Loading...
HomeMy WebLinkAbout008.25.15 Gary Ratliff Intermt Storage ExpansionCity of Chubbuck Design Review August 25, 2015 Applicant: Gary Ratliff / Rich Phillips Proposed site address: Intermountain Storage expansion at 4860 Burley Drive Present: Steve Smart, Public Works Director; Rodney Burch, Assistant Public Works Director; Paul Andrus, City Planner; Sean Harris, Engineering Technician; Ray Griffin, Building Official; Eric King, Fire Chief; Tom Holmes, City Attorney; Nelli Simmons, Administrative Assistant. Rich Phillips was in attendance representing the application. Meeting today is a site plan review for expansion of Intermountain Storage. Single family storage units are planned. A cul-de-sac on Laurel Lane and Burley Drive with gates is proposed. Water line will need to be completed and protected with an easement. Staff suggests submitting a new lay out to the city showing water lines ect. Making decisions off of the old drawings is tough. If the plan is to build in phases that also will need to be discussed. A second meeting will be scheduled. Spring start is planned. PROJECT REQUIREMENTS TRAFFIC SAFETY AND TRAFFIC CONGESTION: Gravel will be in between the storage units. OUTDOOR ADVERTISING: No additional signage is planned. LANDSCAPING: Paul will find out if fencing is required. STRUCTURES AND SITE LAYOUT: Need new plans. DRAINAGE: A plan needs to be in place. PRETREATMENT: Not needed, there are no floor drains, only domestic waste. EXTERIOR LIGHTING: Lighting is required to be shielded to prevent light trespass. ENGINEERING: Platting will need to be done. Sean stated it could be a short plat on lot 4 to create easement on the water line and a cul-de-sac on the north end. FIRE DEPARTMENT: Knox box will be required. There will need to be a hydrant on the south end of the units. New plans will need to show 3 to 4 fire hydrants depending on code. BUILDING DEPARTMENT: Plans will go to Ray for approval. POLICE DEPARTMENT: Not in attendance. BUSINESS LICENSE: Is in place. Minutes from today’s meeting were e-mailed to riphil2@gmail.com on 8.25.15