That the document or notice, a true copy of
which is attached, was published in the said
IDAHO STATE JOURNAL, on the following
dates, to -wit:
Feb 11 2009 2009
Feb 18 209 2009
2009 2009
2009 2009
That said paper has been continuously and
uninterruptedly published in said County for
a period of seventy-eight weeks prior to the
publication of said notice of advertisement
and is a newsp er within the meaning of the laws
of Idaho. ��
STATE OF IDAHO
COUNTY OF BANNOCK
On this 18 of Feb in the year of 2009,
before me, a Notary Public, personally appeared
KAREN MASON Known or identified to me to be
the person whose name subscribed to the within
instrument, and being by me first duly sworn,
declared that the statements therein are true, and
acknowledge to me that he executed the same.
O' �Q•�y ���/= u of Public ry 7 /inm.
Exp.2/09
r: '0 .�
`0
RFO 09-001
City of Chubbuck - Northwest Interceptor
Program, Portion A
Rio Vista Lift Station I Force Mains and
Gravity Sewer to the Pocatello WWTP
Pursuant to IC 67-2805, "Procurement of
Public Works Construction", the City of
Chubbuck (City), Idaho is requesting State-
ments of Qualifications (SOQ) from li-
censed public works contractors who are
interested in bidding on the Northwest
Sewer Interceptor Program - Portion A,
Rio Vista Lift Station / Force Mains and
Gravity Sewer to the Pocatello WWTP.
The project consists of approximately
10,100 feet of gravity sewer ranging from
12" to 42" diameter, approximately 5,040
feet of parallel force mains (10" and 18"),
and the construction of one site -built lift sta-
tion with an ultimate capacity of 24 cfs (ini-
tial pumping capacity of approximately 3
cfs). Actual bid quantities may change
pending the ongoing final design of the
project. Several borings underneath water
ways are anticipated as part of the project.
The opinion of estimated project cost is be-
tween $7,000,000 and $10,000,000. It is
estimated that the project will bid during the
Summer of 2009 and have a contract dura-
tion of approximately twelve (12) months.
The City reserves the right to cancel or
postpone bidding or award of a contract for
the project.
The Request for SOQ Informational Packet
contains the project description, SOO forms
and requirements, and evaluation criteria.
Contractors must submit a response in the
format outlined in the Request for Contrac-
tor Qualifications. Any response may be
withdrawn prior to the scheduled time be-
low for the opening of the responses or au-
thorized postponement thereof. Copies of
the SOO Informational Packet may be ob-
tained from:
J -U -B ENGINEERS, Inc.
250 South Beechwood Ave, Suite 201
Boise, ID 83709
(208) 376-7330
J -U -B ENGINEERS, Inc.
275 S. 5th Ave, Suite 220
Pocatello, ID 83201
(208) 232-1313
Eight (8) copies of the SOQ and required
forms must be received by the Public
Works Director at the location listed below
prior to 11:00 AM MST on March 19, 2009
Mark the envelope in which the qualificatior
response is enclosed with: SOO - North
west Sewer Interceptor Program, Por
tion A. Submit your responses to:
City of Chubbuck
c/o City of Chubbuck Public Works Depart
ment
5160 Yellowstone Avenue
Chubbuck, Idaho 83202
All qualification responses must be signe
and proposing firms must have a current
valid Idaho Public Works Contractor licens
in order to submit.
Upon receipt of SOQs, the City will evalua
Statements and determine which contra
tors are qualified to bid. If the City pr
ceeds with bidding of the project, all firr
deemed qualified by the City will be invite
to submit formal bids for the project as d
lineated in the Project Manual, which is a
rently under development. Formal t
forms will generally conform to the fora
specified in the most recent Engineers Jo
Contract Documents Committee (EJCD
Contract Documents.
Any protest of determination of qualificatic
or bidding procedures will be handled in
cordance with procedures delineated in
67-2805.
Firms will be responsible for all costs (incl
ing site visits, if any) incurred in prepai
or responding to this request for SOQ's.
February 11, 18, 2009