Loading...
HomeMy WebLinkAboutDR Gantol land Co. . . . DESIGN REVIEW COMMITTEE MEETING May 23rd, 2006 APPLICANT: Gantol Land Company, Blackfoot, Idaho 83221. PROJECT TITLE: Business Park Expansion. LOCATION: Industry Way and Southside Way. PURPOSE FOR REVIEW: Site Plan Approval. Present: Mayor Steven M. England, Attorney Thomas J. Holmes, Steve Smart, Larry Kohntopp, Ron Conlin, Ken Quinn, Ray Griffin and Eric King. Dennis and Devin, Harper-Leavitt Engineering the Gantol Representatives presented the site plan. Discussion about the following: 1. The three new buildings will be like the three existing building on adjacent property. 2. Stated they will take care of dust abatement issues. 3. Discussion about them having a designated irrigation water meter. 4. Discussion about driveway between the two sets of buildings. 5. All accesses should go to South side Way. After discussion, Design Review Committee approved the site plan subject to: 1. Fire Department requested the building be sprinkled. 2. Some sort of Dust Abatement is required. 3. All accesses will be to South side Way, no access to Y ellowstone Ave. 4. Required to install street type radius approaches. 5. No access to Yellowstone Ave. 6. Clear addresses on buildings. 7. 10' Landscaping with automatic sprinkling on street side, with 5% interior landscaping. 8. Water and Sewer shall be extended across length of property frontage along South side Way. 9. Sanitation pad with 3 sided covering as required. 10. Sewer and Water connection to each building. 11. If any type of food operation required to install the required 1500 grease interceptor. 12. Required to have a Knox box on each building. 13. Developer is required to discourage a business that needs sewer pretreatment. . . . . CITY OF CHUBBUCK, IDAHO DESIGN REVIEW MEETING APPLICATION The purpose of this application is to establish a meeting and review time with the City of Chubbuck Design Review Team consisting of the Mayor, Building Official, City Planner, City Engineer, Fire Marshal, Police Chief and other City staff as required. The Design Review Team meets every Tuesday morning between the hours of 10:30 and 1l:30 AM. This team will work inunison,withlou, to establish the criteria for your project as it relates to the adopted ordinances 0 the City of Chubbuck. Keep in mind, this is an informal review and is only conducted on Submitted applications. This is a review team not a design team. Provide (10) ten sets of drawings, (8 1/2 X I 1), at least eight days in advance of your schedaled meeti.,. Formal review of your plans or project by City Staff is conducted after formal application. Once you schedule your Design Review, it is very important to keep that appointment so others can be scheduled accordingly. Applicant I Agent: Ha&perILearitt p~ - Gautol LaQd Company (pLEASE PRINT) Telephone Number: 785-2977 - __ Braa Mailing Address: P.O. Box 866 BIackfoot)d. 83221 Project Title: Location: Parcel Number: a..I!Wlt PlukeXJ)8lllion IddusUy W.., and Southside Way Loti, BlocIt, 2, NortbIide Plala Purpose For The Review: Site Plan Approval Meeting Request Date: 0 5 , 2 3 , 0 6 Alternate Date: " Approved Date: 0 5 1[!TIJ, [ITTI Approved Time: 10:30 AM (Notify Applicant) (Be at permit counter at least 15 minutes prior to your scheduled time.) City Official: L. KoIDopp Date: [BI] '[!ill , @ill Fee - $25 Initials Receipt # Please pay Design Review fee prior to the meeting time. (Tuesdays only) (10:30 to 11 :30) Do not request or expect to get on the Design Review agenda in fewer than 8 days prior to the regularly scheduled Tuesday meeting! .', . . . CITY OF CHUBBUCK DESIGN REVIEW COMMITTEE MEETING AGENDA May 23rd, 2006 TO: FROM: DESIGN REVIEW COMMITTEE MAYOR STEVEN ENGLAND ATTORNEY TOM HOLMES STEVE SMART RAYQRIFFIN RANDY.SEVERE BlUC KING MERLIN MILLER LARRY KOHNTOPP - STAFF SEAN HARRIS - STAFF JASON MENDENHALL - 4983 PLEASANT VIEW R.OBRAY, TREE COMMITTEE, 803 E. MOUNTAIN PARK R.ON C. CONLIN RE: DESIGN REVIEW COMMITTEE WILL BE CONDUCTING A DESIGN REVIEW MEETING at 1 0:30a.m, Tuesday, May 23rd, 2006 in regards to a site plan approval for business park expansion at Industry Way and South side Way, Lot 1, Block 2, Northside Plaza. IF YOU WILL NOT BE ABLE TO ATTEND, PLEASE ADVISE, THANK yOU.