Loading...
HomeMy WebLinkAboutNCC Construction Plans 08.03.20SHEET NUMBERC - 1.0TITLE SHEETCONSTRUCTION PLAN SETNORTHSIDE CROSSING COMMERCIAL LOCATED IN CHUBBUCK, IDAHO PROJECT NO. 20-025 AUGUST, 2020 SPECIFICATIONS IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION AND CITY OF CHUBBUCK SPECIFICATIONS, CURRENT EDITIONS, SHALL BE USED FOR THE CONSTRUCTION OF THIS PROJECT. IF A CONFLICT OCCURS THE MORE STRINGENT REQUIREMENT SHALL BE DEEMED TO GOVERN OVER THE PROJECT AS DETERMINED BY THE ENGINEER. DETAIL REFERENCES THE DETAILS AND SPECIFICATIONS IN THIS PLAN SET SHALL GOVERN THIS PROJECT. WHERE THERE IS A CONFLICT BETWEEN THESE DOCUMENTS & A GOVERNING STANDARD, THE MOST "STRINGENT" REQUIREMENT SHALL BE DEEMED TO GOVERN AS DETERMINED BY THE ENGINEER UNLESS OTHERWISE APPROVED. ATTENTION CONTRACTOR THE CONTRACTOR WILL BE RESPONSIBLE TO FULLY COMPLY WITH EPA NPDES REQUIREMENTS AND TO MODIFY THE SWPPP ASSOCIATED WITH THIS PROJECT AS NECESSARY TO ENSURE COMPLIANCE. THE CONTRACTOR IS RESPONSIBLE FOR 100% OF THE SITE MANAGEMENT DURING CONSTRUCTION. THIS INCLUDES IMPLEMENTATION, MAINTENANCE, ADJUSTMENTS, ADDITIONS AND REVISIONS OF SWPPP MEASURES NECESSARY TO ENSURE COMPLIANCE WITH EPA NPDES REQUIREMENTS. THIS IS TO INCLUDE RESPONSIBILITY FOR FINES, ETC. LEVIED BY THE EPA FOR NON-COMPLIANCE DURING CONSTRUCTION. EngineersSurveyorsPlanners 600 E. Oak St. Pocatello, ID 83201 (208) 234-0110 301 58th St. W. #138 Williston, ND 58801 (701) 572-0110 TM Know what's Callbefore you dig. below. INTELLECTUAL PROPERTY NOTICE THE DESIGN, IDEAS, DRAWINGS CONTAINED WITHIN THIS SET OF ASSOCIATED DOCUMENTS ARE THE SOLE PROPERTY OF RMES. THEY ARE SUBJECT TO COPYRIGHT OF RMES. THEY ARE CREATED, EVOLVED AND DEVELOPED FOR USE ON THIS SPECIFIC PROJECT. ANY USE OF THESE DRAWINGS, DESIGNS, MATERIALS OR INFORMATION CONTAINED HEREIN, INCLUDING BUT NOT LIMITED TO COPYING OR REPRODUCTION, WHICH IS NOT EXPRESSLY AUTHORIZED BY RMES, IS STRICTLY PROHIBITED AS AN INFRINGEMENT OF ITS COPYRIGHT AND WILL RESULT IN ENFORCEMENT UP TO THE FULLEST EXTENT OF THE LAW RMES ENGINEER OF RECORD MR. J. MITCHELL GREER, P.E., P.L.S. 600 EAST OAK STREET POCATELLO, ID (208) 234-0110 CITY OF CHUBBUCK PUBLIC WORKS DIRECTOR MR. RODNEY BURCH, PLS 5160 YELLOWSTONE AVE BOX 5604 POCATELLO, ID 83204 (208) 237-2430 CITY OF CHUBBUCK CITY ENGINEER MR.BRIDGER MORRISON, PE 5160 YELLOWSTONE AVE BOX 5604 POCATELLO, ID 83204 (208)237-2430 RMES PROJECT MANAGER MR. BRADY SMITH 600 EAST OAK STREET POCATELLO, ID (208) 234-0110 KEY CONTACTS D.E.Q. MR. JESSE BENNETT, E.I.T. 444 HOSPITAL WAY, NO. 300 POCATELLO, ID 83201 (208) 236-6160 PROJECT CONTACT MR. LYN YOST 13982 N RIO VISTA RD POCATELLO, ID 83202 (740) 258-7094 SHEET KEY SHEET #SHEET TITLE C - 1.0 TITLE SHEET C - 1.1 GENERAL NOTES C - 2.0 SITE PLANC - 3.0 SITE OVERVIEW C - 4.0 UTILITY PLAN C - 5.0 C - 6.0 EROSION AND CONTROL PLAN PROJECT DETAILSC - 7.0 9 TOTAL SHEETS GRADING PLAN PROJECT DETAILSC - 7.1 CONSTRUCTION PLANS FOR: GENERAL NOTES SHEET IS NOT TO SCALE SHEET NUMBERC - 1.1GENERAL NOTESSHEET NUMBERC - 1.1GENERAL NOTESNORTHSIDE CROSSING COMMERCIALEngineersSurveyorsPlanners 600 E. Oak St. Pocatello, ID 83201 (208) 234-0110 301 58th St. W. #138 Williston, ND 58801 (701) 572-0110 TM INTELLECTUAL PROPERTY NOTICE THE DESIGN, IDEAS, DRAWINGS CONTAINED ON THIS SHEET AND WITHIN THIS SET OF ASSOCIATED DOCUMENTS ARE THE SOLE PROPERTY OF RMES AND SURVEYING, AND ARE SUBJECT TO THE COPYRIGHT OF RMES. THEY ARE CREATED, EVOLVED AND DEVELOPED FOR USE ON THIS SPECIFIC PROJECT. ANY USE OF THESE DRAWINGS, DESIGNS, MATERIALS OR INFORMATION CONTAINED HEREIN, INCLUDING BUT NOT LIMITED TO COPYING OR REPRODUCTION, WHICH IS NOT EXPRESSLY AUTHORIZED BY RMES IS STRICTLY PROHIBITED AS AN INFRINGEMENT OF ITS COPYRIGHT AND MAY RESULT IN LIABILITY. SHEET INFORMATION DESIGNER:BRADY M. SMITH CREATED:07.28.20 REVIEWER:J. MITCHELL GREER LAST REVISED: REVISIONSX # 1 DATE BY DESCRIPTION X 2 3 4 08.03.20 CONSTRUCTION PLAN SETCONSTRUCTION PLAN SETALL DISTANCES AND DATA SHALL BE CHECKED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN THE CASE OF ANY CONFLICTS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY SO THAT CLARIFICATION MAY BE MADE PRIOR TO THE START OF WORK. THE CONTRACTOR SHALL RETAIN AND PROTECT OR REMOVE AND REPLACE ALL LANDSCAPING, TREES, DITCHES CULVERTS, SIGNS, MAILBOXES, UTILITIES, SIDEWALKS AND ANY OTHER MISCELLANEOUS ITEMS. ANY DAMAGE TO THESE ITEMS BY THE CONTRACTOR SHALL BE REPAIRED TO THE SATISFACTION OF THE PRIVATE OWNER WITHOUT ANY EXPENSE TO THE OWNERS. ALL CONCRETE REQUIRED ON THIS PROJECT SHALL BE 4000 PSI (28 DAY) CONCRETE DETAILED IN IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION SECTION 700. PRIOR TO PLACEMENT OF PLANT MIX PAVEMENT, SIDEWALK, CURB AND GUTTER, THE GROUND SHALL BE STERILIZED FOR WEED CONTROL WITH TRIFLURIN HF OR AN APPROVED EQUIVALENT AT MANUFACTURER'S RECOMMENDED RATE. WHERE WORK IS PERFORMED ON EASEMENTS, THE CONTRACTOR SHALL TAKE EVERY PRECAUTION TO ELIMINATE ANY ADVERSE IMPACTS TO THE ADJACENT PROPERTY AND RESTORE THE EASEMENT TO ITS ORIGINAL CONDITION. ALL BACKFILL SHALL BE COMPACTED TO 95% OF MAX DENSITY. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL WATER REQUIRED FOR DUST ABATEMENT, COMPACTION ETC. THROUGH THE COMPLETION OF THE PROJECT. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN SHOWN ON THE PROJECT PLANS. THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE APPROPRIATE UTILITIES PRIOR TO THE START OF ANY CONSTRUCTION. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO HAVE THE UTILITIES MARKED / LOCATED IN THE FIELD BY THE APPROPRIATE AGENCIES PRIOR TO THE START OF WORK. CONTACT "DIG-LINE" AT 1-800-342-1585. ANY DAMAGE OR DISTURBANCE OF EXISTING UTILITIES AND THE COST FOR IMPACTS AND RESTORATION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. ANY CONFLICTS OR DISCREPANCIES WITH EXISTING UTILITIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER IMMEDIATELY. DIGLINE - (800) 342-1585 OR 811 INTERMOUNTAIN GAS COMPANY (208) 637-6400 IDAHO POWER (208) 236-7851 CENTURYLINK (208) 234-0075 THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING SOURCES FOR GRANULAR MATERIALS, WATER, WASTE SITES, AND ANY OTHER MATERIALS SOURCES AS REQUIRED FOR PROJECT COMPLETION. THE CONTRACTOR SHALL TAKE PRECAUTIONS TO ASSURE ADEQUATE INFORMATION ON SUBSURFACE CONDITIONS PRIOR TO BIDDING THE PROJECT AND SHALL CONDUCT WHATEVER SUBSURFACE INVESTIGATIONS ARE NECESSARY. ANY WORK DONE WITHIN A PUBLIC RIGHT-OF-WAY SHALL BE COORDINATED WITH THE APPROPRIATE TRANSPORTATION AGENCY AND SHALL MEET THE REQUIREMENTS OF THAT AGENCY AND THE REQUIREMENTS OF ANY RIGHT-OF-WAY OR SPECIAL USE PERMITS. THE CONTRACTOR IS RESPONSIBLE FOR DUST ABATEMENT AND ANY LIABILITY ISSUES RELATED TO DUST AT ANY LOCATION WHICH MAY BE CAUSED BY THIS PROJECT. CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ACCESS AND RELATED TRAFFIC CONTROL WITH THE COUNTY, CITY, AND STATE ROADWAY DEPARTMENTS. THE ENGINEER SHALL REVIEW ALL TRAFFIC CONTROL PLANS. CONTRACTOR SHALL HIRE A MATERIALS TESTING FIRM TO PROVIDE ALL TESTING NECESSARY TO COMPLY WITH THE REQUIREMENTS OF THE CITY AND/OR ISPWC CURRENT EDITION. CONTRACTOR SHALL RECORD ANY CHANGES TO THESE PLANS ON A SET OF RECORD DRAWINGS. DRAWINGS SHALL BE RETURNED TO THE ENGINEER AT COMPLETION OF THE PROJECT. THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ALL NECESSARY TRAFFIC & PEDESTRIAN CONTROL FOR PROTECTION OF THE WORK AREA. THE CONTRACTOR SHOULD REFERENCE THE MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES. ALL CONSTRUCTION ON THIS PROJECT SHALL BE PERFORMED IN ACCORDANCE WITH IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION (I.S.P.W.C. CURRENT EDITION), CITY STANDARDS AND WITH OSHA FOR TRENCH WORK. THE CONTRACTOR SHALL COORDINATE WITH THE CITY AND WITH THE ENGINEER FOR ALL NECESSARY INSPECTIONS PRIOR TO BACKFILLING. THE CONTRACTOR SHALL COORDINATE ALL INSPECTIONS WITH THE ENGINEER AND WITH THE CITY. AT A MINIMUM, THE ENGINEER SHALL BE NOTIFIED TO INSPECT THE CONCRETE FORMS PRIOR TO POURING. ACCEPTANCE OF ALL IMPROVEMENTS BY THE CITY & OWNER SHALL CONSTITUTE SUBSTANTIAL COMPLETION OF THIS PROJECT. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FROM THE APPROPRIATE AGENCIES ON THIS PROJECT. GENERAL NOTES ALL DISTANCES AND DATA SHALL BE CHECKED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN THE CASE OF ANY CONFLICTS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY SO THAT CLARIFICATION MAY BE MADE PRIOR TO THE START OF WORK. DIMENSIONS SHOWN ARE TO THE CENTER OF THE PIPELINE UNLESS OTHERWISE NOTED. DISTANCES SHOWN ALONG PIPELINES ARE HORIZONTAL DISTANCES AND NOT ACTUAL PIPE LENGTH. MORE PIPE MAY BE REQUIRED TO COMPLETE CONSTRUCTION THAN IS DIMENSIONED ON THE PLANS. MINIMUM CLEARANCE BETWEEN NEW PIPELINES AND EXISTING UTILITIES AND STRUCTURES (EXCEPT SEWERS) SHALL BE FIVE FEET HORIZONTALLY. SEPARATION BETWEEN WATER LINES AND OTHER UTILITIES SHALL BE 10' MIN. THERE SHALL BE TEN FEET MINIMUM SEPARATION BETWEEN ALL NEW WATERLINES AND NEW SEWER LINES EXCEPT WHERE THE LINES CROSS AT APPROXIMATE RIGHT ANGLES. A MINIMUM OF 18 INCHES VERTICAL SEPARATION SHALL BE MAINTAINED AT ALL CROSSINGS. SEE THE DETAILS IN THE PROJECT PLANS. ALL SEWER SYSTEM COMPONENTS SHALL BE INSTALLED AND VIDEO INSPECTIONS DONE AND APPROVED PRIOR TO CONTINUING ANY ROADWAY CONSTRUCTION. IF NECESSARY, THE CONTRACTOR SHALL PAY FOR THIS EXPENSE AND IT IS CONSIDERED INCIDENTAL TO SEWER CONSTRUCTION. ALL SEWER SHALL BE INSPECTED BY CLOSED CIRCUIT CAMERAS PRIOR TO APPROVAL OF SUBDIVISION AS PER CITY OF CHUBBUCK STANDARDS. THE CONTRACTOR SHALL CONDUCT A LOW PRESSURE TEST AS OUTLINED IN ISPWC SECTION 501.3.4.C. OF DIVISION 500. THE CONTRACTOR SHALL CONDUCT A DEFLECTION TEST AS OUTLINED IN ISPWC SECTION 3.4.G OF DIVISION 500. THE CONTRACTOR SHALL CONDUCT A HYDROSTATIC TEST AS OUTLINED IN SECTION 502.3.12.C.1 OF DIVISION 500. SEWER NOTES WATER NOTES DIMENSIONS SHOWN ARE TO THE CENTER OF THE PIPELINE UNLESS OTHERWISE NOTED. DISTANCES SHOWN ALONG PIPELINES ARE HORIZONTAL DISTANCES AND NOT ACTUAL PIPE LENGTH. MORE PIPE MAY BE REQUIRED TO COMPLETE CONSTRUCTION THAN IS DIMENSIONED ON THE PLANS. ALL WATER LINES ARE TO BE LOCATED AS SHOWN ON THE PROJECT PLANS UNLESS RELOCATED IN THE FIELD BY THE ENGINEER. MINIMUM CLEARANCE BETWEEN NEW PIPELINES AND EXISTING UTILITIES AND STRUCTURES (EXCEPT SEWERS) SHALL BE FIVE FEET HORIZONTALLY. SEPARATION BETWEEN WATER LINES AND OTHER UTILITIES SHALL BE 10' MIN. THRUST BLOCKS SHALL BE PLACED ON WATERLINES AT ALL DIRECTION CHANGES, FITTINGS, BENDS, ELBOWS, FIRE HYDRANTS AND GATES VALVES AS SHOWN IN THE PROJECT PLANS. MINIMUM COVER FOR WATERLINES SHALL BE FIVE FEET, 6 FEET MAXIMUM, MEASURED TO THE TOP OF PIPE UNLESS OTHERWISE SHOWN ON THE PLANS. THERE SHALL BE TEN FEET MINIMUM SEPARATION BETWEEN ALL NEW WATERLINES AND NEW SEWER LINES EXCEPT WHERE THE LINES CROSS AT APPROXIMATE RIGHT ANGLES. A MINIMUM OF 18 INCHES VERTICAL SEPARATION SHALL BE MAINTAINED AT ALL CROSSINGS. SEE THE DETAILS IN THE PROJECT PLANS. THE CONTRACTOR SHALL COORDINATE ALL LIVE TAPS AND ANY OTHER WORK OR MANIPULATION OF THE EXISTING WATER SYSTEM WITH THE ENGINEER AND THE WATER SYSTEM OWNER / CITY. ALL REDUCERS SHALL BE CONCENTRIC. CHLORINATION WILL BE DONE BY THE CONTRACTOR AT THE CONTRACTORS EXPENSE. THE CONTRACTOR IS TO USE SODIUM HYPOCHLORITE TO CHLORINATE THE SYSTEM AS OUTLINED IN SECTION 401.3.9.B.2. A & B OF DIVISION 400 OF THE ISPWC. THE CONTRACTOR IS TO FOLLOW THE FILLING PROCEDURE OUTLINED IN SECTION 401.3.9.B.B.4 IN DIVISION 400 OF THE ISPWC. THE CONTRACTOR IS ALSO TO FOLLOW THE FINAL FLUSHING AND BACTERIOLOGICAL TESTS AS OUTLINED IN SECTION 3.9.C & D OF DIVISION 400 OF THE ISPWC. ALL WATER SYSTEM COMPONENTS SHALL BE INSTALLED, PRESSURE TESTED, AND CHLORINATED PRIOR TO COMPLETING ANY ROADWAY CONSTRUCTION. THE TESTING IS TO INCLUDE FLUSHING AND DISINFECTION AS OUTLINED IN SECTION 401.3.9 OF DIVISION 400 OF THE ISPWC. ALL AIR RELEASE AND COMBINATION AIR VALVES SHALL BE INSTALLED AT ANY HIGH POINT CREATED DURING INSTALLATION OF THE WATER LINE. CONTRACTOR SHALL RECORD ACTUAL LOCATION OF VALVES ON FIELD RECORD DRAWINGS. FOR CONNECTIONS TO EXISTING WATER LINES, SEWER LINES, OR ANY OTHER UTILITIES, CONTRACTOR SHALL FIELD VERIFY ALL PIPE DIAMETERS, PIPE MATERIALS, FITTING ETC. PRIOR TO ORDERING FITTING AND MATERIALS. NO PAYMENT WILL BE MADE FOR SHIPPING OR RESTOCKING OR REFABRICATION OF FITTINGS. ALL GATE VALVES SHALL BE LOCATED NEAR TO TEES OR CROSSES AND THEIR ASSOCIATED REDUCERS AS SHOWN ON THE PROJECT PLANS. ALL CROSSES AND TEES SHALL BE INSTALLED WITH THE BRANCHES HAVING THE SIZE OF THE LARGEST ADJOINING PIPE UNLESS OTHERWISE SHOWN. THE CONNECTION TO THE SMALLER LINES SHALL THEN BE MADE BY MEANS OF REDUCERS. ALL MECHANICAL JOINT FITTINGS SHALL BE RESTRAINED USING MEGALUG RESTRAINING GLANDS OR APPROVED EQUAL. ALL MAINLINE VALVES AND FITTINGS LOCATED NEAR OTHER FITTINGS WILL BE REQUIRED TO BE FLANGED. THE CONTRACTOR SHALL INSTALL AND MAINTAIN ALL EROSION CONTROL MEASURES AS DETAILED IN THE PROJECT PLANS UNTIL FINAL ACCEPTANCE OF THIS PROJECT. THE CONTRACTOR SHALL ALSO BE REQUIRED TO TAKE ALL PRECAUTIONS NECESSARY TO INSURE THAT NO STORM WATER/SEDIMENT AND/OR CONSTRUCTION DEBRIS ARE RELEASED FROM THE SITE. ANY RELEASES SHALL BE CLEANED AND MITIGATED AT CONTRACTOR'S EXPENSE THE CONTRACTOR SHALL CONDUCT A LOW PRESSURE TEST AS OUTLINED IN ISPWC SECTION 501.3.4.C. OF DIVISION 500. THE CONTRACTOR SHALL CONDUCT A DEFLECTION TEST AS OUTLINED IN ISPWC SECTION 3.4.G. OF DIVISION 500. THE CONTRACTOR SHALL CONDUCT A HYDROSTATIC TEST AS OUTLINED IN SECTION 502.3.12.C.1 OF SECTION 500. STORM NOTES (CONTINUED) 1.CONTOURS SHOWN ARE FOR FINISHED GRADES. CALCULATION TO ADJUST SUBGRADE IS THE CONTRACTOR'S RESPONSIBILITY. 2.ALL DISTURBED AREAS THAT ARE UNSURFACED OR ARE NOT DESIGNATED AS LANDSCAPE AREAS ARE TO BE SEEDED, FERTILIZED UNTIL A HEALTHY STAND OF DRY LAND GRASS IS OBTAINED. 3.IF DURING THE GRADING PROCESS, CONDITIONS ARE ENCOUNTERED WHICH COULD INDICATE THAT AN UNIDENTIFIED SITUATION IS PRESENT, THE ENGINEER SHALL BE CONTACTED FOR RECOMMENDATIONS. 4.UNLESS OTHERWISE SHOWN, NO PROPOSED SLOPE SHALL EXCEED THREE (3) HORIZONTAL TO ONE (1) VERTICAL. ALL SLOPED AREAS MUST BE PROTECTED FROM EROSION BY CAT TRACKING & TEMPORARY STABILIZATION UNTIL FINAL LANDSCAPING INSTALLED. 5.IF STRIPPED MATERIALS CONSISTING OF VEGETATION AND ORGANIC MATERIALS ARE STOCKPILED ON THE SITE, TOPSOIL MAY BE PLACED TO A HEIGHT OF EIGHT (8) FEET. SILT FENCE SHALL BE PLACED AROUND THE BASE OF THE STOCKPILE AND THE STOCKPILE SHALL BE SEEDED WITH NATIVE SEED MIX IMMEDIATELY AFTER STRIPPING OPERATIONS ARE COMPLETE. 6.ON - SITE MATERIALS SUITABLE FOR FILL BENEATH DRIVES AND PARKING AREAS BEYOND 5' (FT.) OF ANY BUILDING SHALL BE COMPACTED IN ACCORDANCE WITH GUIDELINES PRESENTED IN THE GEOTECHNICAL REPORT. 7.SPOT ELEVATIONS SHALL TAKE PRECEDENCE OVER CONTOURS AND SLOPES SHOWN. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF SPOT ELEVATIONS THAT DO NOT APPEAR TO BE CONSISTENT WITH THE CONTOURS AND SLOPES. SPOT ELEVATIONS AND SPECIFIC PROFILE DESIGNS SHALL BE USED FOR SETTING ELEVATIONS OF CURB, GUTTER, AND UTILITIES. 8.ALL UTILITIES (MANHOLES, VALVE COVERS, CLEANOUTS,VAULTS, BOXES, ETC.) SHALL BE ADJUSTED TO FINAL GRADE AFTER TO THE FINAL LIFT OF ASPHALT PER THE DETAILS. 9.ALL EARTH MOVING AND PLACEMENT OPERATIONS SHALL BE IN CONFORMANCE WITH THE RECOMMENDATIONS IDENTIFIED IN THE SOILS REPORT OR IN ACCORDANCE WITH ISPWC STANDARDS. THE CONTRACTOR SHALL HAVE A SIGNED AND SEALED COPY OF THE SOILS REPORT ON SITE AT ALL TIMES AND SHALL FOLLOW ALL RECOMMENDATIONS. 10.THE CONTOURS SHOWN ON THE SITE REPRESENT FINAL GRADE, THE TOP SIX (6) INCHES OF MATERIAL IN LANDSCAPED AREAS SHALL BE TOPSOIL. 11.GRADES WITHIN THE ASPHALT PARKING AREAS SHALL BE CONSTRUCTED TO WITHIN 0.05 FEET OF THE DESIGN GRADE. HOWEVER, THE CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE IN ALL PAVEMENT AREAS AND ALONG ALL CURBS. ALL CURBS, SIDEWALKS AND PAVEMENT AREAS WHICH DO NOT PROVIDE PROPER DRAINAGE MUST BE REMOVED AND REPLACED AT THE CONTRACTOR'S EXPENSE. 12.THE EARTHWORK QUANTITY IS AN ESTIMATE PROVIDED AS REQUIRED TO OBTAIN THE GRADING PERMIT. IT WAS DEVELOPED USING AN ORIGINAL SURVEY BY RMES. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE EARTHWORK ESTIMATE. THE ENGINEER DOES NOT GUARANTEE FINAL QUANTITIES AND ANY DISAGREEMENT ABOUT QUANTITY ESTIMATE SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO ANY SITE GRADING AND PROVIDING A BID ON THIS PROJECT EARTHWORK PAYMENT WILL BE MADE BASED ON A LUMP SUM AND THE BID PROVIDED SHALL BE BASED SOLELY ON THE CONTRACTORS EARTHWORK ESTIMATE. 13.WHERE NEW CURB AND GUTTER IS BEING CONSTRUCTED ADJACENT TO EXISTING ASPHALT OR CONCRETE PAVEMENT, THE FOLLOWING SHALL APPLY: PRIOR TO PLACEMENT OF ANY CONCRETE THE CONTRACTOR SHALL HAVE A LICENSED SURVEYOR VERIFY THE GRADE AND CROSS SLOPE OF THE CURB AND GUTTER FORMS. THE CONTRACTOR SHALL SUBMIT THE SLOPES AND GRADES TO THE ENGINEER FOR APPROVAL PRIOR TO PLACEMENT OF CONCRETE. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY OF ANY SECTION WHICH DOES NOT CONFORM TO THE DESIGN OF TYPICAL CROSS SECTION. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR CURB AND GUTTER PLACED WITHOUT THE APPROVAL OF THE ENGINEER. 14.IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR BETTER. 15.THE CONTRACTOR SHALL ADJUST AND/OR CUT EXISTING PAVEMENT AS NECESSARY TO ASSURE A SMOOTH FIT AND CONTINUOUS GRADE BETWEEN NEW AND EXISTING CONSTRUCTION. 16.CONTRACTOR SHALL ASSURE POSITIVE DRAINAGE AWAY FROM ANY STRUCTURES AND IN ALL NATURAL AND PAVED AREAS. 17.TOPOGRAPHIC INFORMATION TAKEN FROM A TOPOGRAPHIC SURVEY BY RMES. IF CONTRACTOR DOES NOT ACCEPT EXISTING TOPOGRAPHY AS SHOWN ON THE PLANS HE SHALL HAVE MADE, WITHOUT EXCEPTION AND AT HIS OWN EXPENSE, A TOPOGRAPHIC SURVEY BY A REGISTERED LAND SURVEYOR AND SUBMIT IT TO THE OWNER FOR REVIEW PRIOR TO CONSTRUCTION. 18.THE CONTRACTOR SHALL TAKE NECESSARY STEPS TO INSURE THAT NO FLOODING OCCURS ON SITE AND ALL UTILITIES IN OPEN TRENCHES SHALL BE CAPPED DURING ANY STORM EVENTS DURING CONSTRUCTION. 19.MATERIAL SHALL BE IMPORTED OR EXPORTED AS REQUIRED TO COMPLETE THE PROJECT TO THE LINES AND GRADES NOTED. GRADING NOTES DIMENSIONS SHOWN ARE TO THE CENTER OF THE PIPELINE UNLESS OTHERWISE NOTED. DISTANCES SHOWN ALONG PIPELINES ARE HORIZONTAL DISTANCES AND NOT ACTUAL PIPE LENGTH. MORE PIPE MAY BE REQUIRED TO COMPLETE CONSTRUCTION THAN IS DIMENSIONED ON THE PLANS. MINIMUM CLEARANCE BETWEEN NEW PIPELINES AND EXISTING UTILITIES AND STRUCTURES (EXCEPT SEWERS) SHALL BE FIVE FEET HORIZONTALLY. SEPARATION BETWEEN WATER LINES AND OTHER UTILITIES SHALL BE 10' MIN. ON SLOPING AREAS THE CONTRACTOR SHALL TAKE PRECAUTIONS TO MITIGATE ANY POSSIBLE EROSION PROBLEMS IN TRENCHES DUE TO STORM WATER THAT MIGHT OCCUR DURING OR AFTER CONSTRUCTION AS DIRECTED OR APPROVED BY ENGINEER. DURING CONSTRUCTION THE CONTRACTOR IS FULLY RESPONSIBLE FOR INTERIM PROVISIONS FOR PASSAGE OF IRRIGATION AND STORM WATER. NO SUPPLEMENTAL COMPENSATION WILL BE MADE FOR WET CONDITIONS OR FLOW DIVERSIONS. STORM NOTES 1.AT ALL TIMES DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING AND CONTROLLING EROSION DUE TO WIND AND RUNOFF. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR MAINTAINING EROSION CONTROL FACILITIES AND INSURING SEDIMENT REMAINS ON-SITE DURING CONSTRUCTION. THE CONTRACTOR SHALL MAKE PROVISIONS TO CONTROL WATER AS IT PASSES THROUGH THESE. 2.ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED DUE TO UNFORESEEN PROBLEMS OR IF THE PLAN DOES NOT FUNCTION AS INTENDED. A REPRESENTATIVE OF THE CITY OR ENGINEER MAY REQUIRE ADDITIONAL CONTROL DEVICES UPON INSPECTION OF THE SITE IF IT IS DETERMINED PROPOSED MEASURES ARE INEFFECTIVE. 3.CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING AND MAINTAINING DRAINAGE AND EROSION CONTROL FACILITIES AS REQUIRED. STREETS SHALL BE KEPT CLEAN OF DEBRIS TRACKED TO AND FROM THE PROJECT SITE AND SHALL BE SWEPT AS NECESSARY. 4.ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE PAVED, SEEDED WITH NATIVE VEGETATION OR LANDSCAPED. REFER TO LANDSCAPE PLANS FOR SEED MIX AND PLANTING SPECIFICATIONS. 5.EROSION CONTROL STRUCTURES BELOW SODDED AREAS MAY BE REMOVED ONCE SOD AND FINAL LANDSCAPING IS IN PLACE. EROSION CONTROL STRUCTURES BELOW SEEDED AREAS MUST REMAIN IN PLACE UNTIL THE ENTIRE AREAS HAVE ESTABLISHED A MATURE COVERING OF HEALTHY VEGETATION. EROSION CONTROL IN PROPOSED PAVED AREAS SHALL REMAIN IN PLACE UNTIL PAVEMENT IS COMPLETE. 6.THIS PLAN IS ONLY TO BE USED FOR INSTALLATION FOR EROSION CONTROL FACILITIES. DO NOT USE THIS PLAN FOR GRADING OR UTILITY CONSTRUCTION. 7.CONTRACTOR SHALL USE VEHICLE TRACKING CONTROL AT ALL LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE. THESE FACILITIES SHALL BE MAINTAINED WHILE CONSTRUCTION IS IN PROGRESS, MOVED WHEN NECESSARY AND REMOVED WHEN THE SITE IS PAVED. 8.INLET PROTECTION DEVICES SHALL BE INSTALLED IMMEDIATELY UPON INDIVIDUAL INLETS BECOMING FUNCTIONAL. 9.THE TEMPORARY PARKING AND STORAGE AREA SHALL ALSO BE USED AS THE EQUIPMENT MAINTENANCE, EQUIPMENT CLEANING AREA, EMPLOYEE BREAK AREA, AND AREA FOR LOCATION PORTABLE FACILITIES, OFFICE TRAILERS, AND TOILET FACILITIES. 10.ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING, ETC.) SHALL BE DISPOSED OF IN THE WASHOUT AREA AS DETAILED IN THE PLANS. 11.MAINTAIN ON THE SITE OR HAVE READILY AVAILABLE SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND FLOATATION BOOMS TO CONTAIN AND CLEAN-UP FUEL OR CHEMICAL SPILLS AND LEAKS. 12.FUGITIVE DUST BLOWING FROM THE SITE SHALL BE CONTROLLED BY SPRAYING WATER AND DUST CONTROL POLYMERS AS NEEDED ON DRY AREAS OF THE SITE. THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS FOR DUST SUPPRESSION OPERATIONS IS ABSOLUTELY PROHIBITED. 13.NO RUBBISH, TRASH, GARBAGE, OR OTHER SUCH MATERIALS SHALL BE DISCHARGED INTO DRAINAGE DITCHES, WATERS OF THE STATE OR IN ANY AREA THAT IS NOT APPROVED TO ACCEPT SUCH MATERIALS. 14.IF THE STABILIZED CONSTRUCTION ENTRANCES ARE NOT EFFECTIVE IN REMOVING THE MAJORITY OF DIRT OR MUD FROM THE TIRES OF THE CONSTRUCTION VEHICLES, THEN THE TIRES MUST BE WASHED BEFORE THE VEHICLES ENTER A PUBLIC ROAD. IF WASHING IS USED, PROVISIONS MUST BE MADE TO INTERCEPT THE WASH WATER AND TRAP THE SEDIMENT BEFORE IT IS CARRIED OFF THE SITE. 15.ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLES ONTO ROADWAYS OR INTO STORM DRAINS MUST BE REMOVED IMMEDIATELY UPON OCCURRENCE. 16.IF SOIL STOCKPILING IS EMPLOYED ON THE SITE, SILT FENCES SHALL BE USED TO HELP CONTAIN THE SEDIMENT. SUCH SILT FENCES WILL BE CONSIDERED TO BE THE CONTRACTOR'S RESPONSIBILITY AND NOT NECESSARILY INCLUDED IN THE QUANTITY OF SILT FENCE AS SHOWN OR DESCRIBED ON THIS PLAN. 17.SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE GRADING PHASE TO REDUCE RUNOFF VELOCITIES AND EROSION (CAT TRACK). 18.ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE DISPOSED OF WITHIN 30 DAYS AFTER FINAL STABILIZATION. FINAL STABILIZATION HAS OCCURRED WHEN ALL SOIL DISTURBING ACTIVITIES ARE COMPLETED AND A UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY OF 70% OF THE COVER FOR UNPAVED AREAS AND AREAS NOT COVERED BY PERMANENT STRUCTURES HAS BEEN EMPLOYED. 19.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING THE EROSION CONTROL MEASURES (SILT FENCES, DITCHES, ETC.) DUE TO GRADE CHANGES AND OTHER WORK DURING THE DEVELOPMENT OF THE PROJECT. 20.ALL OFF-SITE CONSTRUCTION SHALL BE STABILIZED AT THE END OF EACH WORKING DAY. THIS INCLUDES BACK FILLING OF TRENCHES FOR STORM DRAIN CONSTRUCTION AND PLACEMENT OF GRAVEL OR BITUMINOUS PAVING FOR ROAD CONSTRUCTION. 21.THE CONTRACTOR IS RESPONSIBLE TO INSURE THAT ALL MEASURES CONTAINED IN THIS PLAN SHALL BE MAINTAINED IN FULLY FUNCTIONAL CONDITION UNTIL FINAL STABILIZATION OF THE SITE. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE CHECKED BY A QUALIFIED PERSON AT LEAST ONCE EVERY 2 WEEKS AND WITHIN 24 HOURS OF THE END OF A RAINFALL EVENT, AND SHOULD BE CLEANED AND REPAIRED IN ACCORDANCE WITH THE FOLLOWING: A. INLET PROTECTION DEVICES AND BARRIERS SHALL BE FIXED OR REPLACED IF THEY SHOW SIGNS OF UNDERMINING, OR SHALL BE REPLACED IF THEY SHOW SIGNS OF DETERIORATION. B. ALL SEEDED AREAS SHALL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND IS MAINTAINED. AREAS SHOULD BE FERTILIZED, RESEEDED, AND WATERED AS NEEDED. C. SILT FENCES SHALL BE REPAIRED TO THEIR ORIGINAL CONDITIONS IF DAMAGED. SEDIMENT SHALL BE REMOVED FROM THE SILT FENCES WHEN IT REACH ONE-THIRD (13) TO ONE-HALF (12) THE HEIGHT OF THE SILT FENCE. D. THE CONSTRUCTION ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOW OF MUD ONTO PUBLIC RIGHTS-OF-WAY. THIS MAY REQUIRE PERIODIC REPLACING TO TOP DRESSING OF THE CONSTRUCTION ENTRANCES WITH CLEAN ROCK, AS CONDITIONS DEMAND. E. THE TEMPORARY PARKING AND STORAGE AREA SHALL BE KEPT IN GOOD CONDITION (SUITABLE FOR PARKING AND STORAGE). THIS MAY REQUIRE PERIODIC TOP DRESSING OF THE TEMPORARY PARKING AREA WITH CRUSHED ROCK AS CONDITIONS DEMAND. F. OUTLET STRUCTURES IN THE SEDIMENTATION BASINS SHALL BE MAINTAINED IN OPERATIONAL CONDITIONS AT ALL TIMES. SEDIMENT IN THE SEDIMENTATION BASINS SHALL NOT EXCEED THE SEDIMENTATION CLEAN OUT LEVEL. G. IF THE STONES IN THE GRAVEL INLET SEDIMENT FILTERS BECOME CLOGGED WITH SEDIMENT, THE STONES MUST BE PULLED AWAY, CLEANED AND REPLACED. H. THE SEDIMENTATION BASIN SHALL BE CHECKED REGULARLY TO INSURE THAT IT IS STRUCTURALLY SOUND AND HAS NOT BEEN DAMAGED BY EROSION OR CONSTRUCTION EQUIPMENT AND THAT SEDIMENT THAT HAS BUILT UP IS REMOVED. 22.ALL EROSION CONTROL MEASURES ARE SUBJECT TO MODIFICATION, CHANGE, ETC... THROUGHOUT THE CONSTRUCTION. THIS PLAN IS INTENDED TO BE A GUIDE TO CONTROL EROSION, HOWEVER ADDITIONAL MEASURES MAY NEED TO BE EMPLOYED TO CONTROL EROSION DURING AND AFTER CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE TO EMPLOY AND DOCUMENT ALL MEASURES NECESSARY TO CONTROL EROSION AND PROTECT THE ENVIRONMENT AND TO FULLY COMPLY WITH EPA NPDES REQUIREMENTS. MODIFICATION OF THIS PLAN AND SUPPORTING DOCUMENTATION BY THE USER OR CONTRACTOR ACCEPTS FULL RESPONSIBILITY FOR EPA NPDES COMPLIANCE. EROSION CONTROL NOTES C 1 N 89°36'44" W 276.01'4473 4473 4474 4476 4475 44754473 44744473 447544774474 4475 WSIRIRIRSSIRIRIRS 1°12'43" E 452.83'S 89°36'44" E 184.52'N 0°14'09" E 432.61' CURVE TABLE NUMBER C1 DELTA ANGLE 90°09'07" CHORD DIRECTION N 45°18'43" E TANGENT 20.05' RADIUS 20.00' ARC LENGTH 31.47' CHORD LENGTH 28.32' SITE OVERVIEW SHEET NUMBERC - 2.0SITE OVERVIEWSHEET NUMBERC - 2.0SITE OVERVIEWNORTHSIDE CROSSING COMMERCIALEngineersSurveyorsPlanners 600 E. Oak St. Pocatello, ID 83201 (208) 234-0110 301 58th St. W. #138 Williston, ND 58801 (701) 572-0110 TM INTELLECTUAL PROPERTY NOTICE THE DESIGN, IDEAS, DRAWINGS CONTAINED ON THIS SHEET AND WITHIN THIS SET OF ASSOCIATED DOCUMENTS ARE THE SOLE PROPERTY OF RMES AND SURVEYING, AND ARE SUBJECT TO THE COPYRIGHT OF RMES. THEY ARE CREATED, EVOLVED AND DEVELOPED FOR USE ON THIS SPECIFIC PROJECT. ANY USE OF THESE DRAWINGS, DESIGNS, MATERIALS OR INFORMATION CONTAINED HEREIN, INCLUDING BUT NOT LIMITED TO COPYING OR REPRODUCTION, WHICH IS NOT EXPRESSLY AUTHORIZED BY RMES IS STRICTLY PROHIBITED AS AN INFRINGEMENT OF ITS COPYRIGHT AND MAY RESULT IN LIABILITY. SHEET INFORMATION DESIGNER:BRADY M. SMITH CREATED:07.28.20 REVIEWER:J. MITCHELL GREER LAST REVISED: REVISIONSX # 1 DATE BY DESCRIPTION X 2 3 4 08.03.20 CONSTRUCTION PLAN SETCONSTRUCTION PLAN SETNORTHKnow what's Callbefore you dig. below. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF VARIOUS UTILITY COMPANIES AND, WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE LOCAL UTILITY LOCATION CENTER AT LEAST 48 HOURS PRIOR TO ANY EXCAVATION TO REQUEST EXACT FIELD LOCATIONS OF THE UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. 3 2 34 35 34 3 N 89°36'44" W 2650.74'S 89°36'44" E984.67'BENCH MARK #2 N: 462370.4920 E: 577533.2551 EL: 4473.44 BENCH MARK #3 N: 462823.3685 E: 577523.6773 EL: 4473.47 BOUNDARY CORNER N: 462821.9063 E: 577739.6830 PROPOSED PARCEL 2.18 ACRES NORTHSIDE CROSSING NEW DAY PARKWAYJYY LLC INST. NO. 21901469 20 20 ARCH D SCALE (24"x36") ARCH B SCALE (12"x18") 400 400 1 INCH = 40 FEET 1 INCH = 20 FEET BENCH MARK #1 N: 462389.3031 E: 577737.9024 EL: 4474.43 BOUNDARY CORNER N: 462369.3858 E: 577717.7672 SOUTH 1/4 CORNER OF SECTION 34. FOUND ITD MONUMENT IN VAULT AS DESCRIBED IN CP & F INST. NO. 21111672 SOUTHEAST CORNER OF SECTION 34. FOUND ALUMINUM CAP MONUMENT AS DESCRIBED IN CP & F INST. NO. 21211748N 89°36'44" W1666.07'NORTHSIDE CROSSING DIVISION 1 INST. NO. 21918163 SITE PLAN SHEET NUMBERC - 3.0SITE PLANSHEET NUMBERC - 3.0SITE PLANNORTHSIDE CROSSING COMMERCIALEngineersSurveyorsPlanners 600 E. Oak St. Pocatello, ID 83201 (208) 234-0110 301 58th St. W. #138 Williston, ND 58801 (701) 572-0110 TM INTELLECTUAL PROPERTY NOTICE THE DESIGN, IDEAS, DRAWINGS CONTAINED ON THIS SHEET AND WITHIN THIS SET OF ASSOCIATED DOCUMENTS ARE THE SOLE PROPERTY OF RMES AND SURVEYING, AND ARE SUBJECT TO THE COPYRIGHT OF RMES. THEY ARE CREATED, EVOLVED AND DEVELOPED FOR USE ON THIS SPECIFIC PROJECT. ANY USE OF THESE DRAWINGS, DESIGNS, MATERIALS OR INFORMATION CONTAINED HEREIN, INCLUDING BUT NOT LIMITED TO COPYING OR REPRODUCTION, WHICH IS NOT EXPRESSLY AUTHORIZED BY RMES IS STRICTLY PROHIBITED AS AN INFRINGEMENT OF ITS COPYRIGHT AND MAY RESULT IN LIABILITY. SHEET INFORMATION DESIGNER:BRADY M. SMITH CREATED:07.28.20 REVIEWER:J. MITCHELL GREER LAST REVISED: REVISIONSX # 1 DATE BY DESCRIPTION X 2 3 4 08.03.20 CONSTRUCTION PLAN SETCONSTRUCTION PLAN SETNORTHNORTHSIDE CROSSING NEW DAY PARKWAY20 20 ARCH D SCALE (24"x36") ARCH B SCALE (12"x18") 400 400 1 INCH = 40 FEET 1 INCH = 20 FEET PROPOSED BUILDING PROPOSED BUILDING PROPOSED BUILDING PROPOSED BUILDING 10.0' 10.0' 10.0'10.0'10.0'10.0'10.0'10.0' 10.0'10.0'10.0'10.0'10.0'10.0'10.0'10.0'10.0'10.0'10.0'6.0'18.0'25.0'18.0'18.0'25.0'18.0'6.0'18.0'25.0'18.0'6.0' 6.0'18.0'25.0'18.0'6.0' 4.0'4.0' 4.0'4.0' 16.0' 16.0'6.5'13.5' 6.5'12.0'12.0'12.0'12.0'RETAIN AND PROTECT ALL EXISTING UNDERGROUND AND OVERHEAD UTILITIES. CALL 811 TO LOCATE EXISTING UTILITIES PRIOR TO THE START OF ANY WORK & COORDINATE AS NECESSARY DURING CONSTRUCTION. INSTALL STANDARD 6" VERTICAL CURB (SEE DETAIL 701-A) MATCH INTO EXISTING CURB, PAVEMENT AND SIDEWALK. FIELD VERIFY LOCATION, MATERIAL AND GRADES AND NOTIFY ENGINEER PRIOR TO CONSTRUCTION. INSTALL ASPHALT PAVEMENT SECTION (SEE DETAIL 810-A) INSTALL HANDICAP RAMP (SEE DETAIL 712) 1 2 701-A 712 810-A 2050 INSTALL 4" THICK CONCRETE SIDEWALK - WIDTH AS NOTED (SEE DETAIL 709-A)709-A INSTALL STANDARD 6" REVERSE DRAIN CURB (SPILL) (SEE DETAIL 701-B)701-B INSTALL CONCRETE DRAIN CHANNEL (SEE DETAIL 702)702 2051 INSTALL HANDICAP PARKING STRIPING (SEE DETAIL 2050) INSTALL ADA HANDICAP SYMBOL (SEE DETAIL 2051) 1104-E INSTALL 4" WIDE SOLID WHITE MARKINGS FOR PARKING FOR PARKING STALLS AND NO PARKING AREAS CONSTRUCTION ITEMS CONSTRUCTION ITEMS 702 701-A 701-A701-A 701-A 701-A 701-A 701-A 701-A 701-B701-B 2051 709-A 709-A 709-A 709-A 709-A 709-A 709-A 709-A 712 712 712 810-A 810-A 810-A 810-A 1104-E 1104-E 1104-E 1104-E 1104-E 1104-E 2050 2050 2050 2051 20512051 2051 2051 22 22 STORM WATER POND 2052 INSTALL HANDICAP SIGN (INSTALL IN ACCORDANCE WITH ADA GUIDELINES) 2052 2052 20522052 2052 2052 14.7'25.0' 25.0'11.2'57.7'21.0'37.8'15.8'2 222 701-B 701-B 701-A 1104-E 1104-E WSIRIRIRSSIRIRIRUTILITY PLAN SHEET NUMBERC - 4.0UTILITY PLANSHEET NUMBERC - 4.0UTILITY PLANNORTHSIDE CROSSING COMMERCIALEngineersSurveyorsPlanners 600 E. Oak St. Pocatello, ID 83201 (208) 234-0110 301 58th St. W. #138 Williston, ND 58801 (701) 572-0110 TM INTELLECTUAL PROPERTY NOTICE THE DESIGN, IDEAS, DRAWINGS CONTAINED ON THIS SHEET AND WITHIN THIS SET OF ASSOCIATED DOCUMENTS ARE THE SOLE PROPERTY OF RMES AND SURVEYING, AND ARE SUBJECT TO THE COPYRIGHT OF RMES. THEY ARE CREATED, EVOLVED AND DEVELOPED FOR USE ON THIS SPECIFIC PROJECT. ANY USE OF THESE DRAWINGS, DESIGNS, MATERIALS OR INFORMATION CONTAINED HEREIN, INCLUDING BUT NOT LIMITED TO COPYING OR REPRODUCTION, WHICH IS NOT EXPRESSLY AUTHORIZED BY RMES IS STRICTLY PROHIBITED AS AN INFRINGEMENT OF ITS COPYRIGHT AND MAY RESULT IN LIABILITY. SHEET INFORMATION DESIGNER:BRADY M. SMITH CREATED:07.28.20 REVIEWER:J. MITCHELL GREER LAST REVISED: REVISIONSX # 1 DATE BY DESCRIPTION X 2 3 4 08.03.20 CONSTRUCTION PLAN SETCONSTRUCTION PLAN SETNORTHNORTHSIDE CROSSING NEW DAY PARKWAY20 20 ARCH D SCALE (24"x36") ARCH B SCALE (12"x18") 400 400 1 INCH = 40 FEET 1 INCH = 20 FEET PROPOSED BUILDING PROPOSED BUILDING PROPOSED BUILDING PROPOSED BUILDING CONSTRUCTION ITEMS CONSTRUCTION ITEMS 3 RETAIN AND PROTECT ALL EXISTING UNDERGROUND AND OVERHEAD UTILITIES. CALL 811 TO LOCATE EXISTING UTILITIES PRIOR TO THE START OF ANY WORK & COORDINATE AS NECESSARY DURING CONSTRUCTION. CONNECT INTO EXISTING WATER LINE. VERIFY LOCATION, MATERIAL AND DEPTH AND NOTIFY ENGINEER PRIOR TO CONSTRUCTION. CONNECTION TO EXISTING MAIN COMPLETED BY THE CITY OF CHUBBUCK AT THE CONTRACTORS EXPENSE. INSTALL 4" SANITARY SEWER CLEAN OUT (SEE DETAILS 503 & 512)503-A 3 2 1 CONNECT INTO EXISTING SEWER LINE. VERIFY LOCATION, MATERIAL AND DEPTH AND NOTIFY ENGINEER PRIOR TO CONSTRUCTION. INSTALL 4" SANITARY SEWER SERVICE (SEE DETAILS 301, 511 & 512)504-A INSTALL 1" SINGLE WATER SERVICE (SEE DETAILS 400 & 401) 4 COORDINATE WITH MECHANICAL PLANS FOR CONNECTION INTO THE BUILDING. 404-A 404-A 404-A 404-A 503-A CO-5 RIM 4474.91 INV 4461.06 503-A CO-4 RIM 4474.57 INV 4460.78503-A CO-3 RIM 4474.31 INV 4460.61 503-A CO-2 RIM 4474.41 INV 4462.43 503-A CO-1 RIM 4473.76 INV 4463.18 404-A 504-A 504-A 504-A 504-A 504-A 2 2 2 2 3 3 3 44 4 444 4 4 4473 4473 4474 4476 4475 44754473 44744473 447544774474 447044754472 4472 447344734473 4473 4473 4474447444744474447444741.81%1.81%1.06%2.39%1.81%1.48%1.48%2.28% 2.53% 3.13%0.41%1.64% 74.70 TA/MTCH 74.83 TA/MTCH 74.90 TA/MTCH 74.99 TA/MTCH 75.49 TSW/MTCH 74.49 TSW/MTCH 74.41 TSW/MTCH 74.71 TSW/MTCH 75.81 TSW 76.11 TSW 75.76 TSW 74.81 TSW 74.78 TSW 74.65 TSW 73.55 TSW 74.02 TSW 74.04 TSW 74.39 TSW 75.09 TSW 74.97 TSW 74.92 TSW 74.92 TSW 74.95 TSW 74.97 TSW 74.87 TSW 74.38 LIP/MTCH 74.38 LIP/MTCH 74.43 LIP/MTCH 75.20 LIP/MTCH 75.26 LIP 75.35 LIP 75.48 LIP 75.17 LIP 74.23 LIP 73.97 LIP 73.43 LIP 73.07 LIP 72.56 LIP 72.12 LIP 71.87 LIP 72.20 LIP 72.54 LIP 73.05 LIP 73.21 LIP 73.72 LIP 74.04 LIP74.20 LIP 74.32 LIP 74.43 LIP74.51 LIP 74.63 LIP 74.51 LIP 74.40 LIP 74.31 LIP 74.26 LIP 74.11 LIP 73.90 LIP 74.10 LIP 74.19 LIP 74.33 LIP 74.33 LIP 74.32 LIP 74.32 LIP 74.15 LIP 74.04 LIP73.83 LIP 74.02 LIP 74.11 LIP 74.14 LIP 74.19 LIP 74.26 LIP 74.34 LIP 74.38 LIP 74.41 LIP 73.75 LIP 73.66 LIP 73.44 LIP73.44 LIP 73.11 LIP 73.45 LIP 73.51 LIP 73.17 LIP 73.23 LIP/SPILL 73.23 LIP/SPILL 72.82 LIP/SPILL 72.82 LIP/SPILL 73.44 HR BOT 73.38 HR BOT 73.72 HR TOP 73.84 HR TOP 73.56 HR BOT 73.98 HR TOP 73.86 HR TOP 73.56 HR BOT 74.92 HR TOP 74.85 HR TOP 74.35 HR BOT 74.47 HR BOT 74.35 HR BOT 74.47 HR BOT 74.85 HR TOP 74.97 HR TOP 75.17 HR TOP 75.06 HR TOP 74.73 HR BOT 74.62 HR BOT 74.83 HR BOT 74.71 HR BOT 75.40 HR TOP 75.27 HR TOP 71.50 71.05 1.44% 0.34%1.19%1.88% GRADING PLAN SHEET NUMBERC - 5.0GRADING PLANSHEET NUMBERC - 5.0GRADING PLANNORTHSIDE CROSSING COMMERCIALEngineersSurveyorsPlanners 600 E. Oak St. Pocatello, ID 83201 (208) 234-0110 301 58th St. W. #138 Williston, ND 58801 (701) 572-0110 TM INTELLECTUAL PROPERTY NOTICE THE DESIGN, IDEAS, DRAWINGS CONTAINED ON THIS SHEET AND WITHIN THIS SET OF ASSOCIATED DOCUMENTS ARE THE SOLE PROPERTY OF RMES AND SURVEYING, AND ARE SUBJECT TO THE COPYRIGHT OF RMES. THEY ARE CREATED, EVOLVED AND DEVELOPED FOR USE ON THIS SPECIFIC PROJECT. ANY USE OF THESE DRAWINGS, DESIGNS, MATERIALS OR INFORMATION CONTAINED HEREIN, INCLUDING BUT NOT LIMITED TO COPYING OR REPRODUCTION, WHICH IS NOT EXPRESSLY AUTHORIZED BY RMES IS STRICTLY PROHIBITED AS AN INFRINGEMENT OF ITS COPYRIGHT AND MAY RESULT IN LIABILITY. SHEET INFORMATION DESIGNER:BRADY M. SMITH CREATED:07.28.20 REVIEWER:J. MITCHELL GREER LAST REVISED: REVISIONSX # 1 DATE BY DESCRIPTION X 2 3 4 08.03.20 CONSTRUCTION PLAN SETCONSTRUCTION PLAN SETNORTHNORTHSIDE CROSSING NEW DAY PARKWAY20 20 ARCH D SCALE (24"x36") ARCH B SCALE (12"x18") 400 400 1 INCH = 40 FEET 1 INCH = 20 FEET PROPOSED BUILDING CONSTRUCTION ITEMS CONSTRUCTION ITEMS RETAIN AND PROTECT ALL EXISTING UNDERGROUND AND OVERHEAD UTILITIES. CALL 811 TO LOCATE EXISTING UTILITIES PRIOR TO THE START OF ANY WORK & COORDINATE AS NECESSARY DURING CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE TO BUILD THIS PROJECT TO THE LINES AND GRADES PROVIDE IN THESE PLANS REGARDLESS OF COMPACTION AND SOIL TYPE OR IMPORT/EXPORT REQUIREMENTS. ALL GRADES SHALL BE COMPLETED TO WITHIN 0.10 FEET AS DETAILED. EXCAVATION & EMBANKMENT (CONTRACTOR SHALL PROVIDE EXCAVATION & EMBANKMENT PER THE LINES AND GRADES SHOWN ON THESE PLANS) IMPORT OR EXPORT AS REQUIRED DISTURBANCE IS NOT PERMITTED OUTSIDE THE CONSTRUCTION LIMITS EARTHWORK QUANTITIES RAW EXCAVATION AND EMBANKMENT: RAW CUT =2,780 CU. YD. RAW FILL = 950 CU. YD. TOTAL RAW CUT =1,830 CU. YD. (1)VOLUMES LISTED ARE RAW AND NO ESTIMATION FOR COMPACTION HAS BEEN APPLIED. (2)VOLUMES DO NOT ACCOUNT FOR POOR SOIL CONDITIONS. (3)THE TOTAL RAW CUT VOLUME INCLUDES GRUBBING. (4)ENGINEERING NUMBERS ARE AN ESTIMATE FOR OBTAINING A GRADING PERMIT AND ARE FOR INFORMATION ONLY. ***CONTRACTOR IS REQUIRED TO DETERMINE SITE EARTHWORK REQUIREMENTS AND BID ACCORDINGLY*** GRADES SHOWN ARE FOR FINISH GRADE AND ARE (+)4400.00 IN ELEVATION - ADJUSTMENT IS NECESSARY FOR SUBGRADE ELEVATIONS. EARTHWORK DISCLAIMER ALL EARTHWORK ON THE PROJECT IS TO BE BID LUMP SUM. THE CONTRACTOR SHALL BE RESPONSIBLE TO DELIVER THE PROJECT TO THE OWNER AS DETAILED IN THE PROJECT WITH REGARD TO SITE GRADING. THE ENGINEER HAS PROVIDED AN ESTIMATE OF QUANTITIES IN THE PROJECT MANUAL AND ON THIS SHEET FOR THE PURPOSE OF OBTAINING A GRADING PERMIT. THIS ESTIMATE IS NOT TO BE USED TO DETERMINE THE WORK NECESSARY TO COMPLETE THE EARTHWORK ASSOCIATED WITH THE PROJECT. THE CONTRACTOR IS RESPONSIBLE TO ESTIMATE THE EXCAVATION AND EMBANKMENT, BORROW AND OR WASTE OF MATERIAL. THE LUMP SUM NUMBER PROVIDED IN THE BID SHALL REFLECT THE CONTRACTOR’S ESTIMATE OF WORK NECESSARY TO DELIVER THE PROJECT DETAILED AND SHALL REFLECT BORROW, WASTE OR OFF-HAUL AS NECESSARY. IF AVAILABLE ON-SITE, THE ENGINEER WILL PROVIDE A LOCATION TO PLACE GRUB MATERIAL AND EXCESS MATERIAL IF ANY EXISTS FROM THE PROJECT. A BORROW SITE WILL ALSO BE IDENTIFIED, IF AVAILABLE, TO OBTAIN ADDITIONAL MATERIAL IF NECESSARY FOR THE PROJECT. IF THESE SITES ARE NOT AVAILABLE, THE CONTRACTOR SHALL PROCURE THEM AND THE COST OF SUCH SHALL BE INCLUDED IN THE EARTHWORK ITEM. NO ADDITIONAL PAYMENTS WILL BE MADE FOR QUANTITY DISCREPANCIES, HAUL, ETC…. ABBREVIATIONS TA -TOP OF ASPHALT FF -FINISH FLOOR TSW -TOP OF SIDEWALK TBC -TOP BACK OF CURB HR -HANDICAP RAMP 1 2 3 202-A 202-K FINISH FLOOR = 4474.85 PROPOSED BUILDING FINISH FLOOR = 4475.85 PROPOSED BUILDING FINISH FLOOR = 4475.00 PROPOSED BUILDING FINISH FLOOR = 4474.10 TOP POND = 4472.50 BOT POND = 4469.00 POND VOLUME = 5,740 CU. FT. 202-K 202-K 202-K 202-K 202-A 202-A 202-A 4473 4473 4474 4476 4475 44754473 44744473 447544774474 SS447044754472 4472 447344734473 4473 4473 447444744474447444744474EROSION CONTROL PLAN SHEET NUMBERC - 6.0EROSION CONTROL PLANSHEET NUMBERC - 6.0EROSION CONTROL PLANNORTHSIDE CROSSING COMMERCIALEngineersSurveyorsPlanners 600 E. Oak St. Pocatello, ID 83201 (208) 234-0110 301 58th St. W. #138 Williston, ND 58801 (701) 572-0110 TM INTELLECTUAL PROPERTY NOTICE THE DESIGN, IDEAS, DRAWINGS CONTAINED ON THIS SHEET AND WITHIN THIS SET OF ASSOCIATED DOCUMENTS ARE THE SOLE PROPERTY OF RMES AND SURVEYING, AND ARE SUBJECT TO THE COPYRIGHT OF RMES. THEY ARE CREATED, EVOLVED AND DEVELOPED FOR USE ON THIS SPECIFIC PROJECT. ANY USE OF THESE DRAWINGS, DESIGNS, MATERIALS OR INFORMATION CONTAINED HEREIN, INCLUDING BUT NOT LIMITED TO COPYING OR REPRODUCTION, WHICH IS NOT EXPRESSLY AUTHORIZED BY RMES IS STRICTLY PROHIBITED AS AN INFRINGEMENT OF ITS COPYRIGHT AND MAY RESULT IN LIABILITY. SHEET INFORMATION DESIGNER:BRADY M. SMITH CREATED:07.28.20 REVIEWER:J. MITCHELL GREER LAST REVISED: REVISIONSX # 1 DATE BY DESCRIPTION X 2 3 4 08.03.20 CONSTRUCTION PLAN SETCONSTRUCTION PLAN SETNORTHNORTHSIDE CROSSING NEW DAY PARKWAY20 20 ARCH D SCALE (24"x36") ARCH B SCALE (12"x18") 400 400 1 INCH = 40 FEET 1 INCH = 20 FEET PROPOSED BUILDING CONSTRUCTION ITEMS CONSTRUCTION ITEMS PROPOSED BUILDING PROPOSED BUILDING PROPOSED BUILDING SWEEP ASPHALT ROUTINELY AS REQUIRED TO REMOVE SOIL DEBRIS. STAGING AREA STABILIZED CONSTRUCTION ENTRANCE (SEE DETAIL 1001) INLET PROTECTION (SEE DETAIL 1006) INSTALL CONCRETE WASH OUT (SEE DETAIL 1009) D P C PORTABLE TOILET DUMPSTER CONCRETE WASHOUT REFER TO SWPPP PLAN AND DOCUMENTS PREPARED BY RMES FOR SPECIFICATIONS DETAILS ON EROSION CONTROL. DISTURBANCE IS STRICTLY PROHIBITED OUTSIDE THE CONSTRUCTION LIMITS. 1 2 3 1001-A 1001-B 1006-C 1009-A INSTALL SILT FENCE (SEE DETAIL 1003)1003-C M MAILBOX INSTALL TEMPORARY MAILBOX FOR EPA CONSTRUCTION DOCUMENTS (SEE DETAIL 1008)1008-A LEGEND DP TEMPORARY SOIL STOCKPILE 25'50'1001-B 1001-A C M 1003-C 1003-C 1003-C 1003-C 1006-C1006-C1006-C 1006-C 1006-C 1008-A 2 1009-A 1 1 3 3 3 3 PROJECT DETAILS SHEET NUMBERC - 7.0PROJECT DETAILSSHEET NUMBERC - 7.0PROJECT DETAILSNORTHSIDE CROSSING COMMERCIALEngineersSurveyorsPlanners 600 E. Oak St. Pocatello, ID 83201 (208) 234-0110 301 58th St. W. #138 Williston, ND 58801 (701) 572-0110 TM INTELLECTUAL PROPERTY NOTICE THE DESIGN, IDEAS, DRAWINGS CONTAINED ON THIS SHEET AND WITHIN THIS SET OF ASSOCIATED DOCUMENTS ARE THE SOLE PROPERTY OF RMES AND SURVEYING, AND ARE SUBJECT TO THE COPYRIGHT OF RMES. THEY ARE CREATED, EVOLVED AND DEVELOPED FOR USE ON THIS SPECIFIC PROJECT. ANY USE OF THESE DRAWINGS, DESIGNS, MATERIALS OR INFORMATION CONTAINED HEREIN, INCLUDING BUT NOT LIMITED TO COPYING OR REPRODUCTION, WHICH IS NOT EXPRESSLY AUTHORIZED BY RMES IS STRICTLY PROHIBITED AS AN INFRINGEMENT OF ITS COPYRIGHT AND MAY RESULT IN LIABILITY. SHEET INFORMATION DESIGNER:BRADY M. SMITH CREATED:07.28.20 REVIEWER:J. MITCHELL GREER LAST REVISED: REVISIONSX # 1 DATE BY DESCRIPTION X 2 3 4 08.03.20 CONSTRUCTION PLAN SETCONSTRUCTION PLAN SETSHEET IS NOT TO SCALE DIR T Y W A T E R DIRTY W A T E R CLEAN WATER NOTES: INLET BASIN PROTECTION NO SCALE TEMPORARY EROSION CONTROL 1. REMOVE ALL TRASH, DEBRIS, DUFF, AND MATERIALS WHICH COULD INTERFERE WITH THE INLET/BASIN PROTECTION FUNCTION PRIOR TO PLACEMENT AND ATERWARDS ON A DAILY BASIS AS NEEDED. 2. MINOR MODIFICATIONS TO THESE INSTALLATIONS MAY BE NECESSARY TO ACCOMMODATE FIELD CONDITIONS. 3. DIRECT RUNOFF DISCHARGED THROUGH INLET/BASIN PROTECTION THROUGH A FILTER BERM, SEDIMENT TRAPS, OR STABALIZED DISCHARGE AREA. 4. WHEN USING FILTER FABRIC ON INLET AND BASIN PROTECTION CONSULT THE MATERIALS SECTION PRIOR TO INSTALLATION. 5. GRAVEL FILTER OR FRAME WIRE MESH INSTALLATAIONS ARE INTENDED TO BE USED ON ANY STRUCTURE SURROUNDED BY PAVEMENT WITH OR WITHOUT CURBS. SOME INSTALLATIONS MAY BE BETTER SERVED BY PLACING THE SWALE & GRAVEL BERM ALL THE WAY AROUND THE STRUCTURE. GRAVEL BAGS GRATE CATCH BASIN WOVEN GEO-TEXTILE CONCRETE WASH STATION NO SCALE NOTES: NOT TO SCALE PLAN A A' 1.ACTUAL LAYOUT DETERMINED IN THE FIELD 2.THE CONCRETE WASHOUT SIGN SHALL BE INSTALLED WITHIN 32' OF THE TEMPORARY CONCRETE WASHOUT FACILITY. 3.WASH OUT CONCRETE TRUCKS IN DESIGNATED AREAS ONLY. 4.AVOID MIXING EXCESS CONCRETE. 5.WASHOUT AREA CAN ALSO BE USED FOR SHEET ROCK MUD, STUCCO, MASONRY, ETC. 6.COLLECT LIQUID WASTE IN A TEMPORARY LINED PIT AND ALLOW IT TO DRY. 7.THE PIT SHOULD BE LARGE ENOUGH TO CONTAIN ALL WASTE FROM WASHOUT. 8.LOCATE WASHOUT FACILITIES A MINIMUM OF 50 FEET FROM STORM DRAIN OR RECEIVING WATERS. 9.KEEP THE WASHOUT AREAS AWAY FROM AREAS OF CONSTRUCTION TRAFFIC. 10.INSPECT DAILY WHEN IN USE. 11.ALLOW WASTE TO DRY AND THEN DISPOSE OF AS SOLID WASTE. 12.MAINTAIN WASHOUTS TO PROVIDE A MINIMUM 1 FOOT FREE-BOARD FOR BELOW GRADE FACILITIES. 13.CLEAN LEAN EXISTING FACILITIES OR CONSTRUCT ADDITIONAL FACILITIES WHEN THE WASHOUT IS 50% FULL. CONCTRETE WASHOUT SIGN DETAIL (OR EQUIVALENT) 1006 1009STABILI=ED CONSTRUCTION ENTRANCE NO SCALE 1001 45 DEGREES4"1'-0"5° OF PARKING SPACE 1'-8" 8" CL 3" 1'-8" R 2'-0" R8"1'-0" 23° WHITE REFLECTIVE PAINT 1'-0" 6 " R 2'-0"BLUE BACKGROUND HANDICAP STRIPING DETAIL NO SCALE HANDICAP SYMBOL DETAIL NO SCALE 4 x 4 POST 24" MIN. 4' COMPACTED BACK FILL AROUND POST 24" MIN. POST "NPDES" PERMIT 4 x 4 POST 4' 1. MAILBOX SHALL CONTAIN THE FOLLOWING AT ALL TIMES: A) CITY APPROVED CONSTRUCTION PLANS B) DEQ APPROVED CONSTRUCTION PLANS C) ANY SITE INSPECTION FORMS 2. MAILBOX SHALL BE LOCKED AT ALL TIMES 13 1/2" 11 1/2" NOTES: 23 1/2" 2 - BOLTS 34" Ø PRESSURE TREATED 2 x 6 TEMPORARY MAILBOX DETAIL NO SCALE 1008 2050 2051 SILT )ENCE DETAIL NO SCALE 1003 GEOTEXTILE CLASS F DRIVEN A MINIMUM OF 16" INTO 16" MINIMUM HEIGHT OF 36" MINIMUM LENGTH FENCE POST,10' MAXIMUM CENTER TO CENTER GROUND JOINING TWO ADJACENT SILT CROSS SECTIONFENCE SECTIONS 8" MINIMUM DEPTH IN SECTION B SECTION A STAPLE TOP VIEW POSTS EMBED GEOTEXTILE CLASS F INTO THE GROUND A MINIMUM OF 8" VERTICALLYSTAPLE CLOTHFILTER FLOW PERSPECTIVE VIEWFLOW FLOW 36" MINIMUM FENCEPOST LENGTH GROUND FENCE POST DRIVEN AMINIMUM OF 16" INTOTHE GROUND MINIMUM 20" ABOVEFENCE POST SECTION GROUNDUNDISTURBEDGROUND 1. FENCE POSTS SHALL BE A MINIMUM OF 36" LONG DRIVE A MINIMUM OF 8" INTO THE GROUND. WOOD POSTS SHALL BE 1.5" SQUARE (MIN) CUT OR 1.75" DIA ROUND AND SHALL BE SOUND QUALITY WOOD. STEEL POSTS SHALL BE STANDARD T OR U SECTION WEIGHING NOT LESS THAN 1 LB/LF. 2. GEOTEXTILE SHALL FASTENED SECURELY TO EACH FENCE POST WITH WIRE TIES OR STAPLES AT THE TOP AND MID-SECTION AND SHALL MEET THE FOLLOWING MINIMUM REQUIREMENTS FOR GEOTEXTILE CLASS F: TENSILE STRENGTH 50 LBS/IN TENSILE MODULUS 20 LBS/IN FLOW RATE .3 GAL/SF./MIN FILTERING EFFICIENCY 75% 3. WHERE ENDS OF GEOTEXTILE COME TOGETHER THEY SHALL BE OVERLAPPED, FOLDED AND STAPLED TO PREVENT SEDIMENT BYPASS. 4. SILT FENCE SHALL BE INSPECTED AFTER EVERY RAINFALL AND MAINTAINED WHEN BULGES OCCUR OR WHEN SEDIMENT HAS REACHED 50% OF THE HEIGHT. ASPHALT PVMT. INTERFACE COURSE-PCC @ BITUMINOUS BIT. TACK COAT W.W.F. 6x6-W.2.9x2.9 LONG RADIUS w BEND END OF LINE OR CONTINUE LINE KNOCKOUT PLUG @ SEWER PIPE CONCRETE DUCTILE IRON SOIL PIPE PROVIDE SCREW TYPE PLUG P.C.C. 6" THK. SEALED W/JOINT SEALANT SPACE ALL AROUND FROM OPENING. SLOPE TO DRAIN AWAY 3.0' DIA. 6" CLEANOUT NO SCALE 503 PROJECT DETAILS SHEET NUMBERC - 7.1PROJECT DETAILSSHEET NUMBERC - 7.1PROJECT DETAILSNORTHSIDE CROSSING COMMERCIALEngineersSurveyorsPlanners 600 E. Oak St. Pocatello, ID 83201 (208) 234-0110 301 58th St. W. #138 Williston, ND 58801 (701) 572-0110 TM INTELLECTUAL PROPERTY NOTICE THE DESIGN, IDEAS, DRAWINGS CONTAINED ON THIS SHEET AND WITHIN THIS SET OF ASSOCIATED DOCUMENTS ARE THE SOLE PROPERTY OF RMES AND SURVEYING, AND ARE SUBJECT TO THE COPYRIGHT OF RMES. THEY ARE CREATED, EVOLVED AND DEVELOPED FOR USE ON THIS SPECIFIC PROJECT. ANY USE OF THESE DRAWINGS, DESIGNS, MATERIALS OR INFORMATION CONTAINED HEREIN, INCLUDING BUT NOT LIMITED TO COPYING OR REPRODUCTION, WHICH IS NOT EXPRESSLY AUTHORIZED BY RMES IS STRICTLY PROHIBITED AS AN INFRINGEMENT OF ITS COPYRIGHT AND MAY RESULT IN LIABILITY. SHEET INFORMATION DESIGNER:BRADY M. SMITH CREATED:07.28.20 REVIEWER:J. MITCHELL GREER LAST REVISED: REVISIONSX # 1 DATE BY DESCRIPTION X 2 3 4 08.03.20 CONSTRUCTION PLAN SETCONSTRUCTION PLAN SETSHEET IS NOT TO SCALE NOTES: 1. GRADE AND ALIGNMENT TO BE APPROVED BY THE ENGINEER. 2. 1/2" EXPANSION JOINT MATERIAL AT TERMINAL POINTS OF RADII. 3. CONTINUOUS PLACEMENT PREFERRED, SCORE INTERVALS MAXIMUM 10 FEET. 4. MATERIALS AND CONSTRUCTION SHALL BE IN COMPLIANCE WITH ISPWC SPECIFICATIONS AND THE CITY. 5. BACKFILL AS PER ISPWC SPECIFICATIONS. 6. SECURE RIGHT-OF-WAY PERMIT BEFORE BEGINNING CONSTRUCTION IN PUBLIC RIGHT-OF-WAY. 7. ALL CONSTRUCTION WITHIN AND ADJACENT TO THE PUBLIC RIGHT OF WAY TO BE APPROVED AND ACCEPTED BY THE CITY. 8. CONCRETE MIX DESIGN PER ISPWC STANDARDS, 28 DAY STRENGTH 4000 PSI, AIR CONTENT 6.5% +-1.5%12"24"6"2"4" MIN. OF 3/4" (MAX) AGGREGATE BASE GRAVEL UNDER CURB 6"R=1/2" LIP OF CURB R=1/2"R=1" R=3" ± 1" STANDARD 6" 9ERTICAL CURB DETAIL NO SCALE 701-A TYPCIAL 6" RE9ERSE (SPILL CURB) NO SCALE 701-B NOTES: 1. GRADE AND ALIGNMENT TO BE APPROVED BY THE ENGINEER. 2. 1/2" EXPANSION JOINT MATERIAL AT TERMINAL POINTS OF RADII. 3. CONTINUOUS PLACEMENT PREFERRED, SCORE INTERVALS MAXIMUM 10 FEET. 4. MATERIALS AND CONSTRUCTION SHALL BE IN COMPLIANCE WITH ISPWC SPECIFICATIONS AND THE CITY. 5. BACKFILL AS PER ISPWC SPECIFICATIONS. 6. SECURE RIGHT-OF-WAY PERMIT BEFORE BEGINNING CONSTRUCTION IN PUBLIC RIGHT-OF-WAY. 7. ALL CONSTRUCTION WITHIN AND ADJACENT TO THE PUBLIC RIGHT OF WAY TO BE APPROVED AND ACCEPTED BY THE CITY. 8. CONCRETE MIX DESIGN PER ISPWC STANDARDS, 28 DAY STRENGTH 4000 PSI, AIR CONTENT 6.5% +-1.5% SLOPE 6" R=1" R=3" ± 1" MIN. SLOPE: NORMAL CROSS SLOPE MAX. SLOPE: 1" FT.12"R=1/2" LIP OF CURB 6"2"24" 4" MIN. OF 3/4" (MAX) AGGREGATE BASE GRAVEL UNDER CURB R=1/2" CONCRETE DRAIN CHANNEL NO SCALE 702 SIDEWALK SECTION - TYPICAL STREET SIDEWALK SECTION NOTES: 1. CONTRACTION JOINTS SHALL BE PLACED AT A MAXIMUM INTERVAL OF 5' (FT.). 2. EXPANSION JOINTS SHALL BE PLACED AT EXISTING JOINT STRUCTURES, POINTS OF CURVE AND AT MAXIMUM INTERVALS OF 30' (FT.). EXPANSION JOINT (E.J.) CONTRACTION JOINT (C.T.J.) 4" TYPICAL SIDEWALK INSTALLATION NO SCALE 709-A TYPICAL HANDICAP RAMP NO SCALE 712 PROFILE VIEW PLAN VIEW FLOWCL PL VARIES VARIES 4" (IN.) SDR-35 SEWER PIPE BENDS AS REQUIRED 6" (IN.) BEDDING 4" "Y" ROTATED 45° FROM HORIZONTAL UNLESS OTHERWISE SPECIFIED SLOPE ± 1/4" (IN.) PER FT. MIN. WATERTIGHT CAP & PLUG MAIN LINE CONNECTION FOR NEW PUBLIC SEWERCONNECTION FOR LATERAL SEWERS PREFABRICATED "Y" OR TAPPING SADDLE LOCATED IN TOP HALF OF PIPE 4" SDR-35 SERVICE LINE MIN. SLOPE = 2.00% OR 1/4" PER FOOT SEWER LATERAL - LESS THAN 10" (IN.) Ø 45° ELBOW PREFABRICATED "Y" OR TAPPING SADDLE IF REQUIRED NOTES: 1. ALL TAPS TO EXISTING SEWER SHALL BE LOCATED IN THE UPPER HALF OF THE PIPE. 2. AN APPROVED TAPPING SADDLE SHALL BE REQUIRED FOR ALL NEW TAPS TO EXISTING SEWER LATERALS. 45° SEWER SER9ICE TAPPING DETAIL NO SCALE 511 STANDARD SEWER SER9ICE NO SCALE 512 CLEAN-OUT VARIES WITHIN 5'FACE OF BUILDING ASPHALT PA9EMENT SECTION DETAIL NO SCALE 810-A 3/4" MINUS GRADATION AGGREGATE LEVELING COURSE SIEVE 1" 3/4" #4 #8 #200 % PASSING 100 90-100 40-65 30-50 3-9 2" MINUS GRADATION AGGREGATE SUBBASE SIEVE 2" 1" #4 #30 #200 % PASSING 90-100 55-83 30-60 10-25 0-8 CLASS II PLANT MIX THREE SEPARATE STOCKPILES TWO COARSE AND ONE FINE (3/4" NOMINAL MAXIMUM SIZE) 4" DEPTH CRUSHED 3/4" MINUS AGGREGATE LEVELING COURSE COMPACTED TO 95% STANDARD PROCTOR DENSITY 3" CLASS II PLANT MIX PAVEMENT PG 58-28, 3/4" MIX DESIGN 12" DEPTH 2" MINUS PIT RUN COMPACTED TO 95% STANDARD PROCTOR DENSITY SUBGRADE EARTH COMPACTED TO 95% STANDARD PROCTOR DENSITY NON-WOVEN GEOTEXTILE FABRIC (AS REQUIRED BY CITY DESIGN STANDARDS) TRENCH BACK FILL I.S.P.W.C. SECTION 302 (VARIES STORM/SEWER)(5' MIN./6' MAX WATER)6" METALLIC WARNING TAPE ABOVE ALL WATER MAINS AND IRRIGATION MAINS TYPICAL ROADWAY SECTION TYPE 'P' ROADWAY REPAIR * 1 TYPICAL UNIMPROVED AREA SECTION *SEE OSHA SECTION NOTE:12 GA. TRACER WIRE REQUIRED ON ALL WATER/IRRIGATION MAIN AND SERVICE LINES IN ACCORDANCE WITH ISPWC.DEPTH OVER 5' (FT.) UNSUPPORTED18"-24"12""PIPE ZONE"5' (FT.) MAX.UNSUPPORTED HEIGHT6"6"PIPE O.D.12" PIPE O.D. TYPICAL TRENCH SECTION PIPE BEDDING DETAIL NO SCALE 301 3/4" (IN.) MINUS BEDDING PER SECTION 302 FILL AS NEEDED 3/4" MINUS CRUSHED BASE4"4"6"6"4'6" 5'