Loading...
HomeMy WebLinkAboutDR William Parrish 99 Feb 16DESIGN REVIEW COMMITTEE MEETING MINUTES February 16th., 1999 DESIGN REVIEW SUBJECT: DATE: APPLICANT: PROJECT: Conversion of 4854 Yellowstone Ave. to a Dental Office. February 16th., 1999 William Parrish, Building just south of Ray' s Custom Interiors. Present: Mayor John O. Cotant, Attorney Thomas J. Holmes, Steven Smart, Cary Campbell, Jerry Rowland, Eric King, Ron C. Conlin, Jim Phelps, Larry Kohntopp and Gerd Dixon. Serio Romero and William Parrish, were present to present a site plan showing the conversion of 4854 Yellowstone Ave. from a residence to a Dental Office. The residence will be reconstructed by Serio Romero for William Parrish. Cary told Mr. Romero and Mr. Parrish the interior is required to meet building code. William Parrish said, he plans to install a solid fence between the proposed dental office, and the garage behind the structure. The following was discussed and required to be presented on a site plan to Staff: 1. Required to have a minimum of 10' landscaping on Yellowstone Ave., including automated sprinkling system. 2. Mr. Parrish is allowed a temporary access, until such time property to south develops, at which time Mr. Parrish will be required to construct a shared radius approach. Mr. Parrish is required to enter into a temporary access agreement with the City of Chubbuck. 3. Mr. Parrish was told a sign is required to be on private property, not taller than 3', not shorter than 10'. 4. Mr. Parrish was told he is required to address storm drainage requirements. Mr. Parrish will work with City Engineer on storm drainage issue. 5. Mr. Parrish was told the solid fence between the garage, and the proposed dental office is required to be installed prior to the dental office opening. 6. BO Campbell told Mr. Parrish, the access ramp for handicap entrance is required to be installed prior to the proposed dental office opening. 7. Parking requirement is 7 or 8 spaces. DESIGN REVIEW MINUTES - (com.) February 16th., 1999 PROPOSED DENTAL OFFICE BEING PROPOSED BY WILLIAM PARRISH AT, 4854 YELLOWSTONE AVE. - (com.) Mr. Romero said the project should be completed within 90 days. Staffto review finished site plan prior to approval.