100 INTRODUCTION..............................................................................................................
1
101
General Procedures of the Agency.........................................................................
4
102
Provisions Necessary to Meet State and Local Requirements: Conformance with
Idaho Code Sections 50-2008 and 50-2906............................................................ 5
103
History and Current Conditions of the Area........................................................... 6
104
Purpose of Activities............................................................................................... 8
105
Open Land Criteria................................................................................................. 9
200 DESCRIPTION OF PROJECT AREA.............................................................................
11
300 PROPOSED REDEVELOPMENT ACTIONS................................................................
11
301
General..................................................................................................................11
302
Urban Renewal Plan Objectives...........................................................................
14
303
Participation Opportunities and Agreement..........................................................
15
303.1 Participation Agreements..........................................................................
15
304
Cooperation with Public Bodies...........................................................................
17
305
Property Acquisition.............................................................................................
18
305.1 Real Property............................................................................................
18
305.2 Personal Property......................................................................................
20
306
Property Management..........................................................................................
20
307
Relocation of Persons (Including Individuals and Families), Business Concerns,
and Others Displaced by the Project.....................................................................
20
308
Demolition, Clearance, and Site Preparation........................................................
20
309
Property Disposition and Development................................................................
21
309.1 Disposition by the Agency........................................................................
21
309.2 Disposition and Development Agreements ..............................................
21
309.3 Development by the Agency.....................................................................
23
310
Development Plans...............................................................................................
23
311
[Reserved]............................................................................................................
23
312
[Reserved]............................................................................................................
23
313
Participation with Others......................................................................................
23
314
Conforming Owners..............................................................................................
24
400 USES PERMITTED IN THE PROJECT AREA..............................................................
24
401
Designated Land Uses...........................................................................................
24
402
[Reserved].............................................................................................................
25
403
Public Rights-of-Way...........................................................................................
25
404
Interim Uses..........................................................................................................
26
405
Development in the Project Area Subject to the Plan ...........................................
26
406
Construction Shall Comply with Applicable Federal, State, and Local Laws and
Ordinances and Agency Development Standards .................................................
26
407
[Reserved].............................................................................................................
26
408
Nonconforming Uses............................................................................................
26
1
409 Design Guidelines for Development under a Disposition and Development
Agreement or Owner Participation Agreement ....................................................
27
500 METHODS OF FINANCING THE PROJECT...............................................................
27
501 General Description of the Proposed Financing Method ......................................
27
502 Revenue Allocation Financing Provisions............................................................
28
502.1 Economic Feasibility Study......................................................................
29
502.2 Assumptions and Conditions/Economic Feasibility Statement ................
29
502.3 Ten Percent Limitation.............................................................................
31
502.4 Financial Limitation..................................................................................
32
502.5 [Reserved]................................................................................................
34
502.6 Participation with Local Improvement Districts and/or Business
Improvement Districts..............................................................................
34
502.7 Issuance of Debt and Debt Limitation......................................................
34
502.8 Impact on Other Taxing Districts and Levy Rate .....................................
34
503 Phasing and Other Fund Sources..........................................................................
36
504 Lease Revenue and Bonds....................................................................................
36
505 Membership Dues and Support of Community Economic Development ............
37
600 ACTIONS BY THE CITY AND OTHER PUBLIC ENTITIES ......................................
37
601 Maintenance of Public Improvements..................................................................
38
700 ENFORCEMENT.............................................................................................................39
800 DURATION OF THIS PLAN, TERMINATION, AND ASSET REVIEW ....................
39
900 PROCEDURE FOR AMENDMENT OR MODIFICATION ..........................................
40
1000 SEVERABILITY..............................................................................................................41
1100 ANNUAL REPORT AND OTHER REPORTING REQUIREMENTS ..........................
41
1200 APPENDICES, ATTACHMENTS, EXHIBITS, TABLES .............................................
41
ii
Attachments
Attachment 1 Boundary Map of Urban Renewal Project Area and Revenue Allocation
Area
Attachment 2 Legal Description of Urban Renewal Project Area and Revenue Allocation
Area
Attachment 3 Private Properties Which May be Acquired by the Agency
Attachment 4 Map Depicting Expected Land Use and Current Zoning Map of the Project
Area
Attachment 5 Economic Feasibility Study
Attachment 6 Agricultural Operation Consents
iii
100 INTRODUCTION
This is the Urban Renewal Plan (the "Plan") for the Yellowstone Corridor Urban
Renewal Project (the "Project") in the City of Chubbuck (the "City"), state of Idaho.
Attachments 1 through 6 attached hereto (collectively, the "Plan Attachments") are incorporated
herein and shall be considered a part of this Plan.
The term "Project" is used herein to describe the overall activities defined in this Plan
and conforms to the statutory definition of an urban renewal project. Reference is specifically
made to Idaho Code §§ 50-2018(10) and 50-2903(13) for the various activities contemplated by
the term "Project." Such activities include both private and public development of property
within the urban renewal area. The Yellowstone Corridor Project Area is also referred to as the
"Project Area" or the "Revenue Allocation Area."
This Plan was prepared by the Board of Commissioners (the "Agency Board") of the
Urban Renewal Agency of the City of Chubbuck, also known as the Chubbuck Development
Authority (the "Agency"), its consultants, and staff, and reviewed and recommended by the
Agency pursuant to the Idaho Urban Renewal Law of 1965, Chapter 20, Title 50, Idaho Code, as
amended (the "Law"), the Local Economic Development Act, Chapter 29, Title 50, Idaho Code,
as amended (the "Act"), and all applicable local laws and ordinances.
Plan Required Information
Idaho Code § 50-2905 identifies what information the Plan must include with specificity
as follows:
(1) A statement describing the total assessed valuation of the base assessment roll of
the revenue allocation area and the total assessed valuation of all taxable property
within the municipality.
(2) A statement listing the kind, number, and location of all proposed public works or
improvements within the revenue allocation area.
(3) An economic feasibility study.
(4) A detailed list of estimated project costs.
(5) A fiscal impact statement showing the impact of the revenue allocation area, both
until and after the bonds are repaid, upon all taxing districts levying taxes upon
property on the revenue allocation area.
(6) A description of the methods of financing all estimated project costs and the time
when related costs or monetary obligations are to be incurred;
(7) A termination date for the plan and the revenue allocation area as provided for in
section 50-2903(20), Idaho Code. In determining the termination date, the plan
shall recognize that the agency shall receive allocation of revenues in the calendar
year following the last year of the revenue allocation provision described in the
urban renewal plan.
(8) A description of the disposition or retention of any assets of the agency upon the
termination date. Provided however, nothing herein shall prevent the agency from
retaining assets or revenues generated from such assets as long as the agency shall
have resources other than revenue allocation funds to operate and manage such
assets.
This Plan includes the above information with specificity.
The proposed development and redevelopment of the Project Area as described in this
Plan conforms to the City of Chubbuck Comprehensive Plan, Chubbuck 2045: Comprehensive
Plan (the "Comprehensive Plan"), and adopted by the Chubbuck City Council (the "City
Council"). The Agency intends to rely heavily on any applicable City design standards which
may cover all or part of the Project Area.
This Plan is subject to the Plan modification limitations and reporting requirements
set forth in Idaho Code § 50-2903A. Subject to limited exceptions as set forth in Idaho Code
§ 50-2903A, if this Plan is modified by City Council ordinance, then the base value for the
year immediately following the year in which modification occurs shall include the current
year's equalized assessed value of the taxable property in the revenue allocation area,
effectively eliminating the Agency's revenue stream.
A modification shall not be deemed to occur when "[t]here is a plan amendment to
make technical or ministerial changes to a plan that does not involve an increase in the use
of revenues allocated to the agency." Idaho Code § 50-2903A(1)(a)(i). Annual adjustments,
as more specifically set forth in the Agency's annual budget, will be required to account for
more/less estimated revenue and project timing, including the specific location and
prioritization of projects. Any adjustments for these stated purposes are technical and
ministerial and are not modifications under Idaho Code § 50-2903A.
Further, a modification shall not be deemed to occur when "[t]here is a plan
amendment to support growth of an existing commercial or industrial project in an
existing revenue allocation area, subject to the provisions of section 50-2905A, Idaho
Code." Idaho Code § 50-2903A(1)(a)(iv). The proposed development of the Project Area
includes primarily mixed-use, commercial, office, retail, multi -family residential and
industrial projects. Any adjustment to the list of improvements and/or revenue stream to
support growth of the proposed commercial and industrial projects is not a modification
under Idaho Code § 50-2903A.
This Plan provides the Agency with powers, duties, and obligations to implement and
further the program generally formulated in this Plan for the development, redevelopment,
rehabilitation, and revitalization of the area within the boundaries of the Project Area. The
Agency retains all powers allowed by the Law and Act. This Plan presents a process and a basic
N
framework within which plan implementation, including contracts, agreements and ancillary
documents will be presented and by which tools are provided to the Agency to fashion, develop,
and proceed with plan implementation. The Plan has balanced the need for flexibility over the
twenty (20) -year timeframe of the Plan to implement the improvements identified in Attachment
5, with the need for specificity as required by Idaho Code § 50-2905. The Plan narrative
addresses the required elements of a plan set forth in Idaho Code § 50-2905(1), (2), (5), (7) and
(8). Attachment 5, together with the Plan narrative, meets the specificity requirement for the
required plan elements set forth in Idaho Code § 50-2905(2)-(6), recognizing that actual Agency
expenditures are prioritized each fiscal year during the required annual budgeting process.
General Plan Objectives
Allowed projects are those activities which comply with the Law and the Act and meet
the overall objectives of this Plan. The public-private relationship is crucial in the successful
development and redevelopment of the Project Area. Typically, the public will fund enhanced
public improvements like utilities, streets, and sidewalks which, in turn, establish the necessary
infrastructure to support adjacent private investment, which in this case includes mixed-use,
commercial, office, residential, retail, and industrial facilities.
The purpose of the Law and Act will be attained through the implementation of the Plan.
The guiding goals of this Plan are:
a. The installation and construction of public improvements, including new local
and collector streets to support future development; improvements to existing
roadways and intersections, including but not limited to improvements to, and
adjacent to, the Yellowstone Highway Corridor between Siphon Road/New Day
Parkway and Interstate 86; installation of curbs, gutters and streetscapes
throughout the Project Area, which for purposes of this Plan, the term
"streetscapes" includes sidewalks, multi -use pathways, lighting,
landscaping/landscape islands, benches, bike racks, signage/wayfinding, public
art and similar amenities between the curb and right of way line; sidewalk
widening projects; intersection improvements and signalization; installation
and/or improvements to fiber optic facilities; improvements to public utilities
including water and sewer improvements, and fire protection systems; removal,
burying, or relocation of overhead utilities; extension of electrical distribution
lines and transformers; improvement of irrigation canals and drainage ditches and
laterals; installation and construction of pathways; and improvement of storm
drainage facilities;
b. The planning, design, construction, and reconstruction of local, collector and
arterial roads to support access management; walkability and bikeability; and to
continue to support high-quality mixed-use activity centers;
C. The replanning, redesign, and development of undeveloped or underdeveloped
areas which are stagnant or improperly utilized because of deteriorating
conditions, limited traffic access, underserved utilities, and other site conditions;
3
d. The strengthening of the economic base of the Project Area and the community
by the installation of needed public improvements to stimulate new private
development providing transportation and mobility improvements; greater
housing density and diversity of housing stock; office buildings; public amenities;
increased employment opportunities and economic growth;
e. The provision of adequate land for open space, street rights-of-way and pedestrian
rights-of-way, including pathways, wider sidewalks and lighting improvements;
establishment of a new City park; improvements to existing parks and open space,
and the installation of community event space;
f. Brownfield and environmental remediation, including building demolition and
site remediation;
g. The reconstruction and improvement of street corridors to allow traffic flows to
move through the Project Area along with the accompanying utility connections,
through the Project Area;
h. In conjunction with the City, the establishment and implementation of
performance criteria to assure high site design standards and environmental
quality and other design elements which provide unity and integrity to the entire
Project Area, including commitment of funds for planning studies, achieving high
standards of development, and leveraging such development to achieve public
objectives and efficient use of scarce resources;
The strengthening of the tax base by encouraging private development, thus
increasing the assessed valuation of properties within the Project Area as a whole
and benefiting the various taxing districts in which the urban renewal area is
located;
j. The acquisition of real property to support development and/or redevelopment
initiatives consistent with the Law and Act;
k. The design, installation, construction and/or redevelopment of public parking
facilities and structures;
The funding of necessary public infrastructure to accommodate both public and
private development.
101 General Procedures of the Agency
The Agency is a public body, corporate and politic, as defined and described under the
Law and the Act. The Agency is governed by its bylaws, as authorized by the Law, and adopted
by the Agency. Under the Law, the Agency is governed by the Idaho open meeting law; the
Public Records Act; the Ethics in Government Act of 2015, Chapters 1, 2 and 4 of Title 74,
2
Idaho Code; reporting requirements pursuant to Idaho Code §§ 67-45013, 67-1076, 50-2903A and
50-2913; and the competitive bidding requirements under Chapter 28, Title 67, Idaho Code, as
well as other procurement or other public improvement delivery methods.
Subject to limited exceptions, the Agency shall conduct all meetings in open session and
allow meaningful public input as mandated by the issue considered or by any statutory or
regulatory provision.
The Agency may adopt separate policy statements. Any modification to any policy
statement is a technical or ministerial adjustment and is not a modification to this Plan under
Idaho Code § 50-2903A.
102 Provisions Necessary to Meet State and Local Requirements: Conformance
with Idaho Code Sections 50-2008 and 50-2906
Idaho law requires that the City Council, by resolution, must determine a geographic area
be a deteriorated area or a deteriorating area, or a combination thereof, and designate such area
as appropriate for an urban renewal project prior to preparation of an urban renewal plan. A
consultant, Perspective Planning & Consulting, was retained to study a proposed 660 -acre
project area (the "Study Area") and prepare an eligibility report. The Study Area Eligibility
Study (the "Report") was submitted to the Agency. The Agency accepted the Report by Agency
Resolution No. 2025-1 on May 20, 2025, and thereafter submitted the Report to the City Council
for its consideration.
The Study Area was deemed by the City Council to be a deteriorating area and/or a
deteriorated area and therefore eligible for an urban renewal project by adoption of Resolution
No. 2025-05 on June 4, 2025. With the adoption of Resolution No. 2025-05, the City Council
declared the Study Area described in the Report to be a deteriorated area and/or a deteriorating
area as defined by the Law and Act and directed the Agency to prepare an urban renewal plan.
Since the base assessment roll value for the Study Area together with the combined base
assessment roll values for the existing revenue allocation areas exceeded ten (10%) percent of
the current assessed valuation of all taxable property within the City, the City Council further
directed the Agency to review the boundary of the Study Area in planning for the proposed
Project Area boundary to ensure compliance with the requirements of Idaho Code Section 50-
2903(15). To comply with Idaho Code Section 50-2913(15), the proposed Project Area is
approximately 389 acres, which is significantly smaller than the proposed boundary in the Study
Area.
Under the Law and Act, Idaho Code Sections 50-2903(8)(f) and 50-2018(8) and (9), the
definition of a deteriorating area shall not apply to any agricultural operation as defined in
Section 22-4502(2), Idaho Code, absent the consent of the owner of the agricultural operation
except for an agricultural operation that has not been used for three (3) consecutive years.
In accordance with the Law and Act, the necessary agricultural operation consents were
obtained from the owners of the agricultural operation within the Project Area for property that
5
has been used as an agricultural operation within the last three (3) years. Copies of the
agricultural operation consents are attached hereto as Attachment 6.
The Plan was prepared and submitted to the Agency for its review and approval. The
Agency approved the Plan by the adoption of Agency Resolution No. and submitted
the Plan to the City Council with its recommendation for adoption.
In accordance with the Law, this Plan was submitted to the Land Use and Development
Commission of the City. After consideration of the Plan, the Commission, by resolution,
reported to the City Council that this Plan is in conformity with the City's Comprehensive Plan.
Pursuant to the Law and Act, the City Council having published due notice thereof, a
public hearing was held on this Plan. Notice of the hearing was duly published in the Idaho State
Journal, a newspaper having general circulation in the City. The City Council adopted this Plan
on , by Ordinance No.
103 History and Current Conditions of the Area
This Project Area includes approximately 389 +/- acres and is generally bounded by New
Day Parkway/Siphon Road on the north, a Union Pacific rail line and Whitaker Road on the east,
I-86 to the south, and Hawthorne Road on the west. The Project Area is centered along the
Yellowstone Highway Corridor between New Day Parkway/Siphon Road on the north and I-86
to the south and expanding to the east and the west of the Yellowstone Highway Corridor. As
noted in Section 102, the Project Area is smaller than the Study Area to comply with the
valuation limitations in Idaho Code Section 50-2903(15).All parcels in the Project Area are
within the city of Chubbuck city limits.
The Project Area overlays multiple land use zones mostly focused on mixed-use,
commercial and higher density residential zones, including Limited Commercial (C-1), General
Commercial (C-2), Limited Residential (R-2), Agriculture (A), Village (V), Industrial (I) and
Dense Residential (R-4). The Project Area contains a mix of uses, including commercial, retail,
office, residential, industrial, and civic, with buildings of diverse construction dates, varying in
condition and states of deterioration. Within the Project Area, there are several pockets of vacant
and re -developable parcels. The Report found deteriorating infrastructure throughout the Project
Area, including deteriorating rights-of-way, with asphalt in poor condition and missing sections
of curb, gutter and sidewalk, or wider sidewalks required along roadways with higher speed.
Several rights-of-way include public and private segments, or lack connectivity to the broader
street network. In general, bicycle and pedestrian connectivity is fragmented throughout the
Project Area and there are limited road crossings on the major roadways, including Chubbuck
Road and the Yellowstone Highway.
The City has identified needed water and sewer utility improvements to support full
buildout of the Project Area and without improvement presents a significant impediment to
development.
Co
Based on the current conditions, development potential within the Project Area is
currently restricted due to defective or inadequate roadways, including broken or missing
sidewalk and curbs and/or streets and pedestrian facilities that are not improved to urban
standards, as well as, necessary improvements to municipal water and wastewater facilities and
systems, which may be undersized for their envisioned purposes. The age of public infrastructure
and related safety concerns have impeded the ability for this area to fully realize its long-term
goals as a dense, mixed-use, vibrant area. As more fully set forth in the Report, the Project Area
lacks the public infrastructure necessary to properly serve the revitalization goals, including
economic development and housing opportunities, as contemplated by the City's Comprehensive
Plan.
The Plan proposes installation and improvements to public infrastructure and other
publicly owned assets throughout the Project Area, as more specifically set forth in Attachment
5, creating the opportunity to support mixed-use, commercial, office, retail, multi -family
residential and industrial projects development projects consistent with the City's
Comprehensive Plan.
The Project Area is underdeveloped and is not being used to its highest and best use due
to the presence of a substantial number of deteriorated or deteriorating structures/deterioration of
site; age or obsolescence; the predominance of defective or inadequate street layout; outmoded
street patterns; lack of correlation of the area with other areas of the City by streets and modern
traffic requirements; faulty lot layout in relation to size, adequacy, accessibility or
usefulness/obsolete platting; insanitary or unsafe conditions; diversity of ownership; the
existence of conditions that endanger life or property by fire and other causes; and inadequate
utility infrastructure needed to support desired development within the Project Area. These
conditions result in the economic underdevelopment of the area and substantially impair or arrest
the sound growth of the City.
The preparation and approval of an urban renewal plan, including a revenue allocation
financing provision, gives the City additional resources to solve the public infrastructure and
development impediment issues in this area. Revenue allocation financing should help to
improve the situation. This Plan will help to deliver development outcomes with significant
public benefit which the market will not otherwise deliver on its own. In effect, property taxes
generated by new developments within the Project Area may be used by the Agency to finance a
variety of needed public improvements and facilities. Finally, economic development
opportunities may generate new jobs in the Project Area and will increase the tax base, which in
turn, could be a factor in lowering taxes, benefiting area residents long-term. These new
developments could support a variety of housing opportunities with diverse rental and income
ranges, which supports and adds to the fabric of the neighborhoods and activity centers in the
Project Area.
It is unlikely that individual developers or public partners will take on the prohibitive
costs of constructing the necessary infrastructure in the Project Area without the ability of
revenue allocation to help offset at least some of these costs. But for urban renewal and revenue
7
allocation financing, the proposed public improvements to support revitalization of the Project
Area would not occur.
104 Purpose of Activities
Attachment 5 includes the public projects list identifying with specificity the proposed
public improvements and projects contemplated in the Project Area. The estimated project costs
of the full public projects list exceed the anticipated revenue projections over the duration of the
Project Area. Based on discussion during a joint meeting of the Agency and City Council,
direction was provided on project prioritization including improvements to Yellowstone Avenue,
including traffic signals, turn lanes and landscaped medians; the widening of Siphon Road; and
other achievable projects. Using the guidance provided by the public entities, the Study
allocated and prioritized projects from the public project list. Project prioritization is based on
year and tranches of funding, with those improvements occurring earlier identified as those that
are most important to incent revitalization and new development. Additional unfunded projects
are identified in the overall project list but are not specifically prioritized. These are projects that
may be advance funded by developers; have alternative sources of funding; or may be re -
prioritized depending on how development occurs within the Project Area. The Yellowstone
Corridor Project Area is projected to generate sufficient revenue allocation proceeds to fund the
top priority projects in the Project Area as outlined in the Study. Attachment 5 identifies the
estimated location of the proposed projects in the Project Area. The description of activities,
public improvements, and the estimated costs of those items are intended to create an outside
limit of the Agency's activity. Due to the inherent difficulty in projecting future levy rates, future
taxable value, and the future costs of construction, the Agency reserves the right to:
a. Change funding amounts from one Project to another.
b. Re -prioritize the Projects described in this Plan and the Plan Attachments,
including eligible projects shown on the projects list may be substituted for
priority projects..
C. Retain flexibility in funding the various activities in order to best meet the Plan
and the needs of the Project Area.
d. Retain flexibility in determining whether to use the Agency's funds or funds
generated by other sources.
Alter the location of proposed improvements identified in Attachment 5 to
support development when it occurs. The information included in Attachment 5
presents a proposed, realistic development scenario, projected timeline, and
location, recognizing the siting of improvements is difficult to project with any
certainty where the improvements will not be sited until any future projects
submit plans to the City for design review and permitting.
The Agency intends to discuss and negotiate with any owner or developer of the
parcels within the Project Area seeking Agency assistance during the duration of the Plan
and Project Area. During such negotiation, the Agency will determine the eligibility of the
activities sought for Agency funding, the amount the Agency may fund by way of percentage or
other criteria including the need for such assistance. The Agency will also take into account the
amount of revenue allocation proceeds estimated to be generated from the developer's activities.
The Agency also reserves the right to establish, by way of policy, its funding percentage or
participation, which would apply to all developers and owners.
Throughout this Plan, there are references to Agency activities, Agency funding, and the
development, and contribution of public improvements. Such references do not necessarily
constitute a full, final, and formal commitment by the Agency but, rather, grant to the Agency
the discretion to participate as stated subject to achieving the objectives of this Plan and provided
such activity is deemed eligible under the Law and the Act. The activities listed in Attachment 5.
will be determined or prioritized as the overall Project Area develops and through the annual
budget setting process.
The activities listed in Attachment 5 are also prioritized by way of importance to the
Agency by the amounts funded, and by year of funding, with earlier years reflecting the more
important activities, achievement of higher objectives, long term goals, and commitments. As
required by the Law and Act, the Agency will adopt more specific budgets annually. The
projected timing of funding is primarily a function of market conditions and the availability of
financial resources but is also strategic, considering the timing of private development
partnership opportunities and the ability of certain strategic activities to stimulate development at
given points in time within the planned 20 -year period of the Plan and Project Area.
The Study (Attachment 5) describes a list of prioritized public improvements and other
related activities to be funded with revenue allocation proceeds with an estimated cost of
approximately $50-72 million dollars. This amount takes into account inflationary factors, such
as increasing construction costs, which increases the costs depending on when the public entity,
owner, developer and/or Agency is able to develop, construct or initiate those activities. The
Study has concluded the capacity of revenue allocation funds through the term of the Plan based
on the projected new development projects and assessed value increases will likely generate an
estimated $50-72 million dollars depending on development scenario. The Study has further
identified and described a list of unfunded projects and public improvements. The Agency
reserves the discretion and flexibility to use revenue allocation proceeds in excess of the amounts
predicted in the event higher increases in assessed values occur during the term of the Plan for
the improvements and activities identified in Attachment Sand this Plan. Additionally, the
Agency reserves the discretion and flexibility to use other sources of funds unrelated to revenue
allocation to assist in the funding of the improvements and activities identified in Attachment5
and this Plan.
105 Open Land Criteria
This Plan contemplates Agency acquisition of property within the Project Area, in part, to
support economic development/demonstration projects, right-of-way acquisition and housing.
The Project Area is not predominantly open; however, the Project Area includes a few parcels
that are vacant and/or transitioning agricultural operations that could meet the undefined "open
I
land" intent requiring the area meet the conditions set forth in Idaho Code § 50-2008(d). These
conditions include defective or unusual conditions of title, diversity of ownership, tax
delinquency, improper subdivisions, outmoded street patterns, deterioration of site, and faulty lot
layout, all of which are included in one form or another in the definitions of deteriorated area or
deteriorating area set forth in Idaho Code §§ 50-2018(8), (9) and 50-2903(8). The issues listed
only in Idaho Code § 50-2008(d)(4)(2) (the open land section) include economic disuse,
unsuitable topography, and "the need for the correlation of the area with other areas of a
municipality by streets and modern traffic requirements, or any combination of such factors or
other conditions which retard development of the area."
Open land areas qualify for Agency acquisition and development for residential uses if
the City Council determines there is a shortage of housing of sound standards and design which
is decent, safe and sanitary in the City, that the need for housing will be increased as a result of
the clearance of deteriorated areas, that the conditions of blight in the area and the shortage of
decent, safe and sanitary housing contributes to an increase in the spread of disease and crime
and constitutes a menace to the public health, safety, morals, or welfare, and that the acquisition
of the area for residential uses is an integral part of and essential to the program of the City. Due
to the City's expected growth, the need for housing is significant and integral to a successful
mixed-use Project Area. Further, the existing zoning designations in the Project Area allow for
mixed -density residential, and the future land use map shows areas of projected increased
residential density.
Open land areas qualify for Agency acquisition and development for primarily
nonresidential uses if acquisition is necessary and appropriate to facilitate the proper growth and
development of the community in accordance with sound planning standards and local
community objectives if any of the deteriorating area conditions set forth in Idaho Code §§ 50-
2018(8), (9) and 50-2903(8) apply. But such areas also qualify if any of the issues listed only in
Idaho Code § 50-2008(d)(4)(2) apply. The parcel size, the needed improvements to the water and
sewer facilities to support future development; deteriorating rights-of-way and fragmented
streetscapes, including curb, gutter, sidewalks, and storm drainage facilities, are all conditions
with delay development in the Project Area. Further, the presence of a substantial number of
deteriorated or deteriorating structures/deterioration of site; the age or obsolescence of existing
uses; a predominance of defective or inadequate street layout; outmoded street patterns; faulty lot
layout in relation to size, adequacy, accessibility or usefulness/obsolete platting; insanitary or
unsafe conditions; diversity of ownership; and economic disuse are all conditions which delay or
impair development of the open land areas and satisfy the open land conditions as more fully
supported by the Study Area Eligibility Report, prepared by Perspective Planning & Consulting
LLC.
This Plan anticipates Agency acquisition of property within the Project Area; however,
the acquisition of specific parcels is unknown at this time. Should the Agency determine the need
to acquire property as further set forth in Attachment 3, then the open land areas in the Project
Area qualify for Agency acquisition and development.
10
200 DESCRIPTION OF PROJECT AREA
The boundaries of the Project Area and the Revenue Allocation Area are shown on the
Boundary Map of Urban Renewal Project Area and Revenue Allocation Area, attached hereto as
Attachment 1 and incorporated herein by reference, and are described in the Legal Description of
Urban Renewal Project Area and Revenue Allocation Area, attached hereto as Attachment 2 and
incorporated herein by reference. For purposes of boundary descriptions and use of proceeds for
payment of improvements, the boundary shall be deemed to extend to the outer boundary of
rights-of-way or other natural boundary unless otherwise stated. The Project Area does not
intend to include right-of-way that is currently within unincorporated Bannock County.
300 PROPOSED REDEVELOPMENT ACTIONS
301 General
The Agency proposes to eliminate and prevent the spread of deteriorating conditions and
deterioration in the Project Area by employing a strategy to improve and develop public and
private lands, and to grow the economy in the Project Area. Implementation of the strategy
includes, but is not limited to the following actions:
a. The engineering, design, installation, construction, and/or reconstruction of storm
water management infrastructure to support compliance with federal, state, and
local regulations for storm water discharge and to support private development;
b. The provision for participation by property owners and developers within the
Project Area to achieve the objectives of this Plan;
C. The engineering, design, installation, construction, and/or reconstruction of the
transportation network within the Project Area, including all streets and
streetscapes within the Project Area, with a focus on enhancements to
Yellowstone Avenue, Chubbuck Road, Siphon Road, Briscoe Road, Valenty
Street, Ward Street, Knudsen Boulevard, Highway Avenue, Evans Lane, West
Linden Avenue, Afton Avenue and Park Lawn Drive, and related pedestrian and
bicycle facilities, sidewalk, curb and gutter, intersection improvements, road
widenings, and traffic signals (if needed), and the engineering, design,
installation, and construction of additional road throughout the Project Area to
support future development;
d. The engineering, design, installation, construction and/or reconstruction of
sidewalks and related pedestrian and bicycle facilities, curb and gutter and
streetscapes, which for purposes of this Plan, the term streetscapes include
sidewalks, lighting, landscaping, benches, signage, way -finding, bike racks,
public art, and similar amenities between the curb and right-of-way line; and other
public improvements, including multi -use pathways with landscape buffers and
11
public open spaces, including but not limited to community event spaces, public
parking facilities, and plazas;
e. The engineering, design, installation, construction, and/or reconstruction of
utilities (within and outside of the Project Area) including but not limited to
improvements and upgrades to the water distribution system, including extension
of the water distribution system, water capacity improvements, including to
increase fire flows, water storage upgrades, wastewater system improvements and
upgrades, including extension of the wastewater collection system, lift stations,
and improvements, and upgrades to power, gas, fiber optics, communications and
other such facilities. To the extent construction of utilities outside of the Project
Area are identified, such improvements are directly related to the growth and
development within the Project Area, but cannot be sited within the Project Area;
f. The engineering, design, installation, construction, and/or reconstruction of public
parking facilities, including structured parking facilities;
g. Removal, burying, or relocation of overhead utilities; removal or relocation of
underground utilities; extension of electrical distribution lines and transformers;
improvement of irrigation canals and drainage ditches and laterals;
undergrounding or piping of laterals; addition of fiber optic lines or other
communication systems; public parking facilities, and other public improvements,
including but not limited to, fire protection systems, floodway and flood zone
mitigation; and other public improvements that may be deemed appropriate by the
Board;
h. The acquisition of real property for public right-of-way and streetscape
improvements, utility undergrounding, extension, upgrades, public parks, plazas,
community spaces and trails, pedestrian facilities, pathways and trails, community
event space and to encourage housing diversity, enhance transportation and
mobility options, decrease underutilized parcels and surface parking lots, create
development opportunities consistent with the Plan, including but not limited to
future disposition to qualified developers for qualified developments;
The disposition of real property through a competitive process in accordance with
this Plan, Idaho law, including Idaho Code § 50-2011, and any disposition
policies adopted by the Agency;
j. The demolition or removal of certain buildings and/or improvements for public
rights-of-way and streetscape improvements, pedestrian facilities, utility
undergrounding extension and upgrades, public parks and trails, public facilities,
and to encourage and enhance housing diversity, enhance transportation and
mobility options, decrease underutilized parcels and surface parking lots, to
eliminate unhealthful, unsanitary, or unsafe conditions, eliminate obsolete or other
uses detrimental to the public welfare or otherwise to remove or to prevent the
spread of deteriorating or deteriorated conditions;
12
k. The management of any property acquired by and under the ownership and
control of the Agency;
1. The development or redevelopment of land by private enterprise or public
agencies for uses in accordance with this Plan;
in. The construction and financial support of infrastructure necessary for the
provision of improved transit and alternative transportation;
n. The engineering, design, installation, construction, and/or reconstruction of below
ground infrastructure to support the construction of certain municipal buildings
pursuant to Idaho Code § 50-2905A;
o. The provision of financial and other assistance to encourage and attract business
enterprise including but not limited to start-ups and microbusinesses, mid-sized
companies and large-scale corporations and industries;
P. The provision of financial and other assistance to encourage greater density and a
diverse mix of rental rates and housing options;
q. The rehabilitation of structures and improvements by present owners, their
successors, and the Agency;
r. The preservation and/or restoration of historic and/or cultural assets as amenities,
including but not limited to fagade restoration;
S. The preparation and assembly of adequate sites for the development and
construction of facilities for housing, retail areas, cultural centers, commercial,
and governmental use;
t. City to amend zoning regulations (if necessary) and standards and guidelines for
the design of streetscape, festival streets, multi -use pathways, parks, plazas and
open space and other like public spaces applicable to the Project Area as needed
to support implementation of this Plan;
U. In conjunction with the City, the establishment and implementation of
performance criteria to assure high site design standards and environmental
quality and other design elements which provide unity and integrity to the entire
Project Area, including commitment of funds for planning studies, achieving high
standards of development, and leveraging such development to achieve public
objectives and efficient use of scarce resources;
V. To the extent allowed by law, lend or invest federal funds to facilitate
development and/or redevelopment;
13
W. The provision for relocation assistance to displaced Project Area occupants, as
required by law, or within the discretion of the Agency Board for displaced
businesses;
X. Agency and/or owner -developer construction, participation in the construction
and/or management of public parking facilities and/or surface lots that support a
desired level and form of development to enhance the vitality of the Project Area;
Y. The environmental assessment and remediation of brownfield sites, or sites where
environmental conditions detrimental to development and/or redevelopment exist;
Z. Agency participation in the remediation of any brownfield or other environmental
conditions present in the Project Area; and
aa. Other related improvements to those set forth above as further set forth in
Attachment 5.
In the accomplishment of these purposes and activities and in the implementation and
furtherance of this Plan, the Agency is authorized to use all the powers provided in this Plan and
all the powers now or hereafter permitted by Law and Act.
302 Urban Renewal Plan Objectives
Urban renewal activity is necessary in the Project Area to combat problems of physical
deterioration or deteriorating conditions. As set forth in greater detail in Section 103,
the Project Area has a history of stagnant growth and development compared to other areas of
the City based on deteriorated or deteriorating conditions that have arrested or impaired growth
in the Project Area primarily attributed to: the presence of a substantial number of deteriorated or
deteriorating structures; deterioration of site; age or obsolescence of existing uses; a
predominance of defective or inadequate street layout; outmoded street patterns; need for
correlation of area with other areas of the City by streets and modern traffic requirements; faulty
lot layout in relation to size, adequacy, accessibility or usefulness/obsolete platting; insanitary or
unsafe conditions; diversity of ownership; economic disuse; and inadequate utility infrastructure
needed to support desired development. The Plan for the Project Area is a proposal to work in
partnership with public and private entities to improve, develop, and grow the economy within
the Project Area by the implementation of a strategy and program set forth in Section 301.
The provisions of this Plan are applicable to all public and private property in the Project
Area. The provisions of the Plan shall be interpreted and applied as objectives and goals,
recognizing the need for flexibility in interpretation and implementation, while at the same time
not in any way abdicating the rights and privileges of the property owners which are vested in
the present and future zoning classifications of the properties. All development under an owner
participation agreement shall conform to those standards specified in Section 303.1 of this Plan.
This Plan must be practical in order to succeed. Particular attention has been paid to how
it can be implemented, given the changing nature of market conditions. Transforming the Project
14
Area into a vital, thriving part of the community requires an assertive strategy. The following list
represents the key elements of that effort:
a. Initiate simultaneous projects designed to revitalize the Project Area. From street
and utility improvements to significant new public or private development, the
Agency plays a key role in creating the necessary momentum to get and keep
things going.
b. Promote mixed-use, commercial, office, retail, multi -family residential and
industrial projects within the Project Area that is oriented toward creating activity
centers and provides economic, civic, recreational, and residential opportunities
for surrounding neighborhoods.
C. Secure and improve certain public open space and community facilities in critical
areas.
d. Initiate projects designed to increase density, encourage activity centers, and
provide workforce transportation and mobility options.
Without direct public intervention, much of the Project Area could conceivably remain
unchanged and in a deteriorated and/or deteriorating condition for the next twenty (20) years.
The Plan creates the necessary flexible framework for the Project Area to support the City's
economic development while complying with the "specificity" requirement set forth in Idaho
Code § 50-2905.
Land use in the Project Area will be modified to the extent that underutilized,
underdeveloped, and vacant land and land now devoted to uses inconsistent with the future land
uses of the area will be converted to mixed-use, commercial, office, retail, multi -family
residential, community uses and industrial projects The Agency shall give due consideration to
the provision of adequate open space, park and recreational areas and facilities that may be
desirable for neighborhood improvement, with special consideration for the health, safety, and
welfare of residents in the general vicinity of the Project Area covered by the Plan. Additional
considerations include overall neighborhood improvements, special consideration for housing,
and transportation and mobility options.
303 Participation Opportunities and Agreement
303.1 Participation Agreements
The Agency shall enter into various development participation agreements with any
existing or future owner of property in the Project Area, in the event the property owner receives
assistance from the Agency in the development and/or redevelopment of the property. The term
"owner participation agreement" or "participation agreement" is intended to include all
participation agreements with a property owner, including reimbursement agreements, grant
agreements or other participation agreements. In that event, the Agency may allow for an
existing or future owner of property to remove the property and/or structure from future Agency
15
acquisition subject to entering into an owner participation agreement. The Agency may also enter
into owner participation agreements with other future owners and developers within the Project
Area throughout the duration of this Plan in order to implement the infrastructure improvements
set forth in this Plan.
Each structure and building in the Project Area to be rehabilitated or to be constructed as
a condition of the owner participation agreement between the Agency and the owner pursuant to
this Plan will be considered to be satisfactorily rehabilitated and constructed, and the Agency
will so certify, if the rehabilitated or new structure meets the standards set forth in an executed
owner participation agreement and meets the conditions described below:
a. Any such property within the Project Area shall be required to conform to all
applicable provisions, requirements, and regulations of this Plan. The owner
participation agreement may require as a condition of financial participation by
the Agency a commitment by the property owner to meet the greater objectives of
the land use elements identified in the Comprehensive Plan, and applicable zoning
ordinances. Upon completion of any rehabilitation each structure must be safe and
sound in all physical respects and be refurbished and altered to bring the property
to an upgraded marketable condition that will continue throughout an estimated
useful life for a minimum of twenty (20) years.
b. Any owner shall give due consideration to the provision of adequate park and
recreational areas and facilities that may be desirable for neighborhood
improvement, with special consideration for the health, safety and welfare of
children and seniors residing in the general vicinity of the site covered by the
Plan.
C. All such buildings or portions of buildings which are to remain within the Project
Area shall be rehabilitated or constructed in conformity with all applicable codes
and ordinances of the City.
d. Any new construction shall also conform to all applicable provisions,
requirements, and regulations of this Plan, as well as to all applicable codes and
ordinances of the City.
All owner participation agreements will address phasing issues, development timing,
justification and eligibility of proiect costs, and achievement of the obiectives of the Plan.
The Agency shall retain its discretion in the funding level of its participation. Obligations
under owner participation agreements shall terminate no later than the termination date of
this Plan, December 31, 2045. The Agency shall retain its discretion to negotiate an earlier
date to accomplish all obligations under any owner participation agreement.
In all participation agreements, participants who retain real property shall be required to
join in the recordation of such documents as may be necessary to make the provisions of this
Plan applicable to their properties. Whether or not a participant enters into a participation
16
agreement with the Agency, the provisions of this Plan are applicable to all public and private
property in the Project Area.
In the event a participant fails or refuses to rehabilitate, develop, use, and maintain its real
property pursuant to this Plan and a participation agreement, the real property or any interest
therein may be acquired by the Agency in accordance with Section 305.1 of this Plan and sold or
leased for rehabilitation or development in accordance with this Plan.
Owner participation agreements may be used to implement the following objectives:
a. Encouraging property owners to revitalize and/or remediate deteriorated areas or
deteriorating areas of their parcels to accelerate development in the Project Area.
b. Subject to the limitations of the Law and the Act, providing incentives to property
owners to encourage utilization and expansion of existing permitted uses during
the transition period to prevent a decline in the employment base and a
proliferation of vacant and deteriorated parcels in the Project Area during the
extended redevelopment of the Project Area.
C. To accommodate improvements and expansions allowed by City regulations.
d. Subject to the limitations of the Law and Act, providing incentives to improve
nonconforming properties so they implement the design guidelines contained in
this Plan to the extent possible and to encourage an orderly transition from
nonconforming to conforming uses through the term of the Plan.
e. Provide for advance funding by the developer/owner participant of those certain
public improvements related to or needed for the private development and related
to the construction of certain public improvements. In that event, the Agency will
agree as set out in the participation agreement to reimburse a portion of, or all of,
the costs of public improvements identified in the participation agreement from
the revenue allocation generated by the private development.
304 Cooperation with Public Bodies
Certain public bodies are authorized by state law to aid and cooperate, with or without
consideration, in the planning, undertaking, construction, or operation of this Project. The
Agency shall seek the aid and cooperation of such public bodies and shall attempt to coordinate
this Plan with the activities of such public bodies in order to accomplish the purposes of
redevelopment and the highest public good.
The Agency, by law, is not authorized to acquire real property owned by public bodies
without the consent of such public bodies. The Agency will seek the cooperation of all public
bodies which own or intend to acquire property in the Project Area. All plans for development of
property in the Project Area by a public body shall be subject to Agency approval, in the event
the Agency is providing any financial assistance.
17
Subject to applicable authority, the Agency may impose on all public bodies the planning
and design controls contained in this Plan to ensure that present uses and any future development
by public bodies will conform to the requirements of this Plan. The Agency is authorized to
financially (and otherwise) assist any public entity in the cost of public land, buildings, facilities,
structures, or other improvements of the Project Area as allowed by the Law and Act.
The Agency intends to cooperate to the extent allowable with the City (or the Idaho
Transportation Department), as the case may be, for the engineering, design, installation,
construction, and/or reconstruction of public infrastructure improvements, including, but not
limited to water, sewer, storm drainage, electrical, natural gas, telecommunication, or other
similar systems and lines, streets, roads, curbs, gutters, sidewalks, walkways, parking facilities
and unoccupied auxiliary structures. The Agency shall also cooperate with the City (or the Idaho
Transportation Department) on various relocation, screening, or undergrounding projects and the
providing of fiber optic capability. To the extent any public entity, including the City, has funded
certain improvements, the Agency may reimburse those entities for those expenses. The Agency
also intends to cooperate and seek available assistance from state, federal and other sources for
economic development.
In the event the Agency is participating in the public development by way of financial
incentive or otherwise, the public body shall enter into a participation agreement with the
Agency and then shall be bound by the Plan and other land use elements and shall conform to
those standards specified in Section 303.1 of this Plan.
This Plan does not financially bind or obligate the City, Agency and/or any other public
entity to any project or property acquisition; rather, for purposes of determining the economic
feasibility of the Plan certain projects and expenditures have been estimated and included in the
analysis. Agency revenue and the ability to fund reimbursement of eligible Project Costs is more
specifically detailed in any owner participation agreement and in the annual budget adopted by
the Agency Board.
305 Property Acquisition
305.1 Real Property
Only as specifically authorized herein, the Agency may acquire, through the voluntary
measures described below, but is not required to acquire, any real property located in the Project
Area where it is determined that the property is needed for construction of public improvements,
required to eliminate or mitigate the deteriorated or deteriorating conditions, to facilitate
economic development, including acquisition of real property intended for disposition to
qualified developers through a competitive process, and as otherwise allowed by law. The
acquisition shall be by any means authorized by law, including, but not limited to, the Law, the
Act, and the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970,
as amended, but shall not include the right to invoke eminent domain authority except as
authorized herein. The Agency is authorized to acquire either the entire fee or any other interest
IN
in real property less than a fee, including structures and fixtures upon the real property, without
acquiring the land upon which those structures and fixtures are located.
The Agency intends to acquire any real property through voluntary or consensual gift,
devise, exchange, or purchase. Such acquisition of property may be for the development of the
public improvements identified in this Plan. Such properties may include properties owned by
private parties or public entities. This Plan does not anticipate the Agency's widespread use of its
resources for property acquisition, except for the construction of public improvements or to
dispose of real property to a qualified developer to incent certain types of development as
permitted by the Law and Act.
In the event the Agency identifies certain property which should be acquired to develop
certain public improvements intended to be constructed under the provisions of this Plan, the
Agency shall coordinate such property acquisition with any other public entity (e.g., without
limitation, the City, the state of Idaho, or any of its authorized agencies), including the assistance
of the Agency of funds to acquire said property through a voluntary acquisition or the public
entity's involving of its eminent domain authority as limited by Idaho Code Section 7-701A.
The Agency is authorized by this Plan to acquire the properties for the uses identified in
Attachment 3 hereto, including but not limited to property to be acquired for the extension or
expansion of certain rights-of-way.
The Agency is authorized by this Plan and Idaho Code §§ 50-2010 and 50-2018(12) to
acquire the properties identified in Attachment 3 hereto for the purposes set forth in this Plan.
The Agency has identified its intent to acquire and/or participate in the development of certain
public improvements, including, but not limited to streets, streetscapes, water and sewer
improvements, environmental remediation/site preparation, public parking, community facilities,
including but not limited to parks, plazas and open spaces, pedestrian/bicycle paths and trails,
irrigation canal improvements, and to support belowground infrastructure improvements to
support other public facilities, and improvements to the power and gas systems. Further, the
Agency may acquire real property to facilitate mixed-use, housing, commercial, retail, and
economic development projects by assembling and disposing of developable parcels. The
Agency's property acquisition will result in remediating deteriorating conditions in the Project
Area by facilitating the development of mixed-use, commercial, office, retail, multi -family
residential, community uses, industrial projects and economic development projects to support
vibrant activity centers. The public improvements are intended to be dedicated to the City and/or
other appropriate public entity, as the case may be, upon completion. The Agency reserves the
right to determine which properties identified, if any, should be acquired. The open land areas
qualify for Agency acquisition as further set forth in Section 105 of this Plan.
It is in the public interest and may be necessary, in order to eliminate the conditions
requiring development and/or redevelopment and in order to execute this Plan, for the power of
eminent domain to be employed by the Agency or by the City with the Agency acting in an
advisory capacity' to acquire real property in the Project Area for the public improvements
' House Bill 1044, adopted by the Idaho Legislature during the 2021 Legislative Session, limited the Agency's
ability to exercise eminent domain.
IM
identified in this Plan, which cannot be acquired by gift, devise, exchange, purchase, or any other
lawful method.
Under the provisions of the Act, the urban renewal plan "shall be sufficiently complete to
indicate such land acquisition, demolition, and removal of structures, redevelopment,
improvements, and rehabilitation as may be proposed to be carried out in the urban renewal
area." Idaho Code § 50-2018(12). The Agency has generally described those properties by use as
set out in Attachment 3 for acquisition for the construction of public improvements. The Agency
may also acquire property for the purpose of developing streetscape and public utilities. The
Agency reserves the right to determine which properties, if any, should be acquired.
305.2 Personal Property
Generally, personal property shall not be acquired. However, where necessary in the
execution of this Plan, the Agency is authorized to acquire personal property in the Project Area
by any lawful means, for the purpose of developing the public improvements described in
section 305.1.
306 Property Management
During the time real property, if any, in the Project Area is owned by the Agency, such
property shall be under the management and control of the Agency. Such property may be rented
or leased by the Agency pending its disposition for development and/or redevelopment, and such
rental or lease shall be pursuant to such policies as the Agency may adopt.
307 Relocation of Persons (Including Individuals and Families), Business
Concerns, and Others Displaced by the Project
If the Agency receives federal funds for real estate acquisition and relocation, the Agency
shall comply with 24 C.F.R. Part 42, implementing the Uniform Relocation Assistance and Real
Property Acquisition Policies Act of 1970, as amended. The Agency reserves the right to extend
benefits for relocation to those not otherwise entitled to relocation benefits as a matter of state
law under the Act or the Law.
In the event the Agency's activities result in displacement, the Agency shall comply with,
at a minimum, the standards set forth in the Law. The Agency shall also comply with all
applicable state laws concerning relocation benefits and shall coordinate with the various local,
state, or federal agencies concerning relocation assistance.
308 Demolition, Clearance, and Site Preparation
The Agency is authorized (but not required) to demolish and clear buildings, structures,
and other improvements from any real property in the Project Area as necessary to carry out the
purposes of this Plan.
Further, the Agency is authorized (but not required) to prepare, or cause to be prepared,
as building sites any real property in the Project Area owned by the Agency including rock
00
removal and site preparation. In connection therewith, the Agency may cause, provide for, or
undertake the installation or construction of streets, utilities, pedestrian walkways, parking
facilities, drainage facilities, and other public improvements necessary to carry out this Plan.
309 Property Disposition and Development
309.1 Disposition by the Agency
For the purposes of this Plan, the Agency is authorized to sell, lease, lease/purchase,
exchange, subdivide, transfer, assign, pledge, encumber by mortgage or deed of trust, or
otherwise dispose of any interest in real property under the reuse provisions set forth in Idaho
law, including Idaho Code § 50-2011 and pursuant to any disposition policies adopted by the
Agency. To the extent permitted by law, the Agency is authorized to dispose of real property by
negotiated lease, sale, or transfer without public bidding.
Real property acquired by the Agency may be conveyed by the Agency and, where
beneficial to the Project Area, without charge to any public body as allowed by law. All real
property acquired by the Agency in the Project Area shall be sold or leased to public or private
persons or entities for development for the uses permitted in this Plan.
309.2 Disposition and Development Agreements
To provide adequate safeguards to ensure that the provisions of this Plan will be carried
out and to prevent the recurrence of deteriorating conditions, all real property sold, leased, or
conveyed by the Agency is subject to the provisions of this Plan.
The Agency shall reserve such powers and controls in the disposition and development
documents as may be necessary to prevent transfer, retention, or use of property for speculative
purposes and to ensure that development is carried out pursuant to this Plan.
Leases, lease/purchases, deeds, contracts, agreements, and declarations of restrictions of
the Agency may contain restrictions, covenants, covenants running with the land, rights of
reverter, conditions subsequent, equitable servitudes, or any other provisions necessary to carry
out this Plan. Where appropriate, as determined by the Agency, such documents, or portions
thereof, shall be recorded in the office of the Recorder of Bannock County, Idaho.
All property in the Project Area is hereby subject to the restriction that there shall be no
discrimination or segregation based upon race, color, creed, religion, sex, age, national origin, or
ancestry in the sale, lease, sublease, transfer, use, occupancy, disability/handicap, tenure, or
enjoyment of property in the Project Area. All property sold, leased, conveyed, or subject to a
participation agreement shall be expressly subject by appropriate documents to the restriction
that all deeds, leases, or contracts for the sale, lease, sublease, or other transfer of land in the
Project Area shall contain such nondiscrimination and nonsegregation clauses as required by
law.
21
As required by law or as determined in the Agency's discretion to be in the best interest
of the Agency and the public, the following requirements and obligations shall be included in the
disposition and development agreement.
That the developers, their successors, and assigns agree:
a. That a detailed scope and schedule for the proposed development shall be
submitted to and agreed upon by the Agency.
b. That the purchase or lease of the land and/or subterranean rights and/or air rights
is for the purpose of redevelopment and not for speculation.
C. That the building of improvements will be commenced and completed as jointly
scheduled and determined by the Agency and the developer(s).
d. That the site and construction plans will be submitted to the Agency for review as
to conformity with the provisions and purposes of this Plan.
e. All new construction shall have a minimum estimated life of no less than twenty
(20) years.
f. That rehabilitation of any existing structure must assure that the structure is safe
and sound in all physical respects and be refurbished and altered to bring the
property to an upgraded marketable condition which will continue throughout an
estimated useful life for a minimum of twenty (20) years.
g. That the Agency receives adequate assurance acceptable to the Agency to ensure
performance under the contract for sale.
h. All such buildings or portions of the buildings which are to remain within the
Project Area shall be reconstructed in conformity with all applicable codes and
ordinances of the City.
All disposition and development documents shall be governed by the provisions
of Section 409 of this Plan.
j. All other requirements and obligations as may be set forth in any participation
policy established and/or amended by the Agency.
22
The Agency also reserves the right to determine the extent of its participation based
upon the achievements of the obiectives of this Plan. Obligations under any disposition and
development agreement and deed covenants, except for covenants which run with the land
beyond the termination date of this Plan, shall terminate no later than December 31, 2043.
The Agency shall retain its discretion to negotiate an earlier date to accomplish all
obligations under any disposition and development agreement.
309.3 Development by the Agency
To the extent now or hereafter permitted by law, the Agency is authorized to pay for,
develop, or construct public improvements within the Project Area for itself or for any public
body or entity, which public improvements are or would be of benefit to the Project Area.
Specifically, the Agency may pay for, install, or construct the public improvements authorized
under Idaho Code §§ 50-2007, 50-2018(10) and (13), and 50-2903(9), (13), and (14), and as
otherwise identified in Attachment 5, attached hereto and incorporated herein by reference, and
may acquire or pay for the land required therefore.
The Agency may enter into contracts, leases, and agreements with the City or other
public body or private entity pursuant to this section, and the obligation of the Agency under
such contract, lease, or agreement shall constitute an indebtedness of the Agency as described in
Idaho Code § 50-2909 which may be made payable out of the taxes levied in the Project Area
and allocated to the Agency under Idaho Code § 50-2908(2)(b) and Section 500 of this Plan or
out of any other available funds.
310 Development Plans
All development plans (whether public or private) prepared, pursuant to an owner
participation or disposition and development agreement, shall be submitted to the Agency Board
for review and approval. All development in the Project Area must conform to those standards
specified in Section 409 and all applicable City ordinances.
311 [Reserved]
312 [Reserved]
313 Participation with Others
Under the Law, the Agency has the authority to lend or invest funds obtained from the
federal government for the purposes of the Law if allowable under federal laws or regulations.
The federal funds that may be available to the Agency are governed by regulations promulgated
by the Department of Housing and Urban Development for the Community Development Block
Grant Program ("CDBG"), the Economic Development Administration, the Small Business
Administration, or other federal agencies. In order to enhance such grants, the Agency's use of
revenue allocation funds is critical.
23
Under those regulations the Agency may participate with the private sector in the
development and financing of those private projects that will attain certain federal objectives.
The Agency may, therefore, use the federal funds for the provision of assistance to
private for-profit business, including, but not limited to, grants, loans, loan guarantees, interest
supplements, technical assistance, and other forms to support, for any other activity necessary or
appropriate to carry out an economic development project.
As allowed by law, the Agency may also use funds from any other sources for any
purpose set forth under the Law or Act.
The Agency may enter into contracts, leases, and agreements with the City, or other
public body or private entity, pursuant to this section, and the obligation of the Agency under
such contract, lease, or agreement shall constitute an indebtedness of the Agency as described in
Idaho Code § 50-2909 which may be made payable out of the taxes levied in the Project Area
and allocated to the Agency under Idaho Code § 50-2908(2)(b) and Section 500 of this Plan or
out of any other available funds.
314 Conforming Owners
The Agency may, at the Agency's sole and absolute discretion, determine that certain real
property within the Project Area presently meets the requirements of this Plan, and the owner of
such property will be permitted to remain as a conforming owner without a participation
agreement with the Agency, provided such owner continues to operate, use, and maintain the real
property within the requirements of this Plan.
315 Arts and Cultural Funding
The Agency may dedicate resources for the construction or purchase of facilities for the
placement and maintenance of public art and art projects may be selected and provided by the
Agency, separately from any construction costs of developers. Though not required, the Agency
Board generally makes selections of the works of art with assistance from the City and may
include review and approval of the City Council.
When possible, any Agency arts funding will be used to leverage additional contributions
from developers, other private sources, and public or quasi -public entities for purposes of
including public art within the streetscape projects identified in this Plan.
400 USES PERMITTED IN THE PROJECT AREA
401 Designated Land Uses
The Agency intends to rely upon the overall land use designations and zoning
classifications of the City, as may be amended, and as depicted on Attachment 4 and as set forth
in the City's Comprehensive Plan, including the future land use map and zoning classifications,
as may be amended. For the most part, the Project Area includes a mix of uses including mixed -
W,
use residential, commercial, retail and office development, industrial development, as well as
public and governmental uses. Provided, however, nothing herein within this Plan shall be
deemed to be granting any particular right to zoning classification or use.
402 [Reserved]
403 Public Rights -of -Way
The Project Area contains existing maintained public rights-of-way included within the
boundaries, as shown on Attachment 1. Any new roadways, including new arterials, collectors
and/or local roads to be engineered, designed, installed, and constructed in the Project Area, will
be constructed in conjunction with any applicable policies and design standards of the City (and
State and Federal standards, as the case may be) regarding dedicated rights-of-way. Additional
public streets, alleys, and easements may be created in the Project Area as needed for proper
development, and other potential roadways described in Attachment 5, or shown in Attachment
5.1.
Additional improvements to existing streets, alleys and easements may be created,
improved, or extended in the Project Area as needed for development. Existing dirt roadways,
streets, easements, and irrigation or drainage laterals or ditches may be abandoned, closed,
vacated, expanded, or modified as necessary for proper development of the Project Area, in
accordance with any applicable policies and standards of the Idaho Transportation Department or
the City regarding changes to dedicated rights-of-way, and appropriate irrigation or drainage
districts regarding changes to laterals or ditches.
Any development, maintenance, and future changes in the interior or exterior street
layout shall be in accordance with the objectives of this Plan and the design standards of the
City, Bannock County, or the Idaho Department of Transportation as may be applicable; and
shall be effectuated in the manner prescribed by State and local law; and shall be guided by the
following criteria:
a. A balancing of the needs of proposed and potential new developments for
adequate pedestrian and vehicular access, vehicular parking, and delivery loading
docks with the similar needs of any existing developments permitted to remain.
Such balancing shall take into consideration the rights of existing owners and
tenants under the rules for owner and tenant participation adopted by the Agency
for the Project and any participation agreements executed thereunder;
b. The requirements imposed by such factors as topography, traffic safety, and
aesthetics; and
C. The potential need to serve not only the Project Area and new or existing
developments, but to also serve areas outside the Project Area by providing
convenient and efficient vehicular access and movement.
25
The public rights-of-way may be used for vehicular and/or pedestrian and bicycle traffic,
as well as for public improvements, public and private utilities, and activities typically found in
public rights-of-way.
404 Interim Uses
Pending the ultimate development of land by developers and participants, the Agency is
authorized to use or permit the use of any land in the Project Area for interim uses that are not in
conformity with the uses permitted in this Plan. However, any interim use must comply with
applicable City Code.
405 Development in the Project Area Subject to the Plan
All real property in the Project Area, under the provisions of either a disposition and
development agreement or an owner participation agreement, is made subject to the controls and
requirements of this Plan. No such real property shall be developed, rehabilitated, or otherwise
changed after the date of the adoption of this Plan, except in conformance with the provisions of
this Plan.
406 Construction Shall Comply with Applicable Federal, State, and Local Laws
and Ordinances and Agency Development Standards
All construction in the Project Area shall comply with all applicable state laws, the
Chubbuck City Code, as may be amended from time to time, and any applicable City Council
ordinances pending codification, including but not limited to, regulations concerning the type,
size, density and height of buildings; open space, landscaping, light, air, and privacy; the
undergrounding of utilities; limitation or prohibition of development that is incompatible with
the surrounding area by reason of appearance, traffic, smoke, glare, noise, odor, or similar
factors; parcel subdivision; off-street loading and off-street parking requirements.
In addition to applicable codes, ordinances, or other requirements governing development
in the Project Area, additional specific performance and development standards may be adopted
by the Agency to control and direct redevelopment activities in the Project Area in the event of a
disposition and development agreement or owner participation agreement.
407 [Reserved]
408 Nonconforming Uses
The Agency may permit an existing use to remain in an existing building and site usage
in good condition, which use does not conform to the provisions of this Plan, provided that such
use is generally compatible with existing and proposed developments and uses in the Project
Area. The owner of such a property must be willing to enter into an owner participation
agreement and agree to the imposition of such reasonable restrictions as may be necessary to
protect the development and use of the Project Area.
we
The Agency may authorize additions, alterations, repairs, or other improvements in the
Project Area for uses which do not conform to the provisions of this Plan where such
improvements are within a portion of the Project Area where, in the determination of the
Agency, such improvements would be compatible with surrounding Project uses and
development.
All nonconforming uses shall also comply with the City codes and ordinances.
409 Design Guidelines for Development under a Disposition and Development
Agreement or Owner Participation Agreement
Under a disposition and development agreement and an owner participation agreement,
the design guidelines and land use elements of the Plan shall be achieved to the greatest extent
feasible, though the Agency retains the authority to grant minor variations under this Plan and
subject to a negotiated agreement between the Agency and the developer or property owner.
Under those agreements, the architectural, landscape, and site plans shall be submitted to
the Agency and approved in writing by the Agency. In such agreements, the Agency may impose
additional design controls. Therefore, such plans shall give consideration to good design and
amenities to enhance the aesthetic quality of the Project Area. These additional design standards
or controls will be implemented through the provisions of any owner participation agreement or
disposition and development agreement. These controls are in addition to any standards and
provisions of any applicable City building or zoning ordinances; provided, however, each and
every development shall comply with all applicable City zoning and building ordinances;
provided however, each and every development shall Comply with all applicable City zoning
and building ordinances.
500 METHODS OF FINANCING THE PROJECT
501 General Description of the Proposed Financing Method
The Agency is authorized to finance this Project with revenue allocation funds, financial
assistance from the City (loans, grants, other financial assistance), state of Idaho, federal
government or other public entities, interest income, developer advanced funds, donations, loans
from private financial institutions (bonds, notes, line of credit), the lease or sale of Agency -
owned property, public parking revenue, or any other available source, public or private,
including assistance from any taxing district or any public entity.
The Agency is also authorized to obtain advances, lines of credit, borrow funds, and
create indebtedness in carrying out this Plan. The Agency may also consider an inter -fund
transfer or grant from the City or an inter -fund transfer from other urban renewal project areas.
The principal and interest on such advances, funds, and indebtedness may be paid from any
funds available to the Agency. The City, as it is able, may also supply additional assistance
through City loans and grants for various public improvements and facilities. The City or any
other public agency, as properly budgeted, may expend money to assist the Agency in carrying
out this Project.
27
As allowed by law and subject to restrictions as are imposed by law, the Agency is
authorized to issue notes or bonds from time to time, if it deems appropriate to do so, in order to
finance all or any part of the Project. Neither the members of the Agency nor any persons
executing the bonds are liable personally on the bonds by reason of their issuance.
502 Revenue Allocation Financing Provisions
The Agency hereby adopts revenue allocation financing provisions as authorized by the
Act, effective retroactively to January 1, 2025. These revenue allocation provisions shall apply to
all taxing districts which are located in or overlap the Revenue Allocation Area shown and
described on Attachments 1 and 2 to this Plan. The Agency shall take all actions necessary or
convenient to implement these revenue allocation financing provisions. The Agency specifically
finds that the equalized assessed valuation of property within the Revenue Allocation Area is
likely to increase as a result of the initiation of the Project.
The Agency, acting by one or more resolutions adopted by its Board, is hereby authorized
to apply all or any portion of the revenues allocated to the Agency pursuant to the Act to pay as
costs are incurred (pay-as-you-go) or to pledge all or any portion of such revenues to the
repayment of any moneys borrowed, indebtedness incurred, or notes or bonds issued by the
Agency to finance or to refinance the Project Costs (as defined in Idaho Code § 50-2903(14)) of
one or more urban renewal projects.
The Agency may consider a note or line of credit issued by a bank or lending institution
premised upon revenue allocation funds generated by a substantial private development
contemplated by the Study, as defined in Section 502.1, which would allow the Agency to more
quickly fund the public improvements contemplated by this Plan. Likewise, a developer/owner
advanced funding of certain eligible public infrastructure improvements to be reimbursed
pursuant to an owner participation agreement could achieve the same purpose.
Upon enactment of a City Council ordinance finally adopting these revenue allocation
financing provisions and defining the Revenue Allocation Area described herein as part of the
Plan, there shall hereby be created a special fund of the Agency into which the County Treasurer
shall deposit allocated revenues as provided in Idaho Code § 50-2908. The Agency shall use
such funds solely in accordance with Idaho Code § 50-2909 and solely for the purpose of
providing funds to pay the Project Costs, including any incidental costs, of such urban renewal
projects as the Agency may determine by resolution or resolutions of its Board.
A statement listing proposed public improvements and facilities, a schedule of
improvements, an economic feasibility study, estimated project costs, fiscal impact upon other
taxing districts, the location of proposed public infrastructure improvements, and methods of
financing project costs required by Idaho Code § 50-2905 is included in this Plan and in
Attachment 5 to this Plan. This information necessarily incorporates estimates and projections
based on the Agency's and consultants' present knowledge and expectations. The Agency is
hereby authorized to adjust the presently anticipated urban renewal projects and use of revenue
allocation financing of the related Project Costs if the Board deems such adjustment necessary or
convenient to effectuate the general objectives of the Plan in order to account for revenue
inconsistencies, market adjustments, future priorities, developers/owners seeking Agency
assistance pursuant to an owner participation agreement, and unknown future costs. Agency
revenue and the ability to fund reimbursement of eligible Project Costs is more specifically
detailed in the annual budget.
Revenues will continue to be allocated to the Agency until termination of the revenue
allocation area as set forth in Section 800. The Study incorporates estimates and projections
based on the Agency's and its consultants' present knowledge and expectations concerning the
length of time to complete the improvements and estimated future revenues. The activity may
take longer depending on the significance and timeliness of development. Alternatively, the
activity may be completed earlier if revenue allocation proceeds are greater or the Agency
obtains additional funds from another source.
The Agency may appropriate funds consisting of revenue allocation proceeds on an
annual basis without the issuance of notes or bonds. The Agency may also obtain advances or
loans from the City or Agency, or private entity and financial institutions in order to immediately
commence construction of certain of the public improvements. Developer advanced funding of
public improvements could also achieve the same purpose. The revenue allocation proceeds are
hereby irrevocably pledged for the payment of the principal and interest on the advance of
monies or making of loans or the incurring of any indebtedness such as bonds, notes, and other
obligations (whether funded, refunded, assumed, or otherwise) by the Agency to finance or
refinance the Project in whole or in part, including reimbursement to any owner/developer or
public entity for the cost of eligible public improvements pursuant to an owner participation
agreement.
The Agency is authorized to make such pledges as to specific advances, loans, and
indebtedness as appropriate in carrying out the Project. The Agency reserves the right to either
pay for Project Costs from available revenue (pay-as-you-go basis) or borrow funds by incurring
debt through notes or other obligations.
Revenue allocation proceeds are deemed to be only a part of the proposed funding
sources for the payment of public improvements and other project improvements. Additionally,
project funding is proposed to be phased for the improvements, allowing various sources of
funds to be accumulated for use.
502.1 Economic Feasibility Study
Attachment 5 constitutes the Economic Feasibility Study for the Project Area (the
"Study"), prepared by Perspective Planning & Consulting, LLC. The Study constitutes the
financial analysis required by the Act and is based upon existing information from property
owners, developers, the Agency, the City, and others.
502.2 Assumptions and Conditions/Economic Feasibility Statement
The information contained in the Study assumes certain completed and projected actions.
3t
All debt is projected to be repaid no later than the duration period of the Plan. The total amount
of indebtedness (and all other loans or indebtedness), developer reimbursement and the amount
of revenue generated by revenue allocation are dependent upon the extent and timing of private
development. Should all of the development take place as projected, the project indebtedness
could be extinguished earlier, dependent upon other legal obligations. Should private
development take longer to materialize, or should the private development be substantially less
than projected, then the amount of revenue generated will be substantially reduced and debt may
continue for its full term.
The Plan and the Plan Attachments incorporate estimates and projections based on the
Agency's and consultants' present knowledge and expectations. The Plan proposes certain public
improvements as set forth in the Study, and as prioritized by year and tranches of funding, and in
Section 301, which will facilitate the mixed-use, commercial, office, retail, multi -family
residential, community uses, industrial projects and economic development opportunities in the
Revenue Allocation Area.
The assumptions set forth in the Study are based upon the best information available to
the Agency and its consultants through public sources or discussions with property owners,
developers, the City, the County, and others. The information has been analyzed by the Agency
and its consultants in order to provide an analysis that meets the requirements set forth under the
Law and Act. At the point in time when the Agency may seek a loan from lenders or others, a
more detailed and then -current financial pro forma will be presented to those lenders or
underwriters for analysis to determine the borrowing capacity of the Agency. As set forth herein,
the Agency reserves the right to fund the Project on a "pay-as-you-go" basis. The Agency Board
will prioritize the activities set forth in this Plan and determine what funds are available and what
activities can be funded. The Agency will establish those priorities through its mandated annual
budgetary process.
The list of public improvements, or activities within the Study are prioritized by way of
importance to the Agency, with the priority projects being identified as the most improvement,
by feasibility based on estimated revenues to be received, amounts funded, and by timing of the
proposed funding. The projected timing of funding is primarily a function of the availability of
financial resources and market conditions but is also strategic, considering the timing of
anticipated or projected private development partnership opportunities and the ability of certain
strategic activities to stimulate development at a given point in time within the duration of the
Plan and Project Area.
The assumptions concerning revenue allocation proceeds are based upon certain
anticipated or projected new developments, assessed value increases, and assumed tax levy rates
as more specifically set forth in the Study. In projecting new construction, the Study considered
parcels identified as expected to develop over the life of the Project Area, communications with
potential developers and City and County staff. Based on a review of past general inflationary
value increases and historical levy rate information, the Study considered two revenue models.
The first assumes total property valuation will inflate at a conservative rate of 2% per year for
the duration of the Project Area and the levy rate is assumed to decrease 1% per year over the
same period. Under this scenario, new taxable development is added to the tax rolls over time
30
and is anticipated to generate approximately $51,586,378 in revenue over the life of the Project
Area.
The second model assumes total property valuation will inflate at a less conservate rate of 5%
per year for the duration of the Project Area and the levy rate is assumed to decrease 1% per year
over the same period. The 5% valuation increase, while higher than the conservative model, is
still conservative based on historical growth data. Under this scenario, new taxable development
is added to the tax rolls over time and is anticipated to generate approximately $71,759,624 in
revenue over the life of the Project Area. What these models show is a revenue generation range
of $51 million to $71 million to support the funding of the priority projects.
The types of new construction expected in the Project Area are: mixed-use buildings;
increased density/multi-family residential projects, including apartments and townhomes;
commercial, retail and office projects; community facilities and public spaced; industrial
projects; and other public facilities and improvements, including but not limited to streets,
streetscapes, water and sewer improvements, environmental remediation/site preparation, public
parking, parks, plazas, community event space, pedestrianibike paths and trails. The Project Area
has potential for a significant increase in high-density residential, commercial, office and retail
growth due to the location of the Project Area. However, without a method to construct the
identified public improvements such as main water and sewer lines, lift stations, street
infrastructure, and pedestrianibicycle amenities, development is unlikely to occur in much of the
Project Area.
The financial analysis set forth in the Study has taken into account and excluded levies
that do not flow to the Agency consistent with Idaho Code § 50-2908.
It is understood that application of certain exemptions, including the homeowner's
exemption and Idaho Code § 63-602K, which provides for personal property tax exemption to
businesses may have the effect of reducing the increment value, which in turn reduces revenue.
502.3 Ten Percent Limitation
Under the Act, the base assessed valuation for all revenue allocation areas cannot exceed
gross/net ten percent (10%) of the current assessed taxable value for the entire City. According to
the Bannock County Assessor, the assessed taxable value for the City as of January 1, 2025, is
$1,596,414,274 (does not include State assessed operating property). Therefore, the 10% limit is
$159,641,427.
The 2025 adjusted base assessed value of each of the existing revenue allocation areas,
together with the 2025 assessed taxable value of the proposed Project Area, as of January 1,
2025, is as follows:
Pine Ridge Mall District $27,112,636
Northside Crossing District $316,520
Harvest Springs District $421,674
Proposed Yellowstone Corridor $126,911,543
31
District
Total: $154,162,373
The adjusted base values for the combined revenue allocation areas total $154,162,373,
which is less than 10% of the City's 2025 taxable value.
502.4 Financial Limitation
The Study identifies several capital improvement projects. Use of any particular funding
source for any particular purpose is not assured or identified. Use of the funding source shall be
conditioned on any limitations set forth in the Law, the Act, by contract, or by other federal
regulation. If revenue allocation funds are unavailable, then the Agency will need to use a
different funding source for that improvement.
The amount of funds available to the Agency from revenue allocation financing is
directly related to the assessed value of new improvements within the Revenue Allocation Area.
Under the Act, the Agency is allowed the revenue allocation generated from inflationary
increases and new development value. Increases have been assumed based upon the projected
value of new development as that development occurs along with possible land reassessment
based on a construction start.
The Study, with the various estimates and projections, constitutes an economic feasibility
study. Costs and revenues are analyzed, and the analysis shows the need for public capital funds
during the project. Multiple financing sources are contemplated in the Study, including proposed
revenue allocation notes, annual revenue allocations, developer contributions, city contributions,
interfund loan, and other financing sources as permitted by law. This Study identifies the kind,
number, and location of all proposed public works or improvements, a detailed list of estimated
project costs prioritized by year and funding tranche, a description of the methods of financing
illustrating project costs, and the time when related costs or monetary obligations are to be
incurred.2 Based on these funding sources, the conclusion is that the Project is feasible.
The Study has further identified and described a list of "unfunded" improvements, i.e.
non -prioritized projects on the project list. The Agency reserves the discretion and flexibility to
use revenue allocation proceeds in excess of the amounts projected in the Study for the purpose
of funding the additional identified projects and improvements. The projections in the Study are
based on reasonable assumptions and existing market conditions. However, should the Project
Area result in greater than anticipated revenues, the Agency specifically reserves the ability to
fund the additional activity and projects identified in the Plan. Further, the Agency reserves the
discretion and flexibility to use other sources of funds unrelated to revenue allocation to assist in
the funding of the improvements and activities identified, including but not limited to owner
participation agreements and disposition and development agreements. The Agency may also re -
prioritize projects in the project list and the prioritized project list pursuant to market conditions,
project timing, funding availability, etc., as more specifically detailed in the annual budget.
2 See Idaho Code § 50-2905.
32
The proposed timing for the public improvements may have to be adjusted depending
upon the availability of some of the funds and the Agency's ability to finance any portion of the
Project. Any adjustment to Project timing or funding is technical or ministerial in nature
and shall not be considered a modification of the Plan pursuant to Idaho Code § 50-2903A.
The Study lists those public improvements the Agency intends to construct or fund
through the term of the Plan. The costs of improvements are estimates only as it is impossible to
know with any certainty what the costs of improvements and projects will be in future years.
There is general recognition that construction costs fluctuate and are impacted by future
unknowns, such as, the cost of materials and laborers. Final costs will be determined by way of
construction contract public bidding or by an agreement between the developer/owner, and/or
public entity, and Agency. The listing of public improvements and projects does not commit the
Agency, City, or other public entity, to any particular level of funding; rather, identification of
the activity in the Plan allows the Agency to negotiate the terms of any reimbursement with the
developer and/or the public entities. This Plan does not financially bind or obligate the Agency,
City, or other public entity to any project or property acquisition; rather, for purposes of
determining the economic feasibility of the Plan certain projects and expenditures have been
estimated and included in the analysis. The City has not committed to fund any public
infrastructure improvements within the Project Area. Such decisions concerning capital
improvement projects and/or other expenditures are made by the City annually pursuant to its
budget and appropriation process. Agency revenue and the ability to fund reimbursement of
eligible Project Costs is more specifically detailed in any participation agreement and in the
annual budget adopted by the Agency Board. The proposed location and siting of the proposed
public infrastructure and other improvement projects in the Project Area are generally described
in the Study and this Plan recognizing that the specific location of the projects will depend on the
type and timing of development. The specific location of the improvements or the change in the
location of the improvements identified in Attachment 5 or this Plan is technical and/or
ministerial and does not constitute a modification to the Plan.
The Agency reserves its discretion and flexibility in deciding which improvements are
more critical for development or redevelopment, and the Agency intends to coordinate its public
improvements with associated development by private developers/owners. Where applicable, the
Agency also intends to coordinate its participation in the public improvements with the receipt of
certain grants or loans which may require the Agency's participation in some combination with
the grant and loan funding.
Generally, the Agency expects to develop those improvements identified in the Study
first, in conjunction with private development within the Project Area generating the increment
as identified in the Study.
The Plan has shown that the equalized valuation of the Revenue Allocation Area as
defined in the Plan is likely to increase as a result of the initiation and completion of urban
renewal projects pursuant to the Plan.
33
502.5 [Reserved]
502.6 Participation with Local Improvement Districts and/or Business
Improvement Districts
Under the Idaho Local Improvement District ("LID") Code, Chapter 17, Title 50, Idaho
Code, the City has the authority to establish local improvement districts for various public
facilities, including, but not limited to, streets, curbs, gutters, sidewalks, storm drains,
landscaping, and other like facilities. To the extent allowed by the Law and the Act, the Agency
reserves the authority, but not the obligation, to participate in the funding of local improvement
district facilities. This participation may include either direct funding to reduce the overall cost
of the LID or to participate as an assessed entity to finance the LID project. Similarly, to the
extent allowed by the Law and the Act, the Agency reserves the authority, but not the obligation,
to participate in the funding of the purposes specified under the Business Improvement Districts,
Chapter 26, Title 50, Idaho Code.
502.7 Issuance of Debt and Debt Limitation
Any debt incurred by the Agency as allowed by the Law and Act shall be secured by
revenue allocation funds as allowed by the Act. All such debt shall be repaid within the duration
of this Plan, except as may be authorized by law.
502.8 Impact on Other Taxing Districts and Levy Rate
An estimate of the overall impact of the revenue allocation project on each taxing district
is shown in the Study through the new development projections set forth in the Study.
The assessed value for each property in a revenue allocation area consists of a base value
and an increment value. The base value is the assessed value as of January 1 of the year in which
a revenue allocation area is approved by a municipality, with periodic adjustments allowed by
Idaho law. The increment value is the difference between the adjusted base assessed value and
current assessed taxable value in any given year while the property is in a revenue allocation
area. Under Idaho Code § 63-802, taxing entities are constrained in establishing levy rates by the
amount each budget of each taxing district can increase on an annual basis. Taxing entities
submit proposed budgets to the County Board of Commissioners, which budgets are required to
comply with the limitations set forth in Idaho Code § 63-802. Therefore, the impact of revenue
allocation on the taxing entities is more of a product of the imposition of Idaho Code § 63-802,
then the effect of urban renewal.
The County Board of Commissioners calculates the levy rate required to produce the
proposed budget amount for each taxing entity using the assessed values which are subject to
each taxing entity's levy rate. Assessed values in urban renewal districts which are subject to
revenue allocation (incremental values) are not included in this calculation. The combined levy
rate for the taxing entities is applied to the incremental property values in a revenue allocation
area to determine the amount of property tax revenue which is allocated to an urban renewal
34
agency. The property taxes generated by the base values in the urban renewal districts and by
properties outside revenue allocation areas are distributed to the other taxing entities. Properties
in revenue allocation areas are subject to the same levy rate as they would be outside a revenue
allocation area. The difference is how the revenue is distributed. If the overall levy rate is less
than assumed, the Agency will receive fewer funds from revenue allocation.
In addition, without the Revenue Allocation Area and its ability to pay for public
improvements and public facilities, fewer substantial improvements within the Revenue
Allocation Area would be expected during the term of the Plan; hence, there would be lower
increases in assessed valuation to be used by the other taxing entities. The Study's analysis is
premised upon the fact the proposed development and/or redevelopment would not occur but for
the ability to use revenue allocation funds to fund certain significant public infrastructure
improvements.
One result of new construction occurring outside the revenue allocation area (Idaho Code
§§ 63-802 and 63-301A) is the likely reduction of the levy rate as assessed values increase for
property within each taxing entity's jurisdiction. From and after December 31, 2006, Idaho Code
§ 63-301A prohibits taxing entities from including, as part of the new construction roll, the
increased value related to new construction within a revenue allocation area until the revenue
allocation authority is terminated. Any new construction within the Project Area is not available
in the short term for inclusion by the taxing entities to increase their budget capacity. Upon
termination of this Plan or deannexation of area, the taxing entities will be able to include a
percentage of the increment value on new construction roll for purposes of setting the following
year's budget and revenue from such value is not limited to the eight percent cap set forth in
Idaho Code § 63-802.
As the 2025 certified levy rates are not determined until late September or October 2025,
the 2024 certified levy rates have been used as a base to support the assumptions in the Study for
purposes of the analysis. 3 Those taxing districts and levy rates are as follows:
Taxing Districts Levy Rates:
Bannock County
.003109503
Bannock County Abatement District
.000019959
Bannock County Ambulance
0
Bannock County Road & Bridge
.000266091
City of Chubbuck
.006224284
Pocatello School District #25
0
Portneuf Free Library
.000383328
Tota14:
0.010003165
s Due to the timing of the taxing districts' budget and levy setting process, certification of the 2025 levy rates did not
occur until after this Plan had been prepared and was in the process of being considered by the Agency. In order to
provide a basis to analyze the impact on the taxing entities, the 2024 levy rates are used. Use of the 2024 levy rates
provides a more accurate base than estimating the 2025 levy rates.
a Net of voter approved bonds and levies.
35
The Study has made certain assumptions concerning the levy rate. For purposes of the
Study, the estimated levy rate is projected to decrease 1% a year in both revenue projection
models. This is consistent with current historical trends. If the overall levy rate is less than
projected, or if expected development fails to occur as estimated, the Agency shall receive fewer
funds from revenue allocation.
Pursuant to Idaho Code § 50-2908, the Agency is not entitled to revenue allocation
proceeds from certain levy increases which are allowed by either specific statutory authorization
or approved by an election of the qualified electors of the particular taxing district. Therefore, for
any levy election, the Agency will not receive revenue allocation funds which would have been
generated by imposing that levy on the assessed valuation within the Project Area. The Study has
taken this statute into account. This is also the reason there is no impact to Pocatello School
District #25.
House Bill 436, effective retroactive to January 1, 2025, amends Idaho Code § 50-2906
providing that fire protection and ambulance service districts are not subject to the financing
provisions of a revenue allocation area modified after July 1, 2025, unless the fire protection
district and/or the ambulance service district each consent to be included pursuant to the process
outlined in Idaho Code § 50-2906(4). This amendment will apply to this Plan. Should the
ambulance service district fail to consent to be included, the levy from the district will not
generate revenue for this Project Area. This is not projected to have a significant impact on the
overall revenue projection in the Project Area; however, to be conservative, the ambulance
service district levy is not included on the revenue projection analysis set forth in Attachment 5.
503 Phasing and Other Fund Sources
The Agency anticipates funding only the prioritized portion of the total cost of the
identified public improvements shown in the Study. The Agency anticipates Other sources of
funds for the additional projects on the project list, which may include City, and other public
entity parties, owner/developer participation, and financing. It is important to note this Plan does
not financially bind or obligate the City, Agency and/or any other public entity to any project or
property acquisition. The City and/or other local government entities continue to be subject to
statutory and constitutional budget and levy limitations. The City, Agency, and/or other public
entity participation in any project shall be determined by the amount of revenue allocation funds
generated and pursuant to the annual budgeting process.
504 Lease Revenue and Bonds
Under the Law (Idaho Code § 50-2012), the Agency is authorized to issue revenue bonds
to finance certain public improvements identified in the Plan. Under that type of financing, the
public entity would pay the Agency a lease payment annually which provides certain funds to the
Agency to retire the bond debt. Another variation of this type of financing is sometimes referred
to as conduit financing, which provides a mechanism where the Agency uses its bonding
authority for the Project, with the end user making payments to the Agency to retire the bond
debt. These sources of revenues are not related to revenue allocation funds and are not
particularly noted in the Study, because of the "pass through" aspects of the financing. Under the
36
Act, the economic feasibility study focuses on the revenue allocation aspects of the Agency's
financial model.
These financing models typically are for a longer period of time than the 20 -year period
set forth in the Act. However, these financing models do not involve revenue allocation funds,
but rather funds from the end users which provide a funding source for the Agency to continue to
own and operate the facility beyond the term of the Plan as allowed by Idaho Code § 50-2905(8)
as those resources involve funds not related to revenue allocation funds.
505 Membership Dues and Support of Community Economic Development
The Act is premised upon economic development being a valid public purpose. To the
extent allowed by the Law and the Act, the Agency reserves the authority to use revenue
allocation funds to contract with non-profit and charitable organizations established for the
purpose of supporting economic development and job creation. Additionally, the Agency
reserves the authority to expend revenue allocation funds to join, participate and support non-
profit organizations established to support Agency best practices and administration. The line
item of Administration within the Study shall be deemed to include expenditures for the purposes
described in this section as may be deemed appropriate during the annual budgetary process.
600 ACTIONS BY THE CITY AND OTHER PUBLIC ENTITIES
The City shall aid and cooperate with the Agency in carrying out this Plan in support of
the Comprehensive Plan and shall take all actions necessary to ensure the continued fulfillment
of the purposes of this Plan and to prevent the recurrence or spread in the area of conditions
causing deterioration. Actions by the City may include, but not be limited to, the following:
a. Institution and completion of proceedings necessary for changes and
improvements in private and publicly owned public utilities within or affecting
the Project Area.
b. Revision of zoning (if necessary) within the Project Area to permit the land uses
and development authorized by this Plan.
C. Imposition, wherever necessary, of appropriate controls within the limits of this
Plan upon parcels in the Project Area to ensure their proper development and use.
d. Provision for administrative enforcement of this Plan by the City after
development. The City and the Agency may develop and provide for enforcement
of a program for continued maintenance by owners of all real property, both
public and private, within the Project Area throughout the duration of this Plan.
e. Building code enforcement.
f. Performance of the above actions and of all other functions and services relating
to public peace, health, safety, and physical development normally rendered in
37
accordance with a schedule which will permit the development and/or
redevelopment of the Project Area to be commenced and carried to completion
without unnecessary delays.
g. The undertaking and completing of any other proceedings necessary to carry out
the Project.
h. Administration of Community Development Block Grant funds that may be made
available for this Project.
Appropriate agreements with the Agency for administration, supporting services,
funding sources, and the like.
j. Assist with coordinating and implementing the public improvements in the
Project Area identified in the Study.
k. Institution and completion of proceedings necessary for the establishment of a
local improvement district under Chapter 17, Title 50, Idaho Code, or a business
improvement district.
1. Joint funding of certain public improvements, subject to public entity annual
appropriation, including but not limited to those identified in this Plan and
Attachment 5 to the Plan.
in. Use of public entity labor, services, and materials for construction of the public
improvements listed in this Plan.
n. Transfer of real property or improvements upon Agency request.
The foregoing actions, if taken by the City, do not constitute any commitment for
financial outlays by the City.
In addition to the above, other public entities shall aid and cooperate with the Agency in
carrying out this Plan and shall take all actions necessary to ensure the continued fulfillment of
the purposes of this Plan.
601 Maintenance of Public Improvements
The Agency has not identified any commitment or obligation for long-term maintenance
of the public improvements identified. The Agency will need to address this issue with the
appropriate entity, public or private, who has benefited from or is involved in the ongoing
preservation of the public improvement. The Agency expects to dedicate public improvements to
the City.
700 ENFORCEMENT
The administration and enforcement of this Plan, including the preparation and execution
of any documents implementing this Plan, shall be performed by the Agency and/or the City.
800 DURATION OF THIS PLAN, TERMINATION, AND ASSET REVIEW
Except for the nondiscrimination and nonsegregation provisions which shall run in
perpetuity, the provisions of this Plan shall be effective, and the provisions of other documents
formulated pursuant to this Plan, shall be effective for twenty (20) years from the effective date
of the Plan subject to modifications and/or extensions set forth in Idaho Code §§ 50-2904 and
50-2905(7). The revenue allocation authority will expire on December 31, 2045, except for any
revenue allocation proceeds received in calendar year 2046, as contemplated by Idaho Code §
50-2905(7). The Agency may use proceeds in 2046 to complete the projects set forth herein. As
stated in the Plan, any owner participation agreement or disposition and development agreement
obligations will cease as of December 31, 2045.
Pursuant to Idaho Code § 50-2914 the Agency may terminate an urban renewal plan
containing a revenue allocation financing provision in accordance with the provisions of Idaho
Code §§ 50-2903(5) and 50-2909(4). Idaho Code § 50-2903(5) provides "[i]n the event that the
[A]gency determines that current tax year revenues are sufficient to cover all estimated expenses
for the current year and all future years", the Agency shall adopt a resolution of intent to
terminate the revenue allocation area by September 1 in the year of termination. In order to
provide sufficient notice of termination to the affected taxing districts to allow them to benefit
from the increased budget capacity, the Agency will use its best efforts to provide notice of its
intent to terminate this Plan and its revenue allocation authority by May 1, 2046, or if the
Agency determines an earlier terminate date, then by May 1 of the early termination year:
a. When the Revenue Allocation Area plan budget estimates that all financial
obligations have been provided for, the principal of and interest on such moneys,
indebtedness, and bonds have been paid in full or when deposits in the special
fund or funds created under this chapter are sufficient to pay such principal and
interest as they come due, and to fund reserves, if any, or any other obligations of
the Agency funded through revenue allocation proceeds shall be satisfied and the
Agency has determined no additional project costs need be funded through
revenue allocation financing, the allocation of revenues under Idaho Code § 50-
2908 shall thereupon cease; any moneys in such fund or funds in excess of the
amount necessary to pay such principal and interest shall be distributed to the
affected taxing districts in which the Revenue Allocation Area is located by the
County Clerk in the same manner and proportion as the most recent distribution to
the affected taxing districts of the taxes on the taxable property located within the
Revenue Allocation Area; and the powers granted to the urban renewal agency
under Idaho Code § 50-2909 shall thereupon terminate.
39
b. In determining the termination date, the Plan shall recognize that the Agency shall
receive allocation of revenues in the calendar year following the last year of the
revenue allocation provision described in the Plan.
C. For the fiscal year that immediately predates the termination date, the Agency
shall adopt and publish a budget specifically for the projected revenues and
expenses of the Plan and make a determination as to whether the Revenue
Allocation Area can be terminated before January 1 of the termination year
pursuant to the terms of Idaho Code § 50-2909(4). In the event that the Agency
determines that current tax year revenues are sufficient to cover all estimated
expenses for the current year and all future years, by May 1, but in any event, no
later than September 1, the Agency shall make its best efforts to adopt a
resolution advising and notifying the local governing body, the county auditor,
and the State Tax Commission, recommending the adoption of an ordinance for
termination of the Revenue Allocation Area by December 31 of the current year,
and declaring a surplus to be distributed as described in Idaho Code § 50-2909
should a surplus be determined to exist. The Agency shall cause the ordinance to
be filed with the office of the county recorder and the Idaho State Tax
Commission as provided in Idaho Code § 63-215.
Upon termination of the revenue allocation authority of the Plan to the extent the Agency
owns or possesses any assets, subject to the following paragraph, the Agency intends to dispose
of any remaining assets by granting or conveying or dedicating such assets to the City, unless
based on the nature of the asset, disposition to another public entity is more appropriate.
As allowed by Idaho Code § 50-2905(8), the Agency may retain assets or revenues
generated from such assets as long as the Agency shall have resources other than revenue
allocation funds to operate and manage such assets. Similarly, facilities which provide a lease
income stream to the Agency for full retirement of the facility debt will allow the Agency to
meet debt services obligations and provide for the continued operation and management of the
facility. For those assets which do not provide such resources or revenues, the Agency will likely
convey such assets to the City, depending on the nature of the asset.
900 PROCEDURE FOR AMENDMENT OR MODIFICATION
Modification of this Plan by City Council ordinance results in a reset of the base value for
the year immediately following the year in which the modification occurred to include the
current year's equalized assessed value of the taxable property in the revenue allocation area,
effectively eliminating the Agency's revenue stream as more fully set forth in Idaho Code § 50-
2903A subject to certain limited exceptions contained therein, including the exception to allow
an amendment to support growth of an existing commercial or industrial project. I.C. § 50-
2903A(1)(a)(iv). As more specifically identified above, the Agency's projections are based on
estimated values, estimated levy rates, estimated future development, and estimated costs of
future construction/improvements. Annual adjustments, as more specifically set forth in the
Agency's annual budget, will be required to account for more/less estimated revenue and
prioritization of projects. Any adjustments for these stated purposes are technical and ministerial
and are not deemed a modification under Idaho Code § 50-2903A(1)(a)(i).
1000 SEVERABILITY
If any one or more of the provisions contained in this Plan to be performed on the part of
the Agency shall be declared by any court of competent jurisdiction to be contrary to law, then
such provision or provisions shall be null and void and shall be deemed separable from the
remaining provisions in this Plan and shall in no way affect the validity of the other provisions of
this Plan.
1100 ANNUAL REPORT AND OTHER REPORTING REQUIREMENTS
Under the Law, the Agency is required to file with the City and the State Controller's
office, on or before March 31 of each year, a report of the Agency's activities for the preceding
calendar year, which report shall include certain financial information required under Idaho Code
§ 67-1076. This annual report shall be considered at a public meeting to report these findings and
take comments from the public.
Additionally, the Agency must comply with certain other reporting requirements as set
forth in the local government registry portal, Idaho Code §§ 67-1076 and 50-2006(5)(c), State of
Idaho Controller's Office, and Idaho Code § 50-2913, the tax commission plan repository, and
Idaho Code § 50-2903A, the tax commission's plan modification annual attestation. Failure to
report the information requested under any of these statutes results in significant penalties,
including loss of increment revenue, and the imposition of other compliance measures by the
Bannock County Board of County Commissioners.
1200 APPENDICES, ATTACHMENTS, EXHIBITS, TABLES
All attachments and tables referenced in this Plan are attached and incorporated herein by
their reference. All other documents referenced in this Plan but not attached are incorporated by
their reference as if set forth fully.
41
Attachment I
Boundary Map of Urban Renewal Project Area and Revenue Allocation Area
[To be Inserted Upon Completion]
Attachment 2
Legal Description of Urban Renewal Project Area and Revenue Allocation Area
[To be Inserted Upon Completion]
Attachment 3
Private Properties Which May Be Acquired by the Agency
The Agency has not identified any particular parcel to be acquired for the construction of
public improvements or for private redevelopment. Properties which may be subject to
acquisition include parcels to:
a) assemble with adjacent parcels to facilitate redevelopment;
b) assemble with adjacent rights-of-way to improve configuration and enlarge
parcels for redevelopment;
C) reconfigure sites for development and possible extension of streets or pathways;
d) assemble for future transfer to qualified developers to facilitate the development
of mixed-use, residential, commercial, office, retail and industrial projects; or
e) assemble for the construction of certain public improvements, including but not
limited to streets, streetscapes, water and sewer improvements, environmental
remediation/site preparation, public parking, community facilities, parks,
pedestrianibike paths and trails, and other public facilities.
2. The Agency reserves the right to acquire any additional right-of-way or access routes near
or around existing or planned rights-of-way.
3. The Agency reserves the right to acquire property needed to provide adequately sized sites
for high priority projects for the development of public improvements (the exact location
of which has not been determined).
4. Other parcels may be acquired for the purpose of facilitating catalyst or demonstration
projects, constructing public parking, constructing new streets or pathways, enhancing
public spaces, or to implement other elements of the urban renewal plan strategy and/or
any master plan for the Project Area.
Attachment 4
Map Depicting Expected Land Uses and Current Zoning Map
of the Project Area
[To be Inserted Upon Completion]
Attachment 5
Economic Feasibility Study
Attachment 6
Agricultural Operation Consents
[To be Inserted Upon Completion]
4894-8109-8869, v. 7
CHUBBUCK URBAN RENEWAL EXHIBIT
THE CITY OF CHUBBUCK, BANNOCK COUNTY, IDAHO
0 150 300 600
( IN FEET )
1 inch = 300 ft.
LEGEND
BOUNDARY
CURRENT DEEDS / PLAT LINES
MATCH LINE
URBAN RENEWAL DISTRICT
w
z
Lu
Q
ry
Q
U)
W
z
W
Q
a
H
U)
w
z
w
a
}
Y
U
Z)
J
LISA STREET
ADAMS STREET
Lu
Lu
U)
J
J_
J
1-1
JAMES AVENUE
fICIVPCi /iVCIVUC
STUART AVENUE
PA CEL 1
BRISCOE ROAD
❑ ❑
I
w
0
Lu
C'1
U)
Lu
I-
W
U-1
z
ry
W
u-
Q
(D
W
z
O
I-
O
J
J
W
}
rn
U)
BRISCOE ROAD
PARCEL 2
PARK LAWN DRIVE
PARCEL 4
LAUREL LANE
Q
0
w
z
O
O
J
J
W
}
07
_MATCH _LINE
_
----- --- -- -- --- - ------------------------SEE SHEET 2----------
NEW DAY PARKWAY
Lu
Ir
0
z
a
J
Y
<Y
Q
a
DIAMOND CIRCLE
PARCEL 3
DIAMOND CIRCLE
HIGHWAY AVENUE
LAURELI LANE
N
LJ_
p
D
ry
..
ry
p
D
CHUBBUCK URBAN RENEWAL EXHIBIT
THE CITY OF CHUBBUCK, BANNOCK COUNTY, IDAHO
0 100 200 400
( IN FEET)
1 inch = 200 ft.
BOUNDARY
CURRENT DEEDS / PLAT LINES
-------------- MATCH LINE
URBAN RENEWAL DISTRICT
SEE SHEET 1
CHUBBUCK URBAN RENEWAL EXHIBIT
THE CITY OF CHUBBUCK, BANNOCK COUNTY, IDAHO
0 100 200 400
( IN FEET )
1 inch = 200 ft.
BOUNDARY
CURRENT DEEDS / PLAT LINES
-------------- MATCH LINE
URBAN RENEWAL DISTRICT
URBAN RENEWAL DISTRICT BOUNDARY DESCRIPTION
A PARCEL OF LAND LOCATED IN SECTIONS 3 AND 10, TOWNSHIP 6 SOUTH, RANGE 34 EAST OF
THE BOISE MERIDIAN, BANNOCK COUNTY, IDAHO, MORE PARTICULARLY DESCRIBED AS
FOLLOWS:
COMMENCING AT THE INTERSECTION OF THE EAST RIGHT-OF-WAY LINE OF HAWTHORNE ROAD
AND THE NORTH RIGHT-OF-WAY LINE OF INTERSTATE 86 OF SECTION 10, TOWNSHIP 6
SOUTH, RANGE 34 EAST OF THE BOISE MERIDIAN ALSO BEING THE POINT OF BEGINNING;
THENCE N 03°50'32" W 249.81 FEET ALONG THE EAST RIGHT-OF-WAY LINE OF HAWTHORNE
ROAD;
THENCE N 00°06'10" W 1531.12 FEET ALONG THE EAST RIGHT-OF-WAY LINE OF HAWTHORNE
ROAD TO THE WEST CORNER OF LOT 1, BLOCK 1 OF YELLOWSTONE COMMONS DIVISION 2
FILED AS INSTRUMENT NUMBER 21314037;
THENCE ALONG THE NORTHELY BOUNDARY OF LOT 1, BLOCK 1 OF YELLOWSTONE COMMONS
DIVISION 2 FILED AS INSTRUMENT NUMBER 21314037 FOR THE FOLLOWING THREE (3)
COURSES:
1) S 89°11'06" E 178.26 FEET,
2) N 00°11'43" W 208.79 FEET,
3) S 89°15'31" E 1103.82 FEET TO THE SOUTHEAST CORNER OF THE LANDS DESCRIBED IN
DEED FILED AS INSTRUMENT No. 22402598;
THENCE N 00°02'36" W 683.79 FEET ALONG THE EAST BOUNDARY OF THE LANDS DESCRIBED IN
DEEDS FILED AS INSTRUMENT No. 22402598 AND 22201846 TO THE SOUTHWEST CORNER
OF CHUBBUCK ACRES FILED AS INSTRUMENT No. 158622 ALSO BEING A POINT ON THE
NORTH RIGHT-OF-WAY LINE OF CHUBBUCK ROAD;
THENCE S 89°16'28" E 701.80 FEET ALONG THE NORTH RIGHT-OF-WAY LINE OF CHUBBUCK
ROAD TO THE SE CORNER OF LOT 5 BLOCK 2 OF LESLIE HOMES SUBDIVISION FILED AS
INSTRUMENT No 286931;
THENCE N 00°30'22" W 308.22 FEET ALONG THE EAST BOUNDARY LINE OF LESLIE HOMES
SUBDIVISION FILED AS INSTRUMENT No 286931 TO THE NORTHEAST CORNER OF LESLIE
HOMES SUBDIVISION LOT 1, BLOCK 2 FILED AS INSTRUMENT No 286931;
THENCE N 00°29'14" W 379.75 FEET ALONG THE EAST BOUNDARY LINE OF THE LAND
DESCRIBED IN THE DEED FILED AS INSTRUMENT No 97022015;
THENCE S 8928'16" E 49.98 FEET TO THE SOUTHWEST BOUNDARY OF THE LAND DESCRIBED IN
THE DEED FILED AS INSTRUMENT No 21615947;
THENCE N 00°29'55" W 314.62 FEET ALONG THE WEST BOUNDARY LINE OF THE LAND
DESCRIBED IN THE DEED FILED AS INSTRUMENT No 21615947 TO THE NORTHWEST CORNER
OF THE LAND DESCRIBED IN THE DEED FILED AS INSTRUMENT No 21615947;
THENCE N 89°37'24" W 747.70 FEET ALONG THE NORTH BOUNDARY LINE OF THE LAND
DESCRIBED IN THE DEED FILED AS INSTRUMENT No 97022015 TO A POINT ON THE EAST
Page 1 of 17
BOUNDARY LINE OF GARDEN PARK SUBDIVISION 1ST ADDITION FILED AS INSTRUMENT No
20302954;
THENCE N 00°21'02" W 526.65 FEET ALONG THE EAST BOUNDARY LINE OF GARDEN PARK
SUBDIVISION JIT ADDITION FILED AS INSTRUMENT No 20302954 TO THE NORTHWEST
CORNER OF LOT 6, BLOCK 1 OF GARDEN PARK SUBDIVISION JIT ADDITION FILED AS
INSTRUMENT No 20302954;
THENCE N 89°26'41" W 331.32 FEET ALONG THE NORTH BOUNDARY LINE OF GARDEN PARK
SUBDIVISION JIT ADDITION FILED AS INSTRUMENT No 20302954 TO THE NORTHWEST
CORNER OF LOT 1, BLOCK 1 OF GARDEN PARK SUBDIVISION 1ST ADDITION FILED AS
INSTRUMENT No 20302954;
THENCE N 01°08'45" W 181.59 FEET ALONG THE WEST BOUNDARY LINE OF LOTS 1 AND 2,
BLOCK 1 OF SMITH SUBDIVISION FILED AS INSTRUMENT No 21311566 TO THE SOUTHWEST
CORNER OF LOT 17, BLOCK 1 OF STUART ADDITION FILED AS INSTRUMENT No 334836;
THENCE S 8926'17" E 1214.29 FEET ALONG THE SOUTH BOUNDARY OF STUART ADDITION
FILED AS INSTRUMENT No 334836 TO THE FURTHEST SHOWN SOUTHEAST CORNER OF FERN
STREET SHOWN IN STUART ADDITION FILED AS INSTRUMENT No 334836;
THENCE N 00°39'49" W 239.11 FEET ALONG THE EAST BOUNDARY LINE OF FERN STREET
SHOWN IN STUART ADDITION FILED AS INSTRUMENT No 334836 TO THE BEGINNING OF A
RIGHT CURVE ON LOT 5, BLOCK 5 OF STUART ADDITION FILED AS INSTRUMENT No 334836;
THENCE N 06°16'06" E 65.34 FEET TO THE SOUTHEAST CORNER OF LOT 1, BLOCK 6 OF STUART
2ND ADDITION FILED AS INSTRUMENT No 387811;
THENCE N 00°51'08" W 629.06 FEET ALONG THE EAST BOUNDARY LINE OF STUART 2ND AND
3RD ADDITION FILED AS INSTRUMENT No 387811 AND No 502716 TO THE NORTHEAST
CORNER OF STUART 3RD ADDITION FILED AS INSTRUMENT No 502716;
THENCE S 89°15'27" E 99.57 FEET ALONG THE SOUTH BOUNDARY LINE OF THE FALLS
SUBDIVISION FILED AS INSTRUMENT No 22011174 TO THE SOUTHEAST CORNER OF THE
FALLS SUBDIVISION FILED AS INSTRUMENT No 22011174;
THENCE N 00°17'54" W 222.81 FEET ALONG THE EAST BOUNDARY OF THE FALLS SUBDIVISION
FILED AS INSTRUMENT No 22011174 TO THE SOUTHWEST CORNER OF SPRING COVE
SUBDIVISION FILED AS INSTRUMENT No 22201120;
THENCE N 89°37'03" E 93.19 FEET ALONG THE SOUTH BOUNDARY OF SPRING COVE
SUBDIVISION FILED AS INSTRUMENT No 22201120 TO THE SOUTHEAST BOUNDARY OF
SPRING COVE SUBDIVISION FILED AS INSTRUMENT No 22201120;
THENCE N 00°06'43" E 50.00 FEET ALONG THE EAST BOUNDARY OF SPRING COVE SUBDIVISION
FILED AS INSTRUMENT No 22201120 TO THE SOUTHWEST CORNER OF TASTEE TREET
SUBDIVISION FILED AS INSTRUMENT No 20504464;
THENCE N 89°37'03" E 199.02 FEET ALONG THE SOUTH BOUNDARY OF TASTEE TREET
SUBDIVISION FILED AS INSTRUMENT No. 20504464 TO THE SOUTHEAST CORNER OF TASTEE
TREET SUBDIVISION FILED AS INSTRUMENT No 20504464;
Page 2 of 17
THENCE N 00°17'30" W 116.94 FEET ALONG THE EAST BOUNDARY OF TASTEE TREET
SUBDIVISION FILED AS INSTRUMENT No 20504464 TO A POINT ON THE WEST BOUNDARY
LINE OF PARK LAWN INTERSECTION SUBDIVISION FILED AS INSTRUMENT No 20505290;
THENCE S 89°38'09" W 179.83 FEET ALONG THE WEST BOUNDARY LINE OF PARK LAWN
INTERSECTION SUBDIVISION FILED AS INSTRUMENT No 20505290 TO THE SOUTHWEST
BOUNDARY LINE OF PARK LAWN INTERSECTION SUBDIVISION FILED AS INSTRUMENT No
20505290;
THENCE N 00°26'00" W 98.40 FEET ALONG THE WEST BOUNDARY LINE OF PARK LAWN
INTERSECTION SUBDIVISION FILED AS INSTRUMENT No 20505290 TO A 5/8" REBAR WITH
ALUMINUM CAP PLS 15295 IN ROMRIELL STORAGE FILED AS INSTRUMENT No 21307042;
THENCE N 02°18'47" E 3.14 FEET;
THENCE N 89°18'00" W 526.59 FEET ALONG THE SOUTH BOUNDARY LINE OF ROMRIELL
STORAGE FILED AS INSTRUMENT No 21307042 TO THE SOUTHWEST CORNER OF LOT 1,
BLOCK 2 OF ROMRIELL STORAGE FILED AS INSTRUMENT No 21307042;
THENCE N 00°12'18" E 171.56 FEET ALONG THE WEST BOUNDARY LINE OF LOT 1, BLOCK 2 OF
ROMRIELL STORAGE FILED AS INSTRUMENT No 21307042 TO THE NORTHWEST CORNER OF
LOT 1, BLOCK 2 OF ROMRIELL STORAGE FILED AS INSTRUMENT No 21307042;
THENCE S 8944'36" E 712.54 FEET ALONG THE NORTH BOUNDARY OF ROMRIELL STORAGE
FILED AS INSTRUMENT No 21307042 TO THE NORTHEAST CORNER OF ROMRIELL STORAGE
FILED AS INSTRUMENT No 21307042;
THENCE N 00°19'38" W 447.30 FEET ALONG THE EAST BOUNDARY LINE OF THE LANDS
DESCRIBED IN THE DEEDS FILED AS INSTRUMENT No 22000552 AND No 21508571 AND THE
PLAT OF RALPH NELSON SUBDIVISION FILED AS INSTRUMENT NUMBER 523927 TO THE
NORTHEAST CORNER OF THE LANDS DESCRIBED IN THE DEEDS FILED AS INSTRUMENT No
21508571;
THENCE N 89°48'07" W 178.25 FEET ALONG THE NORTH BOUNDARY LINE OF THE LANDS
DESCRIBED IN THE DEEDS FILED AS INSTRUMENT No 21508571 TO THE NORTHWEST CORNER
OF THE LANDS DESCRIBED IN THE DEEDS FILED AS INSTRUMENT No 21508571;
THENCE S 00°31'44" W 118.00 FEET ALONG THE WEST BOUNDARY LINE OF THE LAND
DESCRIBED IN THE DEEDS FILED AS INSTRUMENT No 21508571 TO THE SOUTHWEST CORNER
OF THE LANDS DESCRIBED IN THE DEEDS FILED AS INSTRUMENT No 21508571;
THENCE N 89°41'59" W 968.67 FEET ALONG THE NORTH BOUNDARY LINE OF RALPH NELSON
SUBDIVISION FILED AS INSTRUMENT No 523927 AND ALONG THE NORTH BOUNDARY LINE
OF THE LAND DESCRIBED IN THE DEEDS FILED AS INSTRUMENT No. 22117290 AND No.
22412203 TO THE SOUTHEAST CORNER OF NELSON SUBDIVISION FIRST ADDITION FILED AS
INSTRUMENT No 99021794.
THENCE N 00°36'13" E 327.27 FEET ALONG THE EAST BOUNDARY LINE OF NELSON SUBDIVISION
FIRST ADDITION FILED AS INSTRUMENT No 99021794 TO THE NORTHEAST CORNER OF
NELSON SUBDIVISION FIRST ADDITION FILED AS INSTRUMENT No 99021794;
Page 3 of 17
THENCE S 89°54'47" E 1145.55 FEET ALONG THE SOUTH BOUNDARY LINE OF THE LANDS
DESCRIBED IN THE DEEDS FILED AS INSTRUMENT No's 22506084, 21817121, 21412582,
21615053. PLATS ALSO RUNNING ALONG THE SOUTH BOUNDARY INCLUDE RASMUSSEN
SUBDIVISION AND P AND B SUBDIVISION FILED AS INSTRUMENT No's 20514371 AND
20112299 TO A POINT ON THE WEST BOUNDARY LINE OF THE LAND DESCRIBED IN THE DEED
FILED AS INSTRUMENT No 21615053;
THENCE N 00°32'56" W 338.77 FEET ALONG THE WESTERN SIDE OF THE LANDS DESCRIBED IN
THE DEEDS FILED AS INSTRUMENT No. 21615053, No. 99000898 AND P AND H SUBDIVISION
FILED AS INSTRUMENT No. 20112299 TO A POINT ON THE SOUTH RIGHT-OF-WAY LINE OF
BRISCOE ROAD;
THENCE N 89°38'35" W 1614.03 FEET ALONG THE SOUTH RIGHT OF WAY LINE OF BRISCOE
ROAD TO A POINT ON THE EAST BOUNDARY LINE OF THE LANDS DESCRIBED IN THE DEEDS
FILED AS INSTRUMENT No 22203985;
THENCE S 0005'16" W 240.56 FEET ALONG THE EAST BOUNDARY OF THE LANDS DESCRIBED IN
THE DEEDS FILED AS INSTRUMENT No 22203985 TO THE SOUTHEAST CORNER OF THE LANDS
DESCRIBED IN THE DEEDS FILED AS INSTRUMENT No 22203985;
THENCE N 89°40'05" W 135.32 FEET ALONG THE SOUTH BOUNDARY LINE OF THE LAND
DESCRIBED IN THE DEED FILED AS INSTRUMENT No 22203985 TO A POINT ALONG THE
SOUTHWEST BOUNDARY OF THE LANDS DESCRIBED IN THE DEEDS FILED AS INSTRUMENT No
22203985;
THENCE N 00°43'41" E 60.13 FEET ALONG THE SOUTHWEST BOUNDARY LINE OF THE LAND
DESCRIBED IN THE DEED FILED AS INSTRUMENT No 22203985 TO ANOTHER POINT ALONG
THE SOUTHWEST BOUNDARY OF THE LANDS DESCRIBED IN THE DEEDS FILED AS
INSTRUMENT No 22203985;
THENCE N 89°40'05" W 124.69 FEET ALONG THE SOUTHWEST BOUNDARY LINE OF THE LAND
DESCRIBED IN THE DEED FILED AS INSTRUMENT No 22203985 AND THE SOUTH BOUNDARY
LINE OF THE LAND DESCRIBED IN THE DEED FILED AS INSTRUMENT No 22409155 TO THE
SOUTHERN CORNER OF THE LAND DESCRIBED IN THE DEED FILED AS INSTRUMENT No
22409155;
THENCE N 00° 43'41" E 36.98 FEET ALONG THE SOUTH BOUNDARY LINE OF THE LAND
DESCRIBED IN THE DEED FILED AS INSTRUMENT No 22409155 TO A POINT ON THE SOUTH
BOUNDARY LINE OF THE LAND DESCRIBED IN THE DEED FILED AS INSTRUMENT No.
22409155;
THENCE N 89°39'42" W 84.81 FEET ALONG THE SOUTHWEST BOUNDARY LINE OF THE LAND
DESCRIBED IN THE DEED FILED AS INSTRUMENT No 22409155 TO THE SOUTHWEST CORNER
OF THE LAND DESCRIBED IN THE DEED FILED AS INSTRUMENT No 22409155;
THENCE N 00°25'07" E 101.36 FEET ALONG THE WEST BOUNDARY LINE OF THE LAND
DESCRIBED IN THE DEED FILED AS INSTRUMENT No 22409155 TO THE START OF A CURVE TO
THE RIGHT;
Page 4 of 17
THENCE 31.28 FEET ALONG SAID CURVE TO THE RIGHT (CURVE DATA: RADIUS = 20.00 FEET,
DELTA=89°36'35", CHORD= N 45°13'30" E 28.19') TO A POINT ON THE WESTERN BOUNDARY
OF THE LAND DESCRIBED IN THE DEED FILED AS INSTRUMENT No. 22409155 TO THE START
OF A CURVE TO THE RIGHT,
THENCE N 00°01'29" E 50.00 FEET ALONG THE EAST BOUNDARY LINE OF COTTAGE PARK
SUBDIVISION FILED AS INSTRUMENT No 20727985 TO THE NORTHEAST CORNER OF COTTAGE
PARK SUBDIVISION FILED AS INSTRUMENT No. 20727985.
THENCE S 89°58'16" E 78.00 FEET ALONG THE SOUTH BOUNDARY LINE OF GARDEN OAKS
DIVISION 2 FILED AS INSTRUMENT No. 20116700 TO THE SOUTHEAST CORNER OF GARDEN
OAKS DIVISION 2 FILED AS INSTRUMENT No. 20116700;
THENCE N 00°00'24" E 929.38 FEET ALONG THE EAST BOUNDARY LINE OF GARDEN OAKS
DIVISION 1 AND 2 FILED AS INSTRUMENT No 20017332 AND No 20116700 TO THE
NORTHEAST CORNER OF GARDEN OAKS DIVISION 1 FILED AS INSTRUMENT No 20017332;
THENCE S 8945'12" E 418.30 FEET ALONG THE SOUTH RIGHT-OF-WAY LINE OF SIPHON ROAD
TO THE SOUTHWEST CORNER OF PARADISE ACRES SUBDIVISION FILED AS INSTRUMENT No.
01-1193*1
THENCE N 00°33'51" E 23.59 FEET ALONG THE WEST BOUNDARY LINE OF PARADISE ACRES
SUBDIVISION FILED AS INSTRUMENT No. 538355 TO THE SOUTHWEST CORNER OF LOT 1
BLOCK 1 OF PARADISE ACRES SUBDIVISION FILED AS INSTRUMENT No. 538355;
THENCE S 8946'10" E 1171.22 FEET ALONG THE NORTH RIGHT-OF-WAY LINE OF SIPHON ROAD
TO A POINT ON THE SOUTH BOUNDARY LINE OF PAULINE FLATS FILED AS INSTRUMENT No.
wz, I[II- :l
THENCE N 00°18'49" E 16.00 FEET ALONG THE EAST BOUNDARY LINE OF PAULINE FLATS FILED
AS INSTRUMENT No. 2240526 TO THE SOUTHWEST CORNER OF LOT 4, BLOCK 1 OF PAULINE
FLATS FILED AS INSTRUMENT No. 2240526;
THENCE S 89°56'15" E 298.75 FEET ALONG THE SOUTH BOUNDARY LINE OF PAULINE FLATS
FILED AS INSTRUMENT No. 2240526;
THENCE S 00°04'02" W 40.88 FEET TO THE NORTHWEST CORNER OF THE LANDS DESCRIBED IN
THE DEED FILED AS INSTRUMENT No. 22507841;
THENCE S 89°36'44" E 1571.58 FEET ALONG THE NORTH BOUNDARY LINE OF THE LANDS
DESCRIBED IN THE DEED FILED AS INSTRUMENT No. 22202404 TO THE NORTHEAST CORNER
OF THE LANDS DESCRIBED IN THE DEED FILED AS INSTRUMENT No. 22202404.
THENCE S 01°03'35" E 3000.78 FEET ALONG THE ALONG THE WEST RIGHT-OF-WAY LINE OF
UNION PACIFIC RAILROAD TO THE SOUTH RIGHT OF WAY LINE OF HIGHWAY AVENUE
THENCE N 89°03'32" W 1579.12 FEET ALONG THE SOUTH RIGHT-OF-WAY LINE OF HIGHWAY
AVENUE TO THE EAST RIGHT-OF-WAY LINE OF YELLOWSTONE AVENUE;
Page 5 of 17
THENCE S 00°15'12" E 312.35 FEET ALONG THE EAST RIGHT-OF-WAY LINE OF YELLOWSTONE
AVENUE TO THE SOUTHWEST CORNER OF HIGHWAY ACRES FILED AS INSTRUMENT No
251785;
THENCE S 89°29'17" E 655.42 FEET ALONG THE SOUTH BOUNDARY LINE OF HIGHWAY ACRES
FILED AS INSTRUMENT No 251785 TO THE NORTHWEST CORNER OF FRASURE INDUSTRIAL
PARK 2ND ADDITION FILED AS INSTRUMENT No 20509107;
THENCE S 00°33'45" W 72.78 FEET ALONG THE WEST BOUNDARY LINE OF FRASURE INDUSTRIAL
PARK 2ND ADDITION FILED AS INSTRUMENT No 20509107 TO THE WEST BOUNDARY LINE OF
FRASURE INDUSTRIAL PARK 2ND ADDITION FILED AS INSTRUMENT No 20509107;
THENCE S 0348'39" W 214.08 FEET ALONG THE WEST BOUNDARY LINE OF FRASURE
INDUSTRIAL PARK 2ND ADDITION FILED AS INSTRUMENT No. 20509107 TO THE SOUTHWEST
CORNER OF LOT 7, BLOCK 4 OF FRASURE INDUSTRIAL PARK 2ND ADDITION FILED AS
INSTRUMENT No 20509107;
THENCE S 0001'52" W 49.96 FEET CROSSING LAUREL LANE TO A POINT ON THE NORTH
BOUNDARY LINE OF LOT 11 BLOCK 1 OF FRASURE INDUSTRIAL PARK 1ST ADDITION FILED AS
INSTRUMENT No. 98013951;
THENCE 89°26'23" W 43.15 FEET ALONG THE NORTH BOUNDARY LINE OF LOT 11 BLOCK 1 OF
FRASURE INDUSTRIAL PARK 1ST ADDITION FILED AS INSTRUMENT No 98013951 TO THE
NORTHWEST CORNER OF LOT 11 BLOCK 1 OF FRASURE INDUSTRIAL PARK 11T ADDITION FILED
AS INSTRUMENT No 98013951;
THENCE S 0040'45" E 283.87 FEET ALONG THE WEST BOUNDARY LINE OF LOTS 8, 9, 11 OF
BLOCK 1 OF FRASURE INDUSTRIAL PARK 1ST ADDITION FILED AS INSTRUMENT No 98013951
TO THE SOUTHWEST CORNER OF LOT 12 OF BLOCK 1 OF FRASURE INDUSTRIAL PARK 1ST
ADDITION FILED AS INSTRUMENT No. 98013951;
THENCE S 89°32'19" E 64.98 FEET ALONG THE WEST BOUNDARY OF LOT 8, BLOCK 1 OF FRASURE
INDUSTRIAL PARK 1ST ADDITION FILED AS INSTRUMENT No 98013951 TO A CORNER ON THE
WEST BOUNDARY OF LOT 8, BLOCK 1 OF FRASURE INDUSTRIAL PARK 1ST ADDITION FILED AS
INSTRUMENT No 98013951;
THENCE S 00°40'44" E 48.93 FEET ALONG THE WEST BOUNDARY LINE OF LOTS 7 AND 8 BLOCK 1
OF FRASURE INDUSTRIAL PARK 11T ADDITION FILED AS INSTRUMENT No. 98013951 TO THE
NORTHEAST CORNER OF THE LAND DESCRIBED IN THE DEED FILED AS INSTRUMENT No
22113148;
THENCE N 89°23'10" W 411.62 FEET ALONG THE NORTH BOUNDARY LINE OF THE LAND
DESCRIBED IN THE DEED FILED AS INSTRUMENT No. 22113148 AND CANDEE SUBDIVISION
FILED AS INSTRUMENT No 22307120 TO THE NORTHWEST CORNER OF CANDEE SUBDIVISION
FILED AS INSTRUMENT No 22307120;
THENCE S 0021'51" W 185.27 FEET ALONG THE WEST BOUNDARY LINE OF CANDEE
SUBDIVISION FILED AS INSTRUMENT No. 22307120 TO THE SOUTHWEST CORNER OF CANDEE
SUBDIVISION FILED AS INSTRUMENT No. 22307120;
Page 6 of 17
THENCE S 89°18'07" E 172.44 FEET ALONG THE NORTH RIGHT-OF-WAY LINE OF WARD ROAD TO
THE NORTHWEST CORNER OF CUSTOM CRAFT COMMERCIAL CONDOMINIUMS FILED AS
INSTRUMENT No. 602213;
THENCE S 00°14'49" E 239.99 FEET ALONG THE WEST BOUNDARY LINE OF CUSTOM CRAFT
COMMERCIAL CONDOMINIUMS FILED AS INSTRUMENT No 602213 TO THE SOUTHWEST
CORNER OF CUSTOM CRAFT COMMERCIAL CONDOMINIUMS FILED AS INSTRUMENT No
602213;
THENCE S 89°25'38" E 383.90 FEET ALONG THE SOUTH BOUNDARY LINE OF CUSTOM CRAFT
COMMERCIAL CONDOMINIUMS FILED AS INSTRUMENT No. 602213 AND ALONG THE SOUTH
BOUNDARY LINE OF LOT 4, BLOCK 1 OF FRASURE INDUSTRIAL PARK FILED AS INSTRUMENT
No 97003299 TO THE SOUTHEAST CORNER OF LOT 4, BLOCK 1 OF FRASURE INDUSTRIAL PARK
FILED AS INSTRUMENT No 97003299;
THENCE S 0030'43" E 101.32 FEET ALONG THE WEST BOUNDARY LINE OF LOT 3, BLOCK 1 OF
FRASURE INDUSTRIAL PARK FILED AS INSTRUMENT No 97003299 TO THE SOUTHEAST
CORNER OF LOT 3, BLOCK 1 OF FRASURE INDUSTRIAL PARK FILED AS INSTRUMENT No
97003299;
THENCE S 8947'49" E 61.40 FEET ALONG THE NORTH BOUNDARY LINE OF LOT 2, BLOCK 1 OF
FRASURE INDUSTRIAL PARK FILED AS INSTRUMENT No 97003299 TO THE NORTHEAST
CORNER OF LOT 2, BLOCK 1 OF FRASURE INDUSTRIAL PARK FILED AS INSTRUMENT No
97003299;
THENCE S 0040'24" E 140.47 FEET ALONG THE EAST BOUNDARY LINE OF LOT 2, BLOCK 1 OF
FRASURE INDUSTRIAL PARK FILED AS INSTRUMENT No. 97003299 TO THE SOUTHEAST
CORNER OF LOT 2, BLOCK 1 OF FRASURE INDUSTRIAL PARK FILED AS INSTRUMENT No
97003299;
THENCE N 89°21'39" W 38.71 FEET ALONG THE SOUTH BOUNDARY LINE OF LOT 2, BLOCK 1 OF
FRASURE INDUSTRIAL PARK FILED AS INSTRUMENT No. 97003299 TO THE NORTHEAST
CORNER OF LOT 3, BLOCK 1 OF MYSTIQUE SUBDIVISION FILED AS INSTRUMENT No.
20019204;
THENCE S 00°38'22" E 158.79 FEET ALONG THE EAST BOUNDARY LINE OF LOT 3, BLOCK 1 OF
MYSTIQUE SUBDIVISION FILED AS INSTRUMENT No. 20019204 TO THE SOUTHEAST CORNER
OF THE LANDS DESCRIBED IN THE DEEDS FILED AS INSTRUMENT No. 20019325;
THENCE N 89°30'34" W 409.19 FEET ALONG THE SOUTH BOUNDARY LINE OF THE LANDS
DESCRIBED IN THE DEEDS FILED AS INSTRUMENT No. 20019325 AND THE SOUTH BOUNDARY
LINE OF BOISE PAYETTE TRACTS FILED AS INSTRUMENT No. 214582 TO THE SOUTHWEST
CORNER OF LOT 4, BLOCK 1 OF BOISE PAYETTE TRACTS FILED AS INSTRUMENT No. 214582;
THENCE S 00°22'22" E 481.60 FEET ALONG THE EAST RIGHT-OF-WAY LINE OF VALENTY ROAD TO
WHERE IT INTERSECTS WITH THE NORTH RIGHT-OF-WAY LINE OF CHUBBUCK ROAD;
THENCE S 8926'59" E 1195.14 FEET ALONG THE NORTH RIGHT-OF-WAY LINE OF CHUBBUCK
ROAD TO WHERE IT INTERSECTS WITH THE WEST RIGHT-OF-WAY LINE OF THE UNION PACIFIC
RAILROAD;
Page 7 of 17
THENCE ALONG THE WEST RIGHT-OF-WAY LINE OF THE UNION PACIFIC RAILROAD FOR THE
NEXT SIX (6) COURSES:
1) S 05°35'54"
E 49.46 FEET;
2) S 01°29'06"
E 497.22 FEET;
3) S 02°25'22"
E 213.60 FEET;
4) S 05°09'59"
E 224.59 FEET;
5) S 07°47'26"
E 499.24 FEET;
6) S 08°13'21"
E 190.54 FEET TO THE SOUTHEAST CORNER OF WILLIES STORAGE
SUBDIVISION FILED AS INSTRUMENT No 21012470;
THENCE N 89°17'20" W 449.34 FEET ALONG THE SOUTH BOUNDARY LINE OF WILLIES STORAGE
SUBDIVISION FILED AS INSTRUMENT No 21012470 AND CROSSING BURLEY DR TO A POINT
ON THE EASTERLY BOUNDARY LINE OF ICCU MAIN CAMPUS FILED WITH THE INSTRUMENT
No. 21602913;
THENCE N 00°02'09" W 59.91 FEET ALONG THE EASTERLY BOUNDARY LINE OF ICCU MAIN
CAMPUS FILED AS INSTRUMENT No 21602913;
THENCE N 44°21'12" W 26.19 FEET ALONG THE NORTHEAST BOUNDARY LINE OF ICCU MAIN
CAMPUS FILED AS INSTRUMENT No 21602913 TO A POINT ON THE SOUTH RIGHT-OF-WAY
LINE OF EVANS LANE;
THENCE N 89°26'58" W 1260.90 FEET ALONG THE SOUTH RIGHT-OF-WAY LINE OF EVANS LANE
TO A POINT ON THE NORTHWEST BOUNDARY LINE OF THE LANDS DESCRIBED IN THE DEEDS
FILED AS INSTRUMENT No. 22407001;
THENCE S 4531'44" W 33.15 FEET ALONG THE NORTHWEST BOUNDARY LINE OF THE LANDS
DESCRIBED IN THE DEEDS FILED AS INSTRUMENT No. 22407001 TO A POINT ON THE EAST
RIGHT-OF-WAY LINE OF YELLOWSTONE AVENUE;
THENCE ALONG THE EAST RIGHT-OF-WAY LINE OF YELLOWSTONE AVENUE FOR THE NEXT FOUR
(4) COURSES:
1) S 00°23'13" W 316.51 FEET;
2) S 01°34'50" E 264.02 FEET;
3) S 04°07'09" W 53.65 FEET;
4) S 07°29'46" E 222.27 FEET TO THE SOUTHWEST CORNER OF JACKSONS FOOD STORE INC
FILED AS INSTRUMENT No. 97006763;
THENCE N 89°32'18" W 128.98 FEET CROSSING YELLOWSTONE AVENUE TO THE EASTERN
CORNER OF INTERSTATE GROUP SUBDIVISION FILED AS INSTRUMENT No. 575288;
THENCE ALONG THE NORTH RIGHT-OF-WAY LINE OF INTERSTATE 86 FOR THE NEXT TWO (2)
COURSES:
1) S 73°18'14" W 686.34 FEET
2) N 8922'25" W 1858.72 FEET TO THE INTERSECTION OF THE EAST RIGHT OF WAY LINE OF
HAWTHORNE ROAD AND THE NORTH RIGHT OF WAY LINE OF INTERSTATE 86 OF SECTION
Page 8 of 17
10, TOWNSHIP 6 SOUTH, RANGE 34 EAST OF THE BOISE MERIDIAN ALSO BEING THE POINT
OF BEGINNING.
DESCRIPTION CONTAINS 440 ACRES MORE OR LESS
AREA MINUS ACREAGES OF EXCEPTIONS 393 ACRES MORE OR LESS
LESS THAN AND EXCPETING BELOW DESCRIBED PARCELS 1 THROUGH 11;
LESS THAN AND EXCEPTING PARCEL 1:
BRISCOE MEADOWS SUBDIVISION FILED AS INSTRUMENT No. 94012599, BRISCOE MEADOWS
SUBDIVISION PHASE 2 FILED AS INSTRUMENT No. 94016206, YELLOWSTONE VILLAGE
SUBDIVISION FILED AS INSTRUMENT No. 22200692, DANCE PUD PHASE 2 FILED AS
INSTRUMENT No. 21714967, LOTS 2, 4, 5, 6, 7, 8, 9, 10 OF DANCE PUD FILED AS INSTRUMENT
No. 21510802 AND THE LANDS DESCRIBED IN THE DEEDS FILED AS INSTRUMENT No. 22504155,
21910220, 22408329, 21414857, 22203821, 21709359, 22019855, BEING FURTHER DESCRIBED
AS FOLLOWS:
COMMENCING AT THE SOUTHWEST CORNER OF BRISCOE MEADOWS SUBDIVISION PHASE 2
FILED AS INSTRUMENT No. 94016206 ALSO BEING THE POINT OF BEGINNING;
THENCE S 8938'35" E 1327.77 FEET ALONG THE NORTH RIGHT-OF-WAY LINE OF BRISCOE ROAD
TO THE SOUTHWEST CORNER OF YELLOWSTONE VILLAGE SUBDIVISION FILED AS
INSTRUMENT No 22200692;
THENCE N 00°13'12" W 365.22 FEET ALONG THE EAST BOUNDARY LINE OF YELLOWSTONE
VILLAGE SUBDIVISION FILED AS INSTRUMENT No 22200692 TO THE NORTHEAST CORNER OF
YELLOWSTONE VILLAGE SUBDIVISION FILED AS INSTRUMENT No 22200692;
THENCE N 89°48'26" W 699.83 FEET ALONG THE SOUTH BOUNDARY LINE OF LANDS DESCRIBED
IN THE DEEDS FILED AS INSTRUMENT No. 21909037, No. 538208, AND No. 97012134 TO THE
SOUTHEAST CORNER OF LOT 2, BLOCK 1 OF DANCE PUD FILED AS INSTRUMENT No
21510802;
THENCE N 00°29'54" W 411.63 FEET ALONG THE EAST BOUNDARY LINE OF DANCE PUD FILED AS
INSTRUMENT No 21510802 TO THE SOUTHEAST CORNER OF LOT 3, BLOCK 1 OF DANCE PUD
FILED AS INSTRUMENT No 21510802;
THENCE N 89°45'12" W 100.00 FEET ALONG THE SOUTH BOUNDARY LINE OF LOT 3, BLOCK 1 OF
DANCE PUD FILED AS INSTRUMENT No 21510802 TO THE SOUTHWEST CORNER OF LOT 3,
BLOCK 1 OF DANCE PUD FILED AS INSTRUMENT No 21510802;
THENCE N 00°29'54" W 95.00 FEET ALONG THE WEST BOUNDARY LINE OF LOT 3, BLOCK 1 OF
DANCE PUD FILED AS INSTRUMENT No 21510802 TO THE NORTHWEST CORNER OF LOT 3,
BLOCK 1 OF DANCE PUD FILED AS INSTRUMENT No 21510802;
Page 9 of 17
THENCE N 89°45'12" W 70.01 FEET ALONG THE NORTH BOUNDARY LINE OF LOT 2, BLOCK 1 OF
DANCE PUD FILED AS INSTRUMENT No 21510802 TO THE NORTHWEST CORNER OF LOT 2,
BLOCK 1 OF DANCE PUD FILED AS INSTRUMENT No 21510802;
THENCE S 00°29'54" E 105.19 FEET ALONG THE WEST BOUNDARY LINE OF LOT 2, BLOCK 1 OF
DANCE PUD FILED AS INSTRUMENT No 21510802 TO THE NORTHEAST CORNER OF LOT 1,
BLOCK 1 OF DANCE PUD PHASE 2 FILED AS INSTRUMENT No 21714967;
THENCE S 64°01'45" W 74.99 FEET ALONG THE NORTH BOUNDARY LINE OF LOT 1, BLOCK 1 OF
DANCE PUD PHASE 2 FILED AS INSTRUMENT No 21714967 TO A POINT ON NORTH
BOUNDARY LINE OF LOT 1, BLOCK 1 OF DANCE PUD PHASE 2 FILED AS INSTRUMENT No
21714967;
THENCE S 8919'26" W 92.30 FEET ALONG THE NORTH BOUNDARY LINE OF LOT 1, BLOCK 1 OF
DANCE PUD PHASE 2 FILED AS INSTRUMENT No 21714967 TO THE NORTHWEST CORNER OF
LOT 1, BLOCK 1 OF DANCE PUD PHASE 2 FILED AS INSTRUMENT No 21714967;
THENCE S 0029'54" E 366.27 FEET ALONG THE WEST BOUNDARY LINE OF LOTS 1 AND 6, BLOCK
1 OF DANCE PUD PHASE 2 FILED AS INSTRUMENT No 21714967 TO THE SOUTHWEST
CORNER OF LOT 6, BLOCK 1 OF DANCE PUD PHASE 2 FILED AS INSTRUMENT No 21714967;
THENCE N 89°39'29" W 297.18 FEET ALONG THE NORTH BOUNDARY LINE OF BRISCOE
MEADOWS SUBDIVISION FILED AS INSTRUMENT No 94012599 TO THE NORTHWEST CORNER
LOT 1, BLOCK 1 OF BRISCOE MEADOWS SUBDIVISION FILED AS INSTRUMENT No 94012599;
THENCE S 0006'32" E 363.04 FEET ALONG THE WEST BOUNDARY LINE OF BRISCOE MEADOWS
SUBDIVISION FILED AS INSTRUMENT No 94012599 AND ALONG THE WEST BOUNDARY LINE
OF BRISCOE MEADOWS SUBDIVISION PHASE 2 TO THE SOUTHWEST CORNER OF BRISCOE
MEADOWS SUBDIVISION PHASE 2 FILED AS INSTRUMENT No 94016206 ALSO BEING THE
POINT OF BEGINNING.
LESS THAN AND EXCEPTING PARCEL 2:
BLOCK 3 OF DIAMOND COURT FILED AS INSTRUMENT No. 96014662 BEING FURTHER
DESCRIBED AS FOLLOWS:
COMMENCING AT THE NORTHWEST CORNER OF LOT 1, BLOCK 3 OF DIAMOND COURT FILED AS
INSTRUMENT No 96014662 ALSO BEING THE POINT OF BEGINNING;
THENCE S 00°30'00" 274.02 FEET ALONG THE EAST BOUNDARY LINE OF LOT 1, BLOCK 3 OF
DIAMOND COURT FILED AS INSTRUMENT No 96014662 TO A CURVE TO THE LEFT,
THENCE 46.73 FEET ALONG SAID CURVE TO THE LEFT (CURVE DATA: RAIDUS = 30.00 FEET, DELTA
= 89°14'31", CHORD = S 45°07'16" E 42.14 FEET) TO THE SOUTHWEST BOUNDARY LINE OF
LOT 1, BLOCK 3 OF DIAMOND COURT FILED AS INSTRUMENT No 96014662;
THENCE S 89°44'37" E 487.74 FEET ALONG THE SOUTH BOUNDARY LINE OF BLOCK 3 OF
DIAMOND COURT FILED AS INSTRUMENT No 96014662 TO A CURVE TO THE LEFT;
Page 10 of 17
THENCE 31.39 FEET ALONG SAID CURVE TO THE LEFT (CURVE DATA; RADIUS = 19.98 FEET, DELTA
= 90°02'46", CHORD N 45°18'11" E 28.26 FEET) TO THE SOUTHEAST CORNER OF LOT 3, BLOCK
3 OF DIAMOND COURT FILED AS INSTRUMENT No 96014662;
THENCE N 00°18'30" E 283.63 FEET ALONG THE EAST BOUNDARY LINE OF LOT 3, BLOCK 3 OF
DIAMOND COURT FILED AS INSTRUMENT No. 96014662, TO THE NORTHEAST CORNER OF
LOT 3, BLOCK 3 OF DIAMOND COURT FILED AS INSTRUMENT No 96014662;
THENCE N 89°44'37" W 541.61 FEET ALONG THE NORTH BOUNDARY LINE OF BLOCK 3 OF
DIAMOND COURT FILED AS INSTRUMENT No. 96014662 TO THE POINT OF BEGINNING.
LESS THAN AND EXCEPTING PARCEL 3:
LOTS 1 THROUGH 12 OF BLOCK 1, ALL OF BLOCK 2 OF DIAMOND COURT FILED AS INSTRUMENT
No 96014662 AND THE ROAD DIAMOND CIRCLE BEING FURTHER DESCRIBED AS FOLLOWS:
COMMENCING AT THE NORTHWEST CORNER OF LOT 12, BLOCK 1 OF DIAMOND COURT FILED
/_T.�1►���:Z�111�����[.>f�'Z7�7S[:ri�_II.�� 1�[ej�a�l�]I�yt�7�:3��lI�I�IVL�A
THENCE S 8939'33" E 560.02 FEET ALONG THE NORTH BOUNDARY LINE OF BLOCK 1 OF
DIAMOND COURT FILED AS INSTRUMENT No 96014662 TO THE NORTHEAST CORNER OF LOT
9, BLOCK 1 OF DIAMOND COURT FILED AS INSTRUMENT No 96014662;
THENCE S 0018'30" W 468.80 FEET ALONG THE EAST BOUNDARY LINE OF BLOCK 1 OF
DIAMOND COURT FILED AS INSTRUMENT No 96014662 TO THE NORHEAST CORNER OF LOT
5, BLOCK 1 OF DIAMOND COURT FILED AS INSTRUMENT No 96014662;
THENCE S 3226'42" W 175.53 FEET ALONG THE EAST LINE OF LOT 5, BLOCK 1 OF DIAMOND
COURT FILED AS INSTRUMENT No 96014662 TO THE SOUTH CORNER OF LOT 5, BLOCK 1 OF
DIAMOND COURT FILED AS INSTRUMENT No 96014662;
THENCE S 60°18'30" W 117.64 FEET ALONG THE SOUTHWEST BOUNDARY LINE OF LOT 4, BLOCK
1 OF DIAMOND COURT FILED AS INSTRUMENT No 96014662 TO A POINT ON THE
SOUTHWEST BOUNDARY LINE OF DIAMOND COURT FILED AS INSTRUMENT No 96014662;
THENCE N 89°35'31" W 371.66 FEET ALONG THE SOUTH BOUNDARY LINE OF BLOCK 1 OF
DIAMOND COURT FILED AS INSTRUMENT No 96014662 TO THE SOUTHWEST CORNER OF LOT
1, BLOCK 1 OF DIAMOND COURT FILED AS INSTRUMENT No 96014662 WHICH IS THE START
OF A NON -TANGENT CURVE TO THE LEFT,
THENCE 33.40 FEET ALONG SAID NON -TANGENT CURVE TO THE LEFT (CURVE DATA; RADIUS =
80.14 FEET, DELTA = 23°52'38", CHORD N 12°17'18" E 33.16 FEET);
THENCE N 00°18'30" 643.50 ALONG THE EAST RIGHT-OF-WAY LINE OF PARK LAWN DRIVE TO
THE POINT OF BEGINNING.
Page 11 of 17
LESS THAN AND EXCEPTING PARCEL 4:
LOTS 2,3,4 OF BLOCK 1 OF CROSSROADS SQUARE FILED AS INSTRUMENT No 21202777 BEING
FURTHER DESCRIBED AS FOLLOWS:
COMMENCING AT THE SOUTHWEST CORNER OF LOT 3, BLOCK 1 OF CROSSROADS SQUARE FILED
AS INSTRUMENT No 21202777 ALSO BEING THE POINT OF BEGINNING:
THENCE S 89°05'57" E 387.61 FEET ALONG THE SOUTH BOUNDARY LINE OF LOTS 2 AND 3 OF
BLOCK 1 OF CROSSROADS SQUARE FILED AS INSTRUMENT No. 21202777 TO THE SOUTHEAST
CORNER OF LOT 2, BLOCK 1 OF CROSSROADS SQUARE FILED AS INSTRUMENT No 21202777;
THENCE N 00°43'36" W 376.96 FEET ALONG THE EAST BOUNDARY LINE OF LOT 2, BLOCK 1 OF
CROSSROADS SQUARE FILED AS INSTRUMENT No 21202777 TO THE NORTHEAST CORNER OF
LOT 2, BLOCK 1 OF CROSSROADS SQUARE FILED AS INSTRUMENT No 21202777;
THENCE N 89°44'37" W 356.80 FEET ALONG THE NORTH BOUNDARY LINE OF LOTS 2 AND 4 OF
CROSSROADS SQUARE FILED AS INSTRUMENT No 21202777 TO THE NORTH BOUNDARY LINE
OF LOT 4 OF CROSSROADS SQUARE FILED AS INSTRUMENT No 21202777 ALSO BEING THE
START OF A CURVE TO THE LEFT;
THENCE 47.66 FEET ALONG SAID CURVE TO THE LEFT (CURVE DATA: RADIUS = 30.00 FEET, DELTA
= 91'01'24", CHORD = S 44°48'40" W 42.80 FEET) TO THE WEST BOUNDARY LINE OF LOT 4 OF
CROSSROADS SQUARE FILED AS INSTRUMENT No. 21202777;
THENCE S 0042'02" E 342.09 FEET ALONG THE WEST BOUNDARY LINE OF LOTS 3 AND 4 OF
CROSSROADS SQUARE FILED AS INSTRUMENT No. 21202777 TO THE POINT OF BEGINNING.
LESS THAN AND EXCEPTING PARCEL 5:
BLOCK 2 OF AFTON MEADOWS SUBDIVISION FILED AS INSTRUMENT No. 20600168 AND THE
LAND DESCRIBED IN THE DEED FILED AS INSTRUMENT No. 22306031 BEING FURTHER
DESCRIBED AS FOLLOWS:
COMMENCING AT TO THE SOUTHWEST CORNER OF LOT 6, BLOCK 2 OF AFTON MEADOWS
SUBDIVISION FILED AS INSTRUMENT No 20600168 ALSO BEING THE POINT OF BEGINNING;
THENCE N 80°12'00" E 281.65 FEET ALONG THE SOUTH SIDE OF BLOCK 2 OF AFTON MEADOWS
SUBDIVISION FILED AS INSTRUMENT No 20600168 TO THE SOUTHEAST CORNER OF LOT 8,
BLOCK 2 OF AFTON MEADOWS SUBDIVISION FILED AS INSTRUMENT No 20600168;
THENCE N 00°43'32" E 408.50 FEET ALONG THE WEST RIGHT-OF-WAY LINE OF AFTON AVENUE
TO A POINT OF THE NORTH BOUNDARY LINE OF AFTON MEADOWS SUBDIVISION FILED AS
INSTRUMENT No 20600168;
THENCE N 89°16'28" W 423.55 FEET ALONG THE NORTH BOUNDARY LINE OF AFTON MEADOWS
SUBDIVISION FILED AS INSTRUMENT No 20600168 AND ALONG THE NORTH BOUNDARY LINE
OF THE LAND DESCRIBED IN THE DEED FILED AS INSTRUMENT No 22306031 TO THE
NORTHWEST CORNER OF THE LAND DESCRIBED IN THE DEED FILED AS INSTRUMENT No
22306031;
Page 12 of 17
THENCE S 00°36'38" E 133.94 FEET ALONG THE WEST BOUNDARY LINE OF THE LAND DESCRIBED
IN THE DEED FILED AS INSTRUMENT No 22306031 TO THE SOUTHWEST CORNER OF THE
LAND DESCRIBED IN THE DEED FILED AS INSTRUMENT No 22306031;
THENCE S 89°40'21" E 139.38 FEET ALONG THE SOUTH BOUNDARY LINE OF THE LAND
DESCRIBED IN THE DEED FILED AS INSTRUMENT No 22306031 TO THE SOUTHEAST CORNER
OF THE LAND DESCRIBED IN THE DEED FILED AS INSTRUMENT No 22306031;
THENCE S 00°00'02" W 327.04 FEET ALONG THE WEST BOUNDARY LINE OF BLOCK 2 OF AFTON
MEADOWS SUBDIVISION FILED AS INSTRUMENT No 20600168 TO THE POINT OF
BEGINNING.
LESS THAN AND EXCEPTING PARCEL 6:
AF CHUBBUCK FILED AS INSTRUMENT No 21002430 AND THE LAND DESCRIBED IN THE DEED
FILED AS INSTRUMENT No 22302965 BEING FURTHER DESCRIBED AS FOLLOWS:
COMMENCING TO THE SOUTHWEST CORNER OF THE LAND DESCRIBED IN THE DEED FILED AS
INSTRUMENT No 22302965 ALSO BEING THE POINT OF BEGINNING;
THENCE S 8928'24" E 255.31 FEET ALONG THE SOUTH BOUNDARY LINE OF THE LAND
DESCRIBED IN THE DEED FILED AS INSTRUMENT No 22302965 AND ALONG THE SOUTH
BOUNDARY LINE OF BLOCK 1 OF AF CHUBBUCK FILED AS INSTRUMENT No 21002430 TO THE
SOUTHEAST CORNER OF BLOCK 1 OF AF CHUBBUCK FILED AS INSTRUMENT No 21002430;
THENCE N 00°04'10" W 112.54 FEET ALONG THE EAST BOUNDARY LINE OF BLOCK 1 OF AF
CHUBBUCK FILED AS INSTRUMENT No 21002430 TO THE NORTHEAST CORNER OF BLOCK 1
OF AF CHUBBUCK FILED AS INSTRUMENT No 21002430;
THENCE N 89°30'51" W 255.04 FEET ALONG THE NORTH BOUNDARY LINE OF AF CHUBBUCK
FILED AS INSTRUMENT No 21002430 AND ALONG THE NORTH BOUNDARY LINE OF THE LAND
DESCRIBED IN THE DEED FILED AS INSTRUMENT No 22302965 TO THE NORTHWEST CORNER
OF THE LAND DESCRIBED IN THE DEED FILED AS INSTRUMENT No 22302965;
THENCE S 00°04'12" W 112.36 FEET ALONG THE WEST BOUNDARY LINE OF THE LAND
DESCRIBED IN THE DEED FILED AS INSTRUMENT No 22302965 TO THE POINT OF BEGINNING;
PARCEL 7:
THE LANDS DESCRIBED IN THE DEED FILED AS INSTRUMENT No. 21407021 BEING FURTHER
DESCRIBED AS FOLLOWS:
COMMENCING AT THE SOUTHWEST CORNER OF THE LAND DESCRIBED IN THE DEED FILED AS
INSTRUMENT No. 21407021 ALSO BEING THE POINT OF BEGINNING:
THENCE S 89°22'11" E 164.26 FEET ALONG THE SOUTHERN BOUNDARY LINE OF THE LANDS
DESCRIBED IN THE DEED FILED AS INSTRUMENT No. 21407021 TO THE SOUTHEAST CORNER
OF THE LANDS DESCRIBED IN THE DEED FILED AS INSTRUMENT No 21407021;
Page 13 of 17
THENCE N 00°09'18" W 190.34 FEET ALONG EAST BOUNDARY LINE OF THE LANDS DESCRIBED IN
THE DEED FILED AS INSTRUMENT No. 21407021 TO THE NORTHEAST CORNER OF THE LANDS
DESCRIBED IN THE DEED FILED AS INSTRUMENT No. 21407021;
THENCE N 89°30'31" W 164.02 FEET ALONG THE NORTH BOUNDARY LINE OF THE LANDS
DESCRIBED IN THE DEED FILED AS INSTRUMENT No. 21407021 TO THE NORTHWEST CORNER
OF THE LANDS DESCRIBED IN THE DEED FILED AS INSTRUMENT No. 21407021;
THENCE S 00°04'54" E 189.94 FEET ALONG THE WEST BOUNDARY LINE OF THE LANDS
DESCRIBED IN THE DEED FILED AS INSTRUMENT No 21407021 TO THE SOUTHWEST CORNER
OF THE LAND DESCRIBED IN THE DEED FILED AS INSTRUMENT No 649272 ALSO BEING THE
POINT OF BEGINNING.
LESS THAN AND EXCEPTING PARCEL 8:
LOTS 1, 2, 3, 4, 5, 6, 8, 9 OF BLOCK 1 OF ARBOR COURT FILED AS INSTRUMENT No. 22202065
BEING FURTHER DESCRIBED AS FOLLOWS:
COMMENCING AT THE SOUTHWEST CORNER OF LOT 6, BLOCK 1 OF ARBOR COURT FILED AS
INSTRUMENT No 22202065 ALSO BEING POINT OF BEGINNING;
THENCE S 8950'42" E 161.65 FEET ALONG THE SOUTH BOUNDARY LINE OF LOTS 6 AND 8 OF
BLOCK 1 OF ARBOR COURT FILED AS INSTRUMENT No 22202065 TO THE SOUTHEAST
CORNER OF LOT 8, BLOCK 1 OF ARBOR COURT FILED AS INSTRUMENT No 22202065;
THENCE N 00°00'39" E 450.87 FEET ALONG THE EAST BOUNDARY LINE OF LOTS 1,8, AND 9 OF
BLOCK 1 OF ARBOR COURT FILED AS INSTRUMENT No 22202065 TO THE NORTHEAST
CORNER OF LOT 1, BLOCK 1 OF ARBOR COURT FILED AS INSTRUMENT No 22202065;
THENCE N 89°49'25" W 161.45 FEET ALONG THE NORTH BOUNDARY LINE OF LOTS 1 AND 2 OF
ARBOR COURT FILED AS INSTRUMENT No 22202065 TO THE NORTWEST CORNER OF LOT 2,
BLOCK 1 OF ARBOR COURT FILED AS INSTRUMENT No 22202065;
THENCE S 00°02'11" W 450.93 FEET ALONG THE WEST BOUNDARY LINE OF LOTS 2,3,4,5,6 OF
ARBOR COURT FILED AS INSTRUMENT No 22202065 TO THE POINT OF BEGINNING.
LESS THAN AND EXCEPTING PARCEL 9:
DESCRIBED IN THE DEEDS FILED AS INSTRUMENT No. 21515936, No. 21208953, AND No.
21613412 BEING FURTHER DESCRIBED AS FOLLOWS:
COMMENCING AT THE SOUTHWEST CORNER OF THE LANDS DESCRIBED IN THE DEED FILED AS
INSTRUMENT No 21613412 ALSO BEING POINT OF BEGINING:
THENCE S 89°29'48" E 100.74 FEET ALONG THE SOUTH BOUNDARY LINE OF THE LANDS
DESCRIBED IN THE DEED FILED AS INSTRUMENT No. 21613412 TO THE SOUTHEAST CORNER
OF THE LAND DESCRIBED IN THE DEED FILED AS INSTRUMENT No 21613412;
Page 14 of 17
THENCE N 00°00'02" E 226.30 FEET ALONG THE EAST BOUNDARY LINE OF THE LANDS
DESCRIBED IN THE DEEDS FILED AS INSTRUMENT No. 21613412, No. 21208953 AND No.
21515936 TO THE NORTHEAST CORNER OF THE LANDS DESCRIBED IN DEED INSTRUMENT No.
21515936;
THENCE S 80°12'00" W 102.11 FEET ALONG THE NORTH BOUNDARY LINE OF THE SAID LANDS
DESCRIBED IN DEED INSTRUMENT No. 21515936;
THENCE S 00°01'54" W 206.49 FEET ALONG THE WEST BOUNDARY THE LANDS DESCRIBED IN
THE DEEDS FILED AS INSTRUMENT No. 21613412, No. 21208953 AND No. 21515936 TO THE
POINT OF BEGINNING.
LESS THAN AND EXCEPTING PARCEL 10:
CHUBBUCK MAVERICK SUBDIVISION FILED AS INSTRUMENT No. 21311667, SGK SUBDIVISION
FILED AS INSTRUMENT No. 21814866 AND THE LANDS DESCRIBED IN THE DEEDS FILED AS
INSTRUMENT No. 20212165, No. 22219236, No. 21910421, No. 97017318, No. 20500396, AND
A PORTION OF No. 22208722 BEING FURTHER DESCRIBED AS FOLLOWS:
COMMENCING THE SOUTHWEST CORNER OF CHUBBUCK MAVERICK SUBDIVISION FILED AS
INSTRUMENT No 21311667 POINT ALSO BEING THE POINT OF BEGINNING:
THENCE S 4451'11" E 33.10 FEET ALONG THE SOUTHWEST BOUNDARY LINE OF CHUBBUCK
MAVERICK SUBDIVISION FILED AS INSTRUMENT No 21311667;
THENCE S 8920'07" E 304.43 FEET ALONG THE SOUTH BOUNDARY LINE OF CHUBBUCK
MAVERICK SUBDIVISION FILED AS INSTRUMENT No 21311667 AND ALONG THE SOUTH
BOUNDARY LINE OF THE LAND DESCRIBED IN THE DEED FILED AS INSTRUMENT No 22208722
TO THE SOUTHEAST CORNER OF THE LANDS DESCRIBED IN THE DEED FILED AS INSTRUMENT
No 22208722;
THENCE N 00°44'08" E 288.25 FEET ALONG THE EAST BOUNDARY LINE OF THE LAND DESCRIBED
IN THE DEED FILED AS INSTRUMENT No 22208722 TO THE NORTHEAST CORNER OF THE
LAND DESCRIBED IN THE DEED FILED AS INSTRUMENT No 22208722;
THENCE N 89°17'55" W 135.52 FEET ALONG THE NORTH BOUNDARY OF THE LAND DESCRIBED
IN THE DEED FILED AS INSTRUMENT No 22208722 TO THE NORTHEAST CORNER OF
CHUBBUCK MAVERICK SUBDIVISION FILED AS INSTRUMENT No 21311667;
THENCE N 00°35'38" W 141.03 FEET ALONG THE EAST BOUNDARY LINE OF THE LAND
DESCRIBED IN THE DEED FILED AS INSTRUMENT No 20500396, AND THE EAST BOUNDARY
LINE OF SGK SUBDIVISIONS FILED AS INSTRUMENT No 21814866 TO THE SOUTHWEST
CORNER OF THE LAND DESCRIBED IN THE DEED FILED AS INSTRUMENT No 97017318;
THENCE ALONG THE BOUNDARY OF THE LANDS DESCRIBED IN DEED FILED AS INSTRUMENT No.
97017318 FOR THE FOLLOWING FOUR (4) COURSES:
1) S 8927'33" E 73.00 FEET;
2) N 0004'10" E 37.10 FEET;
Page 15 of 17
3) S 89°26'28" E 82.00 FEET,
4) N 00°04'13" 104.00 FEET,
THENCE N 89°10'11" E 34.85 FEET ALONG THE NORTH BOUNDARY LINE OF THE LANDS
DESCRIBED IN THE DEED FILED AS INSTRUMENT No 20827117;
THENCE N 00°06'06" E 469.05 FEET CROSSING LINDED AVENUE AND ALONG THE WEST SIDE OF
THE LANDS DESCRIBED IN THE DEEDS FILED AS INSTRUMENT No's 20502051 AND 20308481
TO THE NORTHWEST CORNER OF THE LAND DESCRIBED IN THE DEED FILED AS INSTRUMENT
No 20308481;
THENCE ALONG THE NORTH BOUNDARY LINE OF THE LANDS DESCRIBED IN THE DEED FILED AS
INSTRUMENT No 20212165 FOR THE NEXT TWO (2) COURSES:
1) N 8200'08" W 92.08 FEET;
2) N 8159'23" W 294.63 FEET TO THE SOUTHWEST CORNER OF RITE AID KEYBANK
COMMERCIAL SUBDIVISION FILED AS INSTRUMENT No 98013442;
THENCE ALONG THE EAST RIGHT-OF-WAY LINE OF YELLOWSTONE AVENUE FOR THE NEXT THREE
(3) COURSES:
1) S 0004'12" W 470.40 FEET;
2) S 0011'06" W 49.80 FEET;
3) S 00°10'21" W 546.75 FEET TO THE POINT OF BEGINNING.
LESS THAN AND EXCEPTING PARCEL 11:
LANDS DESCRIBED IN THE DEEDS FILED AS INSTRUMENT No. 22301528, No. 22205950, No.
2205951 AND No. 22205952 BEING FURTHER DESCRIBED AS FOLLOWS:
COMMENCING AT THE SOUTHWEST CORNER OF THE LANDS DESCRIBED IN DEED INSTRUMENT
No. 22301528, ALSO BEING POINT OF BEGINNING;
THENCE ALONG THE NORTH BOUNDARY LINE OF THE LANDS DESCRIBED IN THE DEED FILED AS
INSTRUMENT No. 22209951 FOR THE NEXT FIVE (5) COURSES:
1) S 72°00'25" E 90.40 FEET,
2) S 88°49'17" E 62.30 FEET,
3) S 01°24'12" W 58.69 FEET,
4) S 37°52'30" E 112.94 FEET,
5) S 89°22'48" E 159.34 FEET TO A POINT ON THE WEST RIGHT-OF-WAY OF ZEBE AVENUE;
THENCE N 00°37'12" E 367.81 FEET ALONG THE WEST RIGHT-OF-WAY LINE OF ZEBE AVENUE TO
A POINT ON THE EAST BOUNDARY LINE OF THE LANDS DESCRIBED IN THE DEED FILED AS
INSTRUMENT No. 22301528;
THENCE N 43°54'33" W 28.32 FEET ALONG THE NORTHEAST BOUNDARY LINE OF THE LANDS
DESCRIBED IN THE DEED FILED AS INSTRUMENT No. 22301528 ALSO BEING THE SOUTH
BOUNDARY OF THE LANDS DESCRIBED IN DEED FILED AS INSTRUMENT No. 21818010 TO A
POINT ON THE NORTH BOUNDARY LINE OF THE LANDS DESCRIBED IN THE DEED FILED AS
Page 16 of 17
INSTRUMENT No. 22301528 ALSO BEING THE START OF A NON -TANGENT CURVE TO THE
RIGHT,
THENCE 144.43 FEET ALONG SAID NON -TANGENT CURVE TO THE RIGHT (CURVE DATA: RADIUS =
433.90 FEET, DELTA = 19°04'19", CHORD = N 79°18'11" W 143.77, FEET) TO A POINT ON THE
SOUTH RIGHT-OF-WAY LINE OF KNUDSEN BOULEVARD;
THENCE N 70°13'17" W 159.09 FEET ALONG THE SOUTH RIGHT-OF-WAY LINE OF KNUDSEN
BOULEVARD TO THE NORTHEAST CORNER OF WDG KNUDSEN MULTIFAMILY SUBDIVISION
FILED AS INSTRUMENT No 22307413;
1::1aill ItW-Awi]ill fej::t=_38 I 0s] IJA:1ye1AAIW&Ito: � kyjRlIs] ►1
FILED AS INSTRUMENT No 22307413FOR THE NEXT THREE (3) COURSES:
1) S 1710'47" W 46.99 FEET;
2) S 0121'21" E 85.58 FEET;
3) S 1940'10" W 169.39 FEET TO THE POINT OF BEGINNING.
Page 17 of 17
CHUBBUCK URBAN RENEWAL EXHIBIT
CURRENT ZONING
THE CITY OF CHUBBUCK, BANNOCK COUNTY, IDAHO
0 150 300 600
( IN FEET )
I inch = 300 ft.
I FrFNn
BOUNDARY
CURRENT DEEDS / PLAT LINES
HIGHWAY CORRIDOR (HC)
PLANNED UNIT DEVELOPMENT (PUD)
DENSE RESIDENTIAL (R-4)
INDUSTRIAL (1)
AGRICULTURE (A)
LIMITED RESIDENTIAL (R-2)
LIMITED COMMERCIAL (C-1)
VILLAGE (V)
GENERAL COMMERCIAL (C-2)
0 150 300 600
( IN FEET )
I inch = 300 ft.
CENTRAL WAY
1 Cr±CAIP1
BOUNDARY
CURRENT DEEDS / PLAT LINES
MIXED USE
MEDIUM DENSITY
COMMERCIAL
VILLAGE
HIGHWAY
HIGHWAY DENSITY
EMPLOYMENT
CHUBBUCK URBAN RENEWAL EXHIBIT
FUTURE PLANNING
THE CITY OF CHUBBUCK, BANNOCK COUNTY, IDAHO
Attachment 5
Yellowstone Corridor Urban Renewal District
Economic Feasibility Study
Background
In 2024, the Chubbuck City Council and the Urban Renewal Agency of the City of Chubbuck,
Idaho, also known as Chubbuck Development Authority (CDA) contracted with the Urban Land
Institute (ULI) to develop a Technical Advisory Report (TAR). The TAR reviewed the
Yellowstone Avenue corridor and surrounding area, including Chubbuck Village east of
Yellowstone Avenue. The recommendations of the TAR included the creation of an urban
renewal area for the Village, West Village, and Yellowstone Avenue areas. City staff developed
a boundary that included these recommendations as well as the Legacy Park development and
several other areas of developable land (collectively, referred to as the "Yellowstone Corridor
Area". The Yellowstone Corridor Area was the subject of an eligibility report which determined
the area was eligible to become an urban renewal area under Idaho Statutes. The eligibility report
was accepted by resolution by the CDA on May 20, 2025. The City Council adopted the report
on June 4, 2025, and authorized the development of an urban renewal plan and creation of a
revenue allocation area (the "Project Area") for the Yellowstone Corridor Area. The boundaries
of the Yellowstone Corridor Project Area are shown on Map 1.
The purpose of this economic feasibility study is to determine whether tax increment revenues
from anticipated development within the proposed Yellowstone Corridor Area will be sufficient
to cover the costs of public improvements and other eligible expenses. This report relies on
information provided by private developers as well as data provided by staff at the City of
Chubbuck and Bannock County. This data was used to create projected revenues, expenses, and
overall cash flow for the life of the urban renewal district. These projections are shown in a
series of tables, followed by a brief analysis of the Project Area's economic feasibility.
Map 1: Yellowstone Corridor Project Area
Project Area and Description
The Yellowstone Corridor Project Area is located generally north of I-86, south of New Day
Parkway/Siphon Road, west of the Union Pacific rail line and east of Hawthorne Road. It
encompasses over 400 parcels and approximately 400 acres. Most of the Project Area is already
developed, although there are several large areas of open, undeveloped parcels as well as several
pockets of infill sites within existing developments. The larger open areas include land in Legacy
Park, lands on either side of Knudsen Boulevard, and north of West Linden Avenue. The area
around City Hall also has nearly 15 acres of vacant land in the vicinity. Besides vacant parcels,
there are also sites which are underutilized and could be redeveloped to other uses. These mainly
include storage yards for equipment and materials.
The Project Area and surrounding lands have seen significant growth and change over the past
few decades. During that time, major commercial development has occurred south of I-86 in
both Chubbuck and Pocatello. There has also been significant development and change along the
Yellowstone Corridor north of I-86 and Chubbuck Road. Some of the most recent development
has occurred within the Project Area, including a new 200 -unit apartment complex on the south
side of Knudsen Boulevard, west of Yellowstone Avenue. Several other projects are planned
within the area, including a small commercial building on Burnside Avenue, another commercial
building in Legacy Park, and townhomes and apartments also within Legacy Park.
2
O City Limits
e�dar Rr
Local
— Collector
—Minor_Arterial
e Major_Arterial
o Freeway
W. Ay vex'
-
Park,
.. ....... d
New URB 6_25_2W5
_
D -'> r�:•-,
Ciubb-. I__ Rd i
If
0.� 1
2 Miles
Map 1: Yellowstone Corridor Project Area
Project Area and Description
The Yellowstone Corridor Project Area is located generally north of I-86, south of New Day
Parkway/Siphon Road, west of the Union Pacific rail line and east of Hawthorne Road. It
encompasses over 400 parcels and approximately 400 acres. Most of the Project Area is already
developed, although there are several large areas of open, undeveloped parcels as well as several
pockets of infill sites within existing developments. The larger open areas include land in Legacy
Park, lands on either side of Knudsen Boulevard, and north of West Linden Avenue. The area
around City Hall also has nearly 15 acres of vacant land in the vicinity. Besides vacant parcels,
there are also sites which are underutilized and could be redeveloped to other uses. These mainly
include storage yards for equipment and materials.
The Project Area and surrounding lands have seen significant growth and change over the past
few decades. During that time, major commercial development has occurred south of I-86 in
both Chubbuck and Pocatello. There has also been significant development and change along the
Yellowstone Corridor north of I-86 and Chubbuck Road. Some of the most recent development
has occurred within the Project Area, including a new 200 -unit apartment complex on the south
side of Knudsen Boulevard, west of Yellowstone Avenue. Several other projects are planned
within the area, including a small commercial building on Burnside Avenue, another commercial
building in Legacy Park, and townhomes and apartments also within Legacy Park.
2
In addition to the private development projects, there are public infrastructure needs throughout
the Project Area. These include essential utility projects needed to support future growth such as
new and upgraded lift stations, water lines and fire hydrants as well as transportation
improvements such as widened roads and intersections and the installation of traffic signals.
There are also projects which are non-essential to support growth, but which are key components
in the City's efforts to implement its vision for the community. These include medians and
landscaping in and along Yellowstone Avenue to improve aesthetics and walkability, and an
overall improved bicycle and pedestrian network throughout the Project Area. Finally, there is a
general need throughout the Project Area for street improvements such as asphalt repairs,
installation of curb, gutter, and sidewalk on several streets, and connection of gaps in roadways.
In the typical development process, certain public infrastructure necessary to support new
construction is built and paid for (at least in part) by the developer. That would likely be the case
for several of the needs within the Project Area. In other situations, larger public projects that
serve not only a specific development, but also a broader region or corridor, such as Yellowstone
Avenue improvements or a regional sewer lift station, demand a public-private partnership to
share in the cost and responsibility to construct. These types of projects are also prevalent within
the Project Area. This study reviews the anticipated public projects along with their costs and
potential start dates compared with the projected tax increment revenues to the CDA through
private development. These data points along with several assumptions outlined with each table
in the report will evaluate if the revenues will be sufficient to cover the costs of the projects. It is
important to emphasize that these are projections and future conditions may change which will
affect both revenues and expenses. It is anticipated that the urban renewal district will be in place
for the 20 -years allowed by Idaho statute. This would not preclude the CDA and City Council
from closing the district earlier if desired.
Summary of Findings:
The Yellowstone Corridor Project Area is estimated to generate approximately $50-72 million in
tax increment revenues over its 20 -year lifespan based on the assumptions outlined in the Study
Approach section below. Total potential projects are estimated to cost $195 million, including
estimated escalation. Although it is unlikely tax increment revenues on their own will be able to
fund all potential projects, there are many priority projects which can be funded. For any private
projects, such as Legacy Park, which will advance fund eligible public infrastructure
improvements subject to reimbursement of certain eligible public project expenditures pursuant
to an owner participation agreement (OPA), there should be sufficient funds for repayment,
although developer requests for CDA participation should be evaluated prior to entering into an
agreement.
The Yellowstone Corridor Project Area Will Generate Sufficient Tax Increment Revenues
to Fund the Top Priority Projects.
3
Study Approach
Project Area Boundaries
The Project Area boundaries for this study are smaller than what was shown in the eligibility
report in order to comply with Idaho Code Section 50-2903(15) which reads, in part:
"The base assessment roll or rolls of revenue allocation area or areas shall
not exceed at any time ten percent (10%) of the current assessed valuation
of all taxable property within the municipality."
The assessed values in the boundaries shown in the eligibility report were valued higher than the
statutory limit. The consultant worked with CDA and City staff to reduce the boundary to
comply with the statute while still capturing areas of greatest potential for development and the
highest priority projects. A revised analysis of the 10% limitation requirement is included here to
verify the Project Area's compliance.
Table 1: Statutory Ten Percent Limitation Analysis
II WEN I
_
City of Chubbuck
$1,596,414,274
Pine Ridge Mall District
$27,112,636
Northside Crossing District
$316,520
Harvest Springs District
$421,674
Proposed Yellowstone
Corridor Project Area
$126,911,543
Total d:.se VaR-
$154,162,373'
Private and Public Projects
This study reviewed private development projects within the Project Area in three different
categories:
• Projects which will receive their certificate of occupancy before December 31, 2025, that
would still contribute to tax increment revenues if the urban renewal district is approved
by City Council ordinance before December 31, 2025;
• Projects which are currently in the entitlement process including, those that have been
permitted, those which have been submitted to the City of Chubbuck for review and
permitting, and those which are being discussed with the City but not yet submitted; and
• Projected projects based on development patterns, local knowledge and assumptions.
For the recently completed apartments on Knudsen, three of the five buildings were on the tax
rolls as of January 1, 2025, and therefore will be included in the base value. The other two
buildings are expected to be added to the tax rolls in January 2026. Revenues for these projects
will not be collected until 2027. For projects currently in the entitlement process, revenues were
assumed to be added two years after the anticipated completion of the project. This is the same
El
method used for projected projects, but without the advantage of firm completion dates.
Valuations for private projects were based on interviews with developers, existing Bannock
County valuation data, and data extrapolation from current projects. It is important to note that
for projects which would likely be phased such as a multi -family apartment complex or small
commercial buildings on a particular street, the study assumed that taxable value would also be
added in phases. For example, if an apartment complex was assumed to be completed in three
phases, or over the course of three years, one-third of the total value generated tax increment
revenues two years after completion of the first phase or first year of the project. Also, project
values were calculated in 2025 dollars and there was no attempt to account for cost escalation
due to inflation.
For public infrastructure projects eligible for tax increment expenditures, projects were taken
from several sources:
• Projects identified by Chubbuck City staff as known needs
• Projects identified in the ULI TAR
• Projects from the comprehensive plan
• Potential projects generated by other development or priorities
Potential projects were then sorted into the following categories:
• Utility Infrastructure
• Street Infrastructure
• Streetscape and Active Transportation Projects
• Site Preparation and Development
• Public Spaces and Amenities
• Acquisition and Financing
Each included a working list of potential projects and estimated costs. Some of the costs were
based on actual bids from the City of Chubbuck, others utilized this data for similar projects and
artificial intelligence (AI) to estimate costs, and others were placeholders and not tied to data.
The working list of projects used for this study are shown in Table 2 below. This table also
shows each project's value in 2025 dollars. Because numerous projects were anticipated to
completed in phases, Table 3 was added to show the total anticipated increment from private
investment per year with an assumed 5% annual escalation cost. 2025 and 2027 show no
increment based on the timing between project completion and taxable increment value being
added to the tax roll. 2046 was not included in this table because the district is anticipated to
close December 31, 2045 and no new increment will be added after that date. 2046 is included in
other tables because 2045 revenues will still be collected and spent in that year.
Table 2 outlines the private new development projects used to project tax increment revenues for
this study. As noted above, these represent a range of projects from recently completed to
projected projects. The project number corresponds with Map 2, which shows roughly where the
projects are anticipated to take place, recognizing that project siting and prioritization may shift
based on new development timing and available funds.
Table 2: Private Development Projects
Project Name and Number
1 -Knudsen Apartments
Location 7Estimated
Knudsen
New
�i
V.
Values Using
Estimated
Start
ir
Estimate
Finish
$28,000,000
NA
2025
2 -Commercial Building
W. Burnside
$2,000,000
2025
2026
3 -CDA Project Site
Village
$1,300,000
2025
2026
4 -Commercial Building
Legacy Park
$1,300,000
2025
2026
5 -Apartments
Legacy Park
$12,600,000
2025
2026-2028
6-Townhomes
Legacy Park
$14,400,000
2026
2026-2028
7 -Apartments
Legacy Park
$18,720,000
2028
2028-2030
8 -Future A artments
Legacy Park
$5,400,000
2028
2028-2030
9 -Commercial, 6 Lots
Legacy Park
$9,000,000
2026
2026-2032
10 -Stora e Units
Legacy Park
$1,600,000
2028
2029
11 -Commercial, 12 acres
Legacy Park
$19,200,000
2029
2030-2036
12 -Multi -family, 7.5 acres
Mingo (south)
$22,000,000
2032
2032-2035
13 -Single-family, 5.3 acres
Lisa/Adams
$7,000,000
2033
2033-2043
14-Townhomes, 3 acres
Adams/Park Lawn
$9,600,000
2035
2035-2038
15 -Commercial, 9 Lots
Laurel/Valen /Ward
$13,500,000
2029
2029-2042
16 -Multi -family, 7 acres
W. Linden
$22,000,000
2036
2036-2040
17 -Multi -family, 3.5 acres
Knudsen (north)
$8,000,000
2029
2029-2032
18 -Commercial pads
Knudsen/Afton
$4,000,000
2029
2030-2032
19 -Multi -family
Knudsen north
$28,000,000
2035
2035-2038
20 -Commercial, 10 acres
Knudsen (north)
$12,500,000
2035
2035-2040
21 -Multi -family
Knudsen south
$18,000,000
2038
2038-2042
22 -Commercial, 10 acres
Knudsen (south)
$12,500,000
2030
2030-2040
23-Commercial/Office, 2.6
acres
Village
$3,000,000
2028
2029
24-Commercial/Office, 2.1
acres
Village
$2,500,000
2029
2030
25 -Redevelopment, multi-
family 2.5 acres
East of Burley
$7,000,000
2032
2035
26 -Multi -family, 5 acres
East of Stuart
$9,000,000
2031
2034
Total
$292,120,000
Legend — Study Area Apartments, Multi -Family, 0 Commercial, Office,
CSingle Family & Townhomes & Storage Units
Map 2: Potential Private Development Projects
A
Table 3: Annual Increment Added with Escalation
2025
2026
$
17,322,223.00
2027
2028
$
17,232,075.00
2029
$
12,502,350.00
2030
$
21,397,772.03
2031
$
20,543,666.17
2032
$
26,888,592.64
2033
$
22,249,327.72
2034
$
30,451,364.05
2035
$
24,400,629.96
2036
$
25,620,661.46
2037
$
43,483,434.61
2038
$
40,283,506.29
2039
$
36,867,012.07
2040
$
46,194,504.12
2041
$
27,985,208.20
2042
$
29,384,468.61
2043
$
12,515,982.75
2044
$
13,141,781.89
2045
$
1,688,462.18
Total
$
470,153,022.75
Table 4 outlines the anticipated public projects within the Project Area and their estimated costs.
Potential timing is addressed in later tables. As noted above, the estimated costs are a blend of
projects which have been designed and estimated, extrapolated data, and simple placeholders.
These project costs were also analyzed with 5% escalation costs, but doing so required an
estimated completion year. As will be explained later in the report, a revenue range was utilized
which meant that projects could be completed in different years based on anticipated revenues.
Variations in completion years meant a variation in the estimated costs. For purposes of this
report, there is not an equivalent to Table 3 for public projects. Rather, Tables 9 and 11 show
only priority project costs with escalation based on each revenue model and respective project
completion years.
Table 4: Public Projects and Estimated Costs
iRMITM
Utility Infrastructure Projects
U size Hydrants
Legacy Park
$202,000
Replace and Upgrade Lift Station
Valenty
$2,100,000
Additional Utilities to Support Future
Development
Throughout District
$2,000,000
Street Infrastructure Projects
Traffic Signal
Chubbuck/Burley
$650,000
Traffic Signal
Yellowstone/Park Lawn
$650,000
Add Turn Lane
Yellowstone/Park Lawn
$250,000
Widen and Realign Intersection
Chubbuck/Yellowstone
$10,000,000
Intersection Improvements/Add Turn Lane
Yellowstone/Knudsen/Evans
$10,000,000
Curb, Gutter, Sidewalk, Paving
Valen /Ward
$450,000
Curb, Gutter, Sidewalk, Paving
Briscoe
$1,500,000
Curb, Gutter Sidewalk, Paving
West Linden/Afton Road
$1,000,000
Additional Roads to Support Future
Development
Throughout District
$2,000,000
Siphon Road Widening
Siphon from Yellowstone to
Stuart
$10,000,000
Streetscape and Active Transportation
Projects
Center Landscape Islands
Yellowstone
$1,500,000
Widen Sidewalks
Yellowstone
$10,000,000
Widen Sidewalks
Chubbuck Road
$10,000,000
Signage and Wayfinding
Throughout District
$1,000,000
Lighting Improvements
Throughout District
$2,000,000
Gateway Treatments and Enhancements
New Da /Yellowstone
$1,000,000
Site Preparation and Development
Studies Related to Parking and Land Use
Throughout District
$250,000
Environmental Cleanup Assistance
Throughout District
$100,000
Public -Private Partnership and Development
Opportunities
Throughout District
$1,000,000
Building Demolition
Throughout District
$300,000
Site Remediation Projects
Throughout District
$1,000,000
Public Spaces and Amenities
Infrastructure Around City Hall to Support
Food Truck Court
City Hall Area
$500,000
Community Event Space
City Hall Area
$100,000
Parking Infrastructure
Throughout District
$5,000,000
Public Spaces: Plazas, Parks, Etc.
Throughout District
$2,500,000
Building Facade Improvement Program
Throughout District
$1,000,000
Acquisition and Financing
Throughout District
Leverage Other Funding Sources
Throughout District
$1,000,000
Property Acquisition
Throughout District
$3,000,000
Cross -Access Agreement and Easement
Acquisition
Throughout District
$250,000
Total
$82,702,000
Revenues, Expenses, and Cash Flow
The tables in this study include reviews of anticipated revenues for the Yellowstone Corridor
Project Area. Those are followed by anticipated cash flow for the Project Area. Each table relies
on assumptions regarding project timing, property valuations, and tax levies. In a review of
historical tax levy and property valuation data, patterns are divided between pre- and post -2018,
with wide variations after COVID-19. Between 2014 and 2018, the annual levy averaged 1.28%
annual growth and valuations rose 3.39% per year. In contrast, between 2019-2024, levies
averaged an annual -8.12% drop, due in part to annual 17.69% average increases in valuation
during this same period. Graphs depicting historic changes are included on the following page.
These variations make building a predictable model challenging.
To try to account for the potential variations of change in levies and valuations, this study used
two revenue models. The first assumed a conservative 2% annual property valuation increase and
an annual 1% decrease in the levy. The second, higher end estimate assumes a 5% growth in
valuation and a 1% increase in the levy, which is more consistent with pre-COVID-19 patterns.
However, this was also before the Idaho Legislature adopted House Bill 389 in 2021, which put
restrictions on how much property values and municipal budgets can increase per year. This
provides a range of potential revenues for the Project Area. The subsequent cash flow tables
which review revenues to expenses consider both options. The tables are followed by an analysis
of the findings.
Because the list of potential project costs exceeds anticipated revenues, for purposes of this study
and determining feasibility, projects were prioritized based on discussion during a joint meeting
of the CDA and City Council. In that meeting, Yellowstone Avenue was identified as a priority,
including traffic signals, turn lanes and landscaped medians. Widening Siphon Road was also
noted as a priority along with other projects that the CDA and City Council believe are more
accessible and achievable. This study used this general guidance to assign priority to projects
from the list above. Priorities were then assigned to various tranches of funding based on
accumulated revenues. These are shown in Tables 9 and 11, reflecting the respective revenue
assumptions. As noted previously, many of the projects should be funded even with the
conservative revenue approach. Additional projects may be funded if revenues are more closely
aligned with the high revenue model. Funding for any projects will depend on actual
performance of tax increment revenues. It is important to note that this is a projection based on
known data and reasonable development scenarios for the purposes of this study and should not
be viewed as a definitive priority list or financing strategy.
10
0.02
0.018
0.016
0.014
0.012
0.01
0.008
0.006
0.004
0.002
0
Levy Rate
O .i N m .zl- m to Il W m o c -i N m lzt m to Il m m o c -i N m lzt
O O O O o O O O O o ri c -I rI c -I c -I c -I c -I .i .--i c -I N N N N N
O O O O o O O O O O o o O O O O o O O O O O o o O
N N N N N N N N N N N N N N N N N N N N N N N N N
$1,800,000,000.00
$1,600,000,000.00
$1,400,000,000.00
$1,200,000,000.00
$1,000,000,000.00
$800,000,000.00
$600,000,000.00
$400,000,000.00
$200,000,000.00
City Valuation
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
City Valuation
11
Table 5 is a list of currently available levy rates for all parcels in the Project Area. These reflect
the 2024 rates as the 2025 levy rates had not been certified as of the writing of this report. These
rates were provided by the Bannock County Assessor's Office. These levies are the taxable rate
per $1.00 of assessed property value. Due to changes in the Idaho Statutes passed in 2025, the
Ambulance district levy is not accounted for. This is a conservative assumption that CDA will
not go through the steps to request the district to opt into the Project Area.
Table 5: Current Applicable Levy Rates
Taxing
Bannock County
.003109503
Bannock County Road & Bride
.000266091
Chubbuck Cit
.006224284
School District No. 25
NA
Ambulance
NA
Portneuf Free Libra
.000383328
Abatement
.000019959
Total
0.010250535
12
Assumptions for Table 6: Yellowstone Corridor Project Area Conservative Revenues
1. Total valuation is assumed to increase 2% per year.
2. Applicable tax levy is assumed to decrease I% per year.
3. Years listed in the table are calendar years, not fiscal years. Revenues shown in tax year
2026, for example, will be collected in calendar year 2027.
4. Revenues for 2045 taxes will be collected and spent in 2046.
Table 6: Yellowstone Corridor
2025' $_126,911,543
2026 $126,911,543
2027 $126,911,543
2028 $126,911,543
2029 $126,911,543
2030 $126,911,543
2031 $126,911,543
2032 $126,911,543
2033 $126,911,543
2034 $126,911,543
2035 $126,911,543
2036 $126,911,543
2037 $126,911,543
2038 $126,911,543
2039 $126,911,543
2040 $126,911,543
2041 $126,911,543
20421 $126,911,543
2043 $126,911,543
2044 $126,911,543
2045 $126,911,543
2046 $126,911,543
$ 126,911,543
$ 146,771,997
$ 149,707,437
$ 169,933,661
$ 185,834,684
$ 210,949,149
$ 235,711,799
$ 267,314,627
$ 294,910,247
$ 331,259,816
$ 362,285,643
$ 395,152,017
$ 446,538,492
$ 495,752,768
$ 542,534,836
$ 599,580,036
$ 639,556,845
$ 681,732,451
$ 707,883,083
$ 735,182,526
$ 751,574,639
$1,236,759,154
$ 19,860,454
$ 22,795,894
$ 43,022,118
$ 58,923,141
$ 84,037,606
$ 108,800,256
$ 140,403,084
$ 167,998,704
$ 204,348,273
$ 235,374,100
$ 268,240,474
$ 319,626,949
$ 368,841,225
$ 415,623,293
$ 472,668,493
$ 512,645,302
$ 554,820,908
$ 580,971,540
$ 608,270,983
$ 624,663,096
$1,109,847,611
ection
0.0102505351 $ -
0.010149045 $ -
0.010048559 $ 201,564.63
0.009949068 $ 229,065.88
0.009850563 $ 428,029.98
0.009753032 $ 580,426.09
0.009656468 $ 819,621.49
0.009560859 $ 1,050,626.15
0.009466197 $ 1,342,374.10
0.009372472 $ 1,590,308.85
0.009279676 $ 1,915,248.55
0.009187798 $ 2,184,195.29
0.009096829 $ 2,464,539.19
0.009006762 $ 2,907,591.81
0.008917586 $ 3,322,065.03
0.008829293 $ 3,706,356.40
0.0087418741 $ 4,173,328.59
0.008655321 $ 4,481,480.74
0.008569625 _$ 4,802,153.05
0.0084847771 $ 4,978,708.08
0.008400769 $ 5,161,043.63
0.008317593 $ 5,247,650.54
$ 201,564.63
$ 430,630.51
$ 858,660.50
$ 1,439,086.59
$ 2,258,708.08
$ 3,309,334.23
$ 4,651,708.33
$ 6,242,017.18
$ 8,157,265.73
$10,341,461.02
$12,806,000.21
$15,713,592.02
$19,035,657.05
$ 22,742,013.45
$26,915,342.05
$ 31,396,822.79
$ 36,198,975.84
$41,177,683.91
$46,338,727.54
$51,586,378.09
13
Assumptions for Table 7: Yellowstone Corridor Project Area Revenues, High Projection
1. Total valuation is assumed to increase 5% per year.
2. Applicable tax levy is assumed to decrease I% per year.
3. Years listed in the table are calendar years, not fiscal years. Revenues shown in tax year
2026, for example, will be collected in calendar year 2027.
4. Revenues for 2045 taxes will be collected and spent in 2046.
Table 7: Yellowstone Corridor
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041
2042
2043
2044
2045
2046
W .--" .'-
$126,911,543
$126,911,543
$126,911,543
$126,911,543
$126,911,543
$126,911,543
$126,911,543
$126,911,543
$126,911,543
$126,911,543
$126,911,543
$126,911,543
$126,911,543
$126,911,543
$126,911,543
$126,911,543
$126,911,543
$126,911,543
$126,911,543
$126,911,543
$126,911,543
$ 126,911,543
$ 150,579,343
$ 158,108,310
$ 183,245,801
$ 204,910,441
$ 236,553,735
$ 268,925,088
$ 309,259,935
$ 346,972,259
$ 394,772,236
$ 438,911,478
$ 486,477,714
$ 554,285,034
$ 622,282,792
$ 690,263,943
$ 770,971,645
$ 837,505,435
$ 908,765,176
$ 966,719,417
$1,028,197,170
$1,081,295,490
$1,605,513,288
$ 23,667,800
$ 31,196,767
$ 56,334,258
$ 77,998,898
$ 109,642,192
$ 142,013,545
$ 182,348,392
$ 220,060,716
$ 267,860,693
$ 311,999,935
$ 359,566,171
$ 427,373,491
$ 495,371,249
$ 563,352,400
$ 644,060,102
$ 710,593,892
$ 781,853,633
$ 839,807,874
$ 901,285,627
$ 954,383,947
$1,478,601,745
0.010250535' $
0.010149045 $
0.010048559 $
0.009949068 $
0.009850563 $
0.009753032 $
0.009656468 $
0.009560859 $
0.009466197 $
0.009372472 $
0.009279676 $
0.009187798 $
0.009096829 $
0.009006762 $
0.008917586 $
0.008829293 $
0.008741874 $
0.008655321 $
0.008569625 $
0.008484777 $
0.008400769 $
0.008317593 $
240,205.56
313,482.56
560,473.38
768,333.03
1,069,343.84
1,371,349.20
1,743,407.28
2,083,138.11
2,510,516.95
2,895,258.19
3,303,621.21
3,887,743.71
4,461,690.80
5,023,743.41
5,686,595.31
6,211,922.41
6,767,194.15
7,196,838.33
7,647,207.53
8,017,559.34
240,205.56
553,688.11
1,114,161.49
1,882,494.52
2,951,838.37
4,323,187.57
6,066,594.84
8,149,732.96
10,660,249.90
13,555,508.09
16,859,129.31
20,746,873.02
25,208,563.82
30,232,307.23
35,918,902.54
42,130,824.95
48,898,019.10
56,094,857.43
63,742,064.96
71,759,624.31
14
Assumptions for Table 8: Yellowstone Corridor Project Area Cash Flow with Conservative
Revenue
1. Assumptions for revenues and valuations are the same as Table 6.
2. Tranches of funding based on estimated costs of public projects.
3. Does not specifically account for potential Owner Participation Agreements.
4. CDA will collect 10% of revenues for district administration up to a maximum of
$100,000 annually.
5. All funds will be expended on projects
Area Cash Flow with Conservative Revenue
2025
$
2026
$
2027
$
201,565
$
20,156
$
181,408
$
181,408-1
2028
$
229,066
$
22,907
$
206,159
$
387,5671
2029
$
428,030
$
42,803
$
385,227
$
772,794
2030
$
580,426
$
58,043
$
522,383
$
1,295,178 1
2031
$
819,621
$
81,962
$ 1,476,785
$
(739,126)
$
556,052
2032
$
1,050,626
$
100,000
$
950,626
$
1,506,678 1
2033
$
1,342,374
$
100,000
$
1,242,374
$
2,749,0531
2034
$
1,590,309
$
100,000
$ 3,025,090
$
(1,534,781)
$
1,214,271 1
2035
$
1,915,249
$
100,000
$ 2,606,231
$
(790,982)
$
423,289)
2036
$
2,184,195
$
100,000
$
2,084,195
$
2,507,484 1
2037
$
2,464,539
$
100,000
$
2,364,539
$
4,872,0231
2038
$
2,907,592
$
100,000
$ 7,071,184
$
(4,263,592)
$
608,431 1
2039
$
3,322,065
$
100,000
$
3,222,065
$
3,830,496
2040
$
3,706,356
$
100,000
$ 6,548,624
$
(2,942,268)
$
888,229 1
2041
$
4,173,329
$
100,000
$ 3,274,312
$
799,017
$
1,687,245)
2042
$
4,481,481
$
100,000
$
4,381,481
$
6,068,726 1
2043
$
4,802,153
$
100,000
$
4,702,153
$
10,770,879
2044
$
4,978,708
$
100,000
$
4,878,708
$
15,649,587
2045
$
5,161,044
$
100,000
_
$
5,061,044
$
20,710,631
2046
$
5,247,651
$
100,000
$ 25,858,281
$
(20,710,630)
$
0 1
15
Table 9: Potential Tranche Funding with Conservative Revenue
16
2031 Tranche 1
$1,476,785
Yellowstone/Park Lawn Traffic Light
$871,062
Yellowstone/Park Lawn Turn Lane
$335,024
Legacy Park Hydrants
$270,699
2034 Tranche 2
$3,025,090
Yellowstone Medians
$2,326,992
Valent /Ward Street Improvements
$698,098
2035 Tranche 3
$2,606,231
Linden/Afton Improvements
$1,628,895
Food Truck Court
$814,447
Event Space
$162,889
2038 Tranche 4
$7,071,184
Valenty Lift Station
$3,959,863
Chubbuck/Burley Traffic Light
$1,225,672
Additional Roads Legacy Park
$942,825
Additional Utilities Legacy Park
$942,825
2040 Tranche 5
$6,548,624
Additional Roads Knudsen Area
$2,182,875
Additional Utilities Knudsen Area
$2,182,875
Additional Roads Village Area
$1,091,437
Additional Utilities Village Area
$1,091,437
2041 Tranche 6
$3,274,312
Briscoe Paving and Street Connection
$3,274,312
2046 Tranche 7
$24,321,610
Siphon Widening
$25,858,281
16
Assumptions for Table 10: Yellowstone Corridor Project Area Cash Flow with High
Revenue
1. Assumptions for revenues and valuations are the same as Table 7.
2. Tranches of funding based on estimated costs of public projects.
3. Does not specifically account for potential Owner Participation Agreements.
4. CDA will collect 10% of revenues for district administration up to a maximum of
$100,000 annually.
5. All funds will be expended on projects
Table 10: Yellowstone Corridor Project Area Cash Flow with High Revenue
17
2026
$
-
$
-
$
-
$
- I
2027
$
240,206
$
24,021
$
216,185
$
216,185
2028
$
313,483
$
31,348
$
282,134
$
498,3191
2029
$
560,473
$
56,047
$
504,426
$
1,002,745
2030
$
768,333
$
76,833
$
691,500
$
1,694,245 1
2031
$
1,069,344
$
100,000
$ 2,079,828
$
(1,110,484)
$
583,76
2032
$
1,371,349
$
100,000
$
1,271,349
$
1,855,1101
2033
$
1,743,407
$
100,000
$ 3,176,529
$
(1,533,122)
$
321,98
2034
$
2,083,138
$
100,000
$
1,983,138
$
2,305,127 1
2035
$
2,510,517
$
100,000
$ 4,398,015
$
(1,987,498)
$
317,628
2036
$
2,895,258
$
100,000
$
2,795,258
$
3,112,887 I
2037
$
3,303,621
$
100,000
$ 5,387,569
$
(2,183,948)
$
928,939
2038
$
3,887,744
$
100,000
$
3,787,744
$
4,716,683
2039
$
4,461,691
$
100,000
$ 4,949,829
$
(588,138)
$
4,128,544
2040
$
5,023,743
$
100,000
$
4,923,743
$
9,052,288 1
2041
$
5,686,595
$
100,000
$
5,586,595
$
14,638,883
2042
$
6,211,922
$
100,000
$
6,111,922
$
20,750,8051
2043
$
6,767,194
$
100,000
$ 24,066,192
$
(17,398,998)
$
3,351,808
2044
$
7,196,838
$
100,000
$
7,096,838
$
10,448,646 I
2045
$
7,647,208
$
100,000
$
7,547,208
$
17,995,854
2046
$
8,017,559
$
100,000
$ 25,913,413
$
(17,995,854)
$
(0)1
17
Table 11: Potential Tranche Funding
with High Revenue
i
Year Tranche Arno
2031 Tranche 1
$2,079,828
Yellowstone/Park Lawn Traffic Light
$871,062
Yellowstone/Park Lawn Turn Lane
$335,024
Legacy Park Hydrants
$270,699
Valent /Ward Street Improvements
$603,043
2033 Tranche 2
$3,176,529
Yellowstone Medians
$3,176,529
Chubbuck/Burley Traffic Light
$960,346
2035 Tranche 3
$4,398,015
Valenty Lift Station
$3,420,679
Event S ace
$162,889
Food Truck Court
$814,447
2037 Tranche 4
$5,387,569
Additional Roads Legacy Park
$897,928
Additional Utilities Legacy Park
$897,928
Additional Roads Knudsen Area
$1,795,856
Additional Utilities Knudsen Area
$1,795,856
2039 Tranche 5
$4,949,829
Briscoe Paving and Street Connection
$2,969,897
Additional Roads Village Area
$989,966
Additional Utilities Village Area
$989,966
2043 Tranche 6
$24,066,192
Siphon Widening
$24,066,192
2046 Tranche 7
$25,917,295
Yellowstone/Chubbuck Intersection
Improvements
$25,913,413
Cash Flow Analysis
Depending on the increase in assessed values over the twenty years of the Project Area, the
timing of development and the annual levy rate, the project is anticipated to generated between
approximately $50-72 million in tax increment revenues. The total of all potential public
improvement costs is anticipated to be approximately $195 million. Although it is not likely tax
increment revenues will be sufficient to cover all possible projects, it is economically feasible to
cover the highest priority projects identified by the CDA and City Council. These entities will
need to coordinate priorities regularly during the life of the Project Area. For some of the higher
cost projects such as the widening of Siphon Road and intersection improvements on
Yellowstone Avenue, funds may not be available until the final 5-7 years of the Project Area.
Project prioritization may change and eligible projects shown Table 4 may be substituted for
priority projects, or may be funded with available revenues, or through owner participation
agreements.
:.
Limitations to the Feasibility Study
This study is based on information provided by the CDA, City of Chubbuck and Bannock
County. Any projects, revenues or expenses within this study may be modified by
changes in estimated construction schedules, including project completion dates, the
economy of the Chubbuck and Pocatello region, significant changes in the tax levies, and
revisions to applicable legislation. The total project costs and potential tax increment
revenues are estimates. Additionally, this report is intended to provide additional
transparency into the proposed projected revenues and expenses for the duration of the
Project Area. It is not intended to be an exhaustive list of proposed projects or potential
development opportunities.
19
Resolution No. 2025 -
CITY OF CHUBBUCK
BY THE LAND USE AND
DEVELOPMENT COMMISSION
A RESOLUTION OF THE LAND USE AND DEVELOPMENT COMMISSION
FOR THE CITY OF CHUBBUCK, IDAHO,
VALIDATING CONFORMITY OF THE URBAN RENEWAL PLAN FOR THE
YELLOWSTONE CORRIDOR URBAN RENEWAL PROJECT WITH THE
CITY'S COMPREHENSIVE PLAN
WHEREAS, the Urban Renewal Agency of the city of Chubbuck (the "City"), Idaho,
also known as Chubbuck Development Authority (hereinafter "Agency"), the duly constituted
and authorized urban renewal agency of the City, has submitted the proposed Urban Renewal
Plan for the Yellowstone Corridor Urban Renewal Project (the "Yellowstone Corridor Plan") to
the City; and
WHEREAS, the Mayor and Chubbuck City Council referred the Yellowstone Corridor
Plan to the City Land Use and Development Commission for review and recommendations
concerning the conformity of said Yellowstone Corridor Plan with the City's Comprehensive
Plan, as amended (the "Comprehensive Plan"); and
WHEREAS, on September 9, 2025, the City Land Use and Development Commission
met to consider whether the Yellowstone Corridor Plan conforms with the Comprehensive Plan
as required by Idaho Code § 50-2008(b); and
WHEREAS, the City Land Use and Development Commission has reviewed said
Yellowstone Corridor Plan in view of the Comprehensive Plan; and
WHEREAS, the City Land Use and Development Commission has determined that the
Yellowstone Corridor Plan is in all respects in conformity with the Comprehensive Plan.
NOW, THEREFORE, BE IT RESOLVED BY THE LAND USE AND
DEVELOPMENT COMMISSION FOR THE CITY OF CHUBBUCK, IDAHO:
Section 1. That the Yellowstone Corridor Plan, submitted by the Agency and referred
to this Commission by the Mayor and City Council for review, is in all respects in conformity
with the Comprehensive Plan.
Section 2. That Exhibit A, outlining the findings supporting the determination that
the Yellowstone Corridor Plan is in conformity with the City's Comprehensive Plan, is hereby
adopted and incorporated as part of this Resolution.
Section 3. That the Chair of the City Land Use and Development Commission is
hereby authorized and directed to provide the Mayor and Chubbuck City Council with a signed
copy of this Resolution relating to said Yellowstone Corridor Plan.
Resolution No. 2025 -
Section 4. That this Resolution shall be in full force and effect immediately upon its
adoption and approval.
ADOPTED by the Land Use and Development Commission of the city of Chubbuck,
Idaho, this 9th day of September 2025.
APPROVED:
ATTEST:
Chair, Land Use and Development
Commission
City Clerk
4900-1929-4049, v. 1