HomeMy WebLinkAboutDesign Review Minutes (applicant) - Caliber Collision 11.16.21Office of the City Clerk
290 E. Linden Avenue, Chubbuck, ID 83202
208.237.2430
www.CityofChubbuck.us
Design Review Minutes
Project Name:
Caliber Collision
Applicant Name:
Nick Fore
Applicant Address:
9461 Kenwood Road, Blue Ash, OH 45242
Project Address:
TBD Briscoe
Email:
nfore@crossdevelopment.net
Date:
November 16, 2021
1. Traffic Safety and Traffic Congestion: (ingress, egress, off-street parking, unloading)
No concerns
2. Traffic Studies, Utility Studies: (as requested)
Traffic study will need to be submitted by the developer
3. Drainage: (storm & surface water, to be engineered, retained on site)
Will need storm water run-off report. Manual is available through Portneuf Valley Stormwater Design
4. Pretreatment / Nonresidential Waste Water Permit: (grease or oil/silt separator)
No floor drains – need permit
Needs a spill contaminant site area
5. Development Agreement (when needed)
Yes will prepare once plans are approved
6. Structures and Site Layout: (exterior design, buffering, fencing, dumpster enclosure)
Dumpster enclosure looks okay
Slat fencing along Yellowstone not ideal on frontage
Code isn’t clear on auto body – could go through CUP permit if needed or treat as permitted use
7. Building Department: (professionally approved plans, ADA compliance, dumpster enclosure)
Need building permit application and drawings
8. Signs / Advertising: (advertising signs, height, structure)
Proposed signs okay with code
9. Landscaping: (ordinance copy, approved tree list)
Need more trees along with shrubs along Yellowstone frontage; see attached landscape standards and street tree list
5% of parking needs landscaping
Eligible for Fort Hall irrigation
South side turf – better buffer with trees & fence between residential property (suggestion)
10. Exterior lighting: (light shielding, light trespass)
Standard
11. Development: (platting, addressing)
Full plat process (preliminary and final) will need to be completed; coordinate with Brandon Ratliff, developer
Address will be on Brisco Road and assigned with final plat
12. Fire Department: (knox Box, fire hydrant locations, sprinkling, visible street address)
Visible address, access and water supply
Knox box outside gate
Sprinkler review completed through the state
13. Police Department: (safety issues)
No concerns
14. Business License: (before opening)
Will need about two weeks before opening
Applicant asked questions about the design review process, deadlines for preliminary plans and final plats.