Loading...
HomeMy WebLinkAboutItem #1 New Day Parkway Animal Care�L CHUBBUCK 1 0 A H 0 PUBLIC WORKS Memo Public Works Department Planning Services 290 E Linden Ave, Chubbuck, ID 83202 Phone 208.237.2430 www.CityofChubbuck.us To: Land Use and Development Commission From: Don Matson, Planning Services Manager Date: March 4, 2026 Re: CUP Extension of Time / FFCL Amendment For a Commercial Kennel at 702-730 New Day Parkway Background: Larry Dunn received a Conditional Use Permit (CUP) from the Commission in July 2023 for a pet boarding business.' Several issues delayed the project, including the failure of access agreements with neighboring property owners. In July 2024, the former Community Services Director (CSD) authorized an 18 -month extension of the CUP to January 2026, acknowledging the progress of potential development on neighboring parcels that would provide a different access point. No conditions listed in City Code 18.28.020.G would require that an extension be denied. Since that time, the neighboring property owners have changed their development plans, without access to Mr. Dunn's property. This request is for one more extension of time with an amendment to the Findings of Fact and Conditions of Law (FFCL) from the Commission (see attached). Request: Mr. Dunn requests the removal of the first condition on the FFCL "When agreement is reached among neighbors for a new road access, and upon its construction, access to the site will change from New Day Pkwy to the new street, and the street frontage will require landscaping per City Code", and replace it with a condition allowing an extension of time for 24 months, to expire on January 23, 2028. At that time, the business was defined as an Animal Care Site. Under current definitions in Title 18 the business would be a Kennel (Commercial). It has the same use/conditional use requirements as it did before the change. Per the direction of the Commission, additional information is provided regarding the original application and extension of time. Summary: To accommodate a different access point via the neighboring property Mr. Dunn's site would need a different layout, engineering, grading, etc. His request at this time is for an extension of time only, not to authorize any change to the site as originally approved with the CUP. The term of approval for a CUP is stated in City Code 18.28.020.F that unless the Commission approves a longer term, the CUP will expire in 12 months if construction does not commence. In agreement with City Code 18.28.020.G the CSD granted an 18 -month extension of time. Any further extension of time may be granted by the Commission but not by the CSD. If Mr. Dunn has not commenced construction by the date determined by the Commission, he will apply for a new CUP from the Commission. Recommendation: • Approve the request to remove the first condition of the FFCL "When agreement is reached among neighbors for a new road access, and upon its construction, access to the site will change from New Day Pkwy to the new street, and the street frontage will require landscaping per City Code." • Replace the first condition with a new condition "The term of approval for this CUP shall be extended 24 months from this date to 73 January, 2028. If construction has not commenced by said date the CUP shall become void and a new CUP shall be required for the project to move forward. " Exhibits: 1. Request for Condition on Amended FFCL: 26 December, 2025 2. Findings of Fact and Conclusions of Law: 11 July, 2023 3. Facts, Findings, & Decision: July 2, 2024 4. Draft Amended FFCL 5. Additional Background Materials on the CUP Application CHUBBUCK 1 0 R H 0 290 E Linden Avenue, Chubbuck, ID 83202 Phone 208.237.2430 www.CityofChubbuck.us Outlook Request for Condition on Amended FFCL From LARRY DUNN <larrydunn1332@msn.com> Date Fri 12/26/2025 5:53 PM To Joey Bowers <JBowers@cityofchubbuck.us> Cc Don Matson <dmatson@cityofchubbuck.us> Hi Mr. Bowers, I am writing to request an amended FFCL for an existing CUP. My original CUP is under FFCL "New Day 730 CUP_FFCL_Approval.pdf". The first amendment I would like to have is under Condition of Approval 1.a. I would like that removed from the FFCL. The agreement describes was cancelled by the neighboring developer after approximately six months of delay during the construction of Bluff Point Rd. My second amendment request is to have a Condition of Approval added to the FFCL that would allow me another 24 months extension on the CUP. The first 18 months were approved in "Approval_702 New Day Parkway Animal Care CUP Extension Request_07.02.2024.pdf". I did not realize how much effort, time, and money the cancellation of the agreement would affect my proposed project. When I received the agreement stating that my business access would have to spur off Bluff Point Rd. I began getting new engineered drawings and architectural drawings. The cancellation of the agreement forced me to make changes to my business plan, financial projections, engineering, architectural drawings, construction bids, etc. This causes me to have to start over with lending institutions as well. These delays and the recent government shutdown have caused substantial delays to the overall progress of my project. I would like to point out that to my knowledge there have been no significant amendments to the Comprehensive Plan or Land Use ordinance, or any significant land use changes in the vicinity which would adversely impact the project or would be adversely impacted by the project. There also have not been any hazardous situations which have developed or discovered in the area. I am also still planning on the same use, layout, and all other details that were presented in the original approved project plan review and CUP application. If this extension is granted, I would fully expect the City of Chubbuck to require a complete reapplication for a new CUP if the extension time expires. I appreciate your time. Please let me know if you have any questions or comments. Thank you, Larry Larry P. Dunn 702 New Day Parkway Chubbuck,ID 83202 (208) 240-4012 CAUTION: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. CHUBBUCK 1 0 A H 0 LAND USE & DEVELOPMENT COMMISSION 290 E Linden Avenue, Chubbuck, ID 83202 Phone 208.237.2430 www.CityofChubbuck.us FINDINGS OF FACT & CONCLUSIONS OF LAW A CONDITIONAL USE PERMIT FOR AN ANIMAL CARE SITE (PET BOARDING) IN AN AGRICULTURE (A) ZONE FACTS REQUEST: Request is for a Conditional Use Permit for an animal care site (pet boarding) in the Agricultural (A) zone district as required by Section 18.08.040 of Chubbuck city code. TYPE OF COMMISSION ACTION: Quasi -Judicial (Subject to appeal; decisions must be supported by the evidence and by applying law to the facts; decisions shall be based on the criteria and standards for approval per section 18.28.020.C.5 of City Code). The Commission may approve with or without conditions, may table a decision, or may deny the application. APPLICANT AND OWNER: Larry P. Dunn 702 New Day Parkway Chubbuck, ID 83202 LOCATION: The site is near the northeast corner of Hiline Rd and New Day Pkwy. The project area is sloped through the center, the facility would be built on the more level upper part of the parcel. SITE CHARACTERISTICS & ZONING CURRENT ZONING: Agriculture (A) CURRENT LAND USE: Pasture EXISTING STRUCTURES: None PROJECT SIZE: ±1.2 acres VIEWS: Less visible from the west; more visible from higher elevated areas south and east TOPOGRAPHY: Slope down from northeast to southwest SURROUNDING LAND USES AND ZONING RECENT TRAFFIC COUNTS ON NEW DAY: West of Hiline Rd — 2020, 5,323/day East of Hiline Rd — no data available RECENT TRAFFIC COUNTS ON HILINE RD: North of New Day — 2021, 4,186/day South of New Day - - 2020, 5,114/day — 2022, 4,754/day NORTH: Single family home with pasture; Agriculture (A) zone EAST: Pasture; Agriculture (A) zone SOUTH: New Day Parkway and undeveloped area; General Commercial (C-2) and Agriculture (A) zones WEST: Single family home (project owner), and Hiline Canal; Agriculture (A) zone SERVICES: ACCESS STREET: New Day Parkway Per Design Review Committee it is recognized that changes to the access and site alignment may happen, depending on whether agreement is reached among neighbors for a new road access. CUP Approval Form- FFCL EMERGENCY SERVICES: City of Chubbuck CULINARY WATER SERVICES: City of Chubbuck, water main below building site in New Day Pkwy SEWAGE DISPOSAL: City of Chubbuck, sewer main below building site in New Day Pkwy PRESSURIZED IRRIGATION: None available, no surface water rights from Fort Hall Irrigation project. APPLICABLE LAWS AND PLANS: 1. Idaho Statutes §67-6512: Special Use Permits, Conditions, and Procedures 2. Chubbuck Comprehensive Plan (as amended) 3. Chubbuck City Code Title 18: Land Use, particularly a. Chapter 18.08 Land Use Districts and General Controls b. Chapter 18.12:30.6 Supplemental Controls for Particular Uses: Animal Care Sites c. Chapter 18.16: Design Overlay District and Criteria d. Chapter 18.28.020 Conditional Use Permits (CUP) Procedures PROCEDURES: 1. A design review clearance was obtained May 3, 2023 in accordance with Chapter 18.16: Design Review Criteria of City Code. 2. In accordance with City Code 18.28.020 and the current fee resolution, a complete petition and fees for a Conditional Use Permit were filed with the City at least 28 days prior to the public hearing and which contained the appropriate documents. 3. In accordance with City Code 18.28.010, a public hearing was scheduled before the LUDC at the July 11, 2023 regular meeting of the Commission. 4. In accordance with City Code 18.28.010 and Idaho Statutes §67-6509 and §67-6512, notice of the public hearing was provided at least 15 days prior to the public hearing as follows: a. Publication in the Idaho State Journal; b. Notice posted on the premises; c. Mailing to owners of property within a 300 ft. radius of the site; d. Notice sent to utilities and political subdivisions providing services within the City; and e. Notices posted prominently at the City office and on webpage. 5. A public hearing was conducted in accordance with procedures established by City Code 18.28.010 and Resolution No. 2021-06. PUBLIC AND AGENCY COMMENTS: Public and agency comments were taken in accordance with statutory requirements. RECORD: The record is on file with City of Chubbuck Staff and consists of the application materials, staff reports and memos, public and agency testimony, meeting minutes, and applicable portions of city and state law. FINDINGS Having reviewed the record, including the application materials, staff report, testimony provided at the hearing and meeting, and the criteria for approval of a Conditional Use Permit as found in city code section 18.28.020.C5 and the ability to impose conditions of approval in accordance with section 18.29.020.C6, the Land Use and Development Commission finds the following: CHUBBUCK 1 0 R H 0 290 E Linden Avenue, Chubbuck, ID 83202 Phone 208.237.2430 www.CityofChubbuck.us CUP Approval Form- FFCL 1. Conditions of Approval necessary to approve the Permit are: a. When agreement is reached among neighbors for a new road access, and upon its construction, access to the site will change from New Day Pkwy to the new street, and the street frontage will require landscaping per City code. b. In lieu of frontage landscaping on New Day Pkwy, applicant shall maintain area behind pathway landscaped strip to their property to minimize weed growth. Contact Parks Department before applying herbicides. C. on 2. The proposed use is conditionally permitted in the subject zoning district and complies with all of the applicable provisions of city code unless modified through the conditional use permit process. 3. The proposed use is generally not in conflict with the goals, objectives, and policies of the adopted Comprehensive Plan. 4. The proposed use is compatible with other existing and permitted uses in the general vicinity. 5. The proposed use is harmonious in scale, mass, coverage, density, and intensity with all adjacent permitted land uses. The proposed use would not place an undue burden on transportation, police, fire and EMS protection, water/sewer, schools, and other public facilities or agencies, in the vicinity. The proposed use, if it complies with all conditions imposed, WILL NOT adversely affect other properties or the environment in the vicinity to a materially greater extent than would uses permitted outright by this Code. ORDER: CONCLUSION AND DECISION: PERMIT TERMS 1. The Land Use and Development Commission, pursuant to the aforementioned, finds that the request for a Conditional Use Permit as herein described, shall be APPROVED. 2. Pursuant to Idaho Code § 67-8001 et seq., the Commission makes the following findings with respect to the decision in this action: a. This Action does not deprive the owner of the property of all viable uses of the property 290 E Linden Avenue, Chubbuck, ID 83202 Phone 208.237.2430 CHUBBUCK www.CityofChubbuck.us 1 0 R H 0 CUP Approval Form- FFCL b. This Action does not have a significant impact on the landowner's economic interest. c. This Action does not deny a fundamental attribute of ownership. 3. Applicant has a right to request a regulatory takings analysis pursuant to section 67-8003, Idaho Code. 4. This decision is effective ten (10) calendar days from its signing by the Chair. 5. Unless a longer time shall be specifically established as a condition or allowance of approval, a conditional use permit shall lapse and become automatically void one (1) calendar year following the date on which such permit became effective, unless prior to expiration, the use has commenced, and all conditions of the permit are satisfied. 6. CUP is non -transferable from one (1) parcel of land to another and shall run with the land and continue to be valid upon a change of ownership of the site or structure, providing however, that the new owner complies with the terms of the permit. CUPs may be revoked by the Community Services Director at any time if it is determined that any condition of the CUP or any other city code is being violated. Prior to revocation, the applicant shall be afforded thirty (30) days after the date of notification of noncompliance/intent to revoke to become compliant. Additionally, prior to revocation, the applicant shall be afforded an opportunity for a hearing before LUDC; said hearing must be requested within ten (10) calendar days of the date of notification of noncompliance/intent to revoke the conditional use permit. Failure to come into compliance within thirty (30) days of the notification of noncompliance and failure to request such a hearing will result in immediate revocation of the approved CUP and may constitute a violation of this title. 8. Whether approved, approved with conditions, or denied, any party seeking judicial review of the decision must first appeal this decision to the City Council in accordance with section 18.28.080 and 18.28.090. APPROVED BY THE CHAIR OF THE LAND USE & DEVELOPMENT COMMISSION OF CITY OF CHUBBUCK, IDAHO, this day of Jason C. Mendenhall, Chair ATTEST: 20 Joey Bowers, Clerk 290 E Linden Avenue, Chubbuck, ID 83202 Phone 208.237.2430 CHUBBUCK www.CityofChubbuck.us 1 0 R H 0 laa,lt\ CHUBBUCK 1 A A H A Community Services Department 290 E Linden Ave., Chubbuck, ID 83202 208.237.2430 Facts, Findings, & Decision www.CityofChubbuck.us To: Larry Dunn, Applicant; City Planning Division, City Building Division, City Development Services Division From: Devin Hillam, Community Services Director -N Date: July 2, 2024 Re: Animal Care Site — 702 New Day Parkway CUP — Extension Request Request: • On July 2, 2024, Larry Dunn formally requested an extension of their approved conditional use permit (CUP) for 18 months. Facts: • At the July 11, 2023 Land Use and Development Commission meeting, a CUP was approved, subject to conditions. The approval was effective 10 days after the signing of the FFCL by the Mayor (July 21, 2023). • Per Chubbuck City Code, CUP approvals are valid for 1 calendar year unless the use has commenced, and conditions are satisfied. o Between receiving this approval and the request for extension, an adjacent property owner filed a preliminary plat with the City to construct a roadway adjacent to the Dunn property. Condition 1.A of the CUP stated that "When agreement is reached among neighbors for a new road access, and upon its construction, access to the site will change from New Day Parkway to the new street, and the street frontage will require landscaping per City code." The discussions amongst the adjoining landowners (Freed/Harvest Springs) were outside of the Applicant's control and he has made all good faith efforts possible to proceed while waiting for the agreement to be reached. It was only as recently as last week (end of June 2024) that the adjoining landowners determined to not construct a roadway adjacent to the Dunn property at this time. • Chubbuck City Code states that extensions of the permit may be requested if a written petition is filed at least 30 days prior to the lapse of the permit. An extension under the code may be approved one time for up to 2 years if the Community Services Director (CSD) finds that certain criteria are satisfied. If the CSD finds that any of the following exist, an extension shall be denied. o There have been significant amendments to the Comprehensive Plan or Land Use ordinance which will affect the CUP authorization. There have been significant land use changes in the vicinity which would adversely impact the project, or which would be adversely impacted by the project. There are hazardous situations which have developed or have been discovered in the area. Findings: J:\Planning\Land Use Projects\Conditional Use Permit (CUP)\2023\New Day 730 E - Northgate Pet Boarding\Final_702 New Day Parkway Animal Care CUP Extension Request_Approved_dbh_7.2.2024.docx • Based upon the several steps taken since the CUP was approved in working with City staff and trying to work with circumstances outside of his control, and the recent change to development plans of the adjacent property owners as indicated in the Facts, the requirement for this extension request is waived so that a review of the extension request could occur prior to the permit's expiration. • The applicant requests an 18 -month extension from July 21, 2024. • The CSD deems commencement of the use as occurring from the time when a building permit is obtained AND the foundation is poured and approved by the Building Division. • The CSD finds that none of the conditions listed in Chubbuck City Code section 18.28.020.G exist which would require that an extension be denied. Decision: Upon review of the request, the facts, and findings, it is hereby decided that the request for an extension to the approved Conditional Use Permit is granted, and that the one-time extension allowed is for an additional 18 months from July 21, 2024 (January 21, 2026) in order to obtain a building permit AND to have the foundation poured and inspected/approved by the Building Division. If the use as defined herein has not commenced by January 21, 2026, and the Applicant wishes to proceed with the project, a new CUP will be required to be obtained in accordance with City Code. Decisions of the Director may be appealed by an applicant or any person having a bona fide interest in real property as defined in Idaho Code §67-6521. The appeal petition must be submitted within ten (10) business days of the CSD's final decision and contain a description of the grievance as it pertains to the specific standards for approval. The appeal shall be heard within a reasonable time by LDDC to review the decision of the PWD and to hear testimony of the appellant and applicant (if different from appellant). LUDC shall determine whether to remand, uphold, modify, or overturn the decision of the CSD, including whether to remove or add conditions. (Chubbuck City Code 18.28.070) J:\Planning\Land Use Projects\Conditional Use Permit (CUP)\2023\New Day 730 E - Northgate Pet Boarding\Final_702 New Day Parkway Animal Care CUP Extension Request_Approved_dbh_7.2.2024.docx From: LARRY DUNN To: Devin Hillam Cc: Don Matson; Sean Harris Subject: Request for CUP Extension - Animal Care Site - 702 New Day Parkeay Date: Tuesday, July 2, 2024 3:21:49 PM Hello Devin, I am writing this email to ask the City of Chubbuck to grant an extension to my CUP that was approved at the LUDC meeting on July 11, 2024. The reason for the extension is because I was directed by the city (Finding I of the CUP) to wait for the construction of Bluff Point Rd. for my commercial access. I have been waiting for many months and asking for updates from the developer of that road. I have been continually told the construction of the road was delayed but still happening. I have also paid for engineering services for my proposed access that will no longer be needed with the revised plan to not build Bluff Point Rd. I am asking the for an 18 month extension so that I can now focus back on my original plan of accessing my property, for commercial purposes, from my driveway. I will need to time to align with my engineer, architect, and general contractor to make the necessary changes to the plans. I appreciate your time and always being willing to meet with me on this project. Please contact me if you have questions or comments. I can be reached at this email or (208) 240-4012. Thank you, Larry CAUTION: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. CHUBBUCK 1 0 A H 0 LAND USE & DEVELOPMENT COMMISSION 290 E Linden Avenue, Chubbuck, ID 83202 Phone 208.237.2430 www.CityofChubbuck.us FINDINGS OF FACT & CONCLUSIONS OF LAW A CONDITIONAL USE PERMIT FOR AN ANIMAL CARE SITE (PET BOARDING) IN AN AGRICULTURE (A) ZONE FACTS REQUEST: Request is for a Conditional Use Permit for an animal care site (pet boarding) in the Agricultural (A) zone district as required by Section 18.08.040 of Chubbuck city code. TYPE OF COMMISSION ACTION: Quasi -Judicial (Subject to appeal; decisions must be supported by the evidence and by applying law to the facts; decisions shall be based on the criteria and standards for approval per section 18.28.020.C.5 of City Code). The Commission may approve with or without conditions, may table a decision, or may deny the application. APPLICANT AND OWNER: Larry P. Dunn 702 New Day Parkway Chubbuck, ID 83202 LOCATION: The site is near the northeast corner of Hiline Rd and New Day Pkwy. The project area is sloped through the center, the facility would be built on the more level upper part of the parcel. SITE CHARACTERISTICS & ZONING CURRENT ZONING: Agriculture (A) CURRENT LAND USE: Pasture EXISTING STRUCTURES: None PROJECT SIZE: ±1.2 acres VIEWS: Less visible from the west; more visible from higher elevated areas south and east TOPOGRAPHY: Slope down from northeast to southwest SURROUNDING LAND USES AND ZONING RECENT TRAFFIC COUNTS ON NEW DAY: West of Hiline Rd — 2020, 5,323/day East of Hiline Rd — no data available RECENT TRAFFIC COUNTS ON HILINE RD: North of New Day — 2021, 4,186/day South of New Day - - 2020, 5,114/day — 2022, 4,754/day NORTH: Single family home with pasture; Agriculture (A) zone EAST: Pasture; Agriculture (A) zone SOUTH: New Day Parkway and undeveloped area; General Commercial (C-2) and Agriculture (A) zones WEST: Single family home (project owner), and Hiline Canal; Agriculture (A) zone SERVICES: ACCESS STREET: New Day Parkway Per Design Review Committee it is recognized that changes to the access and site alignment may happen, depending on whether agreement is reached among neighbors for a new road access. CUP Approval Form- FFCL EMERGENCY SERVICES: City of Chubbuck CULINARY WATER SERVICES: City of Chubbuck, water main below building site in New Day Pkwy SEWAGE DISPOSAL: City of Chubbuck, sewer main below building site in New Day Pkwy PRESSURIZED IRRIGATION: None available, no surface water rights from Fort Hall Irrigation project. APPLICABLE LAWS AND PLANS: 1. Idaho Statutes §67-6512: Special Use Permits, Conditions, and Procedures 2. Chubbuck Comprehensive Plan (as amended) 3. Chubbuck City Code Title 18: Land Use, particularly a. Chapter 18.08 Land Use Districts and General Controls b. Chapter 18.12:30.6 Supplemental Controls for Particular Uses: Animal Care Sites c. Chapter 18.16: Design Overlay District and Criteria d. Chapter 18.28.020 Conditional Use Permits (CUP) Procedures PROCEDURES: 1. A design review clearance was obtained May 3, 2023 in accordance with Chapter 18.16: Design Review Criteria of City Code. 2. In accordance with City Code 18.28.020 and the current fee resolution, a complete petition and fees for a Conditional Use Permit were filed with the City at least 28 days prior to the public hearing and which contained the appropriate documents. 3. In accordance with City Code 18.28.010, a public hearing was scheduled before the LUDC at the July 11, 2023 regular meeting of the Commission. 4. In accordance with City Code 18.28.010 and Idaho Statutes §67-6509 and §67-6512, notice of the public hearing was provided at least 15 days prior to the public hearing as follows: a. Publication in the Idaho State Journal; b. Notice posted on the premises; c. Mailing to owners of property within a 300 ft. radius of the site; d. Notice sent to utilities and political subdivisions providing services within the City; and e. Notices posted prominently at the City office and on webpage. 5. A public hearing was conducted in accordance with procedures established by City Code 18.28.010 and Resolution No. 2021-06. PUBLIC AND AGENCY COMMENTS: Public and agency comments were taken in accordance with statutory requirements. RECORD: The record is on file with City of Chubbuck Staff and consists of the application materials, staff reports and memos, public and agency testimony, meeting minutes, and applicable portions of city and state law. FINDINGS Having reviewed the record, including the application materials, staff report, testimony provided at the hearing and meeting, and the criteria for approval of a Conditional Use Permit as found in city code section 18.28.020.C5 and the ability to impose conditions of approval in accordance with section 18.29.020.C6, the Land Use and Development Commission finds the following: CHUBBUCK 1 0 R H 0 290 E Linden Avenue, Chubbuck, ID 83202 Phone 208.237.2430 www.CityofChubbuck.us CUP Approval Form- FFCL 1. Conditions of Approval necessary to approve the Permit are: a. The term of approval for this CUP shall be extended 24 months from this date to 13 January, 2028. If construction has not commenced by said date the CUP shall become void and a new CUP shall be required for the project to move forward. b. In lieu of frontage landscaping on New Day Pkwy, applicant shall maintain area behind pathway landscaped strip to their property to minimize weed growth. Contact Parks Department before applying herbicides. C. on 2. The proposed use is conditionally permitted in the subject zoning district and complies with all of the applicable provisions of city code unless modified through the conditional use permit process. 3. The proposed use is generally not in conflict with the goals, objectives, and policies of the adopted Comprehensive Plan. 4. The proposed use is compatible with other existing and permitted uses in the general vicinity. 5. The proposed use is harmonious in scale, mass, coverage, density, and intensity with all adjacent permitted land uses. The proposed use would not place an undue burden on transportation, police, fire and EMS protection, water/sewer, schools, and other public facilities or agencies, in the vicinity. The proposed use, if it complies with all conditions imposed, WILL NOT adversely affect other properties or the environment in the vicinity to a materially greater extent than would uses permitted outright by this Code. ORDER: CONCLUSION AND DECISION: PERMIT TERMS 1. The Land Use and Development Commission, pursuant to the aforementioned, finds that the request for a Conditional Use Permit as herein described, shall be APPROVED. 2. Pursuant to Idaho Code § 67-8001 et seq., the Commission makes the following findings with respect to the decision in this action: a. This Action does not deprive the owner of the property of all viable uses of the property 290 E Linden Avenue, Chubbuck, ID 83202 Phone 208.237.2430 CHUBBUCK www.CityofChubbuck.us 1 0 R H 0 CUP Approval Form- FFCL b. This Action does not have a significant impact on the landowner's economic interest. c. This Action does not deny a fundamental attribute of ownership. 3. Applicant has a right to request a regulatory takings analysis pursuant to section 67-8003, Idaho Code. 4. This decision is effective ten (10) calendar days from its signing by the Chair. 5. Unless a longer time shall be specifically established as a condition or allowance of approval, a conditional use permit shall lapse and become automatically void one (1) calendar year following the date on which such permit became effective, unless prior to expiration, the use has commenced, and all conditions of the permit are satisfied. 6. CUP is non -transferable from one (1) parcel of land to another and shall run with the land and continue to be valid upon a change of ownership of the site or structure, providing however, that the new owner complies with the terms of the permit. CUPs may be revoked by the Community Services Director at any time if it is determined that any condition of the CUP or any other city code is being violated. Prior to revocation, the applicant shall be afforded thirty (30) days after the date of notification of noncompliance/intent to revoke to become compliant. Additionally, prior to revocation, the applicant shall be afforded an opportunity for a hearing before LUDC; said hearing must be requested within ten (10) calendar days of the date of notification of noncompliance/intent to revoke the conditional use permit. Failure to come into compliance within thirty (30) days of the notification of noncompliance and failure to request such a hearing will result in immediate revocation of the approved CUP and may constitute a violation of this title. 8. Whether approved, approved with conditions, or denied, any party seeking judicial review of the decision must first appeal this decision to the City Council in accordance with section 18.28.080 and 18.28.090. APPROVED BY THE CHAIR OF THE LAND USE & DEVELOPMENT COMMISSION OF CITY OF CHUBBUCK, IDAHO, this day of Jason C. Mendenhall, Chair ATTEST: 20 Joey Bowers, Clerk 290 E Linden Avenue, Chubbuck, ID 83202 Phone 208.237.2430 CHUBBUCK www.CityofChubbuck.us 1 0 R H 0 Outlook Fw: Engineered Drawings for Bluff Point Road From LARRY DUNN <larrydunn1332@msn.com> Date Tue 1/13/2026 6:52 PM To Joey Bowers <JBowers@cityofchubbuck.us>; Don Matson <dmatson@cityofchubbuck.us> FYI Get Outlook for iOS From: LARRY DUNN <larrydunn1332@msn.com> Sent: Tuesday, January 13, 2026 6:50:59 PM To: Joey Bowers <jbowers@cityofchubbuck.us>; Don Matson <dmatson@cityofchubbuck.us> Subject: Fw: Engineered Drawings for Bluff Point Road Iwil Get Outlook for iOS From: Ryan Satterfield <ryan@satterfieldrd.com> Sent: Thursday, June 20, 2024 10:22 PM To: LARRY DUNN <LARRYDUNN1332@msn.com> Cc: cyyfreed@msn.com <cyyfreed@msn.com> Subject: Re: Engineered Drawings for Bluff Point Road La rry, Devin at the city asked me to reach out to you and let you know where things currently stand with the previously proposed road, so that is what I did. It was not known until just recently that the costs for the previously proposed road through Freed would no longer be considered reimbursable through the city since the new road option just came to light and that changed the city's perspective as well as the contract we had with the Freed's. We have been upfront as new information on the situation has come to light between all the players. Hopefully you can move forward with your project and it can be successful for you. Ryan Satterfield Satterfield Realty & Development, Inc. I Satterfield Builders 3308 Autumn Rain Rd. I Pocatello, ID 83201 208.232.1468 office 1 208.221.8848 cell !yan@satterfieldrd.com www.satterfieldrd.com I www.satterfieldbuilders.com On Thu, Jun 20, 2024 at 10:01 PM LARRY DUNN <LARRYDUNN1332@msn.com> wrote: Hi Ryan, I took your advice and called Chris. He informed me that you are still under contract with him to build the Bluff Point Road. That is really between you and the Freeds. It would be wiser for you to contact Chris and be up front with your business decisions. I have been asking for updates from you for months and you are just now telling me this. I have had to delay my project for months. I will wait to hear from the Freeds about the future development near my property. Larry From: Ryan Satterfield <ryan satterfieldrd.com> Sent: Thursday, June 20, 2024 10:16 AM To: LARRY DUNN <larrydunn1332@rnsn.com> Cc: Sean Harris <sharris cityofchubbuck.us>; Don Matson <dmatson(@cityofchubbuck.us> Subject: Re: Engineered Drawings for Bluff Point Road Good morning Larry - I am not sure if you have heard, but there have been some recent changes with road plans. Terraventure has come forward with plans for developing their property which will allow for Harvest Springs Blvd to go directly to New Day Parkway so we no longer need to build the Bluff Point Rd through the Freed property as we had planned. It will now be up to Chris Freed to decide what he will be doing with his property and we are no longer involved inthe development there for that road. It may be wise for you to coordinate with Chris Freed as he moves forward with development on his property with any questions you have about layout, etc. Thank you. Ryan Satterfield Satterfield Realty & Development, Inc. I Satterfield Builders 3308 Autumn Rain Rd. I Pocatello, ID 83201 208.232.1468 office 1 208.221.8848 cell ryan@satterfieldrd.com www.satterfieldrd.com I www.satterfieldbuilders.com On Thu, Jun 6, 2024 at 9:44AM Ryan Satterfield <ryan@satterfieldrd.com> wrote: Good morning Larry. Here is a shot of Bluff Point Rd utilities as we recently submitted to the City: ! ! r ! WATER TAR LE BLUFF POINT RD. SUNRISE ENGINEEl a $ITE OEfi�ry�W s RING wFa o�. Ryan Satterfield Satterfield Realty & Development, Inc. I Satterfield Builders 3308 Autumn Rain Rd. I Pocatello, ID 83201 208.232.1468 office 1 208.221.8848 cell ryan@satterfieldrd.com www.satterfieldrd.com I www.satterfieldbuilders.com On Thu, Jun 6, 2024 at 6:17AM LARRY DUNN <larrydunn1332@msn.com> wrote: Hi Ryan, just wondering if you have received the engineered drawings yet? Thank you, Larry Sent from my T -Mobile 4G LTE Device Get Outlook for Android CAUTION: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Outlook Fwd: Recent Access Road Meeting From LARRY DUNN <larrydunn1332@msn.com> Date Wed 1/14/2026 7:17 AM To Joey Bowers <JBowers@cityofchubbuck.us>; Don Matson <dmatson@cityofchubbuck.us> FYI Sent from my T -Mobile 4G LTE Device Get Outlook for Android From: LARRY DUNN <larrydunn1332@msn.com> Sent: Wednesday, November 8, 2023 7:35:29 PM To: Sean Harris <sharris@cityofchubbuck.us> Subject: Re: Recent Access Road Meeting Sean, I really appreciate what you put together. I will try to call you tomorrow to ask a few questions. Thank you again! Sent from my T -Mobile 4G LTE Device Get Outlook for Android From: Sean Harris <sharris@cityofchubbuck.us> Sent: Wednesday, November 8, 2023 3:53:59 PM To: LARRY DUNN <LARRYDUNN1332@msn.com> Subject: RE: Recent Access Road Meeting Larry, I have attached the pages from the staff report being submitted to the LUDC committee for next Tuesday's meeting. Please take a look at the blue highlighted text to see what the City has come up with to help protect your property. Regards, UWr Sean Harris Development Services Manager sharris@cityofchubbuck.us City Hall Address 290 E. Linden Avenue Chubbuck, Idaho 83202 Office: 208-237-2430 ext 108 CityHall Hours M-TH 7:30 am — 5:30 pm F 7:30 am — 11:30 am From: LARRY DUNN <LARRYDUNN1332@msn.com> Sent: Tuesday, November 7, 2023 5:38 PM To: Sean Harris <sharris@cityofchubbuck.us>; Don Matson <dmatson@cityofchubbuck.us>; Ryan Lewis <rlewis@cityofchubbuck.us> Subject: Recent Access Road Meeting Hi Sean, I wanted to take a few minutes and recap some of my concerns I brought to the attention of the city in our meeting this afternoon. It is my hope that these concerns can be placed in the packet for the meeting on Tuesday, November 14th. I originally sent an email to Ryan Satterfield on October 20, 2023. The email contained a list of items I wanted addressed in a proposed agreement in the event that my driveway needed to be replaced because of the new road proposed by Ryan and his business partners. Ryan responded to me on October 31, 2023. After reading that email is seems to me that it is going to be difficult to come to a reasonable agreement with Ryan. I would like the following items to be considered as the City of Chubbuck works through the process of analyzing the effects of the proposed road on my property: • The building of the road would not allow me to use the current access to my home that was in use when I purchased the property. • The proposed road will be used for a for-profit private enterprise. I am not expected to receive any benefit from that road and should not have to pay for anything or be burdened by the construction. I was using the access to my property first. • The proposed driveway would split my property and make some of the property no longer useable and completely change the dynamics of the property. My property would lose use and value. • I currently have cattle on my property. The cattle would have to cross the proposed driveway to access water and shelter. This would create a huge mess and safety issues. • I would have to open and close gates each time I wanted to leave or return to my property. • The proposed road could be placed to the east and cross through other property where there are not currently homes, or businesses. • I have made contact with J. Stuart Adams of Terraventure Development, LTD. He advised me that he is willing to negotiate with Ryan and come to an agreement on crossing his property vice building the proposed road and displacing my property access. • A portion of City of Chubbuck property would have to be crossed to install the proposed road. Currently installed concrete islands would have to be demolished to gain access to the new road. This would not be the case if moved to the east. I purchased my property within the City of Chubbuck in good faith that the city would protect my interests. I do not believe this is a civil matter since it is the city that would be allowing him to build the road. I also feel that proposed a reasonable list of items in my email to Ryan. I appreciate your time today. Respectfully, Larry Dunn 702 New Day Parkway Chubbuck, ID 83202 Sent from Mail for Windows CAUTION: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. CAUTION: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. /a 0�t\ CHUBBUCK I o A H o Community Services Department Development Services Division 290 E. Linden Avenue, Chubbuck, ID 83202 208.237.2430 www.CityofChubbuck.us CASCADE FALLS AT HARVEST SPRINGS DIVISION 1 PRELIMINARY PLAT REQUEST - STAFF REPORT CITY OF CHUBBUCK LAND USE AND DEVELOPMENT COMMISSION REGULAR MEETING ON NOVEMBER 14, 2023 STAFF FINDINGS SUMMARIZED After reviewing the proposed Cascade Falls at Harvest Springs Division 1 preliminary plat, Staff finds that it meets the code requirements with the following comments: • Preliminary Plat recommendations are conditional upon City Council approval of Cascade Falls at Harvest Springs Division 1. Bluff Point Road is being proposed to connect to New Day Parkway at the current Dunn driveway access point to New Day Parkway. This proposal would require the Dunn driveway/commercial access point to be relocated up Bluff Point Road just over 300 -feet away from the new intersection to meet the City's adopted Access Management Guidelines and requiring a new driveway through the existing pasture. Mr. Dunn was in the process of getting a commercial pet boarding business approved through the City when the application for this development was submitted to the City. Staff is supportive of allowing Mr. Dunn's personal private access to remain at its current location for access to the single residence, and a condition of approval for this application that any commercial accesses be located to meet the required spacing distance from the intersection, and that the commercial access be in a location agreed upon by the parties and be paved as is required by city code. Because the Dunn commercial project was in the works prior to the application for this plat and the existing driveway would have been approved for the commercial and residential use without any change in location (it would need to be paved, however), staff is supportive of requiring the plat applicant to work with the Dunns to determine the best location of the commercial drive which minimizes impacts to the land uses, and to require the plat applicant to plat the ingress and egress easement and to pave the driveway to the property line. Secondary irrigation facilities will be required to be designed and constructed in accordance with section 16.12.230 of city code, which will likely include a pump station o The applicant has requested to defer the secondary pressure irrigation pump station to a future division. STAFF RECOMMENDATION: Staff recommends approval of the preliminary plat with the following conditions or deviations: • Development agreements between the adjacent and included property owners (Ryan Satterfield, Chris Freed, Larry Dunn) be submitted for review prior to submittal of the final plat. • The secondary pressure irrigation pump station be deferred to a future division and $10,297.00 per acre irrigation pump station guarantee be collected with building permit applications for each lot. • That the developer works with the Dunns to locate the Dunn's commercial drive in a location which will minimize impacts to the Dunns' lands uses and which is amenable to the Dunns. The drive up the Dunns' property line is required to be paved. Relocation of the shown drive to accommodate the needs of the Dunns will not require resubmission of a preliminary plat. • Based upon a recommendation from City Staff, a waiver from the Access Management Guidelines is granted allowing the existing Dunn residential approach to remain at its current location for the purpose of a single residential access. FACTS REQUEST: The applicant proposes a 6 lot Preliminary Plat for commercial building lots in the Cascade Falls At Harvest Springs subdivision, Division 1. It includes providing public streets, water, sewer, and irrigation system including services. BACKGROUND: This is the 1st division of the Cascade Falls At Harvest Springs subdivision. TYPE OF COMMISSION ACTION: Quasi -Judicial (Subject to appeal; decisions must be supported by the evidence and by applying law to the facts; decisions shall be based on the standards for approval). Recommendation/approval of this preliminary plat shall be whether it meets the requirements of the City of Chubbuck ordinance and State of Idaho statutes. The Commission may recommend approval with or without conditions, may table a decision, or may recommend denial of the application. OWNER: Harvest Springs Joint Venture 3308 Autumn Rain Rd. Pocatello, ID 83201 PROFESSIONAL SERVICES: Sunrise Engineering 600 E. Oak St. Pocatello, ID 83201 LOCATION: SE and SW 1/4 of Section 35, Township 5 South, Range 34 East, of the Boise Meridian, Idaho. Generally located west of Interstate 15, north of New Day Parkway, and east of Hiline Road. SITE CHARACTERISTICS & ZONING: CURRENT ZONING: Creative Community -Harvest Springs (CC -HS) and Agriculture (A) CURRENT LAND USE: Vacant/Pasture PROJECT SIZE: ±13.98 acres VIEWS: Generally visible from the south and east TOPOGRAPHY: Hillside / Sloping EXISTING STRUCTURES: None SURROUNDING LAND USES AND ZONING RECENT TRAFFIC COUNTS: 2022: Hiline Rd at New Day Parkway, 4754/day NORTH: Farming/Pasture; Creative Community -Harvest Springs (CC -HS) and Agriculture (A) zones 194�0t\ CHUBBUCK 1 0 290 E. Linden Avenue, Chubbuck, ID 83202 208.237.2430 www.CityofChubbuck.us Outlook Fw: Property Access Replacement Agreement From LARRY DUNN <1arrydunn1332@msn.com> Date Wed 1/14/2026 7:38 AM To Joey Bowers <JBowers@cityofchubbuck.us>; Don Matson <dmatson@cityofchubbuck.us> FYI From: Ryan Satterfield <ryan@satterfieldrd.com> Sent: Friday, October 20, 2023 2:50 PM To: LARRY DUNN <LARRYDUNN1332@msn.com> Cc: Sean Harris <sharris@cityofchubbuck.us>; rlewis@cityofchubbuck.us <rlewis@cityofchubbuck.us>; Don Matson <dmatson@cityofchubbuck.us>; jaxon@murrayziel.com <jaxon@murrayziel.com> Subject: Re: Property Access Replacement Agreement Thanks Larry - I can review and discuss with everyone involved and begin to formulate an agreement for review. We will likely need to discuss a number of your conditions, and for clarification purposes, there are three parties involved in the road proposal, Chris and Janie Freed, View Pointe Developments (Kevin Loveland), and Satterfield Realty & Development, so the agreement will likely need to involve all four entities with you included. The main agreement, in my view, needs to be between you and the Freeds since you are the two property owners that will need to plan in conjunction to assure that any road or layout meets future needs for both parties, and where Freed will be granting an access easement through his property, which neither myself or View Pointe Developments has control over. I'll get back to you with some thoughts though. Thanks. Ryan Satterfield Satterfield Realty & Development, Inc. I Satterfield Builders 3308 Autumn Rain Rd. I Pocatello, ID 83201 208.232.1468 office 1 208.221.8848 cell _ryan@satterfieldrd.com www.satterfieldrd.com I www.satterfieldbuilders.com On Fri, Oct 20, 2023 at 1:17 PM LARRY DUNN <LARRYDUNN1332@msn.com> wrote: Hi Ryan, here are some things I would like to see in the agreement. Please don't hesitate to call if you want to discuss this. Thank you, Larry Full access rights to my property. Built to City of Chubbuck requirements. Reasonable compensation to me for the loss of my property to build the new access, amount M • $750 up front for my legal review of the agreement. Any other legal fees incurred by me for this access replacement to be paid by Satterfield Realty and Development (SRD). • Repair/replacement of irrigation/fencing/other modifications to the property during access construction to be paid by SRD. • Current engineered drawings of proposed access, dimensions, materials used agreed upon prior to groundbreaking. • Warranty for construction of access, 2 years. • Access roadbed and other disturbed areas to be hydroseeded to avoid erosion. Other erosion control as deemed necessary by me. • Estimated timeline and monthly progress reports to me. • A clause that states that the access will be constructed to my satisfaction or I have the right to stop any further construction until I agree on a resolution. Sent from Mail for Windows CAUTION: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. CHUBBUCK 1 0 A H A Community Services Department Planning Services Division 290 E Linden Avenue, Chubbuck, ID 83202 Phone 208.237.2430 www.CityofChubbuck.us APPLICATION FOR A CONDITIONAL USE PERMIT FOR AN ANIMAL CARE SITE (PET BOARDING) IN THE AGRICULTURE (A) ZONE CITY OF CHUBBUCK LAND USE AND DEVELOPMENT COMMISSION REGULAR MEETING ON JULY 11, 2023 (11I1LTA ILTA IA WA DESCRIPTION: An application for a Conditional Use Permit for an animal care site (pet boarding) in the Agricultural (A) zone on approximately 1.2 acres of land. Subject property is located at 730 New Day Parkway, Chubbuck, Idaho. The Comprehensive Plan Future Land Use Map designates this area as Commercial. The application will be reviewed against criteria in section 18.28.020.C.5 of City Code. Type of action: Decision. STAFF FINDINGS: After reviewing the application and related materials, staff finds that it meets the standards established by the City for a Conditional Use Permit (CUP). • Animal care sites are conditionally permitted in the Agricultural (A) zone. • The Design Review Committee has reviewed the site plan against technical requirements of the City as required by city code and requested revisions from the developer; the committee's recommendations are reflected in the site plan included with this report. The Committee did not approve the use and only reviewed technical requirements: o The committee directly reviews and approves such details as parking, landscaping, access, utility services, and sanitation. o The Land Use and Development Commission may approve other or more stringent conditions on the proposal. The applicant has met City Code requirements to be heard for a CUP. Staff and the applicant have met with neighboring property owners to clarify future improvements to the site access. Staff recommends approval of the proposed CUP and Findings of Fact and Conclusions of Law with the following conditions: When agreement is reached among neighbors for a new road access, and upon its construction, access to the site will change from New Day Pkwy to the new street, and the street frontage will require landscaping per City code. In lieu of frontage landscaping on New Day Pkwy, applicant shall maintain area behind pathway landscaped strip to their property to minimize weed growth. Contact Parks Department before applying herbicides. FACTS BACKGROUND: The proposed project, at the northeast corner of Hiline Rd and New Day Pkwy, is on a slope up from the corner. Development of the slope across the middle of the project area is not feasible for development. A special access to the site was built with the construction of New Day Pkwy. The access is through a parcel owned by the city, and weed control has been an issue. TYPE OF COMMISSION ACTION: Quasi -Judicial (Subject to appeal; decisions must be supported by the evidence and by applying law to the facts; decisions shall be based on the criteria and standards for approval per section 18.28.020.C.5 of City Code). The Commission may approve with or without conditions, may table a decision, or may deny the application. APPLICANT AND OWNER: Larry P. Dunn 702 New Day Parkway Chubbuck,ID 83202 LOCATION: The site is near the northeast corner of Hiline Rd and New Day Pkwy. The project area is sloped through the center; the facility would be built on the flatter upper part of the parcel. COMPREHENSIVE PLAN FUTURE LAND USE MAP DESIGNATION: The building site and access drive are designated Commercial (C). The remainder of the parcel is designated Mixed Use (MU) REFERENCE MAP: SITE CHARACTERISTICS & ZONING CURRENT ZONING: Agriculture (A) CURRENT LAND USE: Pasture EXISTING STRUCTURES: None PROJECT SIZE: ±1.2 acres VIEWS: Less visible from the west; more visible from higher elevated areas south and east TOPOGRAPHY: Slope down from northeast to southwest CHUBBUCK 1 0 R H 0 RECENT TRAFFIC COUNTS ON NEW DAY: West of Hiline Rd — 2020, 5,323/day East of Hiline Rd — no data available RECENT TRAFFIC COUNTS ON HILINE RD: North of New Day— 2021, 4,186/day South of New Day - - 2020, 5,114/day — 2022, 4,754/day 290 E Linden Avenue, Chubbuck, ID 83202 Phone 208.237.2430 www.CityofChubbuck.us SURROUNDING LAND USES AND ZONING NORTH: Single family home with pasture; Agriculture (A) zone EAST: Pasture; Agriculture (A) zone SOUTH: New Day Parkway and undeveloped area; General Commercial (C-2) and Agriculture (A) zones WEST: Single family home (project owner), and Hiline Canal; Agriculture (A) zone SERVICES: ACCESS STREET: New Day Parkway The Design Review Committee recognized that changes to the access and site alignment may happen, depending on whether agreement is reached among neighbors for a new road access. EMERGENCY SERVICES: City of Chubbuck CULINARY WATER SERVICES: City of Chubbuck, water main below building site in New Day Pkwy SEWAGE DISPOSAL: City of Chubbuck, sewer main below building site in New Day Pkwy PRESSURIZED IRRIGATION: None available, no surface water rights from Fort Hall Irrigation project. PROCESS APPLICABLE LAWS AND PLANS: Idaho Statutes §67-6512: Special Use Permits, Conditions, and Procedures Chubbuck Comprehensive Plan (as amended) Chubbuck City Code Title 18: Land Use, particularly: a. Chapter 18.08: Land Use Districts and General Controls b. Chapter 18.12:30.6 Supplemental Controls for Particular Uses: Animal Care Sites c. Chapter 18.16: Design Overlay District and Criteria d. Chapter 18.28.020: Conditional Use Permits (CUP) Procedures PROCEDURES: 1. In accordance with City Code 18.28.020 and the current fee resolution, a complete petition and fees for a Conditional Use Permit were filed with the City at least 29 days prior to the public hearing and which contained the appropriate documents. 2. In accordance with City Code 18.28.010, the application is scheduled to be heard at a Regular Meeting of the Land Use and Development Commission at a public hearing. 3. In accordance with City Code 18.28.010 and Idaho Statutes §67-6509 and §67-6512, notice of the public hearing was provided at least 15 days prior to the public hearing: a. Publication in the Idaho State Journal; b. Notice posted on the premises; c. Mailing to owners of property within a 300 ft. radius of the site; and d. Notice sent to utilities and political subdivisions providing services within the City; and e. Notices posted prominently at the City office and on webpage. 4. The hearing will be conducted in accordance with procedures established by City Code 18.28.010 and Resolution No. 2021-06. PUBLIC COMMENTS: No written comments were received as of this report. POLITICAL SUBDIVISION/AGENCY COMMENTS: No written comments were received as of this report 290 E Linden Avenue, Chubbuck, ID 83202 Phone 208.237.2430 CHUBBUCK www.CityofChubbuck.us 1 0 R H 0 GENERAL REQUIREMENTS AND PROCEDURES The following code regarding CUPS should be used in evaluating and weighing the application: 18.28.020.CS. Standards for Approving a CUP: A CUP may only be approved if the Commission makes affirmative findings of fact on each of the following standards. These are addressed by the applicant with the submittal (see attached), section E8: 1. The proposed use is conditionally permitted in the subject zoning district and complies with all of the applicable provisions of city code unless modified through the conditional use permit process. 2. The proposed use is generally not in conflict with the goals, objectives, and policies of the adopted Comprehensive Plan. 3. The proposed use is compatible with other existing and permitted uses in the general vicinity. 4. The proposed use is harmonious in scale, mass, coverage, density, and intensity with all adjacent permitted land uses. 5. The proposed use would not place an undue burden on transportation, police, fire and EMS protection, water/sewer, schools, and other public facilities or agencies, in the vicinity. 6. The proposed use, if it complies with all conditions imposed, will not adversely affect other properties or the environment in the vicinity to a materially greater extent than would uses permitted outright by this Code. 18.28.020.C6. Conditions for Approval: To make affirmative findings relating to the standards established in section 18.28.020.C.5, the Commission may condition approval of the permit on compliance, including but not limited to, the following: Conformity to approved plans and specifications. The Comprehensive Plan Future Land policy designates the area as Commercial, allowing for General and Limited Commercial (C-2 and C-7) zones. If the property were to change to the C-2 zone in the future, on Animal Care Site is also a conditional use. 2. Provision of open spaces, pathways, buffer strips, walls, fences, landscaping, and lighting. The site design includes the required landscaping and lighting. As a small site in an agricultural setting, it is surrounded by undeveloped land. 3. Minimizing adverse impact on other development. The proposed site plan, and recommended by the Design Review Committee, includes: a. The project will only have road access via the current private drive across city property to New Day Parkway. b. Existing neighboring uses are pasturing of livestock and growing crops. The proposed development is compatible with these uses. c. The applicant has considered the presence of multiple animals on site. The building and individual animal runs have been designed to reduce any impacts on the other properties. 4. Controlling the sequence and timing of development. Because the project is not building any new streets, utilities are stubbed into the property, and there is only one structure planned, the sequence and timing should not disrupt traffic or utility service provision. 290 E Linden Avenue, Chubbuck, ID 83202 Phone 208.237.2430 CHUBBUCK www.CityofChubbuck.us 1 0 R H 0 5. Assuring that development is maintained properly. The development site is on the same land as the owner. The site frontage is not on the street, but against a City parcel. In lieu of frontage landscaping on the parcel, staff recommends the applicant maintain the area between his property line and City landscaping along the New Day Pkwy pathway to minimize weed growth. 6. Designating the provision of on-site or off-site public facilities or services. There are no outstanding issues. 7. Requiring more restrictive standards than those generally required by the Code. The development is adhering to higher and more restrictive standards than are normal requirements for the Agriculture zone. 8. Requiring the mitigation of effects of the proposed development upon service delivery to the property by any political subdivision, including school districts. During the Design Review no impacts or burdens were recognized. No comments have been received from utilities, the school district, or other political subdivisions. STAFF RECOMMENDATION Based on the Standards for Approving a CUP, and Conditions for Approval above, staff recommends approval of the Findings of Fact and Conclusions of Law, with the proposed use, site plan, and other details of the project as presented. When agreement is reached among neighbors for a new road access, and upon its construction, access to the site will change from New Day Pkwy to the new street, and the street frontage will require landscaping per City code. In lieu of frontage landscaping on New Day Pkwy, applicant shall maintain area behind pathway landscaped strip to their property to minimize weed growth. Contact Parks Department before applying herbicides. EXHIBITS 1. Findings of Fact and Conclusions of Law 2. Application Materials 3. Current Zoning Map 4. Comprehensive Plan Future Land Use Map 5. Comprehensive Plan Policies Relevant to the Application • Additional materials on file with staff, available upon request o Copy of warranty deed o Traffic Statement o Evidence of notice REPORT: Don Matson, MSP I AICP Staff comments in this report are based Planning Manager solely upon evidence available at the time dmatson@cityofchubbuck.us 1 (208) 239-3252 of the report. Additional information may be DATE: June 30, 2023 brought to light at or before the hearing. CHUBBUCK 1 0 R H 0 290 E Linden Avenue, Chubbuck, ID 83202 Phone 208.237.2430 www.CityofChubbuck.us CHUBBUCK 1 0 A H 0 LAND USE & DEVELOPMENT COMMISSION 290 E Linden Avenue, Chubbuck, ID 83202 Phone 208.237.2430 www.CityofChubbuck.us FINDINGS OF FACT & CONCLUSIONS OF LAW A CONDITIONAL USE PERMIT FOR AN ANIMAL CARE SITE (PET BOARDING) IN AN AGRICULTURE (A) ZONE FACTS REQUEST: Request is for a Conditional Use Permit for an animal care site (pet boarding) in the Agricultural (A) zone district as required by Section 18.08.040 of Chubbuck city code. TYPE OF COMMISSION ACTION: Quasi -Judicial (Subject to appeal; decisions must be supported by the evidence and by applying law to the facts; decisions shall be based on the criteria and standards for approval per section 18.28.020.C.5 of City Code). The Commission may approve with or without conditions, may table a decision, or may deny the application. APPLICANT AND OWNER: Larry P. Dunn 702 New Day Parkway Chubbuck, ID 83202 LOCATION: The site is near the northeast corner of Hiline Rd and New Day Pkwy. The project area is sloped through the center, the facility would be built on the more level upper part of the parcel. SITE CHARACTERISTICS & ZONING CURRENT ZONING: Agriculture (A) CURRENT LAND USE: Pasture EXISTING STRUCTURES: None PROJECT SIZE: ±1.2 acres VIEWS: Less visible from the west; more visible from higher elevated areas south and east TOPOGRAPHY: Slope down from northeast to southwest SURROUNDING LAND USES AND ZONING RECENT TRAFFIC COUNTS ON NEW DAY: West of Hiline Rd — 2020, 5,323/day East of Hiline Rd — no data available RECENT TRAFFIC COUNTS ON HILINE RD: North of New Day — 2021, 4,186/day South of New Day - - 2020, 5,114/day — 2022, 4,754/day NORTH: Single family home with pasture; Agriculture (A) zone EAST: Pasture; Agriculture (A) zone SOUTH: New Day Parkway and undeveloped area; General Commercial (C-2) and Agriculture (A) zones WEST: Single family home (project owner), and Hiline Canal; Agriculture (A) zone SERVICES: ACCESS STREET: New Day Parkway Per Design Review Committee it is recognized that changes to the access and site alignment may happen, depending on whether agreement is reached among neighbors for a new road access. CUP Approval Form- FFCL EMERGENCY SERVICES: City of Chubbuck CULINARY WATER SERVICES: City of Chubbuck, water main below building site in New Day Pkwy SEWAGE DISPOSAL: City of Chubbuck, sewer main below building site in New Day Pkwy PRESSURIZED IRRIGATION: None available, no surface water rights from Fort Hall Irrigation project. APPLICABLE LAWS AND PLANS: 1. Idaho Statutes §67-6512: Special Use Permits, Conditions, and Procedures 2. Chubbuck Comprehensive Plan (as amended) 3. Chubbuck City Code Title 18: Land Use, particularly a. Chapter 18.08 Land Use Districts and General Controls b. Chapter 18.12:30.6 Supplemental Controls for Particular Uses: Animal Care Sites c. Chapter 18.16: Design Overlay District and Criteria d. Chapter 18.28.020 Conditional Use Permits (CUP) Procedures PROCEDURES: 1. A design review clearance was obtained May 3, 2023 in accordance with Chapter 18.16: Design Review Criteria of City Code. 2. In accordance with City Code 18.28.020 and the current fee resolution, a complete petition and fees for a Conditional Use Permit were filed with the City at least 28 days prior to the public hearing and which contained the appropriate documents. 3. In accordance with City Code 18.28.010, a public hearing was scheduled before the LUDC at the July 11, 2023 regular meeting of the Commission. 4. In accordance with City Code 18.28.010 and Idaho Statutes §67-6509 and §67-6512, notice of the public hearing was provided at least 15 days prior to the public hearing as follows: a. Publication in the Idaho State Journal; b. Notice posted on the premises; c. Mailing to owners of property within a 300 ft. radius of the site; d. Notice sent to utilities and political subdivisions providing services within the City; and e. Notices posted prominently at the City office and on webpage. 5. A public hearing was conducted in accordance with procedures established by City Code 18.28.010 and Resolution No. 2021-06. PUBLIC AND AGENCY COMMENTS: Public and agency comments were taken in accordance with statutory requirements. RECORD: The record is on file with City of Chubbuck Staff and consists of the application materials, staff reports and memos, public and agency testimony, meeting minutes, and applicable portions of city and state law. FINDINGS Having reviewed the record, including the application materials, staff report, testimony provided at the hearing and meeting, and the criteria for approval of a Conditional Use Permit as found in city code section 18.28.020.C5 and the ability to impose conditions of approval in accordance with section 18.29.020.C6, the Land Use and Development Commission finds the following: CHUBBUCK 1 0 R H 0 290 E Linden Avenue, Chubbuck, ID 83202 Phone 208.237.2430 www.CityofChubbuck.us CUP Approval Form- FFCL 1. Conditions of Approval necessary to approve the Permit are: a. When agreement is reached among neighbors for a new road access, and upon its construction, access to the site will change from New Day Pkwy to the new street, and the street frontage will require landscaping per City code. b. In lieu of frontage landscaping on New Day Pkwy, applicant shall maintain area behind pathway landscaped strip to their property to minimize weed growth. Contact Parks Department before applying herbicides. C. on 2. The proposed use is conditionally permitted in the subject zoning district and complies with all of the applicable provisions of city code unless modified through the conditional use permit process. 3. The proposed use is generally not in conflict with the goals, objectives, and policies of the adopted Comprehensive Plan. 4. The proposed use is compatible with other existing and permitted uses in the general vicinity. 5. The proposed use is harmonious in scale, mass, coverage, density, and intensity with all adjacent permitted land uses. The proposed use would not place an undue burden on transportation, police, fire and EMS protection, water/sewer, schools, and other public facilities or agencies, in the vicinity. The proposed use, if it complies with all conditions imposed, WILL NOT adversely affect other properties or the environment in the vicinity to a materially greater extent than would uses permitted outright by this Code. ORDER: CONCLUSION AND DECISION: PERMIT TERMS 1. The Land Use and Development Commission, pursuant to the aforementioned, finds that the request for a Conditional Use Permit as herein described, shall be APPROVED. 2. Pursuant to Idaho Code § 67-8001 et seq., the Commission makes the following findings with respect to the decision in this action: a. This Action does not deprive the owner of the property of all viable uses of the property 290 E Linden Avenue, Chubbuck, ID 83202 Phone 208.237.2430 CHUBBUCK www.CityofChubbuck.us 1 0 R H 0 CUP Approval Form- FFCL b. This Action does not have a significant impact on the landowner's economic interest. c. This Action does not deny a fundamental attribute of ownership. 3. Applicant has a right to request a regulatory takings analysis pursuant to section 67-8003, Idaho Code. 4. This decision is effective ten (10) calendar days from its signing by the Chair. 5. Unless a longer time shall be specifically established as a condition or allowance of approval, a conditional use permit shall lapse and become automatically void one (1) calendar year following the date on which such permit became effective, unless prior to expiration, the use has commenced, and all conditions of the permit are satisfied. 6. CUP is non -transferable from one (1) parcel of land to another and shall run with the land and continue to be valid upon a change of ownership of the site or structure, providing however, that the new owner complies with the terms of the permit. CUPs may be revoked by the Community Services Director at any time if it is determined that any condition of the CUP or any other city code is being violated. Prior to revocation, the applicant shall be afforded thirty (30) days after the date of notification of noncompliance/intent to revoke to become compliant. Additionally, prior to revocation, the applicant shall be afforded an opportunity for a hearing before LUDC; said hearing must be requested within ten (10) calendar days of the date of notification of noncompliance/intent to revoke the conditional use permit. Failure to come into compliance within thirty (30) days of the notification of noncompliance and failure to request such a hearing will result in immediate revocation of the approved CUP and may constitute a violation of this title. 8. Whether approved, approved with conditions, or denied, any party seeking judicial review of the decision must first appeal this decision to the City Council in accordance with section 18.28.080 and 18.28.090. APPROVED BY THE CHAIR OF THE LAND USE & DEVELOPMENT COMMISSION OF CITY OF CHUBBUCK, IDAHO, this day of Jason C. Mendenhall, Chair ATTEST: 20 Joey Bowers, Clerk 290 E Linden Avenue, Chubbuck, ID 83202 Phone 208.237.2430 CHUBBUCK www.CityofChubbuck.us 1 0 R H 0 L CHUBBUCK 290 E Linden Avenue CONDITIONAL USE PERMIT Chubbuck, ID 83202 208.237.2430 — Fax 208.237.2409 (CUP) APPLICATION www.CityofChubbuck.us Aug. 2021 Form PAGE 1 OF 4 Complete applications which require review by the Land Use & Development Commission must be submitted at least 28 days before the desired review meeting. The Commission meets regularly on the 2nd Tuesday of every month. Applications which are incomplete may not be able to be scheduled on the desire date if missing information or materials are not submitted at least 28 days before the desire review meeting. DATE RECEIVED: INITIALS: FEES PAID? Y N AMOUNT: SECTION A —APPLICANT INFORMATION Al. Name Larry P. Dunn A2. Mailing Address 702 New Day Parkway city Chubbuck State ID Zip Code 83202 A3. Phone Number (including area code) A4. Email Address (208) 240-4012 larrydunn1332@msn.com AS. Is Applicant the Owner of Record? ❑✓ Yes M No; If "No", an Affidavit of Legal Interest must be completed and submitted under Section E, below SECTION B—OWNER INFORMATION (IF DIFFERENT THAN SECTION A) B1. Name Same as above B2. Mailing Address City State Zip Code B3. Phone Number (including area code) B4. Email Address SECTION C - SITE INFORMATION Cl. Site Address (or Location if no Address) City Zip C2. Subdivision Name, Lot, Block, Div. No. (or Parcel No.) 730 New Day Parkway Chubbuck 83202 Parcel 2 SECTION D — PLANNING INFORMATION D1. Project Name D2. Project Size in Acres Northgate Pet Boarding Appx. 1.2 acres D3. Current Land Use(s) and Structures: The parcel where the project is to be located is fenced pasture without any structures. L CHUBBUCK 1 0 A H d 290 E Linden Avenue Chubbuck, ID 83202 208.237.2430 — Fax 208.237.2409 www.CityofChubbuck.us CONDITIONAL USE PERMIT (CUP) APPLICATION Aug. 2021 Form PAGE 2 OF 4 D5. Project request and detailed summary (attach additional sheet if necessary): See attachment SECTION E —SUBMITTAL REQUIREMENTS AND ATTACHMENTS E1. Application Fees: $ 585.00 CUP Fee + $ _ Notice Fee ($1.50 x _ required noticed — get # from staff) = $ Total E2. Affidavit of Legal Interest: To be signed by the property owner(s) if the application will be represented by someone other than the property owner E3. Warranty deed(s) showing ownership for all properties included in amendment request E4. Proposed site plan and drawings showing: • Property boundaries • Existing and proposed buildings • Proposed buildings/uses • Proposed parking stalls and drive aisles • Sidewalks and pathways E5. Floor Plan E6. Copy of Design Review Committee minutes (if Committee approval is required) showing technical requirements of project and conditions of approval, and explanation of how the project design has resolved any issues. E7. Copies of any special studies or other information required by City Staff E8. Explanation of how the use meets the Standards for Approving a CUP (use additional sheet if necessary): 1. How will the proposed use comply with all applicable provisions of city code, unless modified through the CUP process? The owner does not believe the development will cause any non-compliance with city codes.The owner has been working closely with the City of Chubbuck Planning Manager and Community Services Director to ensure all codes have been met. The owner is very interested in meeting or exceeding all codes. If any modifications granted through the CUP process are made the owner will submit a written plan including expected actions and completion dates. CONDITIONAL USE PERMIT (CUP) APPLICATION Aug. 2021 Form PAGE 3 OF 4 2. How is the proposed use in conformance with the goals, objectives, and policies of the adopted Comprehensive Plan? See attached. 3. How is the use compatible with other existing or permitted uses in the general vicinity? Have changes been made to the proposal to enhance compatibility? There are not any commercial businesses in the general vicinity. Existing uses are pasturing of farm animals and agricultural lands. This project is compatible with other types of uses. 4. How is the proposed use harmonious in scale, mass, coverage, density, and intensity with all adjacent permitted land uses? The adjacent properties are also used for animal care. Most is pasture land or crop land. The proposed development for this CUP will not significantly change the current or future land use. Are there any elements of the proposed use which could create undue burdens on transportation, police, fire, EMS protection, water/sewer, schools, or other public agencies or facilities in the vicinity? If so, how are the impacts being mitigated? During the design review there were not any impacts or burdens recognized. 290 E Linden Avenue Chubbuck,ID 83202 CHUBBUCK 208.237.2430 — Fax 208.237.2409 www.CityofChubbuck.us 1 0 A H d CONDITIONAL USE PERMIT (CUP) APPLICATION Aug. 2021 Form PAGE 3 OF 4 2. How is the proposed use in conformance with the goals, objectives, and policies of the adopted Comprehensive Plan? See attached. 3. How is the use compatible with other existing or permitted uses in the general vicinity? Have changes been made to the proposal to enhance compatibility? There are not any commercial businesses in the general vicinity. Existing uses are pasturing of farm animals and agricultural lands. This project is compatible with other types of uses. 4. How is the proposed use harmonious in scale, mass, coverage, density, and intensity with all adjacent permitted land uses? The adjacent properties are also used for animal care. Most is pasture land or crop land. The proposed development for this CUP will not significantly change the current or future land use. Are there any elements of the proposed use which could create undue burdens on transportation, police, fire, EMS protection, water/sewer, schools, or other public agencies or facilities in the vicinity? If so, how are the impacts being mitigated? During the design review there were not any impacts or burdens recognized. 290 E Linden Avenue CONDITIONAL USE PERMIT Chubbuck, 1D 83202 208.237.2430 — Fax 208.237.2409 (CUP) APPLICATION CHUBBUCK www.CityofChubbuck.us Aug. 2021 Form PAGE 4 OF 4 I Q 9 11 3 6. Are there any elements of the proposed use which could adversely affect other properties or the environment in the vicinity? if so, how are the impacts being mitigated? There are not any adverse effects recognized with the proposed development. The owner has considered the sight and sound of multiple animals. The building and individual animal runs have been designed to reduce any impacts on the other properties. There are not any environmental concerns that have not been addressed. Stormwater run-off, chemicals, animal hair, solid waste, and liquid waste have all been addressed with the current project. SECTION F- CERTIFICATION • 1, the undersigned, hereby certify that the information herein and attached hereto is true and correct to the best of my knowledge. • i am aware that if this application is not complete, the review process will not continue until it is so deemed by the City upon further submission of materials. • 1 hereby authorize the filing of this application and grant approval of on-site review of the development described herein. • 1 certify that I am authorized to file this application. • Prior to the hearings, a public notice sign will be posted on the property in 1 or more locations as required by city and state law. I certify that I will ensure that the signs remain where placed and will remain upright and in their original condition until removed by city staff and that failure to do so may result in a delay in process/hearing and may result in additional fees for rescheduled public hearings. Fl. Signature F2. Printed Name F3. Date /Z, ---- a J'//v c/ o14a 3 I STOP. SECTION G -FOR STAFF USE ONLY G1. COMPLETENESS REVIEW: Reviewed by: Deemed complete? ❑Yes ❑ No If no, list concerns): Date: Applicant Notified? ❑Yes FINo Comments: G:!. SCHEDULED FOR LDDC: Scheduled Meeting Date: Applicant Contacted? F1Yes ❑No Conditional Use Permit Application for Northgate Pet Boarding, 730 New Day Parkway, Chubbuck, 83202. Section D5 Larry and Heather Dunn are applying to the City of Chubbuck for a Conditional Use Permit (CUP) to operate an Animal Care site at 730 New Day Parkway, Chubbuck, ID 83202. There is a definite shortage of facilities that provide dog day care and dog and cat boarding in the areas of Chubbuck and Pocatello. As Chubbuck grows the need for dog and cat daycare and boarding will grow as well. We have adequate space on our land in the new area of New Day Parkway where we can build a state-of-the-art facility. We believe our business will be a fantastic addition to the city. The project is being designed to be an attractive building and site. Pet owners will have a safe and clean environment to take their pets when needed. This will reduce the number of pet issues for the city. A Design Review Clearance has been granted in leu of the following comments. Below are the responses to the Committee's highlighted comments. All other comments will be satisfied to meet the City's requirements. • Lighting Standards — Fixture descriptions are being addressed by the building contractor and will be submitted with the engineered site plan in progress. • Curb, Gutter, Sidewalks/ADA - The project will provide payment with the building permit to pave approximately eighty feet of the walking path along the frontage of the business entrance (Subject to change with construction of new connector, construction will be negotiated with and completed under the direction of the city. • Site Plan / Traffic Circulation — (1) The driveway and parking area will be paved as soon as the proposed connector is constructed. There will be ongoing discussions with the city and the two parties that are developing the connector that will possibly be the future access to the business and residence of the Owner. We have discussed with the city the possibility of a temporary allowance for a gravel driveway until construction of the connector is finalized. (2) The culvert will be installed per the city's requirements. The Owner has asked tin engineering firm to include this on the civil plans. • Sanitation — Owner has asked the engineering firm to include the requested location for the dumpster enclosure on the civil plans. • Fire Codes — A knock Box will be installed on the building and water supply for suppression will be addressed in the civil plans. • Stormwater—This will be addressed in the civil plans. • Landscaping — An agreement between the Owner and the city will be completed prior to the application for a building permit. Conditional Use Permit Application for Northgate Pet Boarding, 730 New Day Parkway, Chubbuck, 83202. Section E4 Attached are preliminary site drawings. Civil drawings are being prepared by Noesis Engineering Services and will be available for submittal to the City of Chubbuck soon. Section E8, Question #2 Chapter 4, Land Use: Goal 3, Provide convenient commercial service locations and limit their adverse impacts on transportation systems, residences, and visual integrity. (There will not be any adverse impacts to transportation systems. A traffic analysis was completed and approved by the city. There will not be any adverse impacts to residences. There is only one residence in the vicinity. Visual integrity will remain high. The building is a new construction and has a very nice design. Light pollution will be reduced by using the proper fixtures and adjustments) Chapter 7, Government Services: Policy 6.2.a, Minimize the cost of services and utilities needed to support new developments using phased service extensions, concurrency of improvements, or through other means. (Animal hair traps will be installed to minimize the hair at the city sanitary sewer). Chapter 9, Natural Resources: Policy 2.1.f, Assure that new development manages stormwater runoff and minimized the impact of flooding downstream. (Civil engineers are preparing drawings and plans to install stormwater retention areas to mitigate flooding) Chapter 9, Natural Resources: Policy 3.1.c, Require the inclusion of bicycle and pedestrian systems during subdivision review and development to support alternative modes of transportation. (The project will help fund a portion of the bicycle/pedestrian path on the North side of New Day Parkway) Chapter 9, Natural Resources: Policy 3.3.d, Require paving of parking lots. All parking areas will be paved when the project and adjacent roads are completed. TETON Oro/ WEST P.O. Box 176 162 N Yellowstone Hwy Rigby, ID 83442 (208) 356-7979 Contract and Proposal for LARRY DUNN Chubbuck, ID Prepared by Ammon Bingham on April 11, 2023 Teton West of Idaho Contract and Proposal for LARRY DUNN Page 1 1 2 3 rd k" on 120'-0" 1' 24'- 0" 24'- 0" 24'- 0" 24'- 0" 24'- 0" 0 B 0 OFFICE CIO L 1 C 0 0 CIO D 0 E 2 3 rd k" on 120'-0" 1' 24'- 0" 24'- 0" 24'- 0" 24'- 0" 24'- 0" j) Level 1 1:140 m m m m NOTES: A. FOR REFERENCE ONLY. COORDINATE WITH ERECTION DRAWINGS. B. UNLESS OTHERWISE NOTED, DIMENSIONS ARE TO CENTER OF COLUMN, CENTER OF FRAMED OPENING, OR TO OUTSIDE OF CONCRETE. C. ENDWALL FRAME BASEPLANTES TO BOLT TO TOP OF CURB WALL. MAIN FRAME BASE- PLATES TO BOLT TO FINISHED FLOOR HEIGHT. D. CONFIRM DOOR AND WINDOW LOCATIONS WITH OWNER. Level 1 - Floor Plan TET 0 N WEST BUILDER Teton West of Idaho CUSTOMER Larry and Heather Dunn LocATION Chubbuck, ID PROJECT Boarding Kennel Scale: 1 : 140 BUILDER'S POM FILENAME: EALany Dunn 60x120.M JOB M Protect lJ�niber DATE 09/23/2022 VP BUILDINGS DRAwwcRECK VARCO-PRUDEN PAGE A 1.1 OFFICE L 1 FALCON RM,,- bee- � ■psi■�■i■�■isi■■■��i■i■�ai IIII!I II j) Level 1 1:140 m m m m NOTES: A. FOR REFERENCE ONLY. COORDINATE WITH ERECTION DRAWINGS. B. UNLESS OTHERWISE NOTED, DIMENSIONS ARE TO CENTER OF COLUMN, CENTER OF FRAMED OPENING, OR TO OUTSIDE OF CONCRETE. C. ENDWALL FRAME BASEPLANTES TO BOLT TO TOP OF CURB WALL. MAIN FRAME BASE- PLATES TO BOLT TO FINISHED FLOOR HEIGHT. D. CONFIRM DOOR AND WINDOW LOCATIONS WITH OWNER. Level 1 - Floor Plan TET 0 N WEST BUILDER Teton West of Idaho CUSTOMER Larry and Heather Dunn LocATION Chubbuck, ID PROJECT Boarding Kennel Scale: 1 : 140 BUILDER'S POM FILENAME: EALany Dunn 60x120.M JOB M Protect lJ�niber DATE 09/23/2022 VP BUILDINGS DRAwwcRECK VARCO-PRUDEN PAGE A 1.1 J Lu EXISTING BLDG EXISTING B HYDRANT I Z m Lu z K ❑ Lu U z W LL Lu LL 0 GG X / P / _LX nSite U 1 " O f � f � l f \ A� Oq f ON \ �O MIN. 1000 GA o < PROPANE TANK O O r 0 009 N OSLO d PROPOSED P�OPd m p a w 170' MIN PROPOSED d ¢ a O p Fl d/ w a Co o NEW CONSTRUCTION TEMPORARY b 25'MAX GRAVEL ON ' PARKING O o DUMPSTER z ENCLOSURE � C5' - 0" 8' - 0" X X � X X X X X X X k X X X X X FIELD FENCE PARCEL NUMBER: RPRCCPC041300 W U z W LL❑ J Lu LL FILENAME: EAL." Dunn 60x720.M NOTES: A. TETON WEST OF IDAHO DOES NOT PROVIDE SURVEYING, CIVIL ENGIN- EERING, OR GEO TECHNICAL DATA. IT IS THE RESPONSIBILITY OF THE OWNER TO OBTAIN THESE SERVIC- ES IF THEY ARE REQUIRED. B. THIS SITE PLAN WAS CREATED USING PUBLIC DOCUMENTS. ALL MEASUREMENTS SHOULD BE ASSUMED APPROXIMATIONS. C. CITY TO CONFIRM UTILITY LOCAT- IONS. D. APPROACH AND PARKING PROPOSED TO BE TEMPORARY COMPACTED GRAVEL. E. CONTRACTOR SHALL PRESERVE EXISTING PLANTS, FENCES, AND GROUNDCOVER WHERE POSSIBLE. F. PROPOSED UTILITY LOCATIONS FOR NEW BUILDING TO BE CONFIRMED BY AUTHORITY HAVING JURISDICTION. /ac -4-\ CHUBBUCK 1 0 A H 0 To: Larry Dunn 208-240-4012 Community Services Department Planning Services Division 290 E Linden Avenue, Chubbuck, ID 83202 Phone 208.237.2430 www.CityofChubbuck.us From: Don Matson, Planning Manager Date: May 3, 2023 RE: Pet Boarding Kennel Northgate Pet Boarding 702 New Day Parkway DESIGN REVIEW COMMENTS FOR CLEARANCE Thank you for your Design Review Clearance application and information for your project. Below are the Design Review Committee (Committee) comments and requirements for clearance for the project. Address items marked with a • at the appropriate points in the development process. Notes: Access and alignment/site plan may result in changes depending on whether agreement is reached among neighbors for a new road access. Civil plans for paving, drainage, water supply etc., may be submitted with building permit application. For the Conditional Use Permit (CUP) application, you'll include this memo and a response to how the issues have been addressed, or will be addressed with the building permit process, etc. Please contact me if you have any questions or would like to meet with members of the Committee about any of the decisions. Regards, Don Matson, Planning Manager Phone: 208-239-3252 1 Email: dmatson@cityofchubbuck.us Design Review clearance is not an approval of other required permits or licenses and is only an approval of authorized functions of the Committee per Chapter 78.76 of Chubbuck Municipal Code. Land Use and Zoning Your project is defined as an animal care site per city land use/zoning code, where there are a few unique references pertaining to your project. There are other references to kennels in the land use and animal control chapters of City Code. A copy of both sections are attached; the kennel references are provided for your information, and offer some guidance in complying with various standards and codes. Traffic Study Standards The submitted traffic impact statement is acceptable to the city. Lighting Standards • Submit fixture descriptions at building permit to verify there will be no light trespass off site or into night sky. Street / Approach / Access Management 1. Will be using existing approach from New Day Parkway. Page 1 Curb, Gutter, Sidewalks / ADA 1. City standards require developments to install curb, gutter, and sidewalk. Curb and gutter at site are already in place, but sidewalk, in this case the pathway, is not yet finished. 2. The width of your project "frontage" is approximately 80 feet. • Rather than finishing/paving an 80 foot section of the path, provide payment in lieu of construction, with building permit. Construction will be completed later under direction of the City with other segments of the path. Site Plan / Traffic Circulation 1. Site plan shows driveway as gravel. Code requires pavement for drive aisles and parking, and striping of stalls is required. • Pave driveway and parking area with site construction. 2. The new driveway will block some runoff, a culvert is needed. • At the time a new drive is constructed to the site a 12" diameter culvert is required from the east to the borrow ditch on the west of the existing drive — see sketch. LU 0 PROPOSED � a V X� 1]V MIN PR�POSF� .J x ' iTEPAMn ED of _ be.. GRAM 12" drainage j I culvert V * z " OUMPSTER ENCLO S U RE S' 0 FIELD FEW Sanitation 1. The shown dumpster enclosure is too small for the city to service. It will need to meet the city's minimum size of 11' wide x 10' deep, inside dimensions. It will also need to meet the minimum requirements shown in the attached city's standard detail. The dumpster can be better served if it is placed about 10' to the south of the shown location. • Please adjust the location as shown in the attached layout. • If sanitation facility/dumpster will contain animal waste, the facility shall be maintained so as to prevent odors detectable from public areas and abutting properties 2. If applicant intends to have a commercial recycle container to be serviced by a private company, the dumpster enclosure will need to be sized for both containers or a separate location for the recycle container will need to be provided. Fire Codes • Install a KnoxBox on the building. • Water supply for fire suppression will need to be addressed on civil plans. Addressing / Display 1. 730 New Day Parkway will be assigned to the business. Please contact staff if a different address is desired. al 290 E Linden Avenue, Chubbuck, ID 83202 208.237.2430 — Fax 208.237.2409 CHUBBUCK www•CityofChubbuck.us 1AAAA Street address needs to be visible from New Day Parkway; city will display addresses for home and business with the private drive sign. Parking / Accessible Parking 1. No standard available — parking supply based on codes from other cities. Staff supports the proposed number of parking stalls; there is also additional area for potential parking — any overflow will not affect street traffic. Stormwater Stormwater must be retained on site. A stormwater report meeting the city's requirements (the Portneuf Valley Stormwater Design Manual) and corresponding plan will need to be submitted for review. • Submit plan with building permit application. Wastewater Pre -Treatment / Chemicals On-site and Disposal Provide filtration system in kennel and grooming areas, to reduce amount of animal hair entering city sewer. A Nonresidential Wastewater Discharge Permit is required after beginning operations. City Public Works will initiate contact at that time. Water / Sewer Standards 1. Estimate of water/sewer usage needs to be provided to help determine appropriate wastewater capacity fee. Water capacity fee will be based on service line/meter size. • Submit plans showing water and sewer utilities for City review, as part of civil plans. Building Codes / Setbacks 1. Emergency Services & Police Development Impact Fees will be due at building permit stage. Fees below based on 7,200 sq. ft and "General Commercial" classification: a. Emergency Services = $2,229.62 b. Police = $2,688.98 Building Design / Elevations 1. Design appropriate for site and zoning district. Comment: Building looks great. Love the design for this use. Signs One wall sign is planned on building, future sign at drive entrance. Wall sign permit can be processed at same time as building permit. Future sign away from building will need review prior to permitting. Any sign facing street will need to be on private property. See also comments under addressing. Landscaping 1. Parking: parking lot area 660 sf landscaping is required, with at least 4 trees. Total sf in site plan exceeds 800 sf, but no trees identified — appear to be shrubs on landscape plan. Please clarify. 2. Street frontage: approximately 750 sf is generally required of this project. • Since the front of the parcel is against city property, not a street, City will consider landscaping agreement for part of City parcel in lieu of property frontage landscaping. 194�0t\ CHUBBUCK 1 0 R H 0 290 E Linden Avenue, Chubbuck, ID 83202 208.237.2430 — Fax 208.237.2409 www.CityofChubbuck.us Conditional Use Permit EXHIBIT 3: CURRENT ZONING MAP Chubbuck Zoning Districts Agriculture (A) Single Family Residential (R-1) Limited Residential (R-2) Limited Residential - P (R -2P) ■ Dense Residential (R-4) Limited Commercial (C-1) ■ General Commercial (C-2) Industrial (1) ■ Planned Unit Development (PUD) . Creative Community Creative Community -Northside Crossing (CC -NC) Creative Community -Harvest Springs (CC -HS) County ■ Highway Cooridor (HC) ■ Village (V) n"F&A Conditional Use Permit EXHIBIT 4: COMPREHENSIVE PLAN FUTURE LAND USE MAP zs DC Subject Property Land Use Designation Commercial ■ Employment ■ High Density Low Density ■ Medium Density Mixed Use Highway Village EXHIBIT 5: COMPREHENSIVE PLAN POLICIES RELEVANT TO THE APPLICATION COMPREHENSIVE PLAN CHAPTER 4: LAND USE GOAL 4.1 DIRECT URBAN GROWTH TO URBAN INFILL AREAS OBJECTIVE 4.1.1 Strongly protect prime agricultural land from development sprawl POLICY c. Discourage sprawl, promote compact development patterns; locate in City limits and Urban Service Boundary (USB) COMMENT The project will consume some pasture, but the site can only be used as pasture, and it is within City limits and the Urban Service Boundary. OBJECTIVE 4.1.2 Coordinate the provision of public services and infrastructure with proposed land use POLICY c. Take advantage of the existing investment by encouraging infill and redevelopment projects COMMENT The property is served by water, sewer, and streets. GOAL 4.5 ENCOURAGE COMPATIBLE LAND USES OBJECTIVE 4.5.1 Encourage a transition from low -intensity to higher intensity land uses POLICY a. Adhere to land use designations on the Comprehensive Plan Map COMMENT The proposal is a commercial purposed and the map designates the area as Commercial. CHAPTER 5: TRANSPORTATION GOAL 5.1 PROVIDE FOR SAFE AND FREE-FLOWING TRAFFIC FOR ALL MODES OF TRANSPORTATION OBJECTIVE 5.1.7 Provide a connected network of pedestrian -friendly streets and pathways POLICY a. Design new streets to connect with other streets, except where topography or existing development prevents a connection COMMENT The project will fund the pavement of the adjacent pathway along New Day Pkwy. CHAPTER 7: GOVERNMENT SERVICES GOAL 7.2 PROTECT LIFE AND PROPERTY IN CHUBBUCK BY PROVIDING FIRE, RESCUE, AND EMERGENCY MEDICAL SERVICES OBJECTIVE 7.2.2 Monitor population growth patterns in consideration of the need for building additional fire stations in Chubbuck POLICY a. Discourage development outside the USB COMMENT The site is within the USB. GOAL 7.5. MANAGE STORMWATER RUN-OFF TO REDUCE SOIL EROSION AND FLOODING OBJECTIVE 7.5.1 Develop and keep up-to-date, a cost-effective and environmentally sensitive stormwater facility master plan POLICY a. Encourage new development to retain stormwater runoff on-site COMMENT Stormwater will be retained on-site. POLICY d. Limit development on steep slopes COMMENT The building will be on the upper level of the property, above the slope. lao�t_\ CHUBBUCK 1 0 R H 0 290 E Linden Avenue, Chubbuck, ID 83202 Phone 208.237.2430 www.CityofChubbuck.us GOAL 7.6 WORK WITH THE CITY OF POCATELLO TO PLAN AND DEVELOP EFFECTIVE PUBLIC WATER AND SANITARY SEWER SERVICES OBJECTIVE 7.6.3 Support efforts to service existing vacant land within the City before extending water and sewer services to development lands outside City limits POLICY d. Public water and sanitary sewer services shall be required for all new urban development within the urban service boundary COMMENT The site is within the USB and water and sewer are available at the site. GOAL 7.7 IDENTIFY FINANCIAL STRATEGIES TO DELIVER COMMUNITY SERVICES AND TO DEVELOP PUBLIC BUILDINGS AND UTILITY SYSTEMS OBJECTIVE 7.7.1 Manage the cost of providing public services to the community POLICY a. Encourage compact development in order to reduce the cost of providing public services COMMENT The topography prevents compact development on the property, and utilities are already extended to the property. CHAPTER 9: NATURAL RESOURCES GOAL 9.3 PROTECT AIR FROM POLLUTION OBJECTIVE 9.3.1 Help citizens reduce reliance on automobiles and the number of daily vehicle miles traveled POLICY c. Require the inclusion of bicycle and pedestrian systems during subdivision review and development to support alternative modes of transportation COMMENT The project will fund the pavement of the adjacent pathway along New Day Pkwy. GOAL 9.4 MINIMIZE THE IMPACT OF NEW DEVELOPMENT ON NATURAL FEATURES OBJECTIVE 9.4.3 Protect steep slopes from erosion and destruction during development POLICY b. Manage hillside development to benefit slope stability, storm drainage management, wildfire protection, and aesthetics COMMENT Most of the slope on the property will remain undisturbed — only a driveway access to the upper part/building site will disturb the slope. GOAL 9.5 PRESERVE FARMLAND WITHIN THE REGION OBJECTIVE 9.5.1 Preserve prime farmland for productive agricultural use for as long as is practical POLICY f. Within agricultural zoning districts, limit residential densities to an average of no more than one dwelling per 40 acres. For new rural development in agricultural districts, use lot -size averaging to cluster homes on small lots while maintaining large parcels for agricultural use COMMENT The property is designated Commercial on the Comprehensive Plan Future Land Use map. With the steep slope the property is no prime farmland. CHAPTER 13: SCHOOL LOCATION AND TRANSPORTATION GOAL 13.1 DELIVER OUR CHILDREN SAFELY TO SCHOOL OBJECTIVE 13.1.2 Create opportunities for children to walk safely to school POLICY a. Establish a system of paths, sidewalks, bike lanes and routes that permit safe access to city schools COMMENT The project will fund the pavement of the New Day pathway adjacent to the site. POLICY b. Consider pedestrian access to nearest school during site plan review COMMENT The adjacent pathway will extend the pedestrian connection to Ellis Elementary. POLICY c. Require sidewalks along both sides of public streets COMMENT The project will fund the pavement of the New Day pathway adjacent to the site. The south side pathway is already paved and landscaped. Aii��Ot\ CHUBBUCK 1 0 290 E Linden Avenue, Chubbuck, ID 83202 Phone 208.237.2430 www.CityofChubbuck.us development. A special access to the site was built with the construction of New Day Pkwy. The access is through a parcel owned by the city, and weed control has been an issue. TYPE OF COMMISSION ACTION: Quasi -Judicial (Subject to appeal; decisions must be supported by the evidence and by applying law to the facts; decisions shall be based on the criteria and standards for approval per section 18.28.020.C.5 of City Code). The Commission may approve with or without conditions, may table a decision, or may deny the application. APPLICANT AND OWNER: Larry P. Dunn 702 New Day Parkway Chubbuck,ID 83202 LOCATION: The site is near the northeast corner of Hiline Rd and New Day Pkwy. The project area is sloped through the center; the facility would be built on the flatter upper part of the parcel. COMPREHENSIVE PLAN FUTURE LAND USE MAP DESIGNATION: The building site and access drive are designated Commercial (C). The remainder of the parcel is designated Mixed Use (MU) REFERENCE MAP: SITE CHARACTERISTICS & ZONING CURRENT ZONING: Agriculture (A) CURRENT LAND USE: Pasture EXISTING STRUCTURES: None PROJECT SIZE: ±1.2 acres VIEWS: Less visible from the west; more visible from higher elevated areas south and east TOPOGRAPHY: Slope down from northeast to southwest CHUBBUCK 1 0 R H 0 RECENT TRAFFIC COUNTS ON NEW DAY: West of Hiline Rd — 2020, 5,323/day East of Hiline Rd — no data available RECENT TRAFFIC COUNTS ON HILINE RD: North of New Day— 2021, 4,186/day South of New Day - - 2020, 5,114/day — 2022, 4,754/day 290 E Linden Avenue, Chubbuck, ID 83202 Phone 208.237.2430 www.CityofChubbuck.us SURROUNDING LAND USES AND ZONING NORTH: Single family home with pasture; Agriculture (A) zone EAST: Pasture; Agriculture (A) zone SOUTH: New Day Parkway and undeveloped area; General Commercial (C-2) and Agriculture (A) zones WEST: Single family home (project owner), and Hiline Canal; Agriculture (A) zone SERVICES: ACCESS STREET: New Day Parkway The Design Review Committee recognized that changes to the access and site alignment may happen, depending on whether agreement is reached among neighbors for a new road access. EMERGENCY SERVICES: City of Chubbuck CULINARY WATER SERVICES: City of Chubbuck, water main below building site in New Day Pkwy SEWAGE DISPOSAL: City of Chubbuck, sewer main below building site in New Day Pkwy PRESSURIZED IRRIGATION: None available, no surface water rights from Fort Hall Irrigation project. PROCESS APPLICABLE LAWS AND PLANS: Idaho Statutes §67-6512: Special Use Permits, Conditions, and Procedures Chubbuck Comprehensive Plan (as amended) Chubbuck City Code Title 18: Land Use, particularly: a. Chapter 18.08: Land Use Districts and General Controls b. Chapter 18.12:30.6 Supplemental Controls for Particular Uses: Animal Care Sites c. Chapter 18.16: Design Overlay District and Criteria d. Chapter 18.28.020: Conditional Use Permits (CUP) Procedures PROCEDURES: 1. In accordance with City Code 18.28.020 and the current fee resolution, a complete petition and fees for a Conditional Use Permit were filed with the City at least 29 days prior to the public hearing and which contained the appropriate documents. 2. In accordance with City Code 18.28.010, the application is scheduled to be heard at a Regular Meeting of the Land Use and Development Commission at a public hearing. 3. In accordance with City Code 18.28.010 and Idaho Statutes §67-6509 and §67-6512, notice of the public hearing was provided at least 15 days prior to the public hearing: a. Publication in the Idaho State Journal; b. Notice posted on the premises; c. Mailing to owners of property within a 300 ft. radius of the site; and d. Notice sent to utilities and political subdivisions providing services within the City; and e. Notices posted prominently at the City office and on webpage. 4. The hearing will be conducted in accordance with procedures established by City Code 18.28.010 and Resolution No. 2021-06. PUBLIC COMMENTS: No written comments were received as of this report. POLITICAL SUBDIVISION/AGENCY COMMENTS: No written comments were received as of this report 290 E Linden Avenue, Chubbuck, ID 83202 Phone 208.237.2430 CHUBBUCK www.CityofChubbuck.us 1 0 R H 0 GENERAL REQUIREMENTS AND PROCEDURES The following code regarding CUPS should be used in evaluating and weighing the application: 18.28.020.CS. Standards for Approving a CUP: A CUP may only be approved if the Commission makes affirmative findings of fact on each of the following standards. These are addressed by the applicant with the submittal (see attached), section E8: 1. The proposed use is conditionally permitted in the subject zoning district and complies with all of the applicable provisions of city code unless modified through the conditional use permit process. 2. The proposed use is generally not in conflict with the goals, objectives, and policies of the adopted Comprehensive Plan. 3. The proposed use is compatible with other existing and permitted uses in the general vicinity. 4. The proposed use is harmonious in scale, mass, coverage, density, and intensity with all adjacent permitted land uses. 5. The proposed use would not place an undue burden on transportation, police, fire and EMS protection, water/sewer, schools, and other public facilities or agencies, in the vicinity. 6. The proposed use, if it complies with all conditions imposed, will not adversely affect other properties or the environment in the vicinity to a materially greater extent than would uses permitted outright by this Code. 18.28.020.C6. Conditions for Approval: To make affirmative findings relating to the standards established in section 18.28.020.C.5, the Commission may condition approval of the permit on compliance, including but not limited to, the following: Conformity to approved plans and specifications. The Comprehensive Plan Future Land policy designates the area as Commercial, allowing for General and Limited Commercial (C-2 and C-7) zones. If the property were to change to the C-2 zone in the future, on Animal Care Site is also a conditional use. 2. Provision of open spaces, pathways, buffer strips, walls, fences, landscaping, and lighting. The site design includes the required landscaping and lighting. As a small site in an agricultural setting, it is surrounded by undeveloped land. 3. Minimizing adverse impact on other development. The proposed site plan, and recommended by the Design Review Committee, includes: a. The project will only have road access via the current private drive across city property to New Day Parkway. b. Existing neighboring uses are pasturing of livestock and growing crops. The proposed development is compatible with these uses. c. The applicant has considered the presence of multiple animals on site. The building and individual animal runs have been designed to reduce any impacts on the other properties. 4. Controlling the sequence and timing of development. Because the project is not building any new streets, utilities are stubbed into the property, and there is only one structure planned, the sequence and timing should not disrupt traffic or utility service provision. 290 E Linden Avenue, Chubbuck, ID 83202 Phone 208.237.2430 CHUBBUCK www.CityofChubbuck.us 1 0 R H 0 5. Assuring that development is maintained properly. The development site is on the same land as the owner. The site frontage is not on the street, but against a City parcel. In lieu of frontage landscaping on the parcel, staff recommends the applicant maintain the area between his property line and City landscaping along the New Day Pkwy pathway to minimize weed growth. 6. Designating the provision of on-site or off-site public facilities or services. There are no outstanding issues. 7. Requiring more restrictive standards than those generally required by the Code. The development is adhering to higher and more restrictive standards than are normal requirements for the Agriculture zone. 8. Requiring the mitigation of effects of the proposed development upon service delivery to the property by any political subdivision, including school districts. During the Design Review no impacts or burdens were recognized. No comments have been received from utilities, the school district, or other political subdivisions. STAFF RECOMMENDATION Based on the Standards for Approving a CUP, and Conditions for Approval above, staff recommends approval of the Findings of Fact and Conclusions of Law, with the proposed use, site plan, and other details of the project as presented. When agreement is reached among neighbors for a new road access, and upon its construction, access to the site will change from New Day Pkwy to the new street, and the street frontage will require landscaping per City code. In lieu of frontage landscaping on New Day Pkwy, applicant shall maintain area behind pathway landscaped strip to their property to minimize weed growth. Contact Parks Department before applying herbicides. EXHIBITS 1. Findings of Fact and Conclusions of Law 2. Application Materials 3. Current Zoning Map 4. Comprehensive Plan Future Land Use Map 5. Comprehensive Plan Policies Relevant to the Application • Additional materials on file with staff, available upon request o Copy of warranty deed o Traffic Statement o Evidence of notice REPORT: Don Matson, MSP I AICP Staff comments in this report are based Planning Manager solely upon evidence available at the time dmatson@cityofchubbuck.us 1 (208) 239-3252 of the report. Additional information may be DATE: June 30, 2023 brought to light at or before the hearing. CHUBBUCK 1 0 R H 0 290 E Linden Avenue, Chubbuck, ID 83202 Phone 208.237.2430 www.CityofChubbuck.us EXHIBIT 5: COMPREHENSIVE PLAN POLICIES RELEVANT TO THE APPLICATION COMPREHENSIVE PLAN CHAPTER 4: LAND USE GOAL 4.1 DIRECT URBAN GROWTH TO URBAN INFILL AREAS OBJECTIVE 4.1.1 Strongly protect prime agricultural land from development sprawl POLICY c. Discourage sprawl, promote compact development patterns; locate in City limits and Urban Service Boundary (USB) COMMENT The project will consume some pasture, but the site can only be used as pasture, and it is within City limits and the Urban Service Boundary. OBJECTIVE 4.1.2 Coordinate the provision of public services and infrastructure with proposed land use POLICY c. Take advantage of the existing investment by encouraging infill and redevelopment projects COMMENT The property is served by water, sewer, and streets. GOAL 4.5 ENCOURAGE COMPATIBLE LAND USES OBJECTIVE 4.5.1 Encourage a transition from low -intensity to higher intensity land uses POLICY a. Adhere to land use designations on the Comprehensive Plan Map COMMENT The proposal is a commercial purposed and the map designates the area as Commercial. CHAPTER 5: TRANSPORTATION GOAL 5.1 PROVIDE FOR SAFE AND FREE-FLOWING TRAFFIC FOR ALL MODES OF TRANSPORTATION OBJECTIVE 5.1.7 Provide a connected network of pedestrian -friendly streets and pathways POLICY a. Design new streets to connect with other streets, except where topography or existing development prevents a connection COMMENT The project will fund the pavement of the adjacent pathway along New Day Pkwy. CHAPTER 7: GOVERNMENT SERVICES GOAL 7.2 PROTECT LIFE AND PROPERTY IN CHUBBUCK BY PROVIDING FIRE, RESCUE, AND EMERGENCY MEDICAL SERVICES OBJECTIVE 7.2.2 Monitor population growth patterns in consideration of the need for building additional fire stations in Chubbuck POLICY a. Discourage development outside the USB COMMENT The site is within the USB. GOAL 7.5. MANAGE STORMWATER RUN-OFF TO REDUCE SOIL EROSION AND FLOODING OBJECTIVE 7.5.1 Develop and keep up-to-date, a cost-effective and environmentally sensitive stormwater facility master plan POLICY a. Encourage new development to retain stormwater runoff on-site COMMENT Stormwater will be retained on-site. POLICY d. Limit development on steep slopes COMMENT The building will be on the upper level of the property, above the slope. lao�t_\ CHUBBUCK 1 0 R H 0 290 E Linden Avenue, Chubbuck, ID 83202 Phone 208.237.2430 www.CityofChubbuck.us Outlook Fw: Info for Animal Care Site From LARRY DUNN <larrydunn1332@msn.com> Date Tue 1/13/2026 6:57 PM To Joey Bowers <JBowers@cityofchubbuck.us>; Don Matson <dmatson@cityofchubbuck.us> B 3 attachments (8 MB) New Day -Dunn Animal Care Site -Design Review Clearance.pdf; CUP Amendment -Oct 2022 -complete and fillable.pdf; Portneuf Valley Stormwater Design Manual.pdf; W41 Get Outlook for iOS From: Devin Hillam <DHillam@cityofchubbuck.us> Sent: Thursday, June 8, 2023 3:52:07 PM To: dsharp@noesis.us <dsharp@noesis.us> Cc: Don Matson <dmatson@cityofchubbuck.us>; larrydunn1332@msn.com <larrydunn1332@msn.com> Subject: Info for Animal Care Site Hi Dan, It was great visiting with you. I've attached a copy of the completed design review clearance that contains items related to design and approvals to move the project forward. I've also attached a copy of the Conditional Use Permit form- in our experience, these CUP applications and the presentations usually go best with the owner/developer making the presentation since they are the ones most familiar with the specific use details and can horse trade on possible conditions of approval, with the owner/developer having their designer in the audience should their technical expertise be needed. As I mentioned, we'll need an application approximately 30 days prior to the scheduled public hearing meeting (our commission meets on the 2nd Tuesday of each month); we can accept the application 28 days prior to the meeting but if documents are missing or the application incomplete, the review will wait for the hearing 60 days out (thus why I recommend getting it in at least 30 days in advance so that we can review and identify any deficiencies). Don Matson is Cc'd and he's our Planning Manager and can walk you and/or Larry through any questions related to the CUP. I've also attached a copy of the Portneuf Valley Stormwater Design Manual. I followed-up with the Fire Chief and provided the access lane is at or under 10% grade, that will work for his department. Vehicle access around the building completely is not required. If the access exceeds 150' in length, it will be deemed a fire apparatus road and require an approved fire turnaround. While our code doesn't require it, I would recommend possibly platting the parcels so that the building does not sit over property lines. As I'm sure you know, structures that sit over property lines can create issues when properties sell and especially when any properties are finances. Again, just a strong recommendation. If the Dunns decide to plat, Sean Harris, our Development Services Manager will be the best point of contact at sharris@cityofchubbuck.us. Best, CHUBBUCK 1 0 0 9 C Devin Hillam, AICP I Community Services Director 290 E Linden Ave. Chubbuck,ID 83202 Office: (208) 239-3239 Work Cell: (208) 844-1436 Department consists of: Parks & Recreation Division Planning Services Division Development Services Division Building Division CAUTION: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. /ac -4-\ CHUBBUCK 1 0 A H 0 To: Larry Dunn 208-240-4012 Community Services Department Planning Services Division 290 E Linden Avenue, Chubbuck, ID 83202 Phone 208.237.2430 www.CityofChubbuck.us From: Don Matson, Planning Manager Date: May 3, 2023 RE: Pet Boarding Kennel Northgate Pet Boarding 702 New Day Parkway DESIGN REVIEW COMMENTS FOR CLEARANCE Thank you for your Design Review Clearance application and information for your project. Below are the Design Review Committee (Committee) comments and requirements for clearance for the project. Address items marked with a • at the appropriate points in the development process. Notes: Access and alignment/site plan may result in changes depending on whether agreement is reached among neighbors for a new road access. Civil plans for paving, drainage, water supply etc., may be submitted with building permit application. For the Conditional Use Permit (CUP) application, you'll include this memo and a response to how the issues have been addressed, or will be addressed with the building permit process, etc. Please contact me if you have any questions or would like to meet with members of the Committee about any of the decisions. Regards, Don Matson, Planning Manager Phone: 208-239-3252 1 Email: dmatson@cityofchubbuck.us Design Review clearance is not an approval of other required permits or licenses and is only an approval of authorized functions of the Committee per Chapter 78.76 of Chubbuck Municipal Code. Land Use and Zoning Your project is defined as an animal care site per city land use/zoning code, where there are a few unique references pertaining to your project. There are other references to kennels in the land use and animal control chapters of City Code. A copy of both sections are attached; the kennel references are provided for your information, and offer some guidance in complying with various standards and codes. Traffic Study Standards The submitted traffic impact statement is acceptable to the city. Lighting Standards • Submit fixture descriptions at building permit to verify there will be no light trespass off site or into night sky. Street / Approach / Access Management 1. Will be using existing approach from New Day Parkway. Page 1 Curb, Gutter, Sidewalks / ADA 1. City standards require developments to install curb, gutter, and sidewalk. Curb and gutter at site are already in place, but sidewalk, in this case the pathway, is not yet finished. 2. The width of your project "frontage" is approximately 80 feet. • Rather than finishing/paving an 80 foot section of the path, provide payment in lieu of construction, with building permit. Construction will be completed later under direction of the City with other segments of the path. Site Plan / Traffic Circulation 1. Site plan shows driveway as gravel. Code requires pavement for drive aisles and parking, and striping of stalls is required. • Pave driveway and parking area with site construction. 2. The new driveway will block some runoff, a culvert is needed. • At the time a new drive is constructed to the site a 12" diameter culvert is required from the east to the borrow ditch on the west of the existing drive — see sketch. LU 0 PROPOSED � a V X� 1]V MIN PR�POSF� .J x ' iTEPAMn ED of _ be.. GRAM 12" drainage j I culvert V * z " OUMPSTER ENCLO S U RE S' 0 FIELD FEW Sanitation 1. The shown dumpster enclosure is too small for the city to service. It will need to meet the city's minimum size of 11' wide x 10' deep, inside dimensions. It will also need to meet the minimum requirements shown in the attached city's standard detail. The dumpster can be better served if it is placed about 10' to the south of the shown location. • Please adjust the location as shown in the attached layout. • If sanitation facility/dumpster will contain animal waste, the facility shall be maintained so as to prevent odors detectable from public areas and abutting properties 2. If applicant intends to have a commercial recycle container to be serviced by a private company, the dumpster enclosure will need to be sized for both containers or a separate location for the recycle container will need to be provided. Fire Codes • Install a KnoxBox on the building. • Water supply for fire suppression will need to be addressed on civil plans. Addressing / Display 1. 730 New Day Parkway will be assigned to the business. Please contact staff if a different address is desired. al 290 E Linden Avenue, Chubbuck, ID 83202 208.237.2430 — Fax 208.237.2409 CHUBBUCK www•CityofChubbuck.us 1AAAA Street address needs to be visible from New Day Parkway; city will display addresses for home and business with the private drive sign. Parking / Accessible Parking 1. No standard available — parking supply based on codes from other cities. Staff supports the proposed number of parking stalls; there is also additional area for potential parking — any overflow will not affect street traffic. Stormwater Stormwater must be retained on site. A stormwater report meeting the city's requirements (the Portneuf Valley Stormwater Design Manual) and corresponding plan will need to be submitted for review. • Submit plan with building permit application. Wastewater Pre -Treatment / Chemicals On-site and Disposal Provide filtration system in kennel and grooming areas, to reduce amount of animal hair entering city sewer. A Nonresidential Wastewater Discharge Permit is required after beginning operations. City Public Works will initiate contact at that time. Water / Sewer Standards 1. Estimate of water/sewer usage needs to be provided to help determine appropriate wastewater capacity fee. Water capacity fee will be based on service line/meter size. • Submit plans showing water and sewer utilities for City review, as part of civil plans. Building Codes / Setbacks 1. Emergency Services & Police Development Impact Fees will be due at building permit stage. Fees below based on 7,200 sq. ft and "General Commercial" classification: a. Emergency Services = $2,229.62 b. Police = $2,688.98 Building Design / Elevations 1. Design appropriate for site and zoning district. Comment: Building looks great. Love the design for this use. Signs One wall sign is planned on building, future sign at drive entrance. Wall sign permit can be processed at same time as building permit. Future sign away from building will need review prior to permitting. Any sign facing street will need to be on private property. See also comments under addressing. Landscaping 1. Parking: parking lot area 660 sf landscaping is required, with at least 4 trees. Total sf in site plan exceeds 800 sf, but no trees identified — appear to be shrubs on landscape plan. Please clarify. 2. Street frontage: approximately 750 sf is generally required of this project. • Since the front of the parcel is against city property, not a street, City will consider landscaping agreement for part of City parcel in lieu of property frontage landscaping. 194�0t\ CHUBBUCK 1 0 R H 0 290 E Linden Avenue, Chubbuck, ID 83202 208.237.2430 — Fax 208.237.2409 www.CityofChubbuck.us ANIMAL CARE SITE REFERENCES IN CITY CODE: 18: LAND USE 18.06 DEFINITIONS 18.06.040: ANIMAL CARE SITE: Any location, other than a kennel, where three (3) or more animals older than six (6) months are kept for sale or for compensated services such as treatment, training or boarding. 18.12.030: SUPPLEMENTAL CONTROLS FOR PARTICULAR USES: B. Animal Care Sites: 1. Will be located at least three hundred feet (300') from any residence including motels and hotels, except for an owner's residence, unless the animals are completely housed in soundproof structures that completely screen them from view of the abutting residential property. 2. Will comply with all state and local regulations relative to such an operation and maintain adequate housekeeping practices designed to prevent the creation of a nuisance and to reduce to a minimum the factors of noise and odor. Kennel References: 9.20 ANIMAL CONTROL 9.20.10: DEFINITIONS KENNEL: Any place other than a veterinary hospital where three (3) or more dogs over four (4) months of age are kept, or where one or more female dogs are kept for breeding and the offspring thereof are sold for profit, or where dogs are received for boarding and care. 9.20.033: KENNELS: No person shall operate or maintain a kennel within the city without first obtaining a license therefor. No license shall be issued unless the location of the proposed kennel is in accordance with the provisions of the Chubbuck land use ordinance as embodied in title 18 of this code, as from time to time amended. 18: LAND USE 18.06 DEFINITIONS 18.06.160: KENNEL: B. Commercial Kennels: 1. Any location where one or more female dogs are kept primarily for breeding and the offspring thereof are sold for profit, and 2. Any location other than a veterinary hospital, where dogs are received for boarding and/or care. 18.12.030: SUPPLEMENTAL CONTROLS FOR PARTICULAR USES: G. Kennels: 1. Commercial kennels shall: a. Be maintained in a separate cage, structure, dog run or kennel for the housing and confinement of all dogs in such commercial kennel, which cage, structure, dog run or kennel: /944�c-\ CHUBBUCK 1 0 R H 0 290 E Linden Avenue, Chubbuck, ID 83202 208.237.2430 — Fax 208.237.2409 www.CityofChubbuck.us (1) Shall have a minimum area of fifteen (15) square feet for each dog kept therein; (2) Shall be located at least three hundred feet (300') from any structure intended for human occupancy or use, except for the owner's residence; (3) Shall have such screening fence or structure as may be necessary to confine the dogs and screen them from public views and from views from abutting properties; and (4) Shall contain facilities for the disposal of animal waste, other than through the use of the city's garbage collection service, which facility shall be maintained so as to prevent odors detectable from public areas and abutting properties. b. Comply with all other state and local regulations relative to such operation, and shall be maintained to prevent noise or odors detectable from public areas or abutting properties. /94�4c\ CHUBBUCK 1 0 R H 0 290 E Linden Avenue, Chubbuck, ID 83202 208.237.2430 — Fax 208.237.2409 www.CityofChubbuck.us Cover Letter — Design Review April 18, 2023 RE: Northgate Pet Boarding Appx. 702 New Day Parkway Northgate Pet Boarding is a proposed 7,200 SF Animal Care Facility located at Appx. 702 New Day Parkway in Chubbuck, ID The ITE manual does not have a classification for Animal Boarding or Pet Day Care. The AM and PM Peak Hour Trip Rates were obtained from a study completed on a similar project in Mill Creek Washington. The study developed a rate based on the maximum number of animals boarded. The rates are as follows: AM Peak Hour Trip Rate = (.08), PM Peak Hour Trip Rate = (.07), Daily Trip Rate = (.87). This formula would show that 53 peak hour trips will be added to New Day Parkway if the facility was at maximum capacity. Total ADT is therefore 53. The entire length of the driveway (TBD) and parking area will be paved. We are proposing a 1320 SF parking area which will include 6 parking spaces, each 220 SF in size. One space will be a handicapped van accessible space. The size and number of spaces is based upon rates published in two books pertaining to dog boarding facilities. The exact sign design has not yet been decided. The sign attached to the building will be approximately 40 square feet. Another sign of the same size will be placed near the entrance to the driveway and will be placed in compliance with the city requirements. Chemicals on site will be mostly household cleaning chemicals. Organic, biodegradable chemicals will be used when possible. There will not be any oil used on the premises. A grease trap is not planned to be used for the project. The lighting descriptions and locations are described in the plans provided with the drawings. DESIGN REVIEW Community Services Department, Planning Division CHUBBUCK 290 E Linden Avenue, Chubbuck, ID 83202 APPLICATION 208.237.2430 December 2022 Form 1 0 A H 0 www.CityofChubbuck.us Page 1 of 2 Please consult the Design Review Information Sheet, city staff, or chapter 18.16 of City Code for guidance on an application. DATE RECEIVED: $150 FEE PAID? ❑ Yes ❑ No CLERK INITIALS: SECTION A — APPLICANT Al. Name A3. Phone Number (include area code) A4. Email Address Larry P. Dunn (208) 240-4012 larrydunn1332@msn.com A2. Mailing Address City State Zip Code 702 New Day Parkway Chubbuck ID 83202 SECTION B — OWNER (IF DIFFERENT THAN APPLICANT) 81. Name 1 133. Phone Number (include area code) 1 64. Email Address 132. Mailing Address City State Zip Code SECTION C — PROFESSIONAL SERVICES (IF ANY) Cl. Point of Contact C3. Phone Number (include area code) C4. Email Address Same as above C2. Firm Name Mailing Address City State Zip Code SECTION D — PROJECT INFORMATION D1. Project Name D6. Zoning on Site Northgate Pet Boarding Currently Agricultural D2. Site Address (or Location if no Address) D7. Project Description and Proposed Use(s) Appx. 702 New Day Parkway A new building constructed Animal Care Facility for D3. Existing Structure(s) and/or Other Conditions on Site boarding dogs, cats, and birds of prey. D4. Size (Acres or Square Feet) of Project Area / Parcel D8. General Traffic, Vehicle Types Expected (include box trucks, tractor trailers) 1.20 Acre Parcel Passenger vehicles, light delivery trucks. D5. Size (Square Feet) of Proposed Structure(s) 7200 SF New Metal Building SECTION E — ADDITIONAL SUBMITTAL REQUIREMENTS E1. Design Review Clearance application fee - $150 e E2. Vicinity map —to scale, with the following elements 0 Preparer's Description Preparer's Description Initials Initials LD Project location and boundaries LD Existing off-street parking facilities LD Existing buildings, fences, signs, etc., and trees LD Adjacent buildings and structures LD Access points to project site LD Access points to adjacent properties and to properties across the street � Community Services Department, Planning Division DESIGN REVIEW 19 290 E Linden Avenue, Chubbuck, ID 83202 APPLICATION CHUBBUCK208.237.2430 December 2022 Form 1 0 9 H a www.CityofChubbuck.us Page 2 of 2 E3. Site plan —to scale, with the following elements 2 Preparer's Initials Description Preparer's Initials Description LD Project boundaries LD Sidewalks, ADA ramps, and pedestrian route(s) to building LD Structures — buildings, loading docks, fences, etc. LD Dumpster enclosures LD Existing structures and trees to remain on property LD Stormwater retention areas LD Parking areas and traffic circulation patterns LD Easements and rights-of-way LD Parking stalls (stalls must be at least 180 square feet) LD Above and below ground utilities LD Accessible parking spaces (if required) LD I Irrigation canals, ditches, and pipes E4. Preliminary landscaping plan [id E5. Floor plan(s), include gross square footage for each floor, occupancy classification and type of construction, location of any floor drains [a I E6. Detailed elevations of all sides of proposed buildings in the development, and other exterior elements such as color, materials, etc. and proposed KnoxBox location(s) 5a I I E7. Signage plan, showing location, size, and dimensions of each, with illustrations 52 I E8 lighting plan, showing locations of lighting structures and fixtures, lighting distribution on site, and demonstrating how light will be aimed and shielded to prevent light trespass off the property and downward from the night sky E9 A list of chemicals, including cooking oils, to be stored and/or used on site and whether any are proposed to be disposed of in the sanitary sewer system - if proposed for disposal in the sanitary sewer system, submit proposed pretreatment method, if any I E10. A traffic analysis, following the format provided in the BTPO Traffic Impact Analysis Guidelines, Appendices A, B, and C Rd I E11. If the project is in the CC -HS, CC -NC, PUP, HC, or V zone, attach any required checklist or certification of compliance for the zone '- (-, ❑ I. " 52 1 SECTION F- CERTIFICATION • I, the undersigned, hereby certify that the information herein and attached hereto is true and correct to the best of my knowledge. • I agree to comply with all provisions of ordinances and laws governing this type of work, whether specified herein or not. • I am aware that if this application is not complete, the Design Review Committee will not begin its review until the proposal is deemed complete by the City upon further submission of materials. • I hereby authorize the fling of this application and grant approval of on-site review of the development described herein. • I certify that I am authorized to file this application. F1. S(nature F2. Printed Name F3. Date Larry P. Dunn 4/18/23 SECTION G- FOR CITY STAFF USE ONLY G3. Completeness Review Reviewed by: Deemed complete? ❑ Yes ❑ No If no, list concern(s): Date: I Q Q w Z J Lu EXISTING BLDG EXISTING B HYDRANT I m \)� 0 O f � A� �4_ O pQSFO OA f ON MIN. 1000 GA z O < PROPANETANK X LL 0 ❑ 0 X/� w LL � g X FENC / a x QPs�° w 0 PROPOSED R aOf p a w 0 % 170' MIN PROPOSED t� /aa O O a w a / Q0 GG X / P _X OI NEW CONSTRUCTION TEMPORARY b 25'MAX GRAVEL ON PARKING O cc 1 0 u' DUMPSTER Z ENCLOSURE' CS' - 0" 8' - 0" X X X �X X 15'-0 X X X X� X X X X X— FIELD FENCE PARCEL NUMBER: RPRCCPC041300 Lu U Z Lu LL 0 J Lu LL FILENAME: EAL." Dunn 60A20.M NOTES: A. TETON WEST OF IDAHO DOES NOT PROVIDE SURVEYING, CIVIL ENGIN- EERING, OR GEO TECHNICAL DATA. IT IS THE RESPONSIBILITY OF THE OWNER TO OBTAIN THESE SERVIC- ES IF THEY ARE REQUIRED. B. THIS SITE PLAN WAS CREATED USING PUBLIC DOCUMENTS. ALL MEASUREMENTS SHOULD BE ASSUMED APPROXIMATIONS. C. CITY TO CONFIRM UTILITY LOCAT- IONS. D. APPROACH AND PARKING PROPOSED TO BE TEMPORARY COMPACTED GRAVEL. E. CONTRACTOR SHALL PRESERVE EXISTING PLANTS, FENCES, AND GROUNDCOVER WHERE POSSIBLE. F. PROPOSED UTILITY LOCATIONS FOR NEW BUILDING TO BE CONFIRMED BY AUTHORITY HAVING JURISDICTION. O v O O X 'IM F�ELO -TEMPORARY -'-,',-,o GRAVEL o-. PARKING.•-_ N 12'-0 DUMPSTER -' ENCLOSURE . �� 4Co...: •,;:.:,'.'`:Q5' n Site Copy 1 1 " = 30'-0" LANDSCAPING SCHEDULE NATIVE GROUNDCOVER GRASS SOD 3/4" CRUSHED GRAVEL 2" RIVER ROCK CONCRETE 'z W CONSTRUCTIONa 8- _ 0^ Z 15-0" FIELD FENCE 25 MAX w U Z w 0 LL NOTES: A. ALL ROCK BEDS SHALL HAVE CONCRETE CURBING B. CONTRACTOR TO PROPOSE SHRUB AND TREE TYPES TO OWNER BEFORE PLANTING. C. CONTRACTOR TO INSTALL SPRINKLER SYSTEM FOR SODDED AREAS. D. ROCK BEDS AND SIDEWALKS SHALL ALL BE 6- 0" WIDE. E. PERIMETER FENCES SHALL BE 8' TALLL VINYL FENCES. INSTALL CONCRETE CURBING BENEATH BOTTOM RAIL. FILENAME: EAL." Dunn 60A20.M Room Schedule Name Number Area Occupancyl Comments Lobby 1 272 SF B Restroom 2 Restroom 1 2 68 SF B 11 Hallway 3 385 SF B 149 SF Grooming 4 194 SF B B Office 5 169 SF B Dog Room Janitorial 6 30 SF B 16 Wait Rm 1 7 45 SF B Wait Rm 2 8 42 SF B A-2.1 2 C C E ■ Room Schedule Name I Number Area Occupancyl Comments Falcon Rm 9 123 SF B Restroom 2 10 51 SF B Indoor Play 11 219 SF B Cat Rm 12 149 SF B Breakroom 13 199 SF B Mechanical 14 81 SF B Dog Room 15 1657 SF B Utility Space 16 158 SF B 1 24'- 0" 8'-0" 9-0" T-0„ H-L.L 2 3 1 I 24'- 0" 101_01. T-0" T-0„ D =iianvvay. Lobby., y - M stroorri co 4'-0" T-0" 13,_0„ n Level 1 1 :140 t,R 1tido'0 Play, _ Rm 21'-0" OUTDOOR PLAY AREA El 120'- 0" 24'-0" f'Z 11MIN NOTES: A. UNLESS OTHERWISE NOTED, DIMENSIONS ARE TO CENTER OF COLUMN, FACE OF FRAMING, OR CENTER OF FRAMED OPENING. B. ANIMAL ENCLOSURES ARE SHOWN FOR VISUAL EFFECT ONLY. DESIGN OF ENCLOSURES WILL BE PROVIDED BY OTHERS. C. INTERIOR WALLS SHALL EXTEND TO ROOF FRAMING MEMBERS. ALL M.E.P. COMPONENTS SHALL BE CONCEALED BY ACOUSTICAL CEILING TILE DROP CEILING. D. FOUNDATION WALL TO EXTEND 1' AFF IN OFFICE AREA, AND 4' AFF IN DOG ROOM. DOOR DOORS TO BE BLOCKED OUT DURING CONCRETE POUR. E. COORDINATE WITH FOUNDATION DRAWINGS AND METAL BUILDING ERECTION DRAWINGS. F. LOCATE 5 PVC FLOOR DRAINS PER SIDE IN DOG ROOM. G. ALL EXTERIOR FENCES AND GATES TO HAVE CONCRETE CURB BENEATH BOTTOM RAIL. 5 'Zllffhi 20'- 0" 64'-0" — -- >PORTAL L �• , o 0 ° O—°o - _ ___ - _ 4.5x5 3x5 - Mee, arucal f - ' -Dog' oom ®" ®, ®' �='T�- 9' -011, O 5x4: 5'- 10 - _ ";D �" Utilit Y , Sp ice , 4x5 ®' 5.5x5 20 _00„ ---;PORTAL FRAMET`= FILENAME: EAL."D-60A20.M . � III V 3Bre;,00m I 1 ��'••�4►1sop, F. F. .. .:, 0� ll D =iianvvay. Lobby., y - M stroorri co 4'-0" T-0" 13,_0„ n Level 1 1 :140 t,R 1tido'0 Play, _ Rm 21'-0" OUTDOOR PLAY AREA El 120'- 0" 24'-0" f'Z 11MIN NOTES: A. UNLESS OTHERWISE NOTED, DIMENSIONS ARE TO CENTER OF COLUMN, FACE OF FRAMING, OR CENTER OF FRAMED OPENING. B. ANIMAL ENCLOSURES ARE SHOWN FOR VISUAL EFFECT ONLY. DESIGN OF ENCLOSURES WILL BE PROVIDED BY OTHERS. C. INTERIOR WALLS SHALL EXTEND TO ROOF FRAMING MEMBERS. ALL M.E.P. COMPONENTS SHALL BE CONCEALED BY ACOUSTICAL CEILING TILE DROP CEILING. D. FOUNDATION WALL TO EXTEND 1' AFF IN OFFICE AREA, AND 4' AFF IN DOG ROOM. DOOR DOORS TO BE BLOCKED OUT DURING CONCRETE POUR. E. COORDINATE WITH FOUNDATION DRAWINGS AND METAL BUILDING ERECTION DRAWINGS. F. LOCATE 5 PVC FLOOR DRAINS PER SIDE IN DOG ROOM. G. ALL EXTERIOR FENCES AND GATES TO HAVE CONCRETE CURB BENEATH BOTTOM RAIL. 5 'Zllffhi 20'- 0" 64'-0" — -- >PORTAL L �• , o 0 ° O—°o - _ ___ - _ 4.5x5 3x5 - Mee, arucal f - ' -Dog' oom ®" ®, ®' �='T�- 9' -011, O 5x4: 5'- 10 - _ ";D �" Utilit Y , Sp ice , 4x5 ®' 5.5x5 20 _00„ ---;PORTAL FRAMET`= FILENAME: EAL."D-60A20.M FILENAME: EAL." Dunn 60A20.M B 1 Ridge A-, i • 11 - :: v -� T.O. Stem 2 IWWIIIIIIIIIIIIIIIWIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIWIW IIIIWIWIWIWIWIWIIIIIIIIIIIIIIIIIIIWIWI� • Tim 1,-o,, O •V A B C D E Ridge T , Winter Eave 121 0„ v _ • • i � I wIIIIIIIIIIE 1 t 7'- 6" El 11 ll h ii • III a jj�m MEMO West U 1/8" = 1'-0" ROOF FINISHES: A. ROOF SHEETS OVER EXTERIOR DOG RUNS SHALL BE TRANSLUCENT ACRYLIC PANELS, "PANEL RIB TUF-LITE ROOF PANELS" BY VARCO PRUDEN METAL BUILDINGS B ALL OTHER ROOF SHEETS SHALL BE 26 GA EXPOSED FASTENER METAL SHEETS, "GALVALUME" FINISH. C. INSTALL ROOF GUTTER AND DOWNSPOUTS PER MANUFACTURER'S STANDARD. WALL FINISHES: A. WALL PANELS SHALL BE 26 GA EXPOSED FASTENER METAL PANELS, 20 YEAR KYNAR FINISH, "ZINC GRAY". B ALL EXTERIOR METAL TRIMS SHALL BE 26 GA, 20 YEAR KYNAR FINISH, "COOL EBONY". C. WALK DOORS PAINTED TO MATCH BLACK TRIM. D. WINDOWS TO HAVE BLACK VINYL FRAMES. EXTERIOR IMPROVEMENTS: A. ENDWALL FACING APPROACH SHALL HAVE A 15'X 3' METAL AWNING, POWDER COAT FINISH. B ENDWALL FACING APPROACH SHALL HOST ONE T- 6" X 4'- 6" SIGN FOR ADVERTISING. C. EXTERIOR LIGHT FIXTURES SHALL BE LED SCONCE FIXTURES. ONE FIXTURE TO BE INSTALLED ABOVE THE SIGN, AND ONE ADDITIONAL FIXTURE SHALL BE INSTALLED NEXT TO EACH EXTERIOR WALK DOOR. D. AN 8' VINYL FENCE SHALL BE INSTALLED AROUND THE PERIMETER OF DOG CONTAINMENT AREA. FILENAME: EAL." Dunn 60A20.M ROOF FINISHES: A. ROOF SHEETS OVER EXTERIOR DOG RUNS SHALL BE TRANSLUCENT ACRYLIC PANELS, "PANEL RIB TUF-LITE ROOF PANELS" BY VARCO PRUDEN METAL BUILDINGS B ALL OTHER ROOF SHEETS SHALL BE 26 GA EXPOSED FASTENER METAL SHEETS, "GALVALUME" FINISH. C. INSTALL ROOF GUTTER AND DOWNSPOUTS PER MANUFACTURER'S STANDARD. WALL FINISHES: A. WALL PANELS SHALL BE 26 GA EXPOSED FASTENER METAL PANELS, 20 YEAR KYNAR FINISH, "ZINC GRAY". B ALL EXTERIOR METAL TRIMS SHALL BE 26 GA, 20 YEAR KYNAR FINISH, "COOL EBONY". C. WALK DOORS PAINTED TO MATCH BLACK TRIM. D. WINDOWS TO HAVE BLACK VINYL FRAMES. 6 EXTERIOR IMPROVEMENTS: A. ENDWALL FACING APPROACH SHALL HAVE A 15'X T METAL AWNING, POWDER COAT FINISH. B ENDWALL FACING APPROACH SHALL HOST ONE T- 6" X 4'- 6" SIGN FOR ADVERTISING. C. EXTERIOR LIGHT FIXTURES SHALL BE LED SCONCE FIXTURES. ONE FIXTURE TO BE INSTALLED ABOVE THE SIGN, AND ONE ADDITIONAL FIXTURE SHALL BE INSTALLED NEXT TO EACH EXTERIOR WALK DOOR. D. AN V VINYL FENCE SHALL BE INSTALLED AROUND THE PERIMETER OF DOG CONTAINMENT AREA. 5 2 1 North 1 J 2 =10- 2 3 4 5 6 Ridge 4'-6" -710 — Sem%r Eave gL — �2'=0" �! Low Eav 9'-6" T.O. Stem 2 —611 _ T. 0. Stem '-0" l 77" ve _1 Ridqe 141-611 Rid Is -091 LowEave 91-61, T.O. Stem nye -091 South FILENAME: EAL." Dunn 60A20.M n 3D Structural FILENAME: EAL." Dunn 60A20.M Cover Letter -Traffic Statement Report March 11, 2023 RE: Northgate Pet Boarding Traffic Statement Report Appx. 702 New Day Parkway Northgate Pet Boarding is a proposed 7,200 SF Animal Care Facility located at Appx. 702 New Day Parkway in Chubbuck, ID The ITE manual does not have a classification for Animal Boarding or Pet Day Care. The AM and PM Peak Hour Trip Rates were obtained from a study completed on a similar project in Mill Creek Washington. The study developed a rate based on the maximum number of animals boarded. The rates are as follows: AM Peak Hour Trip Rate = (.08), PM Peak Hour Trip Rate = (.07), Daily Trip Rate = (.87). This formula would show that 53 peak hour trips will be added to New Day Parkway if the facility was at maximum capacity. Total ADT is therefore 53. Traffic Analysis Guidelines Appendix B. Traffic Statement Report Format Developers shall submit a traffic statement report as a part of the development review process for all developments which generate fewer than 100 peak hour trips, and there are no additional traffic and safety concerns in the area, Description of Proposed Development ❑ Project Name ❑ Location ❑ Trip Generation ❑ Attach the complete Traffic Impact Analysis Category Form (Appendix A) Description of the Existing Conditions ❑ For each intersection with a collector or arterial public street intersections within the study area, provide the following: • Figure depicting the intersection layout including the number of lanes • Traffic control at the intersection ❑ Provide the surrounding land use within the study area. Description of the Proposed Development ❑ Figure depicting the trip distribution to the nearest collector or arterial street in each direction. ❑ Provide a table identifying the streets within the development which access the existing street network. The table should include the name of the street, classification, existing ADT, development ADT, and Leve of Service (Table 6). The table should also include the data for any collector or arterial the development access directly or can be accessed within % mile of the development. 14 Traffic Analysis Guidelines Appendix A. Traffic Impact Analysis Category Form This initial assessment form will help determine the category of TIA required for the development. Development Name: Development Location: (Attach a map of the proposed development location) Type of Size AM Peak PM Peak Daily trip AM PM Daily Development (e.g., residential, commercial) (The number of dwelling units or gross floor area) Hour trip rate per unit Hour trip rate per Peak Peak Trips rate per unit* Hour Hour unit Trips Trips -F-- Total * Commercial trip generation rates can be found in the Institute of Transportation Engineers Trip Generation Manual. The dwelling trip rate is one trip for each unit in the AM and PM peak hour and 12 trips for the day. (Source of the residential trip generation is the BTPO Household Survey and time of day factors used in the regional travel demand model. 13 ADT/LOS Table -Traffic Statement Report March 11, 2023 Collector/Arterial within %: mile. Classification Existing ADT Development ADT Level of Service Northside Crossing, N of New Day No Data Available No Data 53 No Data Whitaker, S of New Day Arterial, No left turn lane 648 A Hiline, N of New Day Arterial, No left turn lane 4186 A Hiline, S of New Day Arterial, No left turn lane 4754 A 1-15 Southbound On Ramp No Data Available No Data No Data 1-15 Northbound On Ramp No Data Available No Data No Data Level of Service Formula x = 10% of Existing ADT + Development ADT divide by the number of travel lanes Then compare x to Table 6 in the Traffic Impact Analysis Guidelines. Signalized Signalized � Y Signalized _ Signalized 50% A oll r fM.1%. 1 �i AN k' .?..tit �1 � _.• L Nptivac e bMT 0 r lD (V Q� �9: