HomeMy WebLinkAbout02 11 2009 POP NWSI Portion BPROOF OF PUBLICATION
STATE OF IDAHO
County of Bannock
LN15995 KAREN MASON
being first duly sworn on oath deposes and says:
that SHE was at all times herein mention a
citizen of the United States of America more
than 21 years of age, and the Principal Clerk of
the Idaho State Journal, a daily newspaper,
printed and published at Pocatello, Bannock
County, Idaho and having a general circulation
therein.
That the document or notice, a true copy of
which is attached, was published in the said
IDAHO STATE JOURNAL, on the following
dates, to -wit:
Feb 11 2009 2009
Feb 18 209 2009
2009 2009
2009 2009
That said paper has been continuously and
uninterruptedly published in said County for
a period of seventy-eight weeks prior to the
publication of said notice of advertisement
and is a newspaper within the meaning of the laws
of Idaho. i
STATE OF IDAHO ��C\
COUNTY OF BANNOCK
On this 18 of Feb in the year of 2009,
before me, a Notary Public, personally appeared
KAREN MASON Known or identified to me to be
the person whose name subscribed to the within
instrument, and being by me first duly sworn,
declared that the statements therein are true, and
acknowledge to me that he executed the same.
K O ► /////
3ing
of Public4 ��Reat Ar►mo Comm. Exp.2/09
i � G 0`
pv : ate.
'�� �\`\\\
////11��llllllll i11\I\U\\\
RFO 09-001
City of Chubbuck - Northwest Sewer Inter-
ceptor Program, Portion B
Paradise Lift Station / Force Main and
Gravity Sewer From Rio Vista Road to
Hiline Road
Pursuant to IC 67-2805, "Procurement of
Public Works Construction", the City of
Chubbuck (City), Idaho is requesting State-
ments of Qualifications (SOQ) from li-
censed public works contractors who are
interested in bidding on the Northwest
Sewer Interceptor Program, Portion B
Paradise Lift Station and Force Main /
Gravity Sewer From Rio Vista Road to
Hiline Road. The project consists of ap-
proximately 16,400 feet of gravity sewer
ranging from 8" to 27" diameter, approxi-
mately 5,400 feet of 12" force main, 700 LF
of 8" force main, and the construction of
one site -built lift station with a capacity of 4
cfs. Actual bid quantities may change
pending the ongoing final design of the
project. Several borings underneath water-
ways and railroad are anticipated as part of
the project. The opinion of estimated proj-
ect cost is between $6,000,000 and
$9,000,000. It is estimated that the project
will bid in the summer or fall of 2009 and
have a contract duration of approximately
nine (9) months. The City reserves the
right to cancel or postpone bidding or
award of a contract for the project.
The Request for SOO Informational Packet
contains the project description, SOO forms
and requirements, and evaluation criteria.
Contractors must submit a response in the
format outlined in the Request for Contrac-
tor Qualifications. Any response may be
withdrawn prior to the scheduled time be-
low for the opening of the responses or au-
thorized postponement thereof. Copies of
the SOO Informational Packet may be ob-
tained from:
J -U -B ENGINEERS, Inc.
250 South Beechwood Ave., Suite 201
Boise, ID 83709
(208) 376-7330
J -U -B ENGINEERS, Inc.
275 S. 5th Ave, Suite 220
Pocatello, ID 83201
(208) 232-1313
Eight (8) copies of the SOO and required
forms must be received by the Public
Works Director at the location listed below
prior to 11:00 AM MST on March 19, 2009.
Mark the envelope in which the qualification
response is enclosed with: SOO - North-
west Sewer Interceptor Program, Por-
tion B. Submit your responses to:
City of Chubbuck
c/o City of Chubbuck Public Works Depart-
ment
5160 Yellowstone Avenue
Chubbuck, Idaho 83202
All qualification responses must be signed
and proposing firms must have a currently
valid Idaho Public Works Contractor license
in order to submit.
Upon receipt of SOQs, the City will evaluate
Statements and determine which contrac-
tors are qualified to bid. If the City pro-
ceeds with bidding of the project, all firms
deemed qualified by the City will be invitec
to submit formal bids for the project as de-
lineated in the Project Manual, which is cur-
rently under development. Formal bic
forms will generally conform to the formai
specified in the most recent Engineers Joini
Contract Documents Committee (EJCDC
Contract Documents.
Any protest of determination of qualificationE
_ or bidding procedures will be handled in ac
cordance with procedures delineated in IC
67-2805.
Firms will be responsible for all costs (includ
ing site visits, if any) incurred in preparinc
or responding to this request for SOQ's.
February 11, 18, 2009
LN15995