HomeMy WebLinkAbout10 07 2003BDESIGN REVIEW COMMITTEE MEETING MINUTES
October 7", 2003
APPLICANT:
PROJECT TITLE:
106167:WINS
PURPOSE FOR REVIEW:
Hawkins Companies, 8645 W. Franklin Road, Boise,
Idaho.
Yellowstone Place.
SWC Interstate 86 and Yellowstone Ave.
Site Plan approval for a retail pharmacy with drive-thru
window.
Present: Mayor John O. Cotant, Attorney Tom Holmes, Steve Smart, Richard Webb, Ray Griffin,
Eric King, Ron Conlin, Jean Higgins and Larry Kohntopp.
Brian Huffaker, Hawkins Co. was present to present a site plan for future development of a
WalGreen Pharmacy at Interstate 86 and Yellowstone Ave, (presently Chevron Station
and Oxbow Rest. and Motel).
Considerable discussion about access on to Yellowstone Ave. Richard Webb expressed concern
about being able to turn left from access on Yellowstone Ave. Richard stated there are a
lot of accidents there now, but this would increase the accidents. Discussion about the
State installing a medium from the Interchange light to Bullock Road in the future, this
will stop right turns onto Yellowstone Ave. The access allowed is required to be a shared
access with WalGreen and the development to the north. WalGreens purchased all the
property from Brenenman Road. WalGreens will access to Brenenman Road also.
Steve Smart stated the owners of the Pine Ridge Mall control access on Breneman Road.
The Oxbow Motel will be gone, but the Pine Ridge Apartments will stay.
Eric King stated there will be a fire hydrant required on the property site.
Steve told Mr. Huffaker the development will require a subdivision plat.
Design Review Committee gave approval to site plan with the following conditions:
1. One shared access on Yellowstone Ave to line up with Bullock St. to the east.
2. Breneman Road access agreement with Pine Ridge Mall.
3. Stormwater is required to be contained on property.
4. Meet all sign and parking requirements as specified in the Chubbuck City Code
5. 10' Landscaping with automatic sprinkling system fronting Yellowstone &
Breneman.
6. Whatever is required on grease trap requirements.
7. Fire Department is requiring a lock box on the building.
8. The property is required to go through subdivision platting procedure.
Breneman Road POOO
1 \vn,h cUmnAna,[.ngrJ, w YJL-.Wa .vrX.,nsvg, "/2`,11,1 ?;q: n,p
2UU- clir Ur UHUbbUUK
UUD rU2 str 'U_1 iU:UU
CITY OF CHUBBUCK, IDAHO
DESIGN REVIEW MEETING APPLICATION
The purpose of this application is to establish a meeting and review time with the City of
Chubbuck Design Review Team consisting of the: Mayor, Building Official, City Planner,
City Engineer, Fire Marshal, Police Chief and other City staff as required. The Design Review
Team meets every Tuesday morning between the hours of 10:30 and 12:00 Noon.
This team will work in unison, with you, to establish the criteria for your project as it
relates to the adopted ordinances of the City of Chubbuck. Keep in mind, this is an
informal review and is only conducted on submitted applications. This is a review team
not a design team. Provide (6) six sets of drawings at least eight days in advance of your
scheduled meeting. Formal reviews of your plans or project by City staff is conducted
after formal application. Once you make your appointment and it is verified, it is very
important to keep that appointment so others can be scheduled accordingly.
Applicant /Agent: Hawkins Companies
(PLEASE PRINT)
Telephone Number: 208-947-4741
Mailing Address: 8 645 IN Franklin Rd
Boise ID 83709
Project Title:
Location:
Yellowstone Place
SWC Interstate 86 & Yellowstone Highway
Parcel Number: RCCPCO29403 & RCCPCO29301
Purpose For The Review: -Site plan approval for a
retail pharmacy with drive-thru window
Meeting Request Date:
Alternate Date:
Approved Date:
Approved Time:
M
MN
MW
gee
OMEN
MM
MM
OR :11
(Tuesdays only)
(10:30 to Noon)
(Notify Applicant)
(Be at permit counter at least 15 minutes prior to your scheduled time.
City Official: L. KohntWp Date:o 9 1EE1 0 3
Fee - $25 Initials
Receipt #
Please pay Design Review fee prior to the meeting time.
Do not request or expect to get on the Design Review agenda in fewer
than 8 days prior to the regularly scheduled Tuesday meeting!
DESIGN REVIEW COMMITTEE MEETING AGENDA
October 7, 2003
TO: DESIGN REVIEW COMMITTEE
MAYOR JOHN O. COTANT
ATTORNEY TOM HOLMES
STEVE SMART
RAY GRIFFIN
RICHARD WEBB
ERIC KING
LARRY KOHNTOPP - STAFF
SEAN HARRIS - STAFF
JASON MENDENHALL - 4983 PLEASANT VIEW
FROM: RON C. CONLIN
RE: DESIGN REVIEW COMMITTEE MEETING WILL BE
CONDUCTED at 11:00 a.m, Tuesday, October 7, 2003 in regards to a site
plan approval for retail pharmacy with drive-thru window for Hawkins
Companies, Boise, Idaho located at Northwest Corner of Yellowstone Ave.
and Breneman.
IF YOU WILL NOT BE ABLE TO ATTEND, PLEASE ADVISE.
THANK YOU
RON CONLIN
Breneman Road
I: K Y•.14iw:turi+\.iN 17 9/2f•/2i1,3 3:51:31i W
u
Bullock Street
WALGREENS
186 & Yellowstone
Pocatello, ID
SCALE: 1" = 60'
Projects/Idaho/Pocatello/186 & Yellowstone/Site 16 9-25-03.dwg
SITE RECAP
TOTAL SITE AREA: 4.7 Acres
TOTAL WALGREENS AREA: 1.5 Acres
BUILDING AREA
Walgreens 14,490 S.F.
TOTAL:* 14,490 S.F.
BUILDING FACTOR N0, OF STAID
Walgreens 4/1000 58
PARKING REWIRED:
58
PARKING SHOWN:
59
Projects/Idaho/Pocatello/186 & Yellowstone/Site 16 9-25-03.dwg
H A WK I N S 8645 W. FRANKLIN ROAD
Companies 828)ID7608853209
FAX: (208) 376-8523
Commercial Developers
Super Wal—Mart
--------InTe_rstaT_e_86—
Home Depot
II
Interstofe 86 off ro I I
mp I
II
II
O I
N eI I
9.0'
J aw •0'
WALGREENS
14,490 S.F. 13
g
Mall
o m
D on s
s libls 6
Brenemon Road
Bullock Street
WALGREENS
186 & Yellowstone
Pocatello, ID
SCALE: 1" = 100'
P,o*te/Idaho/Pocotello/I86 k Yellowstone/Site 16 9-25-03.dw9
LN
SITE RECAP
TOTAL SITE AREA: 4.7 Aa
TOTAL WALGREENS AREA: 1.5 Aces
BUILDING AREA _
W019reena 14,490 S.F.
TOTAL 14,490 S.F.
BUILDING FACTOR NO, OF STALLS
WW9reens 4/1000 58
PARKING REQUIRED:
58
PARKING SHOWN:
59
P,o*te/Idaho/Pocotello/I86 k Yellowstone/Site 16 9-25-03.dw9
LN
H A WK I N S 6645 W. FRANKLIN ROAD
CompanIes BOISE, IDAHO 83709
208 376-8522
FA : (06) 376-8523
Commercial Developers
Super Wal—Mart