DESIGN REVIEW COMMITTEE MEETING MINUTES
March 27th, 2007
APPLICANT:
Dave Gebo/WEBCO
PROJECT TITLE:
Storage Buildings
LOCATION:
Approximately 220 Laurel Lane.
PURPOSE OF REVIEW:
Site Plan Approval.
Present: Mayor Steven M. England, Attorney Thomas J. Holmes, Steve Smart, Ron Conlin,
Randy Severe, Ray Griffin, Merlin Miller and Eric King.
Greg Williams, Architect and Owner Dave Gebo presented the proposed site plan with a change.
Mr. Gebo stated he would like construct two buildings for storage of inventory only. Mr.
Williams explained why the change.
Steve Smart told Mr. Gebo he is required to maintain the 10' utility easement.
The site plan was approved subject to;
1. The 10' utility easement is required.
2. Required to have on site storm drainage. Present a plan to City Engineer Sean Harris.
3. 10' Landscape requirement with automatic sprinkling system, along with curb, gutter
and sidewalk on street frontage.
4. Address will be 220 Laurel Lane, Building A & B.
5. Required to get City a copy of cross access agreement with neighbor.
6. A knox box is required. Mr. Gebo can purchase from City or Company that sells them.
7. Required to present a new site plan drawing to City.
8. Required to have all purpose road surface.
9. City cannot require, but recommends plumbing be installed in the buildings. Developer
will review.
.
.
.
CITY OF CHUBBUCK, IDAHO
DESIGN REVIEW MEETING APPLICATION
Project Title:
Location:
Parcel Number:
Storage Bllildings
APJ?roxirnately 220 Laurel Lane
Lot #6, Block 4, Frasure Ind. p~ 2nd Addition
Purpose For The Review: Site Plan Apl'roval
Meeting Request Date: 0 3 I 2 7 I 0 7
Alternate Date: I I
Approved Date: 0 3 I.E!EJ l~
Approved Time: 10:30 AM (Notify Applicant)
(Be at permit counter at least 15 minutes prior to your scheduled time.)
City Official: L. Kobntopp. Date: [Q]I] I [IT!] I 02l
Fee - $25 Initials R.eceipt #
Please pay Besign Review fee prior to the meeting time.
(Tuesdays only)
(10:30 to 11 :30)
Do not request or expect to get on the Design Review agenda In fewer
than 8 days priQI'to the regularly scheduled Tuesday meeting!
',."
. ..;........,
~
.
.
.
.,
TO:
FROM:
CITY OF CHUBBUCK
DESIGN REVIEW COMMITTEE MEETING AGENDA
March 27th, 2007
DESIGN REVIEW COMMITTEE
MA.YOR STEVEN ENGLAND
ATIORNEYTOM HOLMES
STEVE SMART
RAY GRIFFIN
RANDY SEVERE
ERIC KING
MERLIN MILLER
LARRY KOHNTOPP.. STAFF
SBAN<HARRIS.. STAFF
JASON MENDENHALL.. 4983 PLEASANT VIEW
ROB RAY, TREE COMMITTEE, 803 E. MOUNTAIN PARK
RONC. CONLIN
RE: DESIGN REVlEWCOMMITTEE WILL BE CONDUCTING A DESIGN
REVIEW MEETINGatlO:30 a.m,Tuesday, March 27th, 2007 for Site Plan
approval of Storage Buildingsatapprox 220 Laurel Lane for Dave Gebo Storage.
IF YOU WILL NOT BE ABLE TO ATTEND, PLEASE ADVISE,
THANK YOU.