HomeMy WebLinkAboutConnor Academy DR minutes 3.1.22 internalOffice of the City Clerk
290 E. Linden Avenue, Chubbuck, ID 83202
208.237.2430
www.CityofChubbuck.us
Design Review Minutes
Project Name:
Alpine Middle School
Applicant Name:
Connor Academy Public Charter School
Applicant Address:
1295 Alpine Ave., Chubbuck ID 83202
Project Address:
Same
Email:
admin@academycharter.net
Date:
March 1, 2022
1. Traffic Safety and Traffic Congestion: (ingress, egress, off-street parking, unloading)
Applicant is working on improvements needed
Parking looks good
2. Traffic Studies, Utility Studies: (as requested)
Working on traffic study
Need to follow Access Management guidelines
Recommend applicant create an agreement with neighbor to the north for extending utilities and road construction.
3. Drainage: (storm & surface water, to be engineered, retained on site)
Need to include storm water report with design plans
4. Pretreatment / Nonresidential Wastewater Permit: (grease or oil/silt separator)
Has a kitchen with 3 sinks and grease trap – interceptor recommended
Permit needed
5. Development Agreement (when needed)
Yes
6. Structures and Site Layout: (exterior design, buffering, fencing, dumpster enclosure)
Need CUP, applicant is aware.
Encouraging them to find mitigation measures for Sawtooth/Philbin to alleviate traffic concerns
Engineered drawings required
Site specific sediment control plan
Need to propose dumpster location
7. Building Department: (professionally approved plans, ADA compliance, dumpster enclosure)
Plans needed
8. Signs / Advertising: (advertising signs, height, structure)
Existing signs?
Plans show location for sign, could be in site triangle depending on what type of sign it is
9. Landscaping: (ordinance copy, approved tree list)
Need more landscaping on street
Required to utilize Fort Hall irrigation. Use existing system? Sean will check.
Need to follow landscaping code, strip, number of trees and shrubs, 5% of parking area and site triangle
Don will send tree list
10. Exterior lighting: (light shielding, light trespass)
Standard requirements
11. Development: (platting, addressing)
Yes, full plat process, DR meeting next week will serve as planning conference
12. Fire Department: (knox Box, fire hydrant locations, sprinkling, visible street address)
Different Alpine address
Knox box
Full kitchen needs suppression hood
Sprinkler plans to State, alarm plans to Fire Department
13. Police Department: (safety issues)
No concerns
14. Business License: (before opening)
No