HomeMy WebLinkAbout04-29-2008dr DESIGN REVIEW COMMITTEE MEETING MINUTES April 29th, 2008 APPLICANT: Biscoe Builders, 553 Vern PROJECT TITLE: Assisted Living Center LOCATION: Behind Ridge Convenience Store on Hiline Road PURPOSE OF REVIEW: Site Plan Approval. Present: Mayor Steven M. England, Councilman Kermit Morrison, Attorney Thomas J. Holmes, Steve Smart, Larry Kohntopp, Ron Conlin, Randy Severe, Ray Griffin, Eric King, Merlin Miller and Andy Despain. Doug Briscoe and Mark Kinghorn presented the site plan. Mr. Briscoe stated they want to build the first building and then start with the next one when finished with the first. It was stated there will a maximum of 15 residents per building. There will be no resident vehicles. Discussion about the common areas for both buildings. The following was discussed: 1. They were asked to move the 24' road access approx 5' to the east. Discussion about patient drop off in the access. 2. Discussion about off street parking - Should be one space for two beds. 3. Larry Kohntopp recommended they reconfigure the buildings. They said they considered this, but, there are transformers on the property they did not know about. 4. They said there will be a walk ramp. 5. They said they will most likely use a monument type sign. They will show Building Department plans when a decision is made. 6. Steve recommended they use a scupper that goes under the sidewalk for storm water drainage. 7. Larry Kohntopp said he will check with Pocatello to see what they require for grease- oil separation for this type of business. 8. Exterior lighting is required to be contained on site. Shielded in some way. 9. Merlin Miller said if they have a code pad system and Fire Department knows the code, they will not be required to have a knox box. 10. Merlin Miller asked if he could get the building sprinkling plans. 11. Ray Griffin said when the sanitation carts will not work for them, they are required to have a 3 sided enclosure for a dumpster. 12. Required to have 10' landscaping with automatic sprinkling system. DESIGN REVIEW COMMITTEE MEETING MINUTES - (cont.) April 29th, 2008 The representatives told the City would like to see the revised plans showing all changes. After discussion, it was decided the Design Review Committee Meeting will be continued on May 6th, 2008 at 10:30 a.m.