Loading...
HomeMy WebLinkAbout10-14-2008 DR1UniverstiyBibleChurchUniversity Bible Church: October 14, 2008, 10:30am Church wants to break ground spring of 2009. The church needs to flair access and extent to 150 feet. City needs to review any street/outdoor signage. Larry will get a copy of landscaping ordinance to University Bible Church. Phase two will continue to be farmed presently. Storm water drainage needs to be engineered and retained on site. Please have architect contact city. Architect will be using Rocky Mountain Engineering. They are familiar with the City’s requirements What about the secondary irrigation requirement? The Developer has heard that McNabb is putting the irrigation system in this fall. This project will require a development plat. Conditional use and rezone applications are on schedule for November land use meeting. Fire dept requires Knox box, fire hydrant, sprinkling the building may be necessary. Address on building needs to be visible from the street. The most eastern hammerhead by the dumpster may need to be signed.