HomeMy WebLinkAbout06-17-2008dr1 DESIGN REVIEW COMMITTEE MEETING MINUTES
June 17th, 2008
APPLICANT: Jerry Gregersen, 1265 Parkway Drive, Blackfoot, Idaho.
PROJECT TITLE: Anytime Fitness
LOCATION: 207 E. Chubbuck Road
PURPOSE OF REVIEW: Approval of site plan.
Present: Mayor Steven M. England, Attorney Thomas J. Holmes, Steve Smart, Larry Kohntopp,
Ron Conlin, Randy Severe, Ray Griffin, Eric King and Andy Despain.
Justin and Tyler Harwood presented their site plan.
Justin Harwood stated Anytime Fitness is a National Chain. There will be surveillance cameras.
They are open 24-7. Rocky Mountain Engineering is doing the engineering.
Justin Harwood stated they were hoping to use the water line going to the existing house on the
property.
The following was discussed if the project is approved:
1. Required to have a radius type approach.
2. If there is a sign other than on the building, they are required to get Building
Department approval.
3.10' landscaping with automatic sprinkling system is required on Chubbuck Road
frontage. 5% interior landscaping is required.
4. Storm water drainage is required to be contained on site. Probably drain to sw corner.
5. All outside lighting is required to be shielded.
6. Required to have water and sewer from E. Chubbuck Road, unless an easement
agreement can be executed with Nick Crookston on property to east. Required to show
easement location if resolved.
7. Steve Smart stated platting is required, a short plat might work. Discussion about
putting the building on the other side of property, this might take care of water-sewer
concerns.
8. The plans are required to have an architect stamp.
9. If a dumpster is required, they are to have the required three sided dumpster enclosure
in compliance with City Code.
10. Required to keep dirt from tracking onto E. Chubbuck Road during construction.
11. Required to have a knox box.
12. Merlin Miller stated they might need to install a fire hydrant. Fire Department will
look at factors.