Loading...
HomeMy WebLinkAboutDR Doug Sayer8/13/02 DESIGN REVIEW COMMITTEE MINUTES th August 13, 2002 APPLICANT:Doug Sayer, Premier Technology, Inc. PROJECT TITLE:Rental building and expansion. LOCATION:SW corner of Industry Way and Southside Way. PURPOSE OF REVIEW: Site plan approval. Present: Mayor John O. Cotant, Attorney Thomas J. Holmes, Steve Smart, Ray Griffin, Eric King, Ron Conlin, Jim Phelps, Merlin Miller and Larry Kohntopp. Doug Sayer, Premier Technology, Inc. and Dan Knoll, Architect were present to present the site plan. Doug Sayer said the building will be a rental building for storage, etc. Doug Sayer said the fence will be moved approx. 15'. The site plan was reviewed by Design Review Committee. Water and sewer will come from Industry Way. Doug Sayer stated there will be six different addresses on the buildings. The following was discussed and required as a condition of approval of the site plan: 1. Type 5 fire sprinkler system will be installed. 2. Fire hydrant installation. 3. Required to meet storm water retention requirements. 4. Required to contact Sean Harris, City Engineer about street approach off Industry Way. 5. 10' Landscaping requirement with automatic sprinkling system. Design Review Committee approved the site plan subject to above requirements.