DESIGN REVIEW MEETING MINUTES
June 21", 2000
APPLICANT: Mike Klingner, Kit Manufacturing.
DATE: June 21', 2000
PROJECT TITLE: Kit Manufacturing Co.
PURPOSE FOR REVIEW: Approval of Kit Courtyard Plan at 4708 Yellowstone Ave.
Present: Mayor John 0. Cotant, Attorney Tom Holmes, Steve Smart, Jerry Rowland, Ray Griffin,
Merlin Miller, Ron Conlin, Jim Phelps and Larry Kohntopp.
Donn Fenner and Mike Klingner, Kit Manufacturing Company was present to present the Kit
Courtyard Site Plan and a proposed sign.
Mr. Klingner felt they need two accesses on Yellowstone Ave. for moving the production homes
in and out. Mr. Klingner felt there could not be adequate landscaping with only one
access.
Steve Smart explained the Access Management Guidelines adopted by the City Council.
Discussion about the sign regulations. Mr. Klingner was told the sign is required to meet the City
Site Triangle Code, either by installing the sign back further off Yellowstone entrances or
raising the bottom of the sign to I 0'rather than the 6' shown on proposed site plan.
The following was discussed:
1. PWD Smart stated a radius turn cut is required, maximum of 40'.
2. The production homes on Yellowstone Ave. should be grassed with automatic
sprinklers beyond the office building.
3. FD Merlin Miller stated there needs to be access for emergency vehicles.
4. Fire Department requires address numbers to visible.
5. Office building needs to be anchored.
6. Mr. Klingner said he will clean up the structure on the property.
Mr. Klingner was asked to present a new site plan showing one access, a radius turn, 40'
maximum..