HomeMy WebLinkAbout04-22-2008dr DESIGN REVIEW COMMITTEE MEETING MINUTES
April 28th, 2008
APPLICANT: Cruise-4-Less, Shane Quick.
PROJECT TITLE: Auto Sales Lot
LOCATION: Approx. 230 E. Chubbuck Road.
PURPOSE OF REVIEW: Site Plan Approval.
Present: Mayor Steven M. England, Councilman Kermit Morrison, Attorney Thomas J. Holmes,
Steve Smart, Larry Kohntopp, Ron Conlin, Randy Severe, Ray Griffin, Eric King, Andy
Despain and Merlin Miller.
Kim, Mrs. Quick and Shane were present to present their site plan.
Site plan was approved subject to the following conditions:
1. Discussion about ingress and egress from E. Chubbuck Road and Cloverdell. The
Quick's are required to share a common access with Rug Rats on E. Chubbuck Road.
Also required to share a common access to Crookston property on Cloverdell.
2. Platting requirement is required.
3. Required to pave off street parking to office and four employee parking spaces.
4. If a sign is installed, they are required to go through Building Department.
5. 10' landscaping requirement with automatic sprinkling system.
6. Storm water is required to be contained on site.
7. Required to have a silt separator - 1500 gallon unit.
8. Lighting is required to be shielded as to be on site only.
9. Required to install a knox box.
10. Address on building is to be visible from street.
11. Building Department requires an architect stamp on plans.
12. If a dumpster is required, it is required to be in a three sided enclosure.
13. One address with suites marked.
14. Distance between cars is required to be a minimum of 3' between vehicles.
15. Required to be in compliance with site triangle code.
16. They are required to complete a non-residential waste water permit application.
Mr. Quick asked if Fire Department would be interested in using the house for training. Eric
stated there can be no asbestos in the structure, they will check the structure out.
Steve stated Park Superintendent will look at trees to see if the City can use.