Loading...
HomeMy WebLinkAboutDR Brett Jensen/ office/shop . . . Design Review March 7, 2006 Jensen Construction! Brett Jensen for office/shop at lot 3, block 4, Frasure Ind. Park 2nd Addition. Present: Mayor Stephen England Larry Kohntopp Steve Smart Ray Griffin Tom Holmes Randy Severe Merlin Miller Eric King Myrna Crapo They need to have: 1. Dumpster in a three sided enclosure. 2. Dust collection system. 3. Storm water retention on site. 4. Spray approved booth. S. Knox box mounted on the outside of the building. 6. Address visible from the street. 7. Extinguishing system in paint booth 8. Landscaping 9. Storm water retention. 10. Slope approached so the water doesn't run off the driveway but into landscape swales. The Jensen discussed their wood working shop. They will be doing finishing work and will need an approved booth. They plan on building a booth within the next four months. They can't get a certificate of occupancy until everything is done.