Loading...
HomeMy WebLinkAbout012.11.17 Well 6 site planPlanning Department PO Box 5604 – 5160 Yellowstone Avenue, Chubbuck, ID 83202 208.237.2430 – Fax 208.237.2409 www.CityofChubbuck.us Design Review Meeting December 11, 2017 Applicant: City of Chubbuck Proposed site address: Unplatted land near Copperfield Landing Subdivision Present: Mayor England; Rodney Burch, Public Works Director; Devin Hillam, Planning & Development Director; Bridger Morrison, City Engineer; Randy Severe, Police Chief; Merlin Miller, Fire Marshal; Paul Andrus, City Planner; Tom Holmes, City Attorney; Nelli Simmons, Office Administrator. Meeting today is a site plan review for well # 6. It is located South of Siphon Road and North of McKay Street. This is a buried tank with a booster station on top of it and an overflow structure on the east. The pond will serve as the storm water run-off location. The buildings will have the same color scheme as the booster station at Stuart Park. An open pavilion on top of the tank has approval from DEQ to build. This will be a water educational park. The well house has an emergency generator on the south side. The well has already been drilled and there will be a generator enclosure at the well. This project is under construction and shooting to be operable by the end of August. Construction of Espie Park is TBD and will include the landscaping around the tank. Star Corp was awarded the bid for the tank.