Loading...
HomeMy WebLinkAbout10 07 2008 DESIGN REVIEW COMMITTEE MINUTES October 7, 2008 APPLICANT: Jeff Lunt, Doug Briscoe, Afton Meadows, LLC PROJECT TITLE: State Farm Office LOCATION: South of Wilkes Funeral Home. PURPOSE OF REVIEW: Site Plan Approval. Present: Mayor Steven M. England, Councilman Kermit G. Morrison, Attorney Thomas J. Holmes, Steve Smart, Larry Kohntopp, Ron Conlin, Randy Severe, Ray Griffin, Eric King, Andy Despain and Merlin Miller. Doug Briscoe and Rodney Burch were present to present the site plan for Jeff Lunt. Mr. Burch stated these will be condominium type offices. Units A & B. Mr. Burch stated there will be a State Farm Office and his own office. The site plan was approved subject to the following conditions: 1. Required to complete the required landscaping with automatic sprinkling. 2. Stow' water drainage is taken care of. 3. Exterior lighting to be shielded on property. 4. A short plat is required. 5. Required to have a knox box on the buildings. CITY OF CHUBBUCK Design Review Checklist Design Review Purpose: To guide the general appearance and arrangement of commercial, industrial and intense residential uses in order to create an attractive and dynamic "downtown business center", assure the compatibility of satellite commercial establishments and industrial areas with their surrounding neighborhoods, and assure the compatibility of dense residential land uses with surrounding neighborhoods. Applicant: Date: 1 0 / 0 7 / 0 8 Name: Doug Briscoe/Afton Meadows, LLC Address: 4922 Yellowstone Ave, St. J City: Chubbuck, ID 83202 State: Zip: CONSIDERATIONS: O 1. Traffic Safety and Traffic Congestion: (Ingress, egress, off-street parking, unloading.) 0 2. Outdoor Advertising: (Outdoor advertising signs, height, structure.) O 3. Landscaping: (Ordinance copy, approved tree list.) O 4. Structures and Site Layout: (Exterior design, buffering, fencing, site arrangement.) O 5. Drainage: (Storm & surface water, to be engineered, retained on site.) O 6. Pretreatment: (Minimum 1,500 gallon grease or oil/silt separator.) O 7. Exterior lighting: (Light shielding, light trespass.) O 8. Engineering: (Platting, other.) O 9. Building Dept.: (Professionally approved plans, ADA compliance, dumpster enclosure.) 0 10. Fire Depaitinent: (Knox Box, fire hydrant locations, sprinkling, visible street address.) LJ 11. Police Department: (Safety issues.) Revised 5-8-08-LLK a // C.o-- r ; $ t . ... _ r 1 Lo A lob 1 mPon ■C� 4922 Yeuowston y Of GepmOft �'---_ C208u2371�73j2 2Ave Uite ,/ 745 w Professlona(s S 3 est 86d client: �� � BI foot, 1973227rte 0 D JEN, �Unt Farm _=o ate: 09_29_ pralect:080 00 Oraw OQ n By' RT B Scale: 1 r d 25' Setback ° 0 0 0 0 0 rn r� cD o tf) tD a 0 ea ent E Holl rr 9otior► _-- fort w72* DICIPTR.A State Farm A Company of Geomatics Professionals Client: Jeff Lunt Project: 08000 4922 Yellowstone Ave Suite J 745 West Bridge St. Suite D Chubbuck, ID 83202 Blackfoot, ID 83221 Dote: 9_29_8 Drown By: RIB Scale: -20* 208-237-7373 208-782-9700 DESIGN REVIEW COMMITTEE MEETING MINUTES \. I October 7, 2008 APPLICANT: Josh Heilesen, Summit Builders PROJECT TITLE: Professional Park LOCATION: 4170 Hawthorne Road PURPOSE OF REVIEW: Site Plan Approval. Present: Mayor Steven M. England, Councilman Kermit G. Morrison, Attorney Thomas J. Holmes, Steve Smart, Larry Kohntopp, Ron Conlin, Randy Severe, Ray Griffin, Eric King, Andy Despain and Merlin Miller. Josh Heilesen, Summit Builders was present to present the site plan. Staff told Mr. Heilesen there needs to be another access other than the Hawthorne Road access. The access problem needs to be resolved prior to the site plan being approved. Mr. Heilesen stated these will be higher end commercial, Dental, Doctor Offices. If access concerns can be solved, the following are the conditions of approval: 1. Need recordable easement for additional access. North/south parking could be marked as access. 2. Hawthorne Road access shall be a 20-30' radius type street approach. 3. When installing a sign Building Official shall be advised. 4. 10' landscaping with automatic sprinkler along Hawthorne Road and Mall Entrance Road. 5. All storm water drainage to be contained on site. The plan shall be engineered. 6. Exterior lighting shall be contained on site. 7. Required to apply for a short plat. 8. Required to have a Professional site plan, ADA requirements. 9. Required to have dumpster pad with 3 sided enclosure. 10. Required to install a knox box. 11. Need clear address on the buildings. 12. Required to show location of fire hydrant on site plan. CITY OF CHUBBUCK, IDAHO DESIGN REVIEW MEETING APPLICATION The purpose of this application is to establish a meeting and review time with the City of Chubbuck Design Review Team consisting of the Mayor, Building Official, City Planner, City Engineer, Fire Marshal, Police Chief and other City staff as required. The Design Review Team meets every Tuesday morning between the hours of 10:30 and 11:30 AM. This team will work in unison, with you, to establish the criteria for your project as it relates to the adopted ordinances of the City of Chubbuck. Keep in mind, this is an informal review and is only conducted on Submitted applications. This is a review team not a design team. Provide (10) ten sets of drawings, (8 1/2 X 11), at least eight days in advance of your scheduled meeting. Formal review of your plans or project by City Staff is conducted after formal application. Once you schedule your Design Review, it is very important to keep that appointment so others can be scheduled accordingly. Applicant /Agent: Josh Heilesen - Summit Builders (PLEASE PRINT) Telephone Number: 520-3943 Mailing Address: 477 Shoup Ave, Suite 107 Idaho Falls, Id 83402 \-1 Project Title: Professional Park Location: 4170 Hawthorne Rd Parcel Number: Westerly half of Lot #2, Block 1 Purpose For The Review: Site Plan Approval Meeting Request Date: t 0 / 0 7 / 0 8 Al (Tuesdays only) ternateDate: _ 2 (10:30 to 11:30) Approved Date: 1 0 / 0 7 / 0 8 Approved Time: 10:30 AM (Notify Applicant) (Be at Public Works Dept at least 15 minutes prior to your scheduled time.) City Official: L. Kohntopp Date: 0 9 / 2 3 / 08 Fee - $25 Initials Receipt # Please pay Design Review fee prior to the meeting time. Do not request or evect to get on the Design Re‘ ieN\ agenda in fewer _ a 1_1 -r.. - I WW1 O prioi w SA.110_11110_1 11.1t. ULt\ ffILCHflul CITY OF CHUBBUCK Design Review Checklist Design Review Purpose: To guide the general appearance and arrangement of commercial, industrial and intense residential uses in order to create an attractive and dynamic "downtown business center", assure the compatibility of satellite commercial establishments and industrial areas with their surrounding neighborhoods, and assure the compatibility of dense residential land uses with surrounding neighborhoods. Applicant: Date: 1 0 / 0 7 / 0 8 Name: Josh Heilesen - Summit Builders Address: 477 Shoup Ave, Suite 107 City: Idaho Falls, Id 83402 State: Zip: CONSIDERATIONS: ❑ 1. Traffic Safety and Traffic Congestion: (Ingress, egress, off-street parking, unloading.) 0 2. Outdoor Advertising: (Outdoor advertising signs, height, structure.) 0 3. Landscaping: (Ordinance copy, approved tree list.) ❑ 4. Structures and Site Layout: (Exterior design, buffering, fencing, site arrangement.) ❑ 5. Drainage: (Storm & surface water, to be engineered, retained on site.) �1)1 ❑ 6. Pretreatment: (Minimum 1,500 gallon grease or oil/silt separator.) ❑ 7. Exterior lighting: (Light shielding, light trespass.) ❑ 8. Engineering: (Platting, other.) ❑ 9. Building Dept.: (Professionally approved plans, ADA compliance, dumpster enclosure.) ❑ 10. Fire Department: (Knox Box, fire hydrant locations, sprinkling, visible street address.) ❑ 11. Police Department: (Safety issues.) Revised 5-8-08-LLK . .o.,, ,..•*. _----- — I 1 - - t, , i ! ,.ti j* / 0 * ' • , Tr! '• ,', I , ., A1 : 1HitH $ 44 a %,..• i, t., -,, i , ii ; i ; •,',- .5i .,,, -,11,;,- I'li i . . _ ,. .. 1 Hawthorne Road ___ „.. _ ..... i 1 I , I I 1 r— --- ----,—,. I ij ; il 1 1 I i• i$ 1 I i ! 4 , 7i i q 1 ; i ' I :1 I 4; i ! 1 I ___ _ :— I , I.s _ -7 1i i... ____.i (1 f,•• & 1— • 111 '1 4.--- I ;--. . • , 1 1 : . . - • I 0 la, I ' ; I r , g , I , (...=-3- .., '-'r 8 i -, , . 1 , t .,.._ i ...,, 1 I 1 .., 1 , . t , , , , i ,,. ; , et, i , . i 1 i / / i.Z . , 7,4 f , , ,,, / 1 '' / / • e**, 1 ...., Nil/ ,.... ,..._........ ,,„ 1 1 f 1 i 1 i (,... / , t , I 1 i ' / ' I 1 I ----1. --J.) nritl $ •, a a *.; t! I 1 i $ ' . .,. 1 /‘Ei r. or rig 2 • _ e s / . i 11' ....1 , /, .. I1 . ,, • mali...............X410.1.111.0•1.00111•10.11.1•11144.a. • C ( ( f MEM BM UMW MeV il I r+c�iMw war MAN may( M Ow so Z T" aaY m rt d it It JJ kw 40o 44 rt Baa It 4W 4a rt, Vim a rt ir i t, � f 4440 la rA 4AVAL WOW M rC mi *Mgr lw aJ g MOWED WOK ANY O[yQN YaY1N, I 4300 44 n ��I aur Wt.........................2„..........Cr::rr..............,...._.,...--e..—..... CONCEPTUAL LAYOUTS PON JOON NELESON OPP Of CNUMUCK ROAD CIRI�UCK,IDAHO oym�p�nr�oo4 Y 14ge�.1a.='4"•�t a+. E gi ieertaln River `Wig N.w:M.a-Y.0 rm • 7 Engineering CITY OF CHUBBUCK Design Review Checklist Design Review Purpose: To guide the general appearance and arrangement of commercial, industrial and intense residential uses in order to create an attractive and dynamic "downtown business center", assure the compatibility of satellite commercial establishments and industrial areas with their surrounding neighborhoods, and assure the compatibility of dense residential land uses with surrounding neighborhoods. Applicant: Date: 1 1 / 0 4 / 0 8 Name: Josh Heilesen - Summit Builders - 520-3943 Address: 477 Shoup Ave, Suite 107 City: Idaho Falls, Id 83402 State: Zip: CONSIDERATIONS: O 1. Traffic Safety and Traffic Congestion: (Ingress, egress, off-street parking, unloading.) O 2. Outdoor Advertising: (Outdoor advertising signs, height, structure.) 0 3. Landscaping: (Ordinance copy, approved tree list.) O 4. Structures and Site Layout: (Exterior design, buffering, fencing, site arrangement.) O 5. Drainage: (Storm & surface water, to be engineered,retained on site.) O 6. Pretreatment: (Minimum 1,500 gallon grease or oil/silt separator.) El 7. Exterior lighting: (Light shielding, light trespass.) El 8. Engineering: (Platting, other.) O 9. Building Dept.: (Professionally approved plans, ADA compliance, dumpster enclosure.) O 10. Fire Department: (Knox Box, fire hydrant locations, sprinkling, visible street address.) El 11. Police Department: (Safety issues.) Revised 5-8-08-LLK