Loading...
HomeMy WebLinkAbout009.25.17 car washJ:\Planning\Design Review\MINUTES Design Review\2017\009.25.17 car wash.docx 1 Planning Department PO Box 5604 – 5160 Yellowstone Avenue, Chubbuck, ID 83202 208.237.2430 – Fax 208.237.2409 www.CityofChubbuck.us Design Review Meeting September 25, 2017 Applicant: Austin Anderson Proposed site address: 4500 Yellowstone Avenue Present: Mayor England; Rodney Burch, Public Works Director; Devin Hillam, Planning & Development Director; Bridger Morrison, City Engineer; Randy Severe, Police Chief; Merlin Miller, Fire Marshal; Paul Andrus, City Planner; Ray Griffin, Building Official; Aaron Harker, Code Enforcement; Tom Holmes, City Attorney; Nelli Simmons, Office Administrator. Kyle Benson and Brandon Pullin were in attendance representing the application. A linear tunnel car wash is planned to replace the Mr. Mower building. The summer hours will be 7 -10, winter 8-9. On the average this is a 5 to 8 month build. The roll-up door will help with noise pollution. PROJECT REQUIREMENTS TRAFFIC SAFETY AND TRAFFIC CONGESTION: There are 3 pay stations to use the facility. There should not be a problem with cars ending up on Yellowstone Avenue waiting to move onto the property. TRAFFIC STUDIES, UTILITY STUDIES: Entrance off Central Way would be beneficial if ITD puts in a divider on Yellowstone Avenue. OUTDOOR ADVERTISING: Ray will process the sign permit application. Signs on the side of the building along with a possible marque are planned. Maximum height for a sign is 70’. Over 35’ requires special approval. Site triangle visibility is between 3’ and 10’. LANDSCAPING: 5% of the paved area needs to be landscaped. A 10’ landscaping strip is required on the street frontage. 1 tree every 50’ needs to be planted, they can be clumped together. Tree list was provided. STRUCTURES AND SITE LAYOUT: Submit a Formal Request to City Council for approval of parking spaces. DRAINAGE: Stormwater drainage will be engineered and retained on site. J:\Planning\Design Review\MINUTES Design Review\2017\009.25.17 car wash.docx 2 PRETREATMENT: Oil, sand and silt separator will be required. EXTERIOR LIGHTING: Lighting needs to be shielded to prevent light trespass. ENGINEERING: Platting has not been done. They would like to submit the short plat application, turning it in 2 weeks prior to the City Council meeting. Council meets on the 1st and 3rd Wednesdays at 6:30 pm. Someone will need to be in attendance to represent the application and formal request. The 3 water lines at the main will need to be capped. Yellowstone Avenue line could be used for irrigation. Yellowstone Avenue access needs to be a 20’ curb radius. To meet that requirement the access may need to be moved south. FIRE DEPARTMENT: no issues BUILDING DEPARTMENT: Plans will go to Ray for approval. Canopy will involve steel columns. City uses front loading sanitation trucks for commercial services. Ray will issue the demolition permit. POLICE DEPARTMENT: During construction mud and dirt will need to be controlled along with property maintenance. Any storage building will need to be screened off. NONRESIDENTIAL WASTEWATER PERMIT: required BUSINESS LICENSE: required Minutes from today’s meeting were e-mailed Kyle at riverrat351@gmail.com and Brandon at brandon@crsa-us.com on 9.26.17