Loading...
HomeMy WebLinkAboutDR 97 Papa Murphys Sept 30DESIGN REVIEW COMMITTEE MEETING MINUTES September 30, 1997 DESIGN REVIEW SUBJECT: DATE: APPLICANT: PROJECT Site Plan Pizza. September for Papa Murphy's Take and Bake 30, 1997. Steve Vifliaturo Papa Murphy's Take and Bake Pizza at 4842 Yellowstone Ave. Present Mayor John O. Cotant, Steve Smart, Gerd Dixon, Kent Kearns, Cary Campbell, Ron Conlin~ Jim Phelps~ Larry Kohntopp~ Jerry Rowland and Charlie Dickman. Steve Vigliaturo was oresent to explain the site plan for Papa Murphy's Take and Bake Pizza to be located at 4842 Yellowstone Ave. Mr. Vigliaturo said[ the buildinK will be built for two tenants. Mr. Vigliaturo said he is willing to share an access with the Mall at W. Chubbuck Rd. and Yellowstone Ave. Mr. Vigliaturo stated the completion date for the shell of the building is January 15~ 1997. He said Papa Murphy's will do the interior. The building will look like the Great American Video mall to the west. Cary told Steve Vi~liaturo a seal is required on the building. Papa Murphy's will do no cookinz, nor food preparation in the building~ if there is a chanEe, Papa Murphy*s is required to install grease traps. PWD Smart stated a swale for drainage should be included in the landscauing requirement. The landscaping requirement should be 5% of the parking lot. It was decided, the site plan does show the 6% landscaping required. PWD Smart stated he would ].ike Steve Vigliaturo to work with Gerd and Steve while installing required radius approach to property and swale. The project is approved subject to, Mr. Vigtiaturo contaeting Gerd Dixom or Steve when making the changes on site plan, when installing the swale for drainaw~_ a~ld / radius a$cess to property. .~~ ~~i~ ~ohn O. Cotant, Mayor