Loading...
HomeMy WebLinkAboutDR Paul PascarelliDesign Review Minutes May 17, 2005 Present: Mayor John O. Cotant, Tom Holmes -City Attorney, Steven Smart, Larry Kohntopp, Rob Ray -Tree Committee, Eric King, Jean Higgins, Ken Quinn, Tracy Letzing -Tait & Associates and Paul Pascorelli -CM Architects for WalMart Meeting commenced at 10:32 am. Pascorelli described the scope of his work and proposed project for expanding the garden center at WalMart. He shared his informal preliminary drawings of Options #1 and #2. He said pallets of stock now stored in the parking area would be brought into the new storage area. Staff discussed parking area gained vs. parking area lost. Letzing said they still need to confirm the actual parking figures. Pascorelli noted that WalMart likes to maximize parking, and the usual goal is a 5:1000 ratio. Ray asked if the usual chainlink fencing with slats would be used to enclose the area. Pascorelli said they can meet city requirements. He said there will be a double egress door and access gates with ramps in the front and back. Larry asked if the project will affect existing landscaping. Pascorelli said it would not, unless the location of the expansion were changed. Steve asked how high they would be stacking. Pascorelli said three levels are planned. Eric asked if the new area would be sprinklered. Pascorelli responded that no canopy at all was planned for the storage, so Eric confirmed it would be considered "high-pile storage." It would probably just be 12-foot fencing. Pascorelli said no masonry materials would be stored along the fence. Staff had positive feedback. Some commented on the improved parking. Jean noted there would be less calls to the Police about theft. Larry asked Pascorelli and Letzing to figure the parking and to bring us the totals. Ray said he will update Staff on the permit status. Steve said there was no need for another meeting. Meeting adjourned at 11:01 am. CITY OF CHUBBUCK, DESIGN REVIEW MEETING IDAHO APPLICATION The purpose of this application is to establish a meeting and review time with the City of Chubbuck Design Review Team consisting of the Mayor, Building Official, City Planner, City Engineer, Fire Marshal, Police Chief and other City staff as required. The Design Review Team meets every Tuesday morning between the hours of 10:30 and 11:30 AM. This team will work in unison, with you, to establish the criteria for your project as it relates to the adopted ordinances of the City of Chubbuck. Keep in mind, this is an informal review and is only conducted on submitted applications. This is a review team not a design team. Provide (10) ten sets of drawings, (8 1/2 X 11), at least eight days in advance of your scheduled meeting. Formal review of your plans or project by City Staff is conducted after formal application. Once you schedule your Design Review, it is very important to keep that appointment so others can be scheduled accordingly. Applicant/Agent: CM Architecture - Paul Pascarelli (PLEASE PRINT) Telephone Number: 1-817-877-0044 Mailing Address: Fort Worth, Texas Walmart Store, Garden Center Expansion 4240 Yellowstone Ave. Project Title: Location: Parcel Number: Purpose For The Review: Site Plan Approval Meeting Request Date: Alternate Date: Approved Date: Approved Time' (Tuesdays only) (10:30 to 11:30) (Notify Applicant) (Be at permit counter at least 15 minutes prior to your scheduled ti~ City Official: I~. Koh~topp Date: ~ / [~ Fee - $25 Initials Receipt # Please pay Design Review fee prior to the meeting time. Do not request or expect to get on the Design Review agenda in fewer than 8 days prior to the regularly scheduled Tuesday meeting! Ill !I 1 ~ Talt & Associates, Inc. Engineering · Architecture · Environmental 'Engineering Solutions to Enhance Project Value' Orange County · San Diego · San Francisco · Sacramento · Phoenix · Reno · Las Vegas · Denver · Boise www.talt.com Wal'Mart Stores Inc Store # 1995 Chubbuck, ID %%, C.M. ARCHITECTURE P.A. 200 BaileY Avenue, Suite 310 Fort Worth, Texas 76107-1210 Office (817) 877-0044 O. Cotant, Mayor Thomas J. Holmes, City Attorney Ron C. Conlin, City Clerk/Treasurer Steven M. Smart, Public Works Director City of Chubbuck P.O. Box 5604 5160 Yellowstone Ave. Chubbuck, ID 83202-0006 Phone (208) 237-2400 DESIGN REVIEW COMMITTEE MEETING AGENDA May 17th, 2005 Leroy S. Quick, Councilman Steven M. England, Councilman Marv C. Gunter, Councilman Kent Kearns, Councilman TO: DESIGN REVIEW COMMITTEE MAYOR JOHN O. COTANT ATTORNEY TOM HOLMES STEVE SMART RAY GRIFFIN RANDY SEVERE JEAN HIGGINS ERIC KING MERLIN MILLER LARRY KOHNTOPP - STAFF SEAN HARRIS - STAFF JASON MENDENHALL - 4983 PLEASANT VIEW ROB RAY, TREE COMMITTEE, 803 E. MOUNTAIN PARK FROM: RON C. CONLIN DESIGN REVIEW COMMITTEE MEETING WILL BE CONDUCTED - 10:30 a.m, Tuesday, May 17th, 2005 in regards to a site plan approval, Wal- Mart Store, Garden Center Expansion. IF YOU WILL NOT BE ABLE TO ATTEND, PLEASE ADVISE. THANK YOU RON CONLIN