Building construcled at Fr, sta t: Induslrml Park.
November 24"'., 1998
J i ln Thilmont
Building - Frasure Industrial Park
Present: Mayor John ()~ Cotant, Steven Smart, Car5, Campbell, Eric King, Rot-, C. Conlim Jim
Phelps~ Larry Kohnt4'~pp and Gerd Dixon.
Gar.,,' Chisum, Pro-Builders explained the building is to be used fbr antique car storage.
The following was discussed aud required:
1. 4' Sidewalk Requirement.
2. 10' Landscaping, with antomatic sprinkling system is required.
3. Builder is not requesting an access at this time.
4. Will pay sewer capacity fee and water deposit up front.
5. On-site paving is not required until any ftm~re development is made.
6. Gate for emergency vehicle response is reqaired.
7. Required to install an approach on Rainbow.
Gary Chistma stated the fencing requirements are finished..!in] Pheips said he will check
(Jaly (Nsum s~ u he w I take care of the complaints, the C~ty received m regards to mud
being tracked from large trucks from the properl7. Mt'. Chisum staled the building x,,ill bt:
finished in phases.
Gerd said he has no prublem with the site-plan.
Design Review' Committee approved the site-plan, subject to the seven requirements
above.