Loading...
HomeMy WebLinkAbout11 24 1998-k,. DESIGN REVIEW COMMITTEE MEFTING MINUTES November 24"'., 1998 DESIGN REVIEW SUBJECT: Building constructed at Frasure Industrial Park. DATE: November 24"., 1998 APPLICANT: Jim Thilmont PROJECT: Building - Frasure Industrial Park Present: Mayor John 0. Cotant, Steven Smart, Cary Campbell, Eric King, Ron C. Conlin, Jim Phelps, Lat'ry Kohntopp and Gerd Dixon. Gary Chisum, Pro -Builders explained the building is to be used for antique car storage. The following was discussed and required: I . 4' Sidewalk Requirement. 2. 10' Landscaping, with automatic sprinkling system is required. 3. Builder is not requesting an access at this time. 4. Will pay sewer capacity fee and water deposit up front. 5. On-site paving is not required until any future development is made. 6. Gate for emergency vehicle response is required. 7. Required to install an approach on Rainbow. Gary Chisurn stated the fencing requirements are I'mished. Jim Phelps said he xili check on. Gary Chisum said he will take care ofthe complaints, the Cltyrecol-.ved in regards to mud being tracked from large trucks from the property. Mr. ChIsurn stated the building N,� lil be finished in phases. Gerd said he has no problem with the site -plan. Design Review Committee approved the site -plan, subject to the seven requirements above. November 20, 1998 TO: DESIGN REVIEW COMMITTEE FROM: Ron Conlin RE: DESIGN REVIEW COMMITTEE MEETING WILL BE CONDUCTED AT 11:00 a.m., TUESDAY, NOVEMBER 24""., 1998, IN REGARDS TO BUILDING BEING CONSTRUCTED IN FRASURE INDUSTRIAL PARK JIM THILMONT THERE WILL BE A DESIGN REVIEW COMMITTEE MEETING, IF YOU WILL NOT BE ABLE TO ATTEND, PLEASE ADVISE. THANKS, RON S. Ron, Rocky Mountain Engr has requested a design review rntg for a building that is being constructed in Frasure Industrial Park for Mr. Tilillont. I have told thern to be here at 11:00 am Thanks Gerd Mw ',�b�