HomeMy WebLinkAbout10-26-2010drpaul
steve
mayor
ray
tom
rich
Jim Woodland – Real Estate
Tyler Wassy -
Tom Seggy -
Ms. Hugue – Own the franchise
Design Review
What is required of them? We bought Jerry Gregersons
plans. Hugues plan on having a wainscoat of stone on the building rather than just stucco. the facility to the west is not going away and for now will leave the building. talked about
getting ride of the swells and put in a French drain. access will be off the access road. no access of Chubbuck road. Elzner has agreed to give access. we need a copy of the access
agreement with elzner
ray needs a design for the rating on the wall of the building that is closer to the street than 10 feet.
demensions on the building. Egress door needs to swing
out. how close can we get to the south line? you can put it on the property line if you rate the wall. on the access our understanding that you will build the road. the total road
to the back of the property. the road needs to be 36 feet wide. woodland thought 30. the road will go back to the property and also over the access to the parking lot.
these people
are from blackfood.
signs – on the building but they would like to provide for a name rider on the corner. ray needs a sign permit application.
paul to provide a landscaping ordinance
to them and a tree list.
no fences planned
exterior lighting is maintained on property. street light. does the city have a plan on putting a street light on that property. no light.
this is an approach not an intersection. light to illuminate the appoarch not a problem.
Platting we are ok. we need a short plat. has this been done? Rodney sent a plat with
signatures. AF Chubbuck.
what are we doing for an address on this? will it take the home address? 207 chubbuck? Access into the building – knox box will be there. The fire department
will work with you on placement.
bob elzner owns the property is in florida. Bob is the top candidate to build the building.
get ray some plans
concerns about the water connection.
use the one in Chubbuck road. the plan amounts to a new service and new connection fees
use the old service to water landscaping and have a new service for the building.
Steve
will have to consider this – can they abandon the old for the new? Where is sean or bryan? Is the building to far from a usable hydrant. ? they might
they will need DEQ approval
for what?
They would like to get this thing pushed through as fast as possible. ? Any extension of the water/sewer line is going to require DEQ approval. Why?
We need an building
application w ith a current EPA NOI
they would rather have a swell that can do a settlement and pretreatment . check with sean on the requirements
will need a busness lic for the facility.
they have approval by the back and are ready to go.
There is a hydrant on the plat on the corner.
after thoughts -