HomeMy WebLinkAbout07 17 2007IM
APPLICANT:
PROJECT TITLE
LOCATION:
DESIGN REVIEW COMMITTEE MINUTES
July 17 1h 2007
Gary Packam, P.O. Box 3 100, Pocatello, Idaho.
Laser Wash
5024 Yellowstone Ave.
PURPOSE OF REVIEW: Site Plan Review.
Present: Mayor Steven M. England, Attorney Thomas J. Holmes, Steven M. Smart, Larry
Kohntopp, Ron Conlin, Randy Severe, Ron Osborn, Merlin Miller and Eric King.
Gary Packham, P.O. Box 3 100, Pocatello was present to present the Laser Car Wash Site Plan.
Gary Packham stated he is completely remodeling the Car Wash at 5024 Yellowstone Avenue.
The site plan was approved with. the following conditions:
1. All storm water drainage will be on site. There is a separator required but no storm
water drainage is allowed down the sewer. Mr. Packham will work with Sean Harris.
2. Landscaping requirement shall be; a) landscaping on north and south comers adjacent
to Yellowstone Ave, b) Pots with flowers in front of car wash structure.
3. Gary Packham is required to complete a non-residential waste water permit application
and return to the City.
4. Exterior lighting is required to be shielded on property as much as possible.
5. Knox box is required.
6. Address shall be clear and visible from Yellowstone Ave.
7. Sanitation dumpster shall be enclosed on three sides.
8. Required to have necessary security for cash boxes.
"I../
W -A
CITY OF CHUBBUCK, IDAHO
ESIGN REVIEW MEET
LICATION
The purpose of this application is to establish a meeting and review time with the City of
Chubbuck Desion Review Team consisting of the Mayor, Building Official, City
i�
Planner, City Engineer, Fire Marshal, Police Chief and other City staff as required.
The Design Review Team meets every Tuesday morning between the hours of
10:30 and 11:30 AM.
This team will work in unison, with you, to establish the criteria for your project as it
relates to the adopted ordinances of the City of Chubbuck. Keep in mind, this is an
informal review and is only conducted on Submitted applications. This is a review team
not a design team. Provide (10) ten sets of drawings, (8 1/2 X 11), at least eight days in
advance of your scheduled meeting. Formal review of your plans or project by City
Staff is conducted after formal application. Once you schedule your Design Review,
it is very important to keep that appointment so others can be scheduled accordingly.
Applicant /Agent: Gar� Packharn
Telephone Number: 251-8286 (PLEASE PRfNT)
Mailing Address: P.o. Box 3 100
Pocatello, ID 83206
Project Title: "Laser" Wash
Location: 5024 Yellowstone Ave.
Parcel Number:
Purpose For The Review: Site Plan Approval
Meeting Request Date:
Alternate Date:
Approved Date:
Approved Time:
(Be at Public Works Dept at least 15
(Tuesdays only)
(10:30 to 11:30)
10:30 AM (Notify Applicant)
minutes prior to your scheduled time.)
Uity Ulticial: L. Kolintopp
Fee - $25 Initials
Receipt #
Date: MO7 / r0—R9 / FOT7�
Please pay Design Review fee prior to the meeting time.
Do not request or expect to cret on the Design
Z� g Review agenda in fewer
than 8 days prior to the regularly scheduled Tuesday meeting!
M17
(Be at Public Works Dept at least 15
(Tuesdays only)
(10:30 to 11:30)
10:30 AM (Notify Applicant)
minutes prior to your scheduled time.)
Uity Ulticial: L. Kolintopp
Fee - $25 Initials
Receipt #
Date: MO7 / r0—R9 / FOT7�
Please pay Design Review fee prior to the meeting time.
Do not request or expect to cret on the Design
Z� g Review agenda in fewer
than 8 days prior to the regularly scheduled Tuesday meeting!
Laser Wash
Owned by GBD,LLC
Chubbuck residents Gary and Bobbi Packham, owners of GBD,LLC have purchased the
old D's Car Wash located at 5024 Yellowstone Hwy. In Chubbuck, ID..
D's Car Wash has not been operational since 2001. The building has been allowed to fall
in to disrepair and the equipment has become obsolete.
GBD currently operates two self -serve car washes one located in Rupert and the other in
Rexburg. The Packham's have also operated five Grease Monkey locations in Southeast
Idaho since January 2001.
GBD will provide the necessary investment to fix up the property so it is no longer an
eyesore to the community, but also a source of revenue to the Packham's and the city.
The lot will also be upgraded to include an oil/ water separator and a storm water
drainage area.
Electrical support for the property will also be upgraded to handle the needs of new car
wash equipment. The building will have roof and concrete repairs done prior to the new
exterior and interior paint application (see renderings).
The existing exterior lighting, will be used as well as the pole sign. New panels will be
replaced in the sign (see rendering).
I would be happy to answer any questions the city may have.
Sincerely,
.7 -5
Gary Packharn
Manager/Owner
GBD,LLC
am
9
7124,t;t C
1- 4 P)�F
11�
T.
CITY OF CHUBBUCK
DESIGN REVIEW COMMITTEE MEETING AGENDA
July 17th, 2007
TO: DESIGN REVIEW COMMITTEE
MAYOR STEVEN ENGLAND
ATTORNEY TOM HOLMES
STEVE SMART
RAY GRIFFIN
RANDYSEVERE
ERIC KING
MERLIN MILLER
LARRY K014NTOPP - STAFF
SEAN HARRIS - STAFF
JASON MENDENHALL - 4983 PLEASANT VIEW
ROB RAY, TREE COMMITTEE, 803 E. MOUNTAIN PARK
FROM: RON C. CONLIN
RE: DESIGN REVIEW COMMITTEE WILL BE CONDUCTING A DESIGN
REVIEW MEETING at 10:30 am, Tuesday, July 17 1h , 2007 for site plan approval
for Gary Packham, "D -Kar Wash" at 5024 Yellowstone Ave.
IF YOU WILL NOT BE ABLE TO ATTEND, PLEASE ADVISE,
THANK YOU.