Loading...
HomeMy WebLinkAboutSpring Cove DR minutes 3.30Office of Community Services & Economic Development PO Box 5604 – 5160 Yellowstone Avenue, Chubbuck, ID 83202 208.237.2430 – Fax 208.237.2409 www.CityofChubbuck.us Design Review Minutes (with applicant) Project Name: Spring Cove Townhouses Applicant Name: Jonathan Vincent – Gate City Builders Address: 975 E. Pidcock Rd., Inkom ID 83245 Email: gatecitybuilders@yahoo.com Date: March 30, 2021 1. Traffic Safety and Traffic Congestion: (ingress, egress, off-street parking, unloading) • Intention is to yellow stripe area for no parking. Also created turn-around area. 2. Traffic Studies, Utility Studies: (as requested) • 3. Drainage: (storm & surface water, to be engineered, retained on site) • Storm water report sent today. 4. Pretreatment / Nonresidential Waste Water Permit: (grease or oil/silt separator) • No concerns. 5. Development Agreement (when needed) • Will complete once we have approved plans. 6. Structures and Site Layout: (exterior design, buffering, fencing, dumpster enclosure) • Jonathan needs measurements for turn-around for dumpster servicing. Current location would not allow a 3-point turn. Once he has the measurements will determine how far location needs to move. • Site triangle in new plan is acceptable. • Amenities are not a set in stone requirement since not a PUD. • The Falls and Spring Cove will have 2 different HOA’s. Water agreement only between the two. 7. Building Department: (professionally approved plans, ADA compliance, dumpster enclosure) • Plans sent to Ron. • Needs approval on CUP. • Can submit plans prior for review, will only issue building permit after Council approval. 8. Signs / Advertising: (advertising signs, height, structure) • End of building wall sign with address 9. Landscaping: (ordinance copy, approved tree list) • No concerns. Meets requirements. 10. Exterior lighting: (light shielding, light trespass) • Keep on property. Will only have soft lighting for security on front of each unit. 11. Development: (platting, addressing) • 12. Fire Department: (knox Box, fire hydrant locations, sprinkling, visible street address) • Hydrant concerns, on east side of access. Will block intersection. Jonathan may acquire other parcel and can then determine hydrant location to service everything. 13. Police Department: (safety issues) • No concerns. 14. Business License: (before opening) • None. Additional notes: Final plat application submitted yesterday, needs to pay fee. Marshal to submit other 2 plans mentioned. Plans will change after easement is drawn in and changes are made. April 13th Land Use meeting for CUP approval. Get revisions to Don by Monday 4/5 for inclusion in meeting packet. Assuming LUDC approves, final plat approval will be on April 21st. Once approved can record final plat and begin project. Can get building permit before plat is recorded.