HomeMy WebLinkAbout1.5.21 Idaho Coffee Company DR Minutes - internalOffice of Community Services
& Economic Development
PO Box 5604 – 5160 Yellowstone Avenue, Chubbuck, ID 83202
208.237.2430 – Fax 208.237.2409
www.CityofChubbuck.us
Design Review Checklist
Design Review Purpose: To guide the general appearance and arrangement of commercial, industrial and intense residential uses in order to create an attractive and dynamic "downtown
business center", assure the compatibility of satellite commercial establishments and industrial areas with their surrounding neighborhoods, and assure the compatibility of dense residential
land uses with surrounding neighborhoods.
Project Name:
Idaho Coffee Company
Applicant Name:
Joseph & Deidra Terrell
Address:
4810 Burley Dr.
Email:
Joe.1911@yahoo.com
Date:
January 5, 2021
Don Matson, Paul Andrus, Devin Hillam, Rodney Burch, Kevin England, Merlin Miller, Ron Osborn, Sean Harris, Bridger Morrison, Mark Wilding, Kami Morrison, Chief Guiberson
1. Traffic Safety and Traffic Congestion: (ingress, egress, off-street parking, unloading)
Access management guidelines require that access be limited to Burley only.
Stacking length in drive through lanes not sufficient. Need additional analysis. Make sure, for customer volume they do not back up into street.
2. Traffic Studies, Utility Studies: (as requested)
3. Drainage: (storm & surface water, to be engineered, retained on site)
Will need to retain storm water on-site.
Site will need to accommodate existing storm water swale and drywell as well as runoff from street.
Runoff from the property to the north needs to be addressed and accounted for.
Site is a known issue for flooding onto Burley Dr.
Not known if applicant owns property.
4. Pretreatment / Nonresidential Waste Water Permit: (grease or oil/silt separator)
Pretreatment device along with wastewater discharge permit required.
Will need grease trap. 3 sinks, size will determine size of grease trap.
Floor drains? Larger interceptor on outside?
1” water line going in.
5. Development Agreement (when needed)
Will need agreement to address storm water, cross access.
6. Structures and Site Layout: (exterior design, buffering, fencing, dumpster enclosure)
Temporary approach on Chubbuck needs to be replaced with new curb and sidewalk, ADA standards.
Ped ramp at the corner of Chubbuck and Burley needs to be updated to meet ADA standards.
May need to change site lay out.
Dumpster enclosure should be rotated 45 degrees counterclockwise or more.
Commercial recycle container? If so, will need to be sufficiently sized to allow space for both containers.
If have gates will need to be secured open to service.
Future ROW needs/widths need to be addressed.
7. Building Department: (professionally approved plans, ADA compliance, dumpster enclosure)
Additional set-backs to allow for future ROW width of 100ft?
Unpaved area between parking stalls and drive through acceptable?
Better set of drawings, engineer drawings required.
Does building need to be ADA accessible? Ron will find out.
8. Signs / Advertising: (advertising signs, height, structure)
Only signs on building for now.
9. Landscaping: (ordinance copy, approved tree list)
Will need to account for sight triangles on Burley and Chubbuck
Landscaping required on frontage.
Will need to submit landscaping plan.
Would like to see parking area and along Burley paved, and to trash enclosure, anything to east of facility could remain unpaved.
10. Exterior lighting: (light shielding, light trespass)
Only what is shown on building
11. Development: (platting, addressing)
No platting issues.
Need to address storm water and cross access and any other items that may come up in design.
12. Fire Department: (knox Box, fire hydrant locations, sprinkling, visible street address)
Knox box and address needed.
13. Police Department: (safety issues)
No concerns.
14. Business License: (before opening)
Required prior to opening.