Loading...
HomeMy WebLinkAbout09 30 1997DESIGN REVIEW COMMITTEE MEETING MINUTES September 30, 1997 DESIGN REVIEW SUBJECT: Site Plan for Papa Murphy's Take and Bake Pizza. DATE: September 30, 1997. APPLICANT: Steve Vigliaturo PROJECT: Papa Murphy's Take and Bake Pizza at 4842 Yellowstone Ave. Present: Mayor John 0. Cotant, Steve Smart, Gerd Dixon, Kent Kearns, Cary Campbell, Ron Conlin, Jim Phelps, Larry Kohntopp, Jerry Rowland and Charlie Dickman. Steve Vigliaturo was present to explain the site plan for Papa Murphy's Take and Bake Pizza to be located at 4842 Yellowstone Ave. Mr. Vigliaturo said the building will be built for two tenants. Mr. Vigliaturo said he is willing to share an access with the Mall at W. Chubbuck Rd. and Yellowstone Ave. Mr. Vigliaturo stated the completion date for the shell of the building is January 15, 1997. He said Papa Murphy�s will do the interior. The building will look like the Great American Video mall to the west. Cary told Steve Vigliaturo a seal is required on the building. Papa Murphy's will do no cooking, nor food preparation in the building, if there is a change-, Papa Murphy's is required to install grease traps. PWD Smart stated a swale for drainage should be included in the landscaping requirement. The landscaping requirement should be 5% of the parking lot. It was decided, the site plan does show the 5% landscaping required. PWD Smart stated he would like Steve Vigliaturo to work with Gerd and Steve while installing required radius approach to property and swale. The project is approved sub.iect to, Mr. Vigliaturo contacting Gerd Dixon or Steve when making the chapges on site plan, when installing the swale for drain� ess to property. 4/ohn 0. Cotant, Mayor SEPTEMBER 25, 1997 TO: DESIGN REVIEW COMMITTEE FROM: RON CONLIN RE: DESIGN REVIEW COMMITTEE MEETING WILL BE CONDUCTED AT 10:30 A.M, TUESDAY, SEPTEMBER 30, 1997 INREGARDS TO PAPA MURPHYS PIZZA, ON OLD MYRTLES PROPERTY NEAR SMITH'S FOOD KING ON YELLOWSTONE AVE. THERE WILL BE A DESIGN REVIEW COMMITTEE MEETING, IF YOU WILL NOT BE ABLE TO ATTEND, PLEASE ADVISE. H>NKS RON { + t J , t r t k 7v DESIGN REVIEW COMMITTEE MEETING MINUTES September 30, 1997 DESIGN REVIEW SUBJECT: Pan Fry Restaurant DATE: September 30, 1997. APPLICANT: Jack Lei PROJECT: Jack Lei wants to operate Pan Fry Restaurant at 141 E. Linden Ave. Present: Mayor Cotant, Steve Smart, Ron Conlin, Cary Campbell, Charlie Dickman, Gerd Dixon, Jerry Rowland, Jim Phelps, Kent Kearns and Larry Kohntopp. Jack Lei and Ed Lei were present to present a site plan for the change over from Vicki's Hitchin Kitchen to Pan Fry Restaurant at 141 E. Linden Ave. Cary told Mr. Lei an architect seal is required because of requested changes. Gerd Dixon explained the requirement of 1600 gallon grease interceptor. Mr. Lei stated they are working with the prior owner on getting the grease interceptor installed. Mr. lei stated they will do want is required. Discussion about improving the landscaping requirement, the prior owners did not do what was required. Mr. Lei was told he is required to grass the landscaping required, also install an automatic sprinkler system. Lee Madden, Madden's Towing will have to arrange for a different access than what he has been using. The Design Review Committee approved the site plan as presented subject to, 1) Landscaping requirement, including grass with automatic sprinkler system. 2) Required grease interceptors installed. (� pohnaO. ACotangt, M4ayor;d- I SEPTEMBER 29, 1997 TO: DESIGN REVIEW COMMITTEE FROM: RON CONLIN RE: DESIGN REVIEW COMMITTEE MEETING WILL BE CONDUCTED AT 11:00 A.M, TUESDAY, SEPTEMBER 30, 1997 INREGARDS TO PAN FRY RESTAURANT, JACK LEI AT THE "OLD HITCHIN KITCHEN". THERE WILL BE A DESIGN REVIEW COMMITTEE MEETING, IF YOU WILL NOT BE ABLE TO ATTEND, PLEASE ADVISE. THANKS� RON 4. 1 I � _ _ a. DESIGN REVIEW COMMITTEE MEETING MINUTES September 30, 1997 DESIGN REVIEW SUBJECT: Ecowater DATE: September 30., 1997. APPLICANT: Brad Hamilton PROJECT: Brad Hamilton wants to put his business, Ecowater into 4751 Yellowstone Ave. (formerly Wally's Automotive) Present: Mayor Cotant, Steve Smart, Ron Conlin, Cary Campbell, Charlie Dickman, Gerd Dixon, Jerry Rowland, Jim Phelps, Kent Kearns and Larry Kohntopp. Brad Hamilton was present to present his proposed site plan for Ecowater at 4751 Yellowstone Ave. Cary said Mr. Hamilton will not be required to have an architect sea]. for this project. Mr. Hamilton said he would like to build a facade to the fro -fit of the building. Mr. Hamilton was told of I anu's c av, i fig requireirient. Mr. Hamilton said he is 4--arin,-4 out asphalt in front of bi-ii.1ding and will �Tista'l 1 requirement, which includes grass and aiitom-at -ic s-p_virllk�'Ling s�,stem. There will be entrance to front v -,or t � "ton has plenty of parking spaces. -at r. r e d M r . Ha irt -L I a r y t o I d Mr. Hamilton he is required to have an accessible bathroom -if he has an employee. Discussion about window to the east., if on the property line, Mr. Hamilton is require install a protective window or discontinue having the window there. Mr. Hamilton stated he would like to have a sign. Cary stated the sign is required to be below 3' or above 10' should be behind the curb 7 to 7 1/2 feet. Design Review Committee approved landscaping requirement being Certificate of Occupancy. �*Cot�ant, Mayor ohn 0. Co the site plan subject to installed prior to issuing a