: Joints with ASTM F 477 Elastomeric gaskets 7. Color: Green B. Solid Wall PVC Pipes Sizes 18 inch through 36 inch: ASTM F 679 1. Minimum Wall Thickness: SDR 35 2. Joints: Joints with ASTM F 477 Elastomeric gaskets 3. Color: Green C. Pressure Pipe for Gravity Sewer 1. PVC Pipe: AWWA C900-16 Class 100 psi or higher 4"-60", or ASTM D2241 Class 160 psi or higher. Match the inside diameter of the connecting non -pressure pipe, plus or minus 0.125 inches. Section 502 — Manholes: Add Section 2.1.D as follows: 2.1— Manhole Size, Type, and Strength: D. Manhole cones shall be concentric. Replace Section 2.3 with the following: 2.3 — Steps: A. No steps shall be placed in manholes. 38 Replace Section 2.6 with the following: 2.6 — Collars: A. Concrete Collars: Class 4000 psi per ISPWC Section 703 — Cast -in -Place Concrete. Add Section 2.8.0 as follows: 2.8 — Mortar and Grout: C. Any holes shall be filled and made smooth with a non -shrink grout. Replace Section 3.5.A.2.b with the following: 3.5 — Placement of Manhole Bases: A. Cast -In-place Manhole Bases 2. Over Existing Mains: b. Prior to cutting the existing pipe, construct the base and channel so wastewater can flow freely per Details SD -501 through SD -503. Once the new manhole has been pressure tested with City acceptance, saw cut the existing pipe to the spring line and remove top portion of the pipe. Section 504 — Sewer Services: Replace Section 2.2.0 with the following: 2.2 — Pipe and Fittings: C. ABS Sewer Pipe and Fittings: ASTM F628 1. Minimum Wall Thickness: Schedule 40 2. Joints: Glued per manufacture's recommendations 3. Pipe transition and connection to wye fitting shall be submitted to and approved by the City. 4. Gasketed deep bell bends are required for Type "E" sewer service installations per SD - 511. If such fittings are unavailable, this type of service line shall not be allowed for Type "E" sewer service installation. Replace Section 2.2.D with the following: D. PVC Sewer Pipe and Fittings (other than ASTM D 3034): ASTM D 1785 1. Minimum Wall Thickness: Schedule 40 2. Joints: Glued per manufacture's recommendations 3. Pipe transition shall be submitted to and approved by the City. 39 Replace Sections 3.3.A.3 through 3.3.A.5 with the following: 3.3 — Connection to Main: A. Connections for new main pipeline or pipeline replacement: 3. New sewer connection to the main shall have a prefabricated wye fitting. Flexible tapping saddles for a new connection will not be allowed unless approved by City Engineer or Sewer Superintendent. 4. Location of the service connection at the main shall be no closer than five feet (5') to the outside of the manhole. 5. Distance between service line connections along the main shall be no closer than two feet (2') from outside of hole to outside of hole between connections. 6. Sewer Service connections to manholes are Not Allowed. Remove Sections 3.3.A.6 through 3.3.A.9 in its entirety: Add Section 3.3.D as follows: 3.3. — Connection to Main D. Type "C" and Type "F" Sewer Service Line Connections as shown on SD -511 are NOT allowed. Replace Section 3.4 with the followi 3.4 — Connection to Existing Manhole: A. Sewer Service connections to existing manholes are Not Allowed. Four inch (4") connections shall be made with a saddle connection to the sewer mainline. 40 Division 700 — Concrete General Information: Concrete Mix: A. All concrete placed for public improvements, such as for sidewalks, pavement, curb, curb and gutter, valley gutters, manholes, manhole and valve collars, etc., shall be Class 4000AF or 4000BF concrete with 3/4 inch minus coarse aggregate in accordance with Section 703, unless the design engineer determines a higher strength concrete class is required. Section 703 — Cast -In -Place Concrete: Realace Section 2.4.D with the following: 2.4 —Concrete Mix D. Unless otherwise approved by the City Engineer, use Class 4000AF or 4000BF concrete with 3/4 inch minus coarse aggregate. This concrete class is required for public improvements such as pavement, sidewalks, curb, curb and gutter, valley gutters, manhole and valve collars, etc., unless the design engineer determines a higher strength concrete class is required. Add Section 3.2.C.4 as follows: 3.2 — Weather and Temperature Limitations: C. Cold Weather Limitations and Concreting Procedures: 4. In cold weather conditions, for the installation of concrete curb or sidewalk, in or along the public right of way, additional measures and special protection shall be made to prevent the concrete from being affected by the exposure of cold weather. This shall include but is not limited to ensuring the ground is not frozen. Contractor shall take additional measures to keep the concrete warm, either with insulation, heaters, and/or enclosures. Quality -control inspections described in this section may also be verified by the City, but if so, shall not remove the responsibility from the contractor. Additional inspection fees may be required at the expense of the contractor. If said protection and testing results are insufficient, the City may reject the newly installed concrete. 41 Section 706 — Other Concrete Construction: Replace Section 2.4.A.4 with the followi 2.4 — Portland Cement Concrete: A. Conform to the requirements of Section 703 - Cast -In -Place Concrete and Section 705 - Concrete Pavement, except use the following classes of concrete: 4. All concrete placed for public improvements, such as for sidewalks, pavement, curb, curb and gutter, valley gutters, manholes, manhole and valve collars, etc., shall be Class 4000AF or 4000BF concrete with 3/4 inch minus coarse aggregate in accordance with Section 703, unless the design engineer determines a higher strength concrete class is required. Add Section 3.14 as follows: 3.14 - Detectable Warning Domes: A. Detectable Warning Domes used in sidewalks shall be constructed of a prefabricated composite material. Metal, rubber, or ceramic detectable warning dome materials are not permitted. Detectable warning domes shall be yellow in color unless approved otherwise by the City. Cast iron detectable warning domes panels may be used in specific areas following approval by the City. Detectable Warning Domes shall meet the requirements of the current version of the Public Right of Way Access Guidelines (PROWAG). Detectable Warning Domes shall extend the full width of the ADA -accessible route (throat width of pedestrian ramp or full width of the pedestrian access route). Add Section 3.15 as follows: 3.15 — Curb Utility Markings: A. During the placement of new concrete curb, utility marking shall be embossed into the top of the curb. The marking shall be two inch (2") high letters and be either "SS" for sanitary sewer, "W" for water, or "I" for irrigation. The stamp shall be placed into the concrete before the concrete sets up. The letters shall be facing the street and indicate the location of the utility crossing at the curb. 42 Division 700 — Concrete City of Chubbuck Standard Drawings CSD -701 Concrete Ribbon Curb CSD -702 Concrete Scupper CSD -703 Commercial Approach 43 I I I/ I ASPHALT PER STREET DESIGN 3" 12" 4" THICK CONCRETE (6" THICK CONCRETE THROUGH DRIVEWAY AREA) 1.5% TO 2.00% f FINISH GRADE OF DRAINAGE SWALE (TOP OF SOD OR ROCK LANDSCAPING) MATCH ROAD DESIGN R=1/2" CONCRETE iT��n CD RIBBON CURB a a a a a a a 4" OF 3/4" MINUS CRUSHED BASE MATERIAL AS PER ISPWC SECTION 800 - /ac -f-- I\- r.NUReuru 1 9 A H 0 FOR PUBLIC WORKS CONSTRUCTION STANDARDS � PEEP 12" v ' , -`/v- P/, l `,'RFq 4" OF 3/4" MINUS CRUSHED BASE MATERIAL AS PER ISPWC SECTION 800 NOTES: A. MATERIALS AND CONSTRUCTION IN COMPLIANCE WITH ISPWC AND CITY OF CHUBBUCK SPECIFICATIONS. B. BASE TO BE COMPACTED TO EXCEED 95% OF STANDARD DENSITY. C. SLOPE SIDEWALK TOWARDS THE STREET NOT TO EXCEED 2% UNLESS OTHERWISE APPROVED BY CITY OF CHUBBUCK. D. CONTINUOUS PLACEMENT PREFERRED, SCORE INTERVALS 10 -FEET MAXIMUM SPACING. E. CONTACT CITY OF CHUBBUCK PRIOR TO PLACING CONCRETE. CONCRETE RIBBON CURB LAST REVISED 3/24/2026 STANDARD DRAWING NO: CSD -701 1 OF 1 1/2" EXPANSION--,, BOARD 6911 B 4'-8" 4" 4'-0" #4 REBAR SPACED @ 1/2" 10" O.C. EACH WAY EXPANSION 4 BOARD SIDEWALK J o 5" 4" OF 3/4" MINUS CRUSHED BASE MATERIAL AS PER ISPWC SECTION 800 FOR PUBLIC WORKS CHUBBUCK CONSTRUCTION STANDARDS IDDH0 VARIES 4" T-10" SECTION VIEW A -A CONCRETE SCUPPER 4" #4 REBAR SPACED @ 10" O.C. EACH WAY 1/2" EXPANSION BOARD WALK 1/2" EXPANSION BOARD SIDEWALK LAST REVISED 3/24/2026 STANDARD DRAWING NO: CSD -702 1 OF 2 B WALK A SIDE ° 'A I B 4'-8" 4" 4'-0" #4 REBAR SPACED @ 1/2" 10" O.C. EACH WAY EXPANSION 4 BOARD SIDEWALK J o 5" 4" OF 3/4" MINUS CRUSHED BASE MATERIAL AS PER ISPWC SECTION 800 FOR PUBLIC WORKS CHUBBUCK CONSTRUCTION STANDARDS IDDH0 VARIES 4" T-10" SECTION VIEW A -A CONCRETE SCUPPER 4" #4 REBAR SPACED @ 10" O.C. EACH WAY 1/2" EXPANSION BOARD WALK 1/2" EXPANSION BOARD SIDEWALK LAST REVISED 3/24/2026 STANDARD DRAWING NO: CSD -702 1 OF 2 #4 REBAR SPACED @ 10" O.C. EACH WAY SLOPE TOWARDS STREET 4 1.5% TO 2.00% FINISH GRADE FINISH GRADE - — — 4" MIN. (TOP OF SOD / (TOP OF SOD / LANDSCAPILANDSCAPING) NG) ° 2" 2'• 3" SLOPE TOWARDS POND AREA 4" OF 3/4" MINUS 1.5% TO 2.00% CRUSHED BASE MATERIAL AS PER ISPWC SECTION 800 SECTION VIEW B -B TOP OF SIDEWALK 1/2" EXPANSION BOARD #4 REBAR SPACED @ 10" O.C. EACH WAY f 4" MIN. FOR PUBLIC WORKS CHUBBUCK CONSTRUCTION STANDARDS IOHH0 3 —° 1 ELEVATION 1/2" EXPANSION BOARD FINISH GRADE (TOP OF SOD OR ROCK LANDSCAPING) A. MATERIALS AND CONSTRUCTION IN COMPLIANCE WITH ISPWC AND CITY OF CHUBBUCK SPECIFICATIONS. B. BASE TO BE COMPACTED TO EXCEED 95% OF STANDARD DENSITY. C. SLOPE SIDEWALK TOWARDS THE STREET NOT TO EXCEED 2% UNLESS OTHERWISE APPROVED BY CITY OF CHUBBUCK. D. TOP SURFACE TO BE BROOM FINISHED. E. ALL EXTERNAL CORNERS SHALL BE TROWELLED WITH 1/4" RADIUS EDGER. F. CONTACT CITY OF CHUBBUCK PRIOR TO PLACING CONCRETE. LAST REVISED 3/24/2026 CONCRETE STANDARD DRAWING NO: SCUPPER CSD -702 2 OF 2 § 2 LL / 0 F- § / z ± ¥ Oz \ 00 e>- i o z i < 0 � \ � LL \/ w \ Z�/ < I «Iw \� � k §} 6 } / F- @/ m� /O 2 i II \ƒ E $ R � 0 jwE 2a-0 7 0 0 < «ƒ m o ± E z \ ƒ ƒ < / \c f§ \i x Lu I m U) E k 7� Cl 2 o 0 I \ 0 i z \Lu \� / < /� § i co o \�/ f/ / /m b 0§ § -0 �� �0 / \ \ƒj �� \� E �\ \7 LU k/ / �c }� \i Lu 7)cd � // // �\ \\ eW < o> 7E= F- C) OL 50 jU) §� w\ 0 ji /E Lu = 0 2 z ±o e$ <I = z <E 0 0= E o _, =7 z z 00 cc Co =\2 2 EO 2» =E —ixI w w 0 e < 00 z -J _j / u « a d 6 E z d ƒ� I mw§} F- W 2 = \ \�o i§?/ / Lu 0 \ /\/ 0 }ƒ\$ > 2 \// /b/\ >z \\/ I0 E CL w()w �0-\ �p� @� 0 �o / IQo � ƒ%f / § �F 0 o f 7 \/ m 0 ƒ ' FOR PUBLIC WORKS LAST REVISED 3/24/2026 CHUBBUCK CONSTRUCTION NO: STANDARDS COMMERCIAL STANDARD DRAWING IDRH] APPROACH CS D_703 1OF1 Division 800 — Aggregates and Asphalt General Information: Asphalt Mix: A. For all asphalt placed for public improvements in or outside the public right of way, such as for walking paths, road surface, etc., the type of asphalt mix design shall be identified on the construction plans either on a street cross section or a construction call out. Construction plans/notes shall also indicate thickness and type of road base and subbase material and subgrade separation fabric. Section 810 — Plant Mix Pavement: Add Section 2.1.1 and Section 2.1.J as follows: 2.1— Hot Mix Asphalt Design: Plant mix pavement shall be Superpave HMA Class SP3 with 1/2" minus aggregate. Percentage of RAP by total weight of aggregate shall not exceed 22 percent. Up to 17 percent of RAP by weight of the total binder in the plant mix may be used. A minimum of five (5) business days prior to installation, the contractor shall submit to the City of Chubbuck, for approval, a job mix formula for each mix required on the project. The job mix formula shall be prepared by an independent testing laboratory approved by the City of Chubbuck. Replace Section 2.3.A.1 with the following: 2.3 —Asphalt: A. Material to meet requirements of Section 805 —Asphalt 1. Asphalt shall be PG 58-28 and conform to Section 702 of Idaho Highway Transportation Department Standard Specifications for Highway Construction and conform to ISPWC Section 805. Add Section 2.9 as follows: 2.9 - Detectable Warning Domes: A. Detectable Warning Domes used in asphalt pavement pathways shall be constructed of a prefabricated composite material. Metal, rubber, or ceramic detectable warning dome materials are not permitted. Detectable warning domes shall be yellow in color unless approved otherwise by the City. Cast iron detectable warning domes panels may be used in specific areas following approval by the City. 48 Detectable Warning Domes shall meet the requirements of the current version of the Public Right of Way Access Guidelines (PROWAG). Detectable Warning Domes shall extend the full width of the ADA -accessible route (throat width of pedestrian ramp or full width of the pedestrian access route). 49 Division 900 — Pressure Irrigation General Information: Requirement: A. All developments with appurtenant agricultural water rights shall be required to construct a secondary pressure irrigation system. If the irrigation system will be dedicated to the City, it shall be designed and constructed to the standards of this section to utilize the water rights for the development. Such secondary pressure irrigation systems will be dedicated to and accepted by the City as a utility and the City will assume ownership and operation of the system. Dedicated secondary irrigation systems shall be designed and constructed in accordance with these standards and the current edition of the City of Chubbuck - Pressure Irrigation Design Specification Manual. Pressure Irrigation Pipe: A. All such pressure irrigation pipe extensions and installations shall be in dedicated public right of way areas and shall extend the full length of the frontage of the property being served unless determined to be unnecessary by the City. B. Sizing: In areas with new development, the City of Chubbuck shall require a hydraulic analysis to verify adequate system pressure and flows. If a proposed pressure irrigation system will be a part of a larger phased development, it is required that the larger development be considered in the hydraulic evaluation. A hydraulic analysis that includes a larger development may be satisfactory to meet the hydraulic analysis requirement for a multi- phase development. Hydraulic model boundary conditions including irrigation water supply and flow controls shall be clearly defined. Summary of design criteria used, including water demands, peaking factors, pipe roughness, etc. should be included. Pressure irrigation pipe shall be sized to meet or exceed the minimum sizes demonstrated in the hydraulic analysis. The pressure irrigation system shall be designed in accordance with the current edition of the City of Chubbuck - Pressure Irrigation Design Specification Manual. 50 C. Inside Easements: The City of Chubbuck may require or allow pressure irrigation pipe to be installed in utility easements if it is deemed necessary for the good of the pressure irrigation system. Depending upon site specific conditions, pressure irrigation pipe located in an easement outside of road right-of-way may be required to be fused HDPE pipe as determined by the City Engineer. Access to all pressure irrigation structures shall be provided by easements of no less than twenty feet (20') in width, centered over the irrigation structure to maintain ten feet (10') from the easement sideline. Greater easement width may be required in special circumstances. D. Pipe Cover: The top of pipe to finish grade for all pressure irrigation pipe and irrigation service lines shall be a maximum of four feet (4') and minimum two and half feet (2.5'). In some special cases, with the approval of the City Engineer, the pressure irrigation pipe may be installed deeper below other utilities or at areas where air entrapment might otherwise occur, given the extents of the pipe greater than four feet (4') deep is minimized and appropriate drains are provided. E. Mainline Coupling: Mainline couplings should be used to a minimum, and only following approval of the City Engineer or Water Superintendent. Pressure Irrigation Valves: A. All pressure irrigation mainline valves and fittings located near other fittings shall be required to be flanged. B. Location: Pressure irrigation mainline valves shall be installed on all directions of the pressure irrigation pipe including all crosses or tees unless otherwise approved by the City. C. Spacing: The maximum distance between pressure irrigation mainline valves shall be fifteen hundred feet (1500') as measured following the distribution irrigation pipe. D. Air entrapment: At all high points in the pressure irrigation pipe where air entrapment is likely to occur, 51 combination air release / air vacuum valves shall be required. Valve sizing calculations shall be provided by the design engineer, and the size and model indicated on the construction plans. Adequate space shall be provided inside a standard manhole to allow for easy access and maintenance. The size and height of all fittings shall be verified. Pressure Irrigation Drain: A. An irrigation drain shall be required at all low points in the pressure irrigation system and at regular spacing to allow the irrigation system to completely drain. The drain and all its appurtenances shall be constructed in accordance with manufacturer's recommendations and City of Chubbuck Standard Drawing CSD -902 (Pressure Irrigation Drain). B. Spacing: The maximum distance between irrigation drains shall be eight hundred feet (800') as measured following the distribution irrigation pipe. Pressure Irrigation Service: A. Location: Upon designing the subdivision, the City of Chubbuck recommends the developer or home builder determine the ideal location of the irrigation service box for each subdivision lot prior to installation. The location should be along the street frontage in future landscape areas within the utility easement, outside the driveway, and readily accessible to the homeowner and City of Chubbuck. After the irrigation service box is in place, if it is determined to be in an undesirable location, the contractor or homeowner may relocate the irrigation service box, following City approval, without disconnecting irrigation fittings or cutting the irrigation service line. Relocation will be allowed if it is possible to swing the irrigation service box and fittings, remaining intact, one direction or other to remain behind the sidewalk. Splices or junctions in the service pipe between the mainline and the service box are not allowed. Prior to relocation, the contractor or homeowner shall notify the City's public infrastructure inspector. B. Maintenance: The City of Chubbuck owns and the Public Works Department shall maintain all completed pressure irrigation service lines after installation from the point of connection at the irrigation main through the irrigation service box in cases where the irrigation service box is set at the nearest property line abutting the pressure irrigation main, or to the nearest property line abutting the main in cases where the irrigation service box is otherwise not adjacent to the nearest property line abutting the main. 52 C. Repairs: If repairs or replacement of any irrigation service line or irrigation service box is rendered necessary by the act, neglect, or carelessness of the owner or occupant of the premises, any expense incurred by the City of Chubbuck for the repair or replacement shall be charged against and collected from the property owner. Backflow Prevention Device: A. Requirement: Any physical arrangement whereby a potable (domestic) water supply is connected, directly or indirectly, with the pressurized irrigation system shall require a backflow prevention device at the expense of the contractor or property owner. B. Installation: The backflow prevention device and appurtenances shall be installed in accordance with manufacturer's recommendations and City of Chubbuck Standard Drawing CSD -903 (1" Backflow Prevention Device). C. Testing: Testing and maintenance of the backflow prevention device shall be the responsibility of the property owner. Backflow prevention devices installed pursuant to this chapter, except atmospheric vacuum breakers, shall be inspected and tested annually, or more often if deemed necessary by the City Engineer. Inspections, tests and maintenance shall be conducted at the property owner's expense. Whenever the devices are found to be defective, they shall be repaired, overhauled, or replaced at the owner's expense. Inspections, tests, repairs and records thereof shall be accomplished by certified testers and written test reports forwarded to the City Engineer. D. City Code: Refer to City Code 13.08.120 and 13.12 for the City's complete Cross Connection Control requirements and codes. Section 901— Pressure Irrigation Pipe and Fittings: Rer lace Section 2.2.A.1 with the followi 2.2 — Polyvinyl Chloride (PVC) Pipe and Fittings: A. PVC Pressure -Rated Pipe: ASTM D 2241 53 1. Pressure Class: 200 PSI (DR -21) minimum Add Section 2.2.A.6 as follows: 6. Color: Purple Replace Section 2.2.13 with the following: B. PVC Pressure Pipe Sizes 4 inch through 36 inch for Irrigation: ANSI/AWWA C 900-16 1. Pressure Class: 200 PSI (DR -21) minimum 2. Outside Diameter Basis: Cast Iron (CI) pipe equivalent 3. Joints: Bell and spigot end with ASTM F 477 elastomeric gaskets 4. Color: Purple Remove Section 2.2.C.2 in its entirety: Replace Sections 2.11 and 2.12 with the following: 2.11— Locate Wire: A. Type: (No 12 AWG) single strand 12 -gauge copper clad steel (CCS) wire with purple high density polyethylene (HDPE) insulated jacket coating for direct bury. B. Splicing: 3M DBR direct bury splice kit or City approved equivalent and shall be watertight to provide electrical continuity. 2.12 — Warning Tape: A. Type: 6" wide metallic warning tape, purple polyethylene vinyl labelled "NON -POTABLE WATER" or "IRRIGATION WATER". Add Section 2.13 and 2.14 as follows: 2.13 — Mechanical Restraint: A. Type: Standard mechanical joint restraint gland, restraint devices for MJ fittings and appurtenances to conform to ANSI/AWWA C 111/A21.11 or ANSI/AWWA C 153/A21.53. B. Product: EBAA iron series 2000 PV (PVC Pipe) or EBAA Iron Series 1100 Megalug (Ductile Iron Pipe) or approved substitution, and to meet requirements of ASTM F 1674. An identification number consisting of year/day/plant/shift to be cast into each gland body from which to trace test results. C. Application: Approved for above -grade installation. All mechanical joint fittings below grade shall be mechanically restrained using mechanical restraints meeting the requirements of ISPWC Section 401.2.9. Mechanical restraints shall be in addition to thrust blocks. 2.14 — Mainline Tapping Saddle: A. Tapping saddle shall conform to AWWA C223. 54 B. Pressure Class: Minimum 175 psi C. Connection: Flange D. Manufacturer and Model: Romac SST, Mueller H304, or Ford FAST Replace Section 3.2.0 with the following: 3.2 — Pipe Installation: O. Locate wire shall be secured to the crown of the pipe with suitable tape every 8 to 10 feet along the buried pressure irrigation pipe. Add Sections 3.2.R and 3.2.S as follows: R. Install 6" wide metallic warning tape, purple polyethylene vinyl labelled "NON -POTABLE WATER" or "IRRIGATION WATER"6" to 12" below road base. S. Where fittings are located adjacent to other fittings, all fittings shall have flanged connections between fittings. Add Section 3.6.0 as follows: 3.6 — Pressure Testing: C. Once the pressure test has passed and is acceptable to City of Chubbuck, it will be the contractor's responsibility to drain water from the pressure irrigation system. The contractor shall open all applicable irrigation branch valves, drain valves, and ball valves inside the irrigation service boxes. The City of Chubbuck may require the contractor to effectively clear out the pressure irrigation system of lingering water with a sufficient air compressor, to be observed by the City's Water Department personnel. Replace Section 3.7 with the following: 3.7 — Locate Wire: A. Locate wire shall be secured with suitable tape every 8 to 10 feet along the buried pressure irrigation pipe. The locate wire shall interconnect to the locate wire of each irrigation service line with 3M DBR direct bury splice kit or City approved equivalent and shall be watertight to provide electrical continuity. Locate wire shall be tested for continuity prior to road subgrade preparation. Any wire found not to be continuous after testing shall be repaired or replaced to City satisfaction by the contractor prior to roadway construction. Replace Section 3.8.A with the following: 3.8 — Pipe Markers: A. Install 6" wide metallic warning tape, purple polyethylene vinyl labelled "NON -POTABLE WATER" or "IRRIGATION WATER" 6" to 12" below road base. 55 Add Section 3.10.D as follows: 3.10 — Connections to Existing Pressure Irrigation Mains: D. For connections to existing pressure irrigation mains or stubs, the City will require, when applicable, the removal of the existing irrigation pipe up to the nearest bell or spigot, starting the new pipe installation at that location. Add Sections 3.12 and 3.13 as follows: 3.12 — Mechanical Joint Fittings: A. All mechanical joint fittings below grade shall be mechanically restrained using mechanical restraints meeting the requirements of ISPWC Section 401.2.9. Mechanical restraints shall be in addition to thrust blocks. 3.13 — Mainline Tapping: A. For live taps onto a charged portion of the city's pressure irrigation system, all materials will be provided and installed by the contractor or customer and the tapping will be performed by City of Chubbuck staff. In no case shall a non -City of Chubbuck personnel operate any part of the city's pressure irrigation system without prior written authorization of the City Engineer or Water Superintendent. B. When a new pressure irrigation connection is required for a new development, etc. the contractor will be required to excavate around the existing pressure irrigation pipe and the trench shall be sufficient to allow the city's tapping crew enough space at each location to safely make the tap without any additional excavation. The adequacy and safety of the excavation shall be at the sole discretion of the city's tapping crew. If the city's tapping crew determines that any excavation does not meet City standards, the crew shall have the option to refuse to make the tap and will reschedule at least 2 days hence. C. The contractor shall provide all needed materials to make the connection to the existing pressurized irrigation system and the City of Chubbuck shall preform the tap connection for all new pressure irrigation pipe of twelve inches (12") or less. Live tap connections for all pressure irrigation pipe larger than twelve inches (12") shall require third party contractor. This connection will be at the expense of the developer or contractor and must be observed and inspected by the city's water department personnel. Section 902 — Pressure Irrigation Valves: Add Sections 2.1.D through 2.1.G as follows: 2.1—Valve Size, Type, and Strength: D. Gate valves are required for pressure irrigation pipe less than 12 inches in diameter. E. Butterfly valves are required for pressure irrigation pipe of 12 inches in diameter or larger. 56 F. If system pressures are expected to exceed 100 psi, a valve rated with a working pressure equal to or greater than the test pressure shall be required. G. Under special circumstances a 12 -inch gate valve may replace the butterfly valve, under approval of City Engineer. Reolace Section 2.2.A.8 with the followi 2.2 — Resilient Seated Gate Valves: A. Resilient Seated Gate Valves and Reduced Wall Resilient Seated Gate Valves for Water Supply Service: ANSI/AWWA C 509 and/or ANSI/AWWA C 515 (ductile iron only): 8. Manufacturer: Kennedy Valve Co., Mueller, Clow Valve Co., or City approved equivalent. Replace Section 2.3.A.10 with the following: 2.3 — Butterfly Valves: A. Rubber Seated Butterfly Valves: ANSI/AWWA C 504 10. Manufacturer: Kennedy Valve Co., Mueller, Clow Valve Co., or City approved equivalent. Add Section 2.4.A.5 as follows: 2.4 —Air Release, Air/Vacuum and Combination Air Valves: A. Air Release/Air Vacuum and Combination Air Valves: ANSI/AWWA C 512. 5. Manufacture and Model: Val -Matic 800 Series Single Body Wastewater Combination Valve 80xA or DeZURIK/APCO series 440 SCAV Single Body Sewage Combination Valve or City approved equivalent. Replace Section 2.6 with the followi 2.6 —Valve Boxes: A. Paved or Traffic Areas: 1. Valve boxes in accordance with ISPWC Section 401 and City of Chubbuck Standard Drawing CSD -405 (Valve Box and Lid) B. Non -Traffic Areas: 1. Valve boxes in accordance with ISPWC Section 401 and City of Chubbuck Standard Drawing CSD -405 (Valve Box and Lid), however concrete collars not required. 57 Replace Sections 3.2.A and 3.2.13 with the following: 3.2 — Installation: A. Install valves and appurtenances in accordance with manufacturer's recommendations and City of Chubbuck Standard Drawings. B. Install valves plumb and vertical. Set valve box centered and plumb over wrench nut and flush with ground or street surface. Install box per City of Chubbuck Standard Drawing CSD -405 (Valve Box and Lid) Section 903 — Pressure Irrigation Service Lines and Appurtenances: Add Sections 2.1.D as follows: 2.1— Pipe and Fittings Size, Type and Strength: D. Pipe over two inches (2") in diameter shall meet the requirements of the pressure irrigation pipe and fittings specified in ISPWC Section 901. Replace Section 2.2.A with the followi 2.2 — Service Pipe and Fittings: A. Polyvinyl Chloride (PVC) Service Pipe Not Allowed Remove Section 2.2.13.5 in its enti Add Section 2.2.13.6 as follows: B. Polyethylene (PE) Pressure Pipe for Water Service: ANSI/AWWA C 901 6. Color: Black or Blue with hand painted purple stripes along the length of the service pipe. Replace Section 2.3.A with the following: 2.3 —Appurtenances: A. Service Saddles for PVC Main: 1. Service line fittings (service saddle, corporation stop, etc.) shall be manufactured by Ford or Romac as detailed in the City of Chubbuck Standard Drawings . 2. All service saddles shall include double strap stainless steel bands. Saddle bodies shall be iron or brass. Iron saddles bodies shall be lined and coated with fusion -bonded epoxy, nylon, or approved substitution. Lining or coating per manufacture's specifications. 58 Replace Section 2.3.C.1 with the following: C. Service Valves: 1. Type: 200 psi rated ball valves, Watts WBVC or City approved equivalent as detailed in the City of Chubbuck Standard Drawings CSD -901 (1" Pressure Irrigation Service). Remove Section 2.3.C.4 in its entirety: Replace Section 2.3.E with the following: E. Irrigation Service Box: 1. Size and Type: For landscape areas, the irrigation service box shall be 18" x 24" Fiberglass Vault with Lid marked "Irrigation", Carson 12201014 or City approved equivalent as detailed in the City of Chubbuck Standard Drawings CSD -901 (1" Pressure Irrigation Service). For driveway areas, the irrigation service box shall be a minimum size of 24" x 24" inside dimensions and shall meet ANSI/SCTE 77—TIER 15 load requirements (15,000 LBS). Before the driveway is poured, an additional 2" minimum diameter sleeve shall be installed below the driveway from the irrigation service box to the landscape area. 2. Marking Tag: Inside the irrigation service box, there shall be two (2) plastic tags at 10 mil minimum thickness with a metal grommet, securely fastened by the contractor to the ball valves or fittings. The first tag shall be supplied by the City and clearly marked "Property of City of Chubbuck, DO NOT MODIFY". The second tag shall be supplied by the contractor and be purple and clearly marked "Non -Potable Water, DO NOT DRINK". Add Sections 2.3.F and 2.3.G as follows: F. Corporation Stops: 1. Product: Ford F1001 -4 -G -NL with CC threads G. Locate Wire: 1. Type: (No 12 AWG) single strand 12 gauge copper clad steel (CCS) wire with purple high density polyethylene (HDPE) insulated jacket coating for direct bury. Replace Section 3.2.A with the following: 3.2 — Installation: A. Install irrigation service line, fittings, and irrigation service box in accordance with the manufacturer's recommendations and City of Chubbuck Standard Drawing CSD -901 (1" Pressure Irrigation Service). 59 Add Sections 3.21 and 3.2.M as follows: L. Locate wire shall be secured with suitable tape every 8 to 10 feet along the buried irrigation service pipe. Locate wire shall interconnect to the locate wire of the pressure irrigation main with 3M DBR direct bury splice kit or City approved equivalent and shall be watertight to provide electrical continuity. Locate wire shall be minimum of 24" of excess wire beyond the ball valve as shown on the City of Chubbuck Standard Drawings CSD -901 (1" Pressure Irrigation Service). M. When irrigation service lines are required to be abandoned, the pressurized irrigation service pipe shall be disconnected at the point of connection to the pressure irrigation main and shall be plugged with a brass plug. The City shall witness that no leaks occur prior to any placement of bedding material. Add Section 3.4 as follows: 3.4 —Mechanical Restraint: Application: All mechanical joint valves below grade shall be mechanically restrained using mechanical restraints meeting the requirements of ISPWC Section 401.2.9. Mechanical restraints shall be in addition to thrust blocks. .0 Division 900 — Pressure Irrigation City of Chubbuck Standard Drawings CSD -901 1" Pressure Irrigation Service CSD -902 Pressure Irrigation Drain CSD -903 1" Backflow Prevention Device 61 ( z Z 0 J OU�o Z z aZ cn�: Oo (DZ�o� Qc N Lu O p U Q Q Q EASEMENT LINE j Z Y Z m OHUZf- wL: OO d LL W U Z W w � z Z � ui 3: o _O o = z_wwQ z H >_w g U 3= ���� LU N (n p Q c J co r Q H kis co 00 w a cD z Z of o M 2 0LLJ HU pLLZ H 0wLL izz Y HZ 0-0 U g w� w i z > a D U pC7pww o z 0 } mz���0 wc~i�0PZU)co W o 2 Q Z w M W z J L Z of W Q Z X U�2mZ �oWQzp� z gQ LL. pwz-0 wP:w zZ O p O O Q m� Z J W 2 Q J U) N H- 0- I-Q<O �0ma0p LL ()z <0- 0(D w w< cl. �=w< W Hc)WO NUcnO��� Lo cn U) U) N — ► J N >Q W N 0 cn r FOR PUBLIC WORKS CHUBBUCK CONSTRUCTION LAST REVISED 3/24/2026 STANDARDS 1" PRESSURE STANDARD DRAWING NO: D R H 0 IRRIGATION SERVICE CSD -901 1 OF 2 MATERIAL LIST: 1. WATER MAIN (PVC, HDPE, OR DUCTILE IRON) PRESSURE CLASS 200 PSI (DR -21) MINIMUM, SEE MATERIAL SPECIFICATIONS. 2. 1" CORPORATION STOP W/ CC THREADS (FORD F1001 -4 -G -NL) 3. 1" IRRIGATION SERVICE LINE (POLYETHYLENE SIDR-7, BLACK OR BLUE WITH HAND PAINTED PURPLE STRIPES ALONG THE LENGTH OF THE SERVICE PIPE, SEE MATERIALS SPECIFICATIONS) NO SPLICES OR FITTINGS ALLOWED BETWEEN CORPORATION STOP AND VALVE ASSEMBLY. 4. FOR LANDSCAPE AREAS THE IRRIGATION SERVICE BOX SHALL BE 18" x 24" FIBERGLASS VAULT W/ LID, CARSON 12201014 OR CITY APPROVED EQUIVALENT. FOR DRIVEWAY AREAS THE IRRIGATION SERVICE BOX SHALL BE A MINIMUM SIZE OF 24" x 24" INSIDE DIMENSIONS AND SHALL MEET ANSI/SCTE 77 - TIER 15 LOAD REQUIREMENTS (15,000 LBS). BEFORE THE DRIVEWAY IS POURED ADDITIONAL 2" MINIMUM SLEEVE SHALL BE INSTALLED BELOW THE DRIVEWAY FROM THE IRRIGATION SERVICE BOX TO THE YARD. 5. SERVICE SADDLE FOR PVC MAIN: 8" PVC (FORD FCD202-905-TAP-CC4) OR (ROMAC 202S - 905 x 1" CC) 10" PVC (FORD FCD202-11 1 0-TAP-CC4) OR (ROMAC 202S - 1110 x 1" CC) 12" PVC (FORD FCD202-1320-TAP-CC4) OR (ROMAC 202S - 1320 x 1" CC) 6. 1" BALL VALVE (WATTS WBVC) OR APPROVED EQUIVALENT 7. 1" BRASS TEE 8. 1" BRASS 90° STREET ELBOW 9. SUPPLIED BY THE CITY, PLASTIC TAG (10 MIL MINIMUM THICKNESS) MARKED "PROPERTY OF CITY OF CHUBBUCK, DO NOT MODIFY" SEE MATERIAL SPECIFICATIONS 10. SUPPLIED BY THE CONTRACTOR, PLASTIC TAG (10 MIL MINIMUM THICKNESS) PURPLE AND MARKED "NON -POTABLE WATER, DO NOT DRINK" SEE MATERIAL SPECIFICATIONS 11. LOCATE WIRE (NO. 12 AWG. COPPER CLAD STEEL (CCS) W/ PURPLE INSULATED JACKET COATING) 12. LOCATE WIRE SPLICE CONNECTER (3M DBR DIRECT BURY SPLICE KIT) SEE MATERIAL SPECIFICATIONS 13. 1" PIPE NIPPLE (4" IN LENGTH) 14. 1" PIPE NIPPLE (2" IN LENGTH) 15. TYPE I PIPE BEDDING PER SECTION -305 OF ISPWC 16. 1" STAINLESS STEEL OR BRASS UNION WITH (2) 1" PIPE NIPPLES (1" IN LENGTH) EACH SIDE NOTES: A. CUL-DE-SAC IRRIGATION SERVICE LATERALS MUST FOLLOW THE MOST DIRECT ROUTE POSSIBLE BETWEEN CORPORATION STOP AND IRRIGATION SERVICE BOX. B. IRRIGATION SERVICE LINE CONNECTION MUST BE A MIN. OF 2 FT. BEHIND EASEMENT LINE. C. ALL CONSTRUCTION SHALL CONFORM TO THE REQUIREMENTS OF THE CITY OF CHUBBUCK AND THE IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION. D. PRIOR TO BACKFILLING THE CITY OF CHUBBUCK SHALL INSPECT INSTALLATION OF THE PRESSURE IRRIGATION PIPE, IRRIGATION SERVICE LINE, AND IRRIGATION SERVICE BOX. E. WHEN USING ROADSIDE DRAINAGE SWALE TYPICAL STREET SECTION SET TOP OF METER BOX 3" TO 4" ABOVE TOP BACK OF CURB. F. ALL FITTING SHALL BE BRASS COMPRESSION WITH INSERTS. CHUBBUCK IDDH0 FOR PUBLIC WORKS CONSTRUCTION LAST REVISED 3/24/2026 STANDARDS 1 1" PRESSURE STANDARD DRAWING NO: IRRIGATION SERVICE I CSD -901 2 OF 2 Q O ry - / I -44�4 c N — CHUBBUCK I D R H 0 FOR PUBLIC WORKS CONSTRUCTION STANDARDS PRESSURE IRRIGATION DRAIN LAST REVISED 3/24/2026 STANDARD DRAWING NO: CSD -902 1 OF 2 MATERIAL LIST: 1. TEE (FLG X MJ) 2. GATE VALVE (FLG X MJ) 3. CONCRETE THRUST BLOCK PER ISPWC SPECIFICATIONS 4. 2 CY OF 3" WASHED DRAIN ROCK 5. NONWOVEN FILTER FABRIC AROUND DRAIN ROCK, 1' OVERLAP MIN. 6. TYPE I BEDDING PER SECTION 305 OF ISPWC 7. CAST IRON VALVE BOX (SEE CITY OF CHUBBUCK STANDARD DRAWING CSD -405) 8. IRRIGATION DRAIN LATERAL TO BE SAME DIAMETER OF PIPE AS MAINLINE (DUCTILE IRON OR PVC) 9. LOCATE WIRE (NO. 12 AWG. COPPER CLAD STEEL (CCS) W/ PURPLE INSULATED JACKET COATING) 10. LOCATE WIRE SPLICE CONNECTER (3M DBR DIRECT BURY SPLICE KIT) SEE MATERIAL SPECIFICATIONS 11. MECHANICAL RESTRAINT IN ADDITION TO THRUST BLOCKS NOTES: A. DRAIN SHALL BE LOCATED AT ALL LOW SPOTS ALONG THE PRESSURE IRRIGATION SYSTEM. B. THE END OF THE IRRIGATION DRAIN LATERAL SHALL BE CENTERED BELOW THE ROADSIDE DRAINAGE SWALE. CHUBBUCK IDDH0 FOR PUBLIC WORKS CONSTRUCTION STANDARDS LAST REVISED 3/24/2026 PRESSURE STANDARD DRAWING NO: IRRIGATION DRAIN I CSD -902 2 OF 2 Z_ Lu Q LLI Lu DZ Q 000 w0 w~ Z Q QQn U UHZ J O� Q — Z ti Q r` O qO LC w (N co Q % Z Z _O X Y o U Lu m 0 � In w m (n U U o > = O o Lo W U Z Z ° z U Q co i Q X o 0 O ~ D g m Q U } YY U) U C) L) u1UU W Q F-- m U 0 2i m z Q co J]fD§ w=Q U) QLo foo -i�Q mCJ� H w Q M Owl- 0- cf) U) Li cr w Q �i w w In JZ Q <0 Q �= OLu Lu 0 �w Q <~ o� O a_ FOR PUBLIC WORKS CHUBBUCKCONSTRUCTION LAST REVISED 3/24/2026 STANDARDS 1" BACKFLOW STANDARD DRAWING NO: I D D H 0 PREVENTION DEVICE CSD -903 1 OF 2 CHUBBUCK IDDH0 MATERIAL LIST: 1. 1" POTABLE WATER SERVICE LINE (POLYETHYLENE) 2. 1" IRRIGATION SERVICE LINE (POLYETHYLENE) 3. PVC VALVE SLEEVE W/ CAP 4. 1" BRASS STOP AND WASTE VALVE 5. 1" REDUCED PRESSURE PRINCIPAL BACKFLOW PREVENTION DEVICE (RP), TO BE TESTED ANNUALLY MAKE MODEL WATTS RK009M2 ZURN WILKINS 1-375 FEBCO LF860 OR APPROVED DEVICE OR ASSEMBLY LISTED ON FOUNDATION FOR CROSS CONNECTION CONTROL HYDRAULIC RESEARCH 6. 1" BRASS 90° ELBOW W/ COMPRESSION FITTINGS 7. 1" BRASS TEE W/ COMPRESSION FITTINGS. NOTES: A. THIS TYPE OF INSTALLATION IS ONLY REQUIRED WHEN CROSS CONNECTION IS TAKING PLACE BETWEEN THE POTABLE AND NON POTABLE WATER. B. THE BACKFLOW PREVENTION DEVICE SHALL BE THE EXPENSE AND RESPONSIBILITY OF THE WATER USER TO HAVE A CERTIFIED INSPECTION AND OPERATIONAL TEST AT LEAST ONCE A YEAR. C. TO PROTECT THE BACKFLOW PREVENTION DEVICE AND APPURTENANCES FROM WATER FREEZING IN WINTER CONDITIONS TO CLOSE THE STOP AND WASTE VALVE AND EFFECTIVELY CLEAR OUT THE PRESSURE IRRIGATION SYSTEM OF LINGERING WATER. FOR PUBLIC WORKS CONSTRUCTION STANDARDS 1" BACKFLOW PREVENTION DEVICE LAST REVISED 3/24/2026 STANDARD DRAWING NO: CSD -903 2 OF 2 Division 1100 —Traffic Section 1102 — Street Lighting: Replace Section 2.10.0 with the following: 2.10 — Metal Poles: C. Install metal pole with a concrete base following City of Chubbuck Standard Drawing CSD - 1101 (Street Light Installation) and ISPWC Standard Drawing SD -1109 (Standard Signal Pole Foundation Detail). Replace Section 2.11 with the following: 2.11— Fiberglass Poles Not Allowed Replace Section 2.13.A with the following: 2.13 — Concrete Pole Bases: A. Concrete to be Class 4000 psi meeting the requirements of ISPWC Section 703 — Cast -in - Place Concrete. Replace Section 3.2.A with the followi 3.2 —Junction Box Installation: A. Install to locations as shown on the plans and at the power source following City of Chubbuck Standard Drawing CSD -1101 (Street Light Installation). If not shown, space equidistant not to exceed 400 feet along straight conduit runs occur, at sharp bends, wire splices, or where direct burial and conduit junctions occur. Between junction boxes that are spaced beyond 200 feet, a minimum of 1-1/2" diameter conduit shall be used. Replace Section 3.8.F with the following: 3.8 — Concrete Pole Bases: F. Base dimensions and installation details shall conform to City of Chubbuck Standard Drawing CSD -1101 (Street Light Installation) and ISPWC Standard Drawings SD -1109 and SD -1116. Replace Section 3.9.13 with the following: 3.9 — Pole Installation: B. Install wood poles in accordance with ISPWC Standard Drawing SD -1118. Install metal poles in accordance with City of Chubbuck Standard Drawing CSD -1101 (Street Light Installation) and ISPWC Standard Drawings SD -1109 and SD -1116. Section 1105 — Permanent Traffic Signing: Add Section 2.2.E as follows: 2.2 — Signs: E. Street Name Signs to follow layout and sizing as shown on City of Chubbuck Standard Drawing CSD -1102 (Street Name Sign). Division 1100 —Traffic City of Chubbuck Standard Drawings CSD -1101 Street Light Installation CSD -1102 Street Name Sign 70 1 of FUSED "IN-LINE" TYPE WIRE CONNECTOR ninTc:c• SET SCREW TYPE ONLY A. THE CONTRACTOR SHALL VERIFY LINE VOLTAGE PRIOR TO CONNECTING WIRE CONNECTORS. B. CONTRACTOR SHALL CONNECT CONDUCTOR FROM THE WIRE CONNECTOR TO NEW LUMINAIRE WITH A NO. 10 AWG. TYPE THW. 600V INSULATED WIRE. C. FOR CONCRETE BASE DETAILS SEE IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION (ISPWC) STANDARD DRAWING SD -1109. D. GROUND ROD MAY BE PLACED IN LIEU OF CONNECTION TO REBAR CAGE. E. 1-1/2" CONDUIT IS REQUIRED WHEN THE DISTANCE BETWEEN JUNCTION BOXES ARE 200 FEET OR GREATER. INSTALL JUNCTION BOX, NEW BASIS PCA 173018 (OR APPROVED EQUIVALENT) TO BE SET WITHIN 3 FEET OF POWER COMPANY J -BOX OR TRANSFORMER. POWERFUSED COMPANY J -BOX J -BOX OR ANSFORM R NEC CODE APPROVED - CONNECTOR HAND HOLE - NEC CODE APPROVED GROUNDING CONNECTOR 0 Z INSTALL FUSE: FAST ACTING -100K RMS MIN. 1" CONDUIT AMPS-600VAC SEC D ¢ 0w 0 MODEL 1791 -DF OR SEC z w O MODEL 1791 -SF (OR 2i d U APPROVED EQUIVALENT). Lu W �0z NEC CODE. JUNCTION T BOX / I - 64 �(t CA - CHUBBUCK I D R H 0 FOR PUBLIC WORKS CONSTRUCTION STANDARDS LED LUMINAIRE PHOTO CELL (TWIST LOCK TYPE) MARK P.E. CONTROL & LAMPS WITH INSTALLATION DATE. INSTALL FUSE: FAST ACTING -100K RMS AMPS-600VAC SEC MODEL 1791 -DF OR SEC MODEL 1791 -SF 1791 -SF (OR APPROVED EQUIVALENT). #10 MIN. WIRES FROM FUSE CONNECTOR TO FIXTURE. #6 MIN. WIRES FROM POWER SOURCE TO FUSE CONNECTOR. CONDUIT & WIRING MIN. 1" CONDUIT TO NEXT STREET (SCHEDULE 40 PVC UL� LIGHT IN SYSTEM APPROVED) SIZE MY VARY PER NEC CODE, NOTES: WIRE COLORS PER ADDITIONAL J -BOX (PULL BOX) IS NEC CODE. I REQUIRED WHEN THE DISTANCE BETWEEN THE STREET LIGHT GROUND ROD (PER AND FUSED JUNCTION BOX IS 50 NEC ARTICLE j FEET OR GREATER. 250 -GROUNDING — WHEN SPLICE REQUIRED USE BONDING PER NEC I SEC MODEL 0791-0 SPLICE KIT, ARTICLE 230 -SERVICE). OR APPROVED EQUIVALENT / I - 64 �(t CA - CHUBBUCK I D R H 0 FOR PUBLIC WORKS CONSTRUCTION STANDARDS LED LUMINAIRE PHOTO CELL (TWIST LOCK TYPE) MARK P.E. CONTROL & LAMPS WITH INSTALLATION DATE. INSTALL FUSE: FAST ACTING -100K RMS AMPS-600VAC SEC MODEL 1791 -DF OR SEC MODEL 1791 -SF 1791 -SF (OR APPROVED EQUIVALENT). #10 MIN. WIRES FROM FUSE CONNECTOR TO FIXTURE. #6 MIN. WIRES FROM POWER SOURCE TO FUSE CONNECTOR. HEIGHT 4" TO 6" 1/2" X 6" P.V.C. CONDUIT SLEEVE FILL TOP 2" WITH SILICONE GROUT. �\ HEIGHT 4" TO 6" 1/2" X 6" P.V.C. CONDUIT SLEEVE FILL TOP 2" WITH SILICONE GROUT. NEC CODE APPROVED GROUNDING CONNECTOR STREET LIGHT INSTALLATION 4000 PSI CONCRETE LAST REVISED 3/24/2026 STANDARD DRAWING NO: CSD -1101 1 OF 1 1" CONDUIT ° 4' (SCHEDULE 40 PVC UL APPROVED) USED AS SLEEVE a FOR DRIP TUBING TO ABOVE HANGING a a PLANTER. DIRECTION OF CONDUIT TO BE ACCESSIBLE, NOT BELOW HARD SURFACE SUCH AS SIDEWALK. NEC CODE APPROVED GROUNDING CONNECTOR STREET LIGHT INSTALLATION 4000 PSI CONCRETE LAST REVISED 3/24/2026 STANDARD DRAWING NO: CSD -1101 1 OF 1 in N / l! ) N u , --- U U H H >- 0 OU Q } m —i Lij } Lu T - = H LLm F- a =z Lu w� > �� F- >_ LU J F- 0 w w LU Z LU LL O} Q LLJ F O m 0 Oz uJ W U U O c/)Lu _ Z U 2 cA W U = U) LL_ J 0. H z Q D Lu O �M QLL Lu z LLJ Li O Lu O = U) = Lu ~ 0Lu = < of 0 0 U) � LL cf)0 � 0 Q U W Y QQ 0 Lu Q w ��z 0� pW W N D co Lu in o LL_ m z LLJ 0 O_ LL 2 z U J O J LL 0 J O J O_ z F- 0- Q J-- m~ Q a O w_ = = Y U O > cn� cn< -jo pv0 U)0 zz UY z00 ()0 LU Li �� F~z =� J z CDw cn Z U)U (nom 0Z UJQ cnQ� F- LU W? Qw LLJ =0Z Lu F- O Q 2 Q 0 J D Z L H Q Y z z z Q0 wHg W Z H� W W W U pip = Q Q H= W m CD � o 0� T� �F- Cl) ()f �_ lif Z U) Q U)� 2� < LL U U OLLC) Q o0 U 6 u1 u i O Z D O C� Y U Q m Z W W CO FOR PUBLIC WORKS °D LAST REVISED 3/24/2026 CHUBBUCK CONSTRUCTION NAME STANDARD DRAWING NO: STANDARDS STREET D R H 0 SIGN CSD -1102 1 OF 1 Division 2000 — Miscellaneous Add the following to Division 2000: Section 2060 — Neighborhood Mailbox: A. Requirement: The developer shall provide for the installation of consolidated mailboxes, generally described by the United States Postal Service as a Cluster Box Unit (CBU), which shall service homes within the proposed subdivision. For the developments of less than (4) four homes, the developer shall endeavor to cooperate with adjoining landowners for the installation of such a CBU system. Upon application to the City Engineer, the requirement for a CBU in a new subdivision may be waived for cause, such as impracticality due to the circumstances of the development or area. B. Sizing: Cluster Box Unit (CBU) shall include (1) one incoming mailbox compartment for each dwelling unit with (1) one outgoing mail slot. There must be at least (1) one parcel locker for every (12) twelve dwelling units. No maximum number of parcel lockers to be installed. C. Location: The Cluster Box Unit (CBU) shall be centrally located in the development, adjacent to the city sidewalk, so that customers are not required to travel an unreasonable distance to obtain their mail and so there is sufficient access to mailbox locations with adequate space for carriers to deliver and customers to retrieve the mail. Typically, a CBU shall be located no more than 300 feet walking distance from the residence. If the CBU is located midblock, it shall be centered near a common lot line. D. Installation: Install Cluster Box Unit (CBU) in accordance with manufacturer's recommendations and City of Chubbuck Standard Drawing CSD -2001 (Neighborhood Mailbox). E. Accessibility: CBU's must be ADA accessible from the sidewalk and from the street. If the CBU is located on private property or on a commonly owned lot, the established Homeowners Association (HOA) or property owner must ensure that access is kept reasonably clear of snow, weeds, and other obstructions. If the CBU is located within the public right-of-way, 73 the adjacent property owner must ensure the access is kept reasonably clear of snow, weeds, and other obstructions. Section 2070 — Garbage Dumpster Enclosure: A. Garbage dumpster enclosures shall be privately owned and maintained by the property owner or homeowner association. If the enclosure includes gates, the gates shall have the ability to be fixed, or pinned, in a 120 -degree open position. Gates shall be operated by the customer. B. Sizing: For multiple dwelling units that utilize commercial style containers/dumpsters and garbage dumpster enclosure(s), the number of containers will be determined as follows: For residential use, each dwelling unit is estimated to generate 0.6 cubic yard of solid waste weekly. The largest container/dumpster shall be a six-yard container with a maximum dump frequency of three times a week. The resulting number of containers shall be rounded up to the next whole number. Example of a 40 -unit complex: 40 units x 0.6 CY = 24 CY of solid waste generated weekly 24 CY/ 6 CY dumpster/3 dumps per week = 1.33 or 2 containers minimum The City will consider requests from the developer or customer to utilize alternate sizing calculations given that the developer or customer provides supporting justification. The developer or customer may choose to increase the number of containers if desired as long as sufficient enclosures are provided. The size and number of enclosures shall be sufficient for the number of containers needed. The garbage dumpster enclosure shall be enclosed on three sides and shall be no less than six (6) feet in height. Enclosure shall have a minimum inside unobstructed width of eleven (11) feet and minimum inside unobstructed depth of ten (10) feet in accordance with City of Chubbuck Standard Drawing CSD -2002 (Garbage Dumpster Enclosure). Double containers may be used side by side which shall require the minimum inside width of twenty-two (22) feet. Additional space may be built to accommodate private recycling container(s) which shall not encroach into said minimum width and depth clearances. C. Location: All garbage dumpster enclosure locations including rollout areas shall provide for direct and unobstructed access by solid waste equipment and personnel. 74 Enclosures located on private drives must have adequate room for a sanitation truck to loop throughout the development or turn around as shown on the City of Chubbuck Standard Drawing CSD -2003 (Sanitation Truck Turnaround). To prevent vehicle parking in these areas, painted pavement markings or other items may be required. The truck is approximately 33.5 feet in length and must be able to line up directly with the dumpster inside the enclosure. A minimum overhead height clearance of 25 feet is required to safely move containers in and out of the enclosure. Gates in the open position shall not infringe in traffic aisles. The City's Sanitation Department and the City Engineer shall approve all proposed enclosure locations prior to issuance of a building permit. 75 Division 2000 — Miscellaneous City of Chubbuck Standard Drawings CSD -2001 Neighborhood Mailbox CSD -2002 Garbage Dumpster Enclosure CSD -2003 Sanitation Truck Turnaround 76 BASE & 1/2" DIA. ANCHOR BOLTS SUPPLIED W/ UNITS AS SPECIFIED. CAST -IN-PLACE USE TEMPLATE TO ENSURE CONCRETE BASE ALIGNMENT OF BOLTS #4 REBAR SPACED 4" THICK CONCRETE TO 1/2" EXPANSION @ 16" O.C. EACH WAY BE CONSTRUCTED AS BOARD 1/2" RADIUS TOOLED PART OF MAILBOX ITEM EDGE ALL EDGES 0 4" OF 3/4" MINUS CRUSHED BASE - _ MATERIAL AS PER q 3" CLR. ISPWC SECTION 800 �;i (TYP.) COMPACTED 3/4" MINUS ' T-0" BASE MATERIAL AS PER EACH WAY UNDISTURBED NATIVE SOIL ISPWC SECTION 800 SECTION VIEW 16 UNIT 8 UNIT �=A �� ELEVATION VIEW CA =A C C I -I FC CHUBBUCK I D R H 0 MODEL #3316 TYPE III MULTI -SIZE COMPARTMENT CBU WITH (1) ONE OUTGOING MAIL SLOT LOCATED IN DOOR "B" (MANUFACTURED BY WWW.MAILBOXES.COM OR APPROVED EQUAL) A: INCOMING MAIL COMPARTMENT B: OUTGOING MAIL SLOT C: PARCEL LOCKER n FOR PUBLIC WORKS CONSTRUCTION STANDARDS MODEL #3308 TYPE I MULTI -SIZE COMPARTMENT CBU WITH (1) ONE OUTGOING MAIL SLOT LOCATED IN DOOR "B" (MANUFACTURED BY WWW.MAILBOXES.COM OR APPROVED EQUAL) MODEL #3312 TYPE II MULTI -SIZE COMPARTMENT CBU WITH (1) ONE OUTGOING MAIL SLOT LOCATED IN DOOR "B" (MANUFACTURED BY SALSBURY INDUSTRIES OR APPROVED EQUAL) LAST REVISED 3/24/2026 NEIGHBORHOOD STANDARD DRAWING NO: MAILBOX CSD -2001 1 OF SIDEWALK T-0" 12" THICK 1'-6" _ CAST -IN-PLACE CONCRETE BASE ° a a a ° - ° N a O a � + M BROOM FINISH + � a a SWALE a °a J Q Ll C? U w } BASE & 1/2" DIA. ANCHOR SWALE >- 4" THICK CONCRETE TO BOLTS SUPPLIED W/ UNITS BE CONSTRUCTED AS AS SPECIFIED. USE PART OF MAILBOX ITEM TEMPLATE TO ENSURE ALIGNMENT OF BOLTS 6'-0" 1/2" RADIUS TOOLED EDGE ALL EDGES °a 1 4 ° RIBBON CURB PLAN VIEW NOTES: A. THE DOORS TO THE MAILBOX COMPARTMENTS SHALL FACE TOWARDS THE STREET. FOR PUBLIC WORKS CHUBBUCK CONSTRUCTION LAST REVISED 3/24/2026 STANDARDS NEIGHBORHOOD STANDARD DRAWING NO: I D R H O MAILBOX CSD -2001 2 OF 2 CL w w p p w z Of D w o O w z ly- w U w z p O cn U z 12'-6" MIN. (SINGLE DUMPSTER) 25-0" MIN. (DOUBLE DUMPSTER) (CONCRETE PAD LENGTH) 11'-0" MIN. (SINGLE DUMPSTER) 22'-0" MIN. (DOUBLE DUMPSTER) (INSIDE ENCLOSURE LENGTH) DESIGN CONCRETE PAD TO WITHSTAND 10,000 LBS PER SINGLE WHEEL LOAD 6" DIA. PIPE BOLLARD, CONCRETE FILLED, SET 3' BELOW GRADE, EXTEND 4' ABOVE GRADE, PAINT OSHA YELLOW CONTAINER ENCLOSURE SHALL BE 6'-0" HIGH MIN. 3/4" DIAMETER BY 1-1/2" DEEP RECESS HOLE FOR - CANE BOLTS. PROVIDE TWO PER EACH GATE IN CLOSED AND OPEN POSITION. O O Oma, 6" DIA. PIPE BOLLARD, z GARBAGE CONCRETE FILLED, SET RECOMMENDED, SWING DUMPSTER BUT OPTIONAL) MIN. I? GRADE, PAINT OSHA co YELLOW PLAN VIEW * IF GATED, THE DOORS IN DESIGN CONCRETE PAD TO WITHSTAND 10,000 LBS PER SINGLE WHEEL LOAD 6" DIA. PIPE BOLLARD, CONCRETE FILLED, SET 3' BELOW GRADE, EXTEND 4' ABOVE GRADE, PAINT OSHA YELLOW CONTAINER ENCLOSURE SHALL BE 6'-0" HIGH MIN. 3/4" DIAMETER BY 1-1/2" DEEP RECESS HOLE FOR - CANE BOLTS. PROVIDE TWO PER EACH GATE IN CLOSED AND OPEN POSITION. / I - 64 �(t CA - CHUBBUCK I D R H 0 IF GATES ARE INSTALLED, THEY MUST BE OPENED AND SECURED TO BOLLARDS PRIOR TO SERVICE. THE CITY WILL NOT SERVICE THE GARBAGE CONTAINER IF GATES ARE NOT OPEN AND PROPERLY SECURED. FOR PUBLIC WORKS CONSTRUCTION STANDARDS GARBAGE DUMPSTER ENCLOSURE LAST REVISED 3/24/2026 STANDARD DRAWING NO: CSD -2002 1 OF 1 DOUBLE SWING 6" DIA. PIPE BOLLARD, GATE (NOT �120' CONCRETE FILLED, SET RECOMMENDED, SWING T BELOW GRADE, BUT OPTIONAL) MIN. EXTEND 4' ABOVE GRADE, PAINT OSHA YELLOW PLAN VIEW * IF GATED, THE DOORS IN THE OPEN POSITION SHALL HAVE THE ABILITY TO BE FIXED OR PINNED TO THE PIPE BOLLARD. / I - 64 �(t CA - CHUBBUCK I D R H 0 IF GATES ARE INSTALLED, THEY MUST BE OPENED AND SECURED TO BOLLARDS PRIOR TO SERVICE. THE CITY WILL NOT SERVICE THE GARBAGE CONTAINER IF GATES ARE NOT OPEN AND PROPERLY SECURED. FOR PUBLIC WORKS CONSTRUCTION STANDARDS GARBAGE DUMPSTER ENCLOSURE LAST REVISED 3/24/2026 STANDARD DRAWING NO: CSD -2002 1 OF 1 REVERSE VEMENT R2 EDGE TIRES FpGF 50, Ck 23.50' FORWARD MOVEMENT i I � l FOG�2.301 TURF R 37.50' S EDGE TIRES I I � IR 39 SOUGK Lo EDC'E�R Z_ Z 00-1 Q� 0c O 11.25' 12.75' 24.00' FOR PUBLIC WORKS CHUBBUCK CONSTRUCTION SCALE: 1" = 12' STANDARDS SANITATION TRUCK D R H O TURNAROUND LAST REVISED 3/24/2026 STANDARD DRAWING NO: CSD -20031 OF 1 Division 2100 — QC Division Supplement the Field QC Manual with the following testing standards and frequencies. The values in this table have precedence over the values in the ISPWC QC Field Manual. 81 Standard Method Acceptance Criteria Test Description Frequency of Tests and (ASTM, AASHTO) Allowable Tolerance Moisture Density Test ASTM D698 1 per material type as required AASHTO T99 Soil Density Testing for ASTM D2922 50-100 ft. every lift and Water, Sewer & Utility AASHTO T2388/2239 39 at valves & manholes 95% compaction Lines one foot max Soil Density Testing for ASTM D2922/3017 50-100 ft. per lift Structural Fill, Subbase, AASHTO T238/239 max 12 o 95/o compaction & Subgrade Soil Density Testing for ASTM D2922/3017 50-100 ft. per lift 3/4 -inch base AASHTO T238/239 max 8" 95% compaction Asphalt Rolling Pattern n/a as needed to controldensity Depth & Density of AC 1 core per every 300 AASHTO T245 feet of standard road 0 95/o max unit weight Cores cross section Rices ASTM D2041 1 Rices per day Oil Extraction ASTM D4125 / NCAT 1 Extraction per day Sieve Analysis ASTM C136 1 Sieve per day 1 test per 50 cubic yds Slump & Air Concrete ASTM C143 (first test starts with Per ISPWC Control Tests ASTM C231 first truck) Concrete Compressive per ISPWC Section 703 Per ISPWC Section 703 Per ISPWC Section 703 Strength Cylinders 81