Loading...
HomeMy WebLinkAbout8.13.19 Blaze Sign - w applicantOffice of Community Planning & Economic Development PO Box 5604 – 5160 Yellowstone Avenue, Chubbuck, ID 83202 208.237.2430 – Fax 208.237.2409 www.CityofChubbuck.us Design Review Committee Meeting Minutes (with applicant) August 13, 2019 Applicant: Blaze Sign Proposed site address: Gem Prep Charter School Present: Rodney Burch, Public Works Director; Devin Hillam, Community Planning and Economic Development Director; Bridger Morrison, City Engineer; Don Matson, Senior Planner; Paul Andrus, City Planner; Merlin Miller, Fire Chief; Kami Morrison, Office Administrator. From Blaze Sign, Justin (fabricator) and Nicki Johnson. Meeting today is a site plan review for monument sign at Gem Prep PROJECT REQUIREMENTS OUTDOOR ADVERTISING: Sign was not considered or proposed as part of the original Gem Prep Design Review. The Committee is concerned current location looks like it will likely cause a site triangle issue for traffic. Options to resolve the issue could be a to push the painted stop bar out towards mall ring road and move sign a little further east. Nicki said they did take that into consideration. Justin stated with long curve hard to judge where to go with site triangle. Got it as close as he could but hasn’t seen where actual stop bar is. If moved closer to building the better. Nicki questioned visibility with double sided sign. Discussion of real site triangle not where stop bar is painted. Rodney offered to have an inspector go out with them and look at where site triangle is. Justin and Nicki would like to meet on site to get a good visual. Other option is to put on pole. In order to meet site triangle requirements, the pole sign would need to be higher than 8’. Justin said they did discuss that but Gem Prep was against a pole. Also discussed blade signs but want to keep height down. Justin spoke with Tiffany at Pro Builders about chain link fence and trying to move it back for better visibility. Didn’t happen, would have effected walking track. Requirement: Justin and Nicki will meet with inspectors to get a concept of new site triangle. Nicki will then discuss with Gem Prep. Safety is priority. Did receive mall approval. Group will meet on site with inspector and building official and will require an updated site plan based on the on-site meeting and direction determined by the applicants. An email from Devin Hillam, Community Planning & Economic Development Director, was sent to Tiffany and Blaze Signs at 2:35 PM today with a proposal that would address the sign location, traffic flow, and the site triangle and Devin asked for the applicants to submit a final site plan to the Building Department. LANDSCAPING: N/A STRUCTURES AND SITE LAYOUT: Only concern is site triangle issue as previous addressed. DRAINAGE: N/A PRETREATMENT: N/A EXTERIOR LIGHTING: Lighting needs to be shielded to prevent light trespass. ENGINEERING: Only concern is site triangle issue as previous addressed. FIRE DEPARTMENT: N/A. BUILDING DEPARTMENT: Plans will go to Ray for approval. POLICE DEPARTMENT: No issues NONRESIDENTIAL WASTEWATER PERMIT: N/A BUSINESS LICENSE: N/A DEVELOPMENT AGREEMENT: N/A Minutes from today’s meeting were e-mailed to applicant.