Loading...
HomeMy WebLinkAbout12-09-2008 DESIGN REVIEW COMMITTEE MINUTES December 9, 2008 APPLICANT: Darel Hardenbrook, Battery Systems, Inc. PROJECT TITLE: Battery Systems, Inc. LOCATION: 145 E. Linden Ave. PURPOSE OF REVIEW: Site plan approval. Present: Mayor Steven M. England, Attorney Thomas J. Holmes, Steve Smart, Larry Kohntopp, Ron Conlin, Randy Severe, Ray Griffin, Merlin Miller and Andy Despain. Darel Hardenbrook and Jeff Prost presented the Battery Systems, Inc site plan. Mr. Prost stated they would like to be in business as soon as possible. Discussion about when the lot can be paved. Mr. Hardenbrook stated the floor drain will be closed off. Design Review Committee approved the site plan subject to the following conditions: 1. Radius type approach on E. Linden is required. 2. Sign will be on building, they are aware if a change in sign is wanted, they will come back to City Building Inspector. 3. Required to meet City Landscaping requirements, 10' with automatic sprinkling system and 5% interior. 4. Storm water drainage to be contained on site. Deadline is June 1, 2009. 5. Exterior lighting to be shielded on site. 6. Work with BI Ray Griffin on any changes inside or outside building. 7. Fire Department wants to know quantities of any aerosols stored inside or outside the building. 8. Required to have clear address on building facing West Linden Ave. 9. Required to apply for business license. 10. Discussion about dumpster, required to have 3 sided enclosure for front end loading of the container.