Loading...
HomeMy WebLinkAbout05 29 2007APPLICANT: PROJECT TITLE LOCATION: DESIGN RE�VIEW COMMITTEE MEETING MINUTES May 29", 2007 Living Waters Christian Fellowship/Rossiter Architecture. Living Waters Christian Fellowship 4883 Valenty PURPOSE OF REVIEW: Site Plan Approval for Chapel at 4883 Valenty. Present: Steve Smart, Attorney Thomas J. Holmes, Larry Kohntopp, Ron Conlin, Randy Severe and Eric King. Marshall Rossiter Architecture was present to present the proposed site plan. Marshall Rossiter stated they would like to start building in August, 2007, but these are the very preliminary stages to see what they can, and cannot do. If everything is okay they will proceed with their fund raising. After discussion, Design Review Committee approved the site plan with the following conditions: I - Discussion about required parking spaces. They are short a few parking spaces, but felt they could use their neighbor's parking lots on Sundays. Mr. Rossiter stated they can get agreements with the neighbors. 2. Sign will be on the Chapel. They are required to present a sign plan to the City. 3. 10' Landscaping with automatic sprinkling system on Valenty. Landscaping as required by Code around the property. 4. Storm water drainage is required to be on site. They will work with City Engineer. 5. Radius curb cut is required. 6. Exterior lighting should be shielded to Drotect neighbors 7. Knox Box is required. 8. Fire Hydrant is required to be within 400', 600, if the building is sprinkled. 9. Address is required to be visible from the street. 10. The building is required to be ADA Compliant. 11. Required to apply to the Land Use & Development Commission for a conditional use permit for a Church. 11� 11-� DESI CITY OF CHUBBUCK, IDAHO MEETING APPLICATI The purpose of this application is to establish a meetina and review time with the City of Chubbuck Design Review Team consisting of the 'Mayor, Building Official, City Planner, City Encrineer, Fire Marshal, Police Chief 1� and other City staff as required. The Design Review Team meets every Tuesday moming between the hours of 10:30 and 11:30 AM. This team will work in unison, with you, to establish the criteria for your project as it relates to the adopted ordinances of the City of Chubbuck. Keep in mind, this is an informal review and is only conducted on Submitted applications. This is a review team not a design team. Provide (10) ten sets of drawings, (8 1/2 X 11), at least eight days in advance of your scheduled meeting. Formal review of your plans or project by City Staff is conducted after formal application. Once you schedule your Design Review, it is very important to keep that appointment so others can be scheduled accordingly. Applicant /Agent: Living Waters Christian Fellowship/Rossiter Arch. Telephone Number: 251-1967 (PLEASE PRINT) Mailing Address: 435 S. 19th. Pocatello, ID 83204 Project Title: Chap J Location: 4883 Valenty Parcel Number: Purpose For The Review: Site Plan Approval 0 7 0 2 9 Meeting Request Date: LE Altemate Date: ED ED / M (Tuesdays only) -T-1 -1 (10:30 to 11:30) Approved Date: 0 5 M29 / FT -7 Approved Time: 10.30 AM (Notify Applicant) (Be at permit counter at least 15 minutes prior to your scheduled time.) City Official: L. Kohntopp Date: M22 Fee - $25 Initials — Receipt# Please pay Design Review fee prior to the meeting time. Do not request or expect to get on the Design.Review agenda in fewer than 8 days prior to the regularly scheduled Tuesday meeting I ,N� rr z r - m z 4 m E IrT m CITY OF CHUBBUCK Design Review Checklist Design Review Purpose: To guide the general appearance and arrangement of commercial, industrial and intense residential. uses in order to create an attractive and dynamic "downtown business center", assure the compatibility of satellite commercial establishments and industrial areas with their surrounding neighborhoods, and assure the compatibility of dense residential land uses with surrounding neighborhoods. Applicant: Name: Living Waters Christian Fellowship/Rossiter Arch. Address: 435 S. 19th. City: Pocatello, ID 83206 State: zip: D a t e: MO5 / M29 / MO7 CONSIDERATIONS: D' 1. Traffic Safety and Traffic Congestion: (Ingress, egress, off-street parking, unloading.) 13' 2. Outdoor Advertising: (Outdoor advertising signs, height, structure.) Er 3. Landscaping: (Ordinance copy, approved tree list.) d4. Structures and Site Layout: (Exterior design, buffering, fencing, site arrangement.) Er 5. Drainage: (Storm & surface water, to be engineered, retained on site.) Er 6. Pretreatment: (Minimum 1,500 gallon grease or oil/silt separator.) Ef 7. Exterior lighting: (Light shielding, light trespass.) EZ 8. Fire Department: (Knox Box, fire hydrant locations, sprinkling, visible street address.) 13 9. Building Dept.: (Professionally approved plans, ADA compliance, dumpster enclosure.) ff10. Police Department: (Safety issues.) Revised 3-19-07 - LLK 0 m CITY OF CHUBBUCK DESIGN REVIEW COMMITTEE MEETING AGENDA May 29th, 2007 TO: DESIGN REVIEW COMMITTEE MAYOR STEVEN ENGLAND ATTORNEY TOM HOLMES STEVE SMART RAY GRIFFIN RANDY SEVERE ERIC KING MERLIN MILLER LARRY KOHNTOPP - STAFF SEAN HARRIS - STAFF JASONMENDENHALL - 4983 PLEASANT VIEW ROB RAY, TREE COMMITTEE, 803 E. MOUNTAIN PARK FROM: RON C. CONLIN RE: DESIGN REVIEW COMMITTEE WILL BE CONDUCTING A DESIGN REVIEW MEETING at 10:30 am, Tuesday, May 29t", 2007, Double R Signs, Mike Teal, Redding, California for a site plan approval for a sign shop at 5341 Yellowstone Ave. IF YOU WILL NOT BE ABLE TO ATTEND, PLEASE ADVISE, THANK YOU. ME