HomeMy WebLinkAboutDR Brett Jensen/ office/shop
.
.
.
Design Review
March 7, 2006
Jensen Construction! Brett Jensen for office/shop at lot 3, block 4, Frasure Ind. Park 2nd
Addition.
Present:
Mayor Stephen England
Larry Kohntopp
Steve Smart
Ray Griffin
Tom Holmes
Randy Severe
Merlin Miller
Eric King
Myrna Crapo
They need to have:
1. Dumpster in a three sided enclosure.
2. Dust collection system.
3. Storm water retention on site.
4. Spray approved booth.
S. Knox box mounted on the outside of the building.
6. Address visible from the street.
7. Extinguishing system in paint booth
8. Landscaping
9. Storm water retention.
10. Slope approached so the water doesn't run off the driveway but into landscape swales.
The Jensen discussed their wood working shop. They will be doing finishing work and will need
an approved booth. They plan on building a booth within the next four months. They can't get a
certificate of occupancy until everything is done.