Loading...
HomeMy WebLinkAboutWEBCO Storage Building ;- . . . DESIGN REVIEW COMMITTEE MEETING MINUTES March 27th, 2007 APPLICANT: Dave Gebo/WEBCO PROJECT TITLE: Storage Buildings LOCATION: Approximately 220 Laurel Lane. PURPOSE OF REVIEW: Site Plan Approval. Present: Mayor Steven M. England, Attorney Thomas J. Holmes, Steve Smart, Ron Conlin, Randy Severe, Ray Griffin, Merlin Miller and Eric King. Greg Williams, Architect and Owner Dave Gebo presented the proposed site plan with a change. Mr. Gebo stated he would like construct two buildings for storage of inventory only. Mr. Williams explained why the change. Steve Smart told Mr. Gebo he is required to maintain the 10' utility easement. The site plan was approved subject to; 1. The 10' utility easement is required. 2. Required to have on site storm drainage. Present a plan to City Engineer Sean Harris. 3. 10' Landscape requirement with automatic sprinkling system, along with curb, gutter and sidewalk on street frontage. 4. Address will be 220 Laurel Lane, Building A & B. 5. Required to get City a copy of cross access agreement with neighbor. 6. A knox box is required. Mr. Gebo can purchase from City or Company that sells them. 7. Required to present a new site plan drawing to City. 8. Required to have all purpose road surface. 9. City cannot require, but recommends plumbing be installed in the buildings. Developer will review. . . . CITY OF CHUBBUCK, IDAHO DESIGN REVIEW MEETING APPLICATION Project Title: Location: Parcel Number: Storage Bllildings APJ?roxirnately 220 Laurel Lane Lot #6, Block 4, Frasure Ind. p~ 2nd Addition Purpose For The Review: Site Plan Apl'roval Meeting Request Date: 0 3 I 2 7 I 0 7 Alternate Date: I I Approved Date: 0 3 I.E!EJ l~ Approved Time: 10:30 AM (Notify Applicant) (Be at permit counter at least 15 minutes prior to your scheduled time.) City Official: L. Kobntopp. Date: [Q]I] I [IT!] I 02l Fee - $25 Initials R.eceipt # Please pay Besign Review fee prior to the meeting time. (Tuesdays only) (10:30 to 11 :30) Do not request or expect to get on the Design Review agenda In fewer than 8 days priQI'to the regularly scheduled Tuesday meeting! ',." . ..;........, ~ . . . ., TO: FROM: CITY OF CHUBBUCK DESIGN REVIEW COMMITTEE MEETING AGENDA March 27th, 2007 DESIGN REVIEW COMMITTEE MA.YOR STEVEN ENGLAND ATIORNEYTOM HOLMES STEVE SMART RAY GRIFFIN RANDY SEVERE ERIC KING MERLIN MILLER LARRY KOHNTOPP.. STAFF SBAN<HARRIS.. STAFF JASON MENDENHALL.. 4983 PLEASANT VIEW ROB RAY, TREE COMMITTEE, 803 E. MOUNTAIN PARK RONC. CONLIN RE: DESIGN REVlEWCOMMITTEE WILL BE CONDUCTING A DESIGN REVIEW MEETINGatlO:30 a.m,Tuesday, March 27th, 2007 for Site Plan approval of Storage Buildingsatapprox 220 Laurel Lane for Dave Gebo Storage. IF YOU WILL NOT BE ABLE TO ATTEND, PLEASE ADVISE, THANK YOU.