Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
07 12 2005
DESIGN REVIEW COMMITTEE MEETING MINUTES July 12'h, 2005 APPLICANT: PROJECT TITLE: LOCATION: PURPOSE OF REVIEW: Gate City Christian Church Gate City Christian Church Campus Development. 202 West Siphon Road Site Plan Approval. Present: Mayor John O. Cotant, Attorney Thomas J. Holmes, Steve Smart, Larry Kohntopp, Jean Higgins, Randy Severe, Ron Conlin, Ray Griffin, Eric King and Jason Mendenhall. Ken Snyder, CSHQA, Architect was present to present the proposed site plan. Mr. Snyder stated the project is permanent, energy efficient and economical. Mr, Snyder stated they are not sure of the color yet. Mr. Snyder stated they are going to sprinkle the entire structure. Base on their budget the project will be build in phases. Mr. Snyder said the Sanctuary will seat 364 people with possible growth of 450 people. Land Use Member Jason Mendenhall suggested the proposal go before the Land Use Commission as a conditional use permit. Discussion about whether or not the proposal should go before the Land Use & Development Commission as a conditional permit. The site plan was approved, subject to City Council approval with the following conditions: I O' Landscaping along Siphon Road and 5% interior landscaping, with automatic sprinkling system. Storm water drainage is to be retained on site. Gate City Church is required to work with City Engineer to meet regulations. Curb, gutter and sidewalk along Siphon Road. 4. One access to Siphon Road. 5. Required to have a Radius type street approach. 6. Clear address on buildings. 7. Required to have a Knox box. 8. Required to comply with grease trap code. 9. Site lighting is required to meet City Code. CITY OF CHUBBUCK, IDAHO DESIGN REVIEW MEETING APPLICATION The purpose of this application is to establish a meeting and review time with the City of Chubbuck Design Review Team consisting of the Mayor, Building Official, City Planner, City Engineer, Fire Marshal, Police Chief and other City staff as required. The Design Review Team meets every Tuesday morning between the hours of 10:30 and 11:30 AM. This team will work in unison, with you, to establish the criteria for your project as it relates to the adopted ordinances of the City of Chubbuck. Keep in mind, this is an informal review and is only conducted on submitted applications. This is a review team not a design team. Provide (10) ten sets of drawings, (8 1/2 X 11), at least eight days in advance of your scheduled meeting. Formal review of your plans or project by City Staff is conducted after formal application. Once you schedule your Design Review, it is very important to keep that appointment so others can be scheduled accordingly. Applicant /Agent: Gate City Christian Church - Ken Schneider (PLEASE PRINT) Telephone Number: 208-343-4635, ex. 4073 Mailing Address: 202 W. siphon Rd. Project Title: Location: Parcel Number: Campus Development 202 W. Siphon Rd. Purpose For The Review: Meeting Request Date: Alternate Date: Approved Date: Site Plan Approval 00 ©o a© (Tuesdays only) (10:30 to 11:30) Approved Time: 10:30 AM (Notify Applicant) (Be at permit counter at least 15 minutes prior to your scheduled time. City Official: L. Kohntopp Date: o 6 i 2 o i o 5 Fee - $25 Initials Receipt # Please pay Design Review fee prior to the meeting time. Do not request or expect to get on the Design Review agenda in fewer than 8 days prior to the regularly scheduled Tuesday meeting! 30' SETBACKS FROM EXSISTINC STRUCTURE INDICATOR VALVE IYDRANT )EPARTMENT CONNECTION SITE PLAN SCALE :NOT TO SCALE Y Z O QK � U Occ zLL of J O N W Z Z a V ega 6 x� ops UN6� U� U FSI ~ F w m Ua Ua Fd' = a a VIU v osas M5 07 m-m-os ow�m cxccx[o PMSFO PROPOSED SITE PLAN s¢* P2.0 i 1 FLOOR PLAN SCALE :NOT TO SCALE Y p zoo � U. Jo F W Z N 2 i V 3¢g S 3H S y s My1 .H��gd a 88833 U a a" �3i mLL$ t y � U� U FSI �z w Ua g �o F� UA � F� 2a osasB m-m-oa pYewx CrvEIXFO flENSE� 4 U TM1 PROPOSED FLOOR PLAN am P3.0 PRELIMINARY ELEVATIONS (WILL DEVELOP SITE PLAZA WITH ENTRY FEATURE) 1 ELEVATIONS SCALE : NOT TO SCALE PRELIMINARY ELEVATIONS