Loading...
HomeMy WebLinkAbout02 11 2009 POP NWSI Portion APROOF OF PUBLICATION STATE OF IDAHO County of Bannock LN15994 KAREN MASON being first duly sworn on oath deposes and says: that SHE was at all times herein mention a citizen of the United States of America more than 21 years of age, and the Principal Clerk of the Idaho State Journal, a daily newspaper, printed and published at Pocatello, Bannock County, Idaho and having a general circulation therein. That the document or notice, a true copy of which is attached, was published in the said IDAHO STATE JOURNAL, on the following dates, to -wit: Feb 11 2009 2009 Feb 18 209 2009 2009 2009 2009 2009 That said paper has been continuously and uninterruptedly published in said County for a period of seventy-eight weeks prior to the publication of said notice of advertisement and is a newsp er within the meaning of the laws of Idaho. �� STATE OF IDAHO COUNTY OF BANNOCK On this 18 of Feb in the year of 2009, before me, a Notary Public, personally appeared KAREN MASON Known or identified to me to be the person whose name subscribed to the within instrument, and being by me first duly sworn, declared that the statements therein are true, and acknowledge to me that he executed the same. O' �Q•�y ���/= u of Public ry 7 /inm. Exp.2/09 r: '0 .� `0 RFO 09-001 City of Chubbuck - Northwest Interceptor Program, Portion A Rio Vista Lift Station I Force Mains and Gravity Sewer to the Pocatello WWTP Pursuant to IC 67-2805, "Procurement of Public Works Construction", the City of Chubbuck (City), Idaho is requesting State- ments of Qualifications (SOQ) from li- censed public works contractors who are interested in bidding on the Northwest Sewer Interceptor Program - Portion A, Rio Vista Lift Station / Force Mains and Gravity Sewer to the Pocatello WWTP. The project consists of approximately 10,100 feet of gravity sewer ranging from 12" to 42" diameter, approximately 5,040 feet of parallel force mains (10" and 18"), and the construction of one site -built lift sta- tion with an ultimate capacity of 24 cfs (ini- tial pumping capacity of approximately 3 cfs). Actual bid quantities may change pending the ongoing final design of the project. Several borings underneath water ways are anticipated as part of the project. The opinion of estimated project cost is be- tween $7,000,000 and $10,000,000. It is estimated that the project will bid during the Summer of 2009 and have a contract dura- tion of approximately twelve (12) months. The City reserves the right to cancel or postpone bidding or award of a contract for the project. The Request for SOQ Informational Packet contains the project description, SOO forms and requirements, and evaluation criteria. Contractors must submit a response in the format outlined in the Request for Contrac- tor Qualifications. Any response may be withdrawn prior to the scheduled time be- low for the opening of the responses or au- thorized postponement thereof. Copies of the SOO Informational Packet may be ob- tained from: J -U -B ENGINEERS, Inc. 250 South Beechwood Ave, Suite 201 Boise, ID 83709 (208) 376-7330 J -U -B ENGINEERS, Inc. 275 S. 5th Ave, Suite 220 Pocatello, ID 83201 (208) 232-1313 Eight (8) copies of the SOQ and required forms must be received by the Public Works Director at the location listed below prior to 11:00 AM MST on March 19, 2009 Mark the envelope in which the qualificatior response is enclosed with: SOO - North west Sewer Interceptor Program, Por tion A. Submit your responses to: City of Chubbuck c/o City of Chubbuck Public Works Depart ment 5160 Yellowstone Avenue Chubbuck, Idaho 83202 All qualification responses must be signe and proposing firms must have a current valid Idaho Public Works Contractor licens in order to submit. Upon receipt of SOQs, the City will evalua Statements and determine which contra tors are qualified to bid. If the City pr ceeds with bidding of the project, all firr deemed qualified by the City will be invite to submit formal bids for the project as d lineated in the Project Manual, which is a rently under development. Formal t forms will generally conform to the fora specified in the most recent Engineers Jo Contract Documents Committee (EJCD Contract Documents. Any protest of determination of qualificatic or bidding procedures will be handled in cordance with procedures delineated in 67-2805. Firms will be responsible for all costs (incl ing site visits, if any) incurred in prepai or responding to this request for SOQ's. February 11, 18, 2009 id- ing