Loading...
HomeMy WebLinkAbout08 02 2000DESIGN REVIEW MEETING MINUTES August 2, 2000 APPLICANT: Home Depot DATE: August 2"d, 2000 PROJECT TITLE: Home Depot PURPOSE FOR REVIEW: Approval of Home Depot Elevations Present: Mayor John O. Cotant, Steve Smart, Ray Griffin, Larry Kohntopp, Eric King and Ron Conlin. Robin Salagio, Home Depot presented the elevation plans. Robin Salagio said they are in the process of a traffic study for Hawthorne Road, should be completed by August 16`h, 2000. Robin Salagio stated Price Development is not talking to them about the road to Hawthorne Road from the Mall. Mayor Cotant suggested Home Depot construct a road to the north of the existing road going to Hawthorne Road, with a median between them. Then if it can be worked out with Price Development there will be a shared road going in to the Mall, a median, and a road going to Hawthorne Road. If it cannot be worked out with Price, Home Depot will have the two way road they constructed. Design Review Committee approved the elevation design as presented. John O. Cotant, Mayor Thomas J. Holmes, City Attorney Ron C. Conlin, City Clerk/Treasurer Steven M. Smart, Public Works Director City of Chubbuck CE=> P.O. Box 5604 5160 Yellowstone Ave. Chubbuck,ED 83202-0006 Phone (208) 237-2400 Leroy S. Quick, Councilman Steven M. England, Councilman Mary C. Gunter, Councilman Kent Kearns, Councilman DESIGN REVIEW COMMITTEE MEETING AGENDA August 2nd, 2000 TO: DESIGN REVIEW COMMITTEE MAYOR JOHN O. COTANT ATTORNEY TOM HOLMES STEVE SMART RAY GRIFFIN DUSTY WHITED - 4640 TETON JERRY ROWLAND ERIC KING LARRY KOHNTOPP - STAFF SEAN HARRIS - STAFF MORI BYINGTON - BPO - P.O. BOX 6079 - POCATELLO FROM: RON C. CONLIN RE: DESIGN REVIEW COMMITTEE MEETING WILL BE CONDUCTED AT 11:00 a.m. on August 2nd., 2000 for the purpose of review Home Depot elevations. IF YOU WILL NOT BE ABLE TO ATTEND, PLEASE ADVISE. THANK YOU RON CONLIN CHUBBUCK CITY CLERK CITY OF CHUBBUCK, IDAHO DEVELOPMENT REVIEW MEETING APPLICATION The purpose of this application is to establish a meeting and review time with the City of Chubbuck Development Review Team consisting of the: Building Official, City Planner, City Engineer, Fire Marshal and other City staff as required. The Development Review Team meets every Tuesday morning between the hours of 10:30 and 12:00 Noon This team will work in unison, with you, to establish the criteria for your project as it relates to the adopted ordinances of the City of Chubbuck. Keep in mind, this is an informal review and is only conducted on submitted applications. This is a review team not a design team. Provide (8) eight sets of drawings at least one week in advance of your scheduled meeting. Formal reviews of your plans or project by City staff is conducted after formal application. Once you make your appointment and it is verified, it is very important to keep that appointment so others can be scheduled accordingly. Applicant /Agent:e� "/J� ` (PLEASE PRINT" Telephone Number: Mailing Address: Project Title: ` Location: n Parcel Number: Purpose For The Review: Meeting Request Date: R/ 0 (Tuesdays only) Alternate Date: / / (10:30 to Noon) Approved Date: Approved Time: / .Z6 -C) A64 (Notify Applicant) (Be at permit coun at.least 15 minutes prior to your scheduled time) City Official: Date: /-215/ —Cyo C:IDEVREV/App EIFS MOJLDING BY EIFS BY ORYVIT— 20'-0' HIGH BLACK VINYL COATED 5TEEL WIRE FABRIC SECURITY FENCING YV PCY ER COATED BLACK STEEL TUBE POST5 t 'J FRAMING` COMPACTOR BEYOND (N.I.C) CONCRETE TILT-I:P PANELS — l I aA tll®1 xN0 SOUTH ELEVATION r.Vt VI+M 24'O' HIGH POST M MOLNTED LI6I— (SEE ELEC. pWGS.�'COORDINAT= Y1/ HOME DEPOT PROJ. NANA6E.� NORTH ELEVATION t� EIF5 MOULDING BY DRYVIT EIF5. MOULDING BY EIFS BY DRYVIT— METAL ROOF C NCRE-TE TILT -UP EXTERIOR EXIT LIGHTS (TYPJ CONCRETE 12'-O' HIGH BLACK VINYL TILT -UP COATED 5TEEL WIRE FABRIC P.N'PLS SECURITY FENCING N POWDER COAT BLACK STEEL FORNLI�`ER —� TUBE POST5 f SUB -FRAMING CONCRETE TILTi PANELS — M5T ELEVATION EIF5 MOULDING BY POST W/ MOUNTED EAST ELEVATION West Coast Support Center 3800 West Chapman Orange, CA 428b8 Tel: (-114) 440-3500 20'O' 411611 BLACK VINYL COA ED STEEL WIRE FABRIC 5E6URITY FENCING w POWDER COATED BLACK STEEL TUBE P05TS f SUB-FRAMINv CONCRETE, TILT -UP PANELS — FORMLIn-R _ Nfw•ttovJyA WALL MOUNTED LIGHT FIXTURE (TYP) '—COVEREDA-FRAME — — .x'Q rtnr, STRUCTURE _ — — spa' ha�J 20'-0' H*F BLACK VINYL COATED STEEL WIRE FABRIC 5ECURITY FENCING N POWDER COAT BLACK STEEL TUBE POSTS t'.AIB-FRAMIN6- WAIL MCUNTEO LI6HT FIXTURE TYP. LAA Project No.: 50.3421.00 Plot Scale: 1=1 Ileus Data: 017-25-00 Prapared 5y, ve 4 f'PJ Sits Dov. Coordinator: B. YSorehima R.C. Manager: Dave Kautz Rl5?G Name: 111.7 a -=."-al CHUBBUCK, ID. lid -L25 Little & Associates Architects Mea Cmis.G 91TA _._ s T" SYgls C6f111101 ••�. lu C6411Lm