Loading...
HomeMy WebLinkAboutConnor Academy DR minutes 3.1.22 internalOffice of the City Clerk 290 E. Linden Avenue, Chubbuck, ID 83202 208.237.2430 www.CityofChubbuck.us Design Review Minutes Project Name: Alpine Middle School  Applicant Name: Connor Academy Public Charter School  Applicant Address: 1295 Alpine Ave., Chubbuck ID 83202  Project Address: Same  Email: admin@academycharter.net  Date: March 1, 2022   1. Traffic Safety and Traffic Congestion: (ingress, egress, off-street parking, unloading) Applicant is working on improvements needed Parking looks good 2. Traffic Studies, Utility Studies: (as requested) Working on traffic study Need to follow Access Management guidelines Recommend applicant create an agreement with neighbor to the north for extending utilities and road construction. 3. Drainage: (storm & surface water, to be engineered, retained on site) Need to include storm water report with design plans 4. Pretreatment / Nonresidential Wastewater Permit: (grease or oil/silt separator) Has a kitchen with 3 sinks and grease trap – interceptor recommended Permit needed 5. Development Agreement (when needed) Yes 6. Structures and Site Layout: (exterior design, buffering, fencing, dumpster enclosure) Need CUP, applicant is aware. Encouraging them to find mitigation measures for Sawtooth/Philbin to alleviate traffic concerns Engineered drawings required Site specific sediment control plan Need to propose dumpster location 7. Building Department: (professionally approved plans, ADA compliance, dumpster enclosure) Plans needed 8. Signs / Advertising: (advertising signs, height, structure) Existing signs? Plans show location for sign, could be in site triangle depending on what type of sign it is 9. Landscaping: (ordinance copy, approved tree list) Need more landscaping on street Required to utilize Fort Hall irrigation. Use existing system? Sean will check. Need to follow landscaping code, strip, number of trees and shrubs, 5% of parking area and site triangle Don will send tree list 10. Exterior lighting: (light shielding, light trespass) Standard requirements 11. Development: (platting, addressing) Yes, full plat process, DR meeting next week will serve as planning conference 12. Fire Department: (knox Box, fire hydrant locations, sprinkling, visible street address) Different Alpine address Knox box Full kitchen needs suppression hood Sprinkler plans to State, alarm plans to Fire Department 13. Police Department: (safety issues) No concerns 14. Business License: (before opening) No